PDX 2026-5 (11) C2.03.pdf

PDF 374 KB Posted

Attached to
Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation
Solicitation number
146992
Issued by
Multnomah County, Oregon

About this file

This is a technical specification and design document for the Portland International Airport (PDX) Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation project in Oregon. The document outlines construction requirements for pavement rehabilitation work at PDX, including detailed specifications for concrete pavement, asphalt concrete, and associated infrastructure improvements. The project involves the rehabilitation of taxiway sections and vehicle service roads serving gates E3 through E6 in the airport's west terminal area. The scope encompasses pavement removal and replacement, drainage improvements, marking and signage installation, and restoration of affected areas. Specific technical requirements are provided for materials, construction methods, quality standards, and testing procedures to ensure compliance with Federal Aviation Administration (FAA) standards and Oregon Department of Transportation specifications. The document establishes performance standards for concrete strength, asphalt composition, compaction rates, and surface friction coefficients necessary for safe aircraft operations.

The specifications detail material sourcing requirements, construction sequencing, and quality assurance protocols for the rehabilitation work. Requirements include independent materials testing, compaction verification, and surface preparation standards. The document references compliance with applicable FAA Advisory Circulars, industry standards, and local airport design standards. Environmental and safety provisions address stormwater management, dust control, noise mitigation, and worker safety protocols during construction. The specifications establish acceptance criteria for completed work, including surface smoothness, drainage functionality, and pavement integrity testing. Bid preparation requirements and contract administration procedures outline how contractors must document compliance with specifications throughout the project execution phase.

View the file

Other files

File Type Posted
PDX 2026-5 (20) C4.03.pdf PDF
PDX 2026-5 (10) C2.02.pdf PDF
PDX 2026-5 (48) E5.02.pdf PDF
PDX 2026-5 (08) C2.00.pdf PDF
PDX 2026-5 (24) C5.02.pdf PDF
PDX 2026-5 (33) C6.06.pdf PDF
PDX 2026-5 (36) C7.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-5 (18) C4.01.pdf PDF
PDX 2026-5 (41) C9.04.pdf PDF
PDX 2026-5 (49) E5.03.pdf PDF
PDX 2026-5 (16) C3.04.pdf PDF
PDX 2026-5 (55) E7.02.pdf PDF
PDX 2026-5 (06) C1.01.pdf PDF
PDX 2026-5 (25) C5.03.pdf PDF
PDX 2026-5 (28) C6.01.pdf PDF
PDX 2026-5 (37) C7.02.pdf PDF
PDX 2026-5 (32) C6.05.pdf PDF
PDX 2026-5 (27) C6.00.pdf PDF
PDX 2026-5 (47) E5.01.pdf PDF
PDX 2026-5 (40) C9.03.pdf PDF
PDX 2026-5 (39) C9.02.pdf PDF
PDX 2026-5 (44) E2.01.pdf PDF
PDX 2026-5 (35) C6.08.pdf PDF
2026-14617 Exhibit A - CSPP.pdf PDF
PDX 2026-5 (52) E5.06.pdf PDF
PDX 2026-5 (46) E4.01.pdf PDF
PDX 2026-5 (13) C3.01.pdf PDF
PDX 2026-5 (38) C9.01.pdf PDF
PDX 2026-5 (53) E6.01.pdf PDF
PDX 2026-5 (15) C3.03.pdf PDF
PDX 2026-5 (43) E1.02.pdf PDF
PDX 2026-5 (19) C4.02.pdf PDF
PDX 2026-5 (17) C4.00.pdf PDF
PDX 2026-5 (29) C6.02.pdf PDF
PDX 2026-5 (02) GI1.02.pdf PDF
PDX 2026-5 (30) C6.03.pdf PDF
PDX 2026-5 (05) C1.00.pdf PDF
PDX 2026-5 (21) C4.04.pdf PDF
PDX 2026-5 (42) E1.01.pdf PDF
PDX 2026-5 (54) E7.01.pdf PDF
PDX 2026-5 (50) E5.04.pdf PDF
PDX 2026-5 (12) C3.00.pdf PDF
PDX 2026-5 (04) GI1.04.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-5 (03) GI1.03.pdf PDF
PDX 2026-5 (01) GI1.00.pdf PDF
PDX 2026-5 (22) C5.00.pdf PDF
PDX 2026-5 (31) C6.04.pdf PDF
PDX 2026-5 (09) C2.01.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING GRADE

REMOVE 9" ASPHALT

PAVEMENT (P-101)

REMOVE 13"

AGGREGATE BASE

REMOVE EXISTING SUBBASE

EXISTING SUBGRADE

TO REMAIN

EXCAVATE TO A

DEPTH TO

ACCOMMODATE

NEW PAVEMENT

SECTION PER PLAN

5'FULL DEPTH

PAVEMENT REMOVAL MILL EXISTING PAVEMENT MATCH

THICKNESS OF TOP LIFT. PARTIAL

VERTICAL SAW CUT EDGE. PROTECT

EXISTING PAVEMENT TO REMAIN.

