PDX 2026-5 (46) E4.01.pdf

PDF 640 KB Posted

Attached to
Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation
Solicitation number
146992
Issued by
Multnomah County, Oregon

About this file

This is an Electrical Lighting Plan drawing for the Portland International Airport (PDX) Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation project in Oregon. The document is a detailed technical plan prepared by registered professional engineer Sergio Perry (PE #92070, expiration 12/31/2026) and dated January 7, 2026. The project involves comprehensive electrical lighting infrastructure work on Taxiway K, including the removal and reinstallation of existing elevated taxiway edge lights, installation of new taxiway centerline lights on PF L-868 specifications with 12-inch diameter, 24-inch deep base cans, 3-inch extensions, and 3/4-inch thick flange rings. The work requires installation of multiple #8, 5KV conductors in 2-inch PVC conduit between lights, with provisions for both new installations and integration with existing electrical systems. Key scope elements include removing and protecting existing lighting fixtures during paving operations, installing isolation transformers (CF 45-watt, 6.6/6.6 AMP), intercepting and removing existing conduit and conductors at pavement removal limits, extending new conduit to connect with existing infrastructure, and reinstalling lighting components upon completion of milling operations.

The drawing indicates coordination with multiple related sheets including removal information (Sheet E2.01), geometry information (Sheet E3.01), and detailed conduit specifications (Sheet E5.04 and E5.02). The project involves work within defined paving limits on Taxiway K and the adjacent taxiway system, with specific attention to protecting and reinstalling electrical infrastructure during construction. The scale of the electrical lighting plan is 1 inch equals 50 feet, with detailed key notes providing specific installation instructions for each lighting element and conduit configuration. No specific pricing terms, budget amounts, or contract award information is contained within this technical drawing document.

View the file

Other files

File Type Posted
PDX 2026-5 (20) C4.03.pdf PDF
PDX 2026-5 (11) C2.03.pdf PDF
PDX 2026-5 (10) C2.02.pdf PDF
PDX 2026-5 (48) E5.02.pdf PDF
PDX 2026-5 (08) C2.00.pdf PDF
PDX 2026-5 (24) C5.02.pdf PDF
PDX 2026-5 (33) C6.06.pdf PDF
PDX 2026-5 (36) C7.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-5 (18) C4.01.pdf PDF
PDX 2026-5 (41) C9.04.pdf PDF
PDX 2026-5 (49) E5.03.pdf PDF
PDX 2026-5 (16) C3.04.pdf PDF
PDX 2026-5 (55) E7.02.pdf PDF
PDX 2026-5 (06) C1.01.pdf PDF
PDX 2026-5 (25) C5.03.pdf PDF
PDX 2026-5 (28) C6.01.pdf PDF
PDX 2026-5 (37) C7.02.pdf PDF
PDX 2026-5 (32) C6.05.pdf PDF
PDX 2026-5 (27) C6.00.pdf PDF
PDX 2026-5 (47) E5.01.pdf PDF
PDX 2026-5 (40) C9.03.pdf PDF
PDX 2026-5 (39) C9.02.pdf PDF
PDX 2026-5 (44) E2.01.pdf PDF
PDX 2026-5 (35) C6.08.pdf PDF
2026-14617 Exhibit A - CSPP.pdf PDF
PDX 2026-5 (52) E5.06.pdf PDF
PDX 2026-5 (13) C3.01.pdf PDF
PDX 2026-5 (38) C9.01.pdf PDF
PDX 2026-5 (53) E6.01.pdf PDF
PDX 2026-5 (15) C3.03.pdf PDF
PDX 2026-5 (43) E1.02.pdf PDF
PDX 2026-5 (19) C4.02.pdf PDF
PDX 2026-5 (17) C4.00.pdf PDF
PDX 2026-5 (29) C6.02.pdf PDF
PDX 2026-5 (02) GI1.02.pdf PDF
PDX 2026-5 (30) C6.03.pdf PDF
PDX 2026-5 (05) C1.00.pdf PDF
PDX 2026-5 (21) C4.04.pdf PDF
PDX 2026-5 (42) E1.01.pdf PDF
PDX 2026-5 (54) E7.01.pdf PDF
PDX 2026-5 (50) E5.04.pdf PDF
PDX 2026-5 (12) C3.00.pdf PDF
PDX 2026-5 (04) GI1.04.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-5 (03) GI1.03.pdf PDF
PDX 2026-5 (01) GI1.00.pdf PDF
PDX 2026-5 (22) C5.00.pdf PDF
PDX 2026-5 (31) C6.04.pdf PDF
PDX 2026-5 (09) C2.01.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G

G

G

G

G

G G

G

G

G

G

G

G G

G

G

G

G G

G

G G G

G G

G

G

G

G

GG

G

G G

G

G

G G

G

G

G

G

G G

GG

G

G G G G G G G G G G G

GG G GG

GG

G

G G GG

GG G G

GG

G G

G G

G G G G G G G G G

G

G G G G G

GG

G

G

G G G G G G G G

G G

G G

G G

E6 E7

E1 E5E4E3 E7E6E2

MPH

STOP

J

J

J

JJ

J

J J

ABAND.

