PDX 2026-5 (32) C6.05.pdf

PDF 330 KB Posted

Attached to
Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation
Solicitation number
146992
Issued by
Multnomah County, Oregon

About this file

This is a specification document for Portland International Airport (PDX), prepared by the City of Portland, Oregon, detailing requirements for Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation. The project encompasses pavement rehabilitation work on taxiway sections and associated vehicle service roads at PDX. The scope of work includes surface preparation, asphalt removal and replacement, concrete repairs, drainage improvements, and related site restoration. Specific quantities are outlined for linear feet of taxiway to be rehabilitated and square feet of pavement areas requiring treatment. The document establishes technical standards and specifications for materials, construction methods, and quality assurance procedures that contractors must follow. Bidders are required to submit proposals in accordance with the stated specifications, with evaluation based on technical compliance, pricing, and contractor qualifications. The project timeline includes mobilization, construction phases, and final completion within defined contract duration.

The specifications detail material requirements including asphalt mix designs, concrete strengths, and drainage system components with corresponding unit prices and payment schedules. The project is funded through Portland International Airport operations and capital improvement budgets, with budget allocations established for the rehabilitation work. The document includes provisions for prevailing wage requirements applicable to Oregon public works projects and establishes performance bonds and insurance requirements for selected contractors. Safety protocols, environmental compliance measures, and airport operational constraints during construction are specified to ensure minimal disruption to airport activities. The specifications reference standard industry practices and applicable Oregon Department of Transportation standards for airfield pavement work.

View the file

Other files

File Type Posted
PDX 2026-5 (20) C4.03.pdf PDF
PDX 2026-5 (11) C2.03.pdf PDF
PDX 2026-5 (10) C2.02.pdf PDF
PDX 2026-5 (48) E5.02.pdf PDF
PDX 2026-5 (08) C2.00.pdf PDF
PDX 2026-5 (24) C5.02.pdf PDF
PDX 2026-5 (33) C6.06.pdf PDF
PDX 2026-5 (36) C7.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-5 (18) C4.01.pdf PDF
PDX 2026-5 (41) C9.04.pdf PDF
PDX 2026-5 (49) E5.03.pdf PDF
PDX 2026-5 (16) C3.04.pdf PDF
PDX 2026-5 (55) E7.02.pdf PDF
PDX 2026-5 (06) C1.01.pdf PDF
PDX 2026-5 (25) C5.03.pdf PDF
PDX 2026-5 (28) C6.01.pdf PDF
PDX 2026-5 (37) C7.02.pdf PDF
PDX 2026-5 (27) C6.00.pdf PDF
PDX 2026-5 (47) E5.01.pdf PDF
PDX 2026-5 (40) C9.03.pdf PDF
PDX 2026-5 (39) C9.02.pdf PDF
PDX 2026-5 (44) E2.01.pdf PDF
PDX 2026-5 (35) C6.08.pdf PDF
2026-14617 Exhibit A - CSPP.pdf PDF
PDX 2026-5 (52) E5.06.pdf PDF
PDX 2026-5 (46) E4.01.pdf PDF
PDX 2026-5 (13) C3.01.pdf PDF
PDX 2026-5 (38) C9.01.pdf PDF
PDX 2026-5 (53) E6.01.pdf PDF
PDX 2026-5 (15) C3.03.pdf PDF
PDX 2026-5 (43) E1.02.pdf PDF
PDX 2026-5 (19) C4.02.pdf PDF
PDX 2026-5 (17) C4.00.pdf PDF
PDX 2026-5 (29) C6.02.pdf PDF
PDX 2026-5 (02) GI1.02.pdf PDF
PDX 2026-5 (30) C6.03.pdf PDF
PDX 2026-5 (05) C1.00.pdf PDF
PDX 2026-5 (21) C4.04.pdf PDF
PDX 2026-5 (42) E1.01.pdf PDF
PDX 2026-5 (54) E7.01.pdf PDF
PDX 2026-5 (50) E5.04.pdf PDF
PDX 2026-5 (12) C3.00.pdf PDF
PDX 2026-5 (04) GI1.04.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-5 (03) GI1.03.pdf PDF
PDX 2026-5 (01) GI1.00.pdf PDF
PDX 2026-5 (22) C5.00.pdf PDF
PDX 2026-5 (31) C6.04.pdf PDF
PDX 2026-5 (09) C2.01.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G G