T-CAP CONNECTION TO MATCH

THICKNESS OF TOP LIFT. (3-INCH DEPTH)

FULL DEPTH

VERTICAL SAW

CUT EDGE.

3"

EXIST SURFACEFINISH SURFACE

VARIES

EXISTING GRADE

REMOVE 17" TO 19" ASPHALT

PAVEMENT (P-101)

REMOVE 6"

AGGREGATE BASE

REMOVE 23" TO 25"

SUBBASE

EXISTING SUBGRADE

TO REMAIN

EXCAVATE TO A

DEPTH TO

ACCOMMODATE

NEW PAVEMENT

SECTION PER PLAN

EXISTING GRADE

3" MIN. ASPHALT PAVEMENT

COLD MILL (P-101)

EXISTING ASPHALT

PAVEMENT TO REMAIN

(THICKNESS VARIES)

EXISTING SUBGRADE

EXISTING AGGREGATE BASE

(THICKNESS VARIES)

EXISTING THICKENED

EDGE PCCP PANEL

EXISTING 5" ASPHALT

BASE COURSE TO REMAIN

EXISTING 6" AGGREGATE

BASE TO REMAIN

EXISTING BULL

NOSE TRANSITION

TO REMAIN

EXISTING

GRADE

EXCAVATE EXISTING SUB-BASE TO

A DEPTH TO ACCOMMODATE NEW

PAVEMENT SECTION PER PLAN

3" ASPHALT PAVEMENT

COLD MILL (P-101)

E

XI

ST

IN

G C

O N

C R

ET

E

PA

VI

N G

SAW CUT

VERTICAL FACE

FU

LL

D

EP

TH

A

PR

O

N

PA

VE

M

EN

T

R

EM

O

VA

L

PE

R

/C 2.

REMOVE EXISTING

AGGREGATE BASE

REMOVE EXISTING

ASPHALT PAVEMENT

2' +/- TYP.

EXISTING GRADE

REMOVE 13" TO 15" ASPHALT

PAVEMENT (P-101)

REMOVE 9" TO 13"

AGGREGATE BASE

REMOVE EXISTING SUBBASE

EXISTING SUBGRADE

TO REMAIN

EXCAVATE TO A

DEPTH TO

ACCOMMODATE

NEW PAVEMENT

SECTION PER PLAN

12/11/2024

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

10:21:18 AM EBERTP R:\Aviation\PDX\2026\0005 - Taxiway K West E3-E6 and VSR Rehab\SHEETS - CIVIL\PAVEMENT REMOVAL SECTIONS.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

TAXIWAY K WEST GATES E3 TO E6 & VEHICLE SERVICE ROAD REHABILITATION

PAVEMENT REMOVAL DETAILS

CHRIS EDWARDS

B. NIELSEN

P. EBERT

B. NIELSEN

OCT 2026

11 CD

PDX 2026-5 C2.032025D033 103134

JUNE 2 , 2 0 10BRENT DA NIEL NIELSEN

EXP: 12/31/2026

ENGINEER

RE

GIS

TERED PROFESSIONAL

OREGON

82697PE

NOTE:

1. WHEN MILLING AREAS WHERE THE

FINISH GRADE IS LOWER THAN

EXISTING GRADE, INCREASE MILLING

DEPTH TO PROVIDE A MINIMUM 3" INLAY

THICKNESS. SEE DETAIL

NOTES:

1. SAW CUT VERTICAL EDGES.

2. PROTECT EXISTING PAVEMENT TO REMAIN.

C2.03

CE

SCALE:

9 INCH FULL DEPTH ASPHALT PAVEMENT REMOVAL

N.T.S.1 SCALE:

17 TO 19 INCH FULL DEPTH TAXIWAY PAVEMENT REMOVAL

N.T.S.3 SCALE:

3'' COLD MILL SECTION

N.T.S.4

SCALE:

TYPICAL PAVEMENT MILLING DETAIL

N.T.S.5 SCALE:

PAVEMENT REMOVAL AND TRANSITION TO EXISTING PAVEMENT

N.T.S.6 SCALE:

EXISTING PCCP TO FULL DEPTH REMOVAL

N.T.S.7

SCALE:

13 TO 15 INCH FULL DEPTH ASPHALT PAVEMENT REMOVAL

N.T.S.2

2026-09-30T11:09:44-0700
Brent Nielsen
I am the author of this document.

File details come from the government source that posted it. Updated .