ABAN

D

EEEE

E E

E E

E E

E E E

E

E

E E E

E

EE

E

E

E

E

E

E

EE

E

E

E

COM

COM

COM

C O

M

C O

M

COM

C O

M

COM

COM

COM

C O

M

COM

CO

M

C O

M

C O

M

C O

M

COM

COM

COM

COM

COM

E

E-BRT

3-LAHSO-E1

A C

W

3-LAHSO-E1

AW

C

Lb

AW

C

La

3-LAHSO-E1

AW

CL

b

AW

CL

a

AW

CL

b

AW

CL

a

G

SA

3-

LA

HSO-E

AC

W

3-

LA

H

SO

-E

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AWCLb

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

A C

W

A C

W

AC

W

AC

W

AC

W

AC

W

A C

W

ACW

AC

WAC

W

AC

W

AW AC

W

G

SAAE AC

W

AC

E

G

SA

GSKK ACW

ACW

AW

G

SA

G

SA

P

A C

WACWAECLbAECLa

AWCLa

GS10L

G

SA

GSA

ACWAW

K

SPARE (E-BRT)

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

AW

C

Lb

AW

C

La

G

SA

P

GSAP

AW

C

Lb

A W

C La

AWCLb AWCLa

AWCLb

AWCLa

ACW

ACW

ACW

ACW

ACW

ACE

AW

AS

B

R

ASBR

ASBR

ASBR

ASBR

AE

C

Lb

AE

C

La

AECLb

AECLa

AECLbAECLa

LW

W

10LWW

10LWW

AE

AE

G S1

0L

GS10L

GS10L

AHBY

AH

B

Y

AHBY

AHBY

GSA

GSA

G

SA

GSA

GSA

GSA

G

SA

G

SA

10LB

RT

LB

R T

10LBRT

10LBRT

T

T

T

T

E-BRT

E-BRT

K C

Lb

K C

La

K C

Lb

K C

La

K C

Lb

K C

La

K C

Lb

K C

La

K C

Lb

K C

La

K C

Lb

K C

La

K C

Lb

K C

La

K C

Lb

K C

La

K C

Lb K

C La

K C

La K

C Lb

K C

La K

C Lb

K C

La K

C Lb

K C

La K

C Lb

K C

La K

C Lb

K C

La K

C Lb

K C

La K

C Lb

K

K

K

K

K K

K

K K K K K K K K K

K

K

K G

SK

AC

W

ACW

AC

W

AC

W

G

SA

ACW

KC

Lb

KC

La

KCLb KCLa

KC

Lb

KC

La

KCLb KCLaACW

ACW

ACW

ACW

GSK

GSK

K

K

K

K

K

K

AW

C

La

AW

C Lb

K C

Lb

K C

Lb

K C

Lb

K C

Lb

K C

Lb

K C

Lb

K C

Lb

K C

Lb

K C

Lb

K C

Lb

K C

Lb

K C

Lb

K C

Lb

K C

La

K C

La

K C

La

K C

La

K C

La

K C

La

K C

La

K C

La

K C

La

K C

La

K C

La

K C

La

K C

La

℄ TAXIWAY K

TAXIWAY A6

E EE

TAXIWAY A5

+0

+0

TAXIWAY A

N

SCALE: IN Feet

100500 25 150

KEY NOTES:

1. AT POINT INDICATED IS AN EXISTING ELEVATED TAXIWAY EDGE

LIGHT. REMOVE AND PROTECT THE LIGHT FOR REINSTALLATION

AFTER PAVING WORK. BASE CAN, EXTENSION AND FLANGE RING

TO REMAIN IN PLACE. INSTALL CF SHORTING DEVICE ON

TRANSFORMER SECONDARY. INSTALL PF COVER PLATE TO

ACCOMMODATE PAVING WORK. REMOVE COVER PLATE AND

REINSTALL THE LIGHT AFTER PAVING WORK IS COMPLETE.

RETURN COVER PLATE TO THE PORT.

2. AT POINT INDICATED, REINSTALL TAXIWAY CENTERLINE LIGHT ON

PF L-868, 12” DIAMETER, 24” DEEP BASE CAN, PF 3” EXTENSION, PF

3/4” THICK FLANGE RING AND CF 45-WATT, 6.6/6.6 AMP ISOLATION

TRANSFORMER AS SHOWN ON SHEET E5.02.