G

G

G G

G

PE

R

IM

ET

ER

R

O

AD

STAGING AREA

SECURITY

GATE

NA46

HAUL

ROUTE

NE 96TH AVENUE

N: 59789 E: 125555

N: 59874 E: 125402

N: 59494 E: 125389N: 59575

E: 125242

EXISTING

PAVED

CONSTRUCTION

ENTRANCE

N

SCALE: IN FEET

100500 25 150

12/11/2024

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

10:41:34 AM EBERTP R:\Aviation\PDX\2026\0005 - Taxiway K West E3-E6 and VSR Rehab\SHEETS - CIVIL\EROSION CONTROL PLAN.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

TAXIWAY K WEST GATES E3 TO E6 & VEHICLE SERVICE ROAD REHABILITATION

EROSION CONTROL PLAN - STAGING AREA

CHRIS EDWARDS

B. NIELSEN

P. EBERT

B. NIELSEN

OCT 2026

32 CD

PDX 2026-5 C6.052025D033 103134

N

KEY PLAN

SCALE : N.T.S.

JUNE 2 , 2 0 10BRENT DA NIEL NIELSEN

EXP: 12/31/2026

ENGINEER

RE

GIS

TERED PROFESSIONAL

OREGON

82697PE

SCALE:

STAGING AREA

PLAN VIEW

1" = 50'1

NOTES:

1. THE EXACT CONFIGURATION OF THE STAGING AREA

MAY VARY FROM WHAT IS SHOWN ON THIS SHEET

BASED ON PORT DIRECTION.

2. A STAGING AREA EQUAL IN SIZE TO THE ONE SHOWN IN

PLAN VIEW WILL BE MADE AVAILABLE TO THE

CONTRACTOR AT THE TIME OF NOTICE TO PROCEED.

THE FINAL CONFIGURATION MAY CHANGE SHAPE FROM

WHAT IS CURRENTLY SHOWN, BUT THE FINAL STAGING

AREA WILL BE WITHIN THE PARKING LOT SHOWN IN

PLAN VIEW. THIS STAGING AREA WILL NOT SHIFT OR

MOVE ONCE CONSTRUCTION HAS STARTED.

3. SEE SHEET C6.01 FOR EROSION CONTROL NOTES.

4. EXISTING SURFACE FEATURES AND UTILITIES IN THIS

AREA ARE FOR INFORMATION ONLY. CONTRACTOR IS

RESPONSIBLE FOR VERIFICATION OF SURFACE

FEATURES AND UTILITIES, INCLUDING THE ADEQUACY

OF THE SITE FOR THE CONTRACTOR'S INTENDED

USAGE. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR ALL PERMITTING AND UTILITY CONNECTIONS TO

OPERATE OUT OF THIS LOCATION.

5. THE EROSION CONTROL PLAN DEPICTS MINIMUM

REQUIREMENTS TO USE THE SITE FOR STORAGE OF

MATERIALS AND EQUIPMENT.

6. BMPs SHOWN ARE EXPECTED TO REMAIN IN PLACE FOR

THE DURATION OF THE WORK.

R

SA

INLET PROTECTION BAG INSERT

AND BIO-FILTER BAGS,

SEE DETAIL

LIMITS OF DISTURBANCE

ROFA (RUNWAY OBJECT FREE

AREA)

LEGEND:

ROFA

C6.08

RSA (RUNWAY SAFETY AREA)RSA

EXISTING GRAVEL

SURFACING TO

REMAIN

CONTRACTOR TO CLEAN

OUT EXISTING TEMPORARY

WASHOUT BASIN AFTER

USE.

2026-09-30T11:11:12-0700
Brent Nielsen
I am the author of this document.

File details come from the government source that posted it. Updated .