3. PROVIDE AND INSTALL 4 #8, 5KV CONDUCTORS (2 FOR KCLa AND 2 FOR KCLb) IN ENCASED 2” PVC BETWEEN LIGHTS. SEE DETAIL 1, SHEET E5.04.

4. AT POINT INDICATED IS AN EXISTING 2” PVC CONDUIT

APPROXIMATELY 24” DEEP CONTAINING #8, 5KV AIRFIELD LIGHTING

CONDUCTORS FOR CIRCUITS SHOWN. INTERCEPT AND REMOVE

CONDUCTORS AND CONDUIT AT PAVEMENT REMOVAL LIMIT AND

DISPOSE OF OFF PORT PROPERTY. EXTEND A NEW 2” PVC

CONDUIT BETWEEN NEW LIGHT CANS AND EXISTING CONDUIT.

PROVIDE AND INSTALL NEW #8, 5KV CONDUCTORS FOR CIRCUITS

AS SHOWN.

5. IN LIGHT BASE INDICATED, CONNECT NEW CONDUCTORS TO

EXISTING CONDUCTORS AND MAKE CONNECTIONS NECESSARY TO

REESTABLISH THE CIRCUITS.

6. AT POINT INDICATED IS AN EXISTING CENTERLINE LIGHT. REMOVE

AND PROTECT THE LIGHT FOR REINSTALLATION AFTER PAVING

WORK. BASE CAN, EXTENSION AND FLANGE RING TO REMAIN IN

PLACE. INSTALL CF SHORTING DEVICE ON TRANSFORMER

SECONDARY. INSTALL PF COVER PLATE TO ACCOMMODATE

PAVING WORK. REMOVE COVER PLATE AND REINSTALL THE LIGHT

AFTER PAVING WORK IS COMPLETE. RETURN COVER PLATE TO

THE PORT.

7. AT POINT INDICATED IS AN EXISTING 1-1/2" IMC CONDUIT.

APPROXIMATELY 6-10" DEEP. INTERCEPT THE CONDUIT AT

PAVEMENT REMOVAL LIMIT AND REMOVE AND DISPOSE OF OFF

PORT PROPERTY. CAP AND SEAL REMAINING CONDUIT.

8. UPON COMPLETION OF MILLING OPERATIONS, SAWCUT TO

REINSTALL TAXIWAY CENTERLINE LIGHT ON PF L-868, 12"

DIAMETER, 24" DEEP BASE CAN, PF 3" EXTENSION, PF 3/4" THICK

FLANGE RING AND CF-45 WATT, 6.6/6/6 AMP ISOLATION

TRANSFORMERS SHOWN ON SHEET E5.02.

9. UPON COMPLETION OF MILLING OPERATIONS, SAWCUT TO INSTALL

FOUR #8, 5KV CONDUCTORS (2 FOR KCLa AND 2 FOR KCLb) IN

ENCASED 2" PVC CONDUIT BETWEEN LIGHTS. SEE DETAIL 2, SHEET

E5.04.

RE

GIS

TERED PROFESSIONAL

SERGIO LEGUIRE PERRY

MA RCH 14 , 2 017

EXP: 12/31/2026

OREGON

92070PE

ENGINEER

SCALE:

ELECTRICAL LIGHTING PLAN TAXIWAY K

1" = 50'1

NOTES:

1. STATION AND OFFSETS ON THIS SHEET ARE

BASED ON TAXIWAY K CENTERLINE ALIGNMENT.

2. FOR REMOVAL INFORMATION ASSOCIATED WITH

THIS DRAWING, SEE SHEET E2.01.

3. FOR GEOMETRY INFORMATION ASSOCIATED

WITH THIS DRAWING, SEE SHEET E3.01.

LIMIT OF

PAVING

1/7/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

4:52:09 PM DETTMM R:\Aviation\PDX\2026\0005 - Taxiway K West E3-E6 and VSR Rehab\SHEETS - ELEC\ELECTRICAL LIGHTING - TWY K WEST.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

TAXIWAY K WEST GATES E3 TO E6 & VEHICLE SERVICE ROAD REHABILITATION

ELECTRICAL LIGHTING PLAN TAXIWAY K

CHRIS EDWARDS

M. TIEASKIE

M. DETTMER

S. PERRY

OCT 2026

46 CD

PDX 2026-5 E4.012025D033 103134

AutoCAD SHX Text

STOP

AutoCAD SHX Text

STOP

DIGITALLY SIGNED
2026-09-24T06:39:31-0700
Sergio Perry

File details come from the government source that posted it. Updated .