PDX 2026-5 (46) E4.01.pdf
PDF 640 KB Posted
- Attached to
- Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation
- Solicitation number
- 146992
- Issued by
- Multnomah County, Oregon
About this file
This is an Electrical Lighting Plan drawing for the Portland International Airport (PDX) Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation project in Oregon. The document is a detailed technical plan prepared by registered professional engineer Sergio Perry (PE #92070, expiration 12/31/2026) and dated January 7, 2026. The project involves comprehensive electrical lighting infrastructure work on Taxiway K, including the removal and reinstallation of existing elevated taxiway edge lights, installation of new taxiway centerline lights on PF L-868 specifications with 12-inch diameter, 24-inch deep base cans, 3-inch extensions, and 3/4-inch thick flange rings. The work requires installation of multiple #8, 5KV conductors in 2-inch PVC conduit between lights, with provisions for both new installations and integration with existing electrical systems. Key scope elements include removing and protecting existing lighting fixtures during paving operations, installing isolation transformers (CF 45-watt, 6.6/6.6 AMP), intercepting and removing existing conduit and conductors at pavement removal limits, extending new conduit to connect with existing infrastructure, and reinstalling lighting components upon completion of milling operations.
The drawing indicates coordination with multiple related sheets including removal information (Sheet E2.01), geometry information (Sheet E3.01), and detailed conduit specifications (Sheet E5.04 and E5.02). The project involves work within defined paving limits on Taxiway K and the adjacent taxiway system, with specific attention to protecting and reinstalling electrical infrastructure during construction. The scale of the electrical lighting plan is 1 inch equals 50 feet, with detailed key notes providing specific installation instructions for each lighting element and conduit configuration. No specific pricing terms, budget amounts, or contract award information is contained within this technical drawing document.
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
G
G
G
G
G G
G
G
G
G
G
G G
G
G
G
G G
G
G G G
G G
G
G
G
G
GG
G
G G
G
G
G G
G
G
G
G
G G
GG
G
G G G G G G G G G G G
GG G GG
GG
G
G G GG
GG G G
GG
G G
G G
G G G G G G G G G
G
G G G G G
GG
G
G
G G G G G G G G
G G
G G
G G
E6 E7
E1 E5E4E3 E7E6E2
MPH
STOP
J
J
J
JJ
J
J J
ABAND.
ABAN
D
EEEE
E E
E E
E E
E E E
E
E
E E E
E
EE
E
E
E
E
E
E
EE
E
E
E
COM
COM
COM
C O
M
C O
M
COM
C O
M
COM
COM
COM
C O
M
COM
CO
M
C O
M
C O
M
C O
M
COM
COM
COM
COM
COM
E
E-BRT
3-LAHSO-E1
A C
W
3-LAHSO-E1
AW
C
Lb
AW
C
La
3-LAHSO-E1
AW
CL
b
AW
CL
a
AW
CL
b
AW
CL
a
G
SA
3-
LA
HSO-E
AC
W
3-
LA
H
SO
-E
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AWCLb
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
A C
W
A C
W
AC
W
AC
W
AC
W
AC
W
A C
W
ACW
AC
WAC
W
AC
W
AW AC
W
G
SAAE AC
W
AC
E
G
SA
GSKK ACW
ACW
AW
G
SA
G
SA
P
A C
WACWAECLbAECLa
AWCLa
GS10L
G
SA
GSA
ACWAW
K
SPARE (E-BRT)
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
AW
C
Lb
AW
C
La
G
SA
P
GSAP
AW
C
Lb
A W
C La
AWCLb AWCLa
AWCLb
AWCLa
ACW
ACW
ACW
ACW
ACW
ACE
AW
AS
B
R
ASBR
ASBR
ASBR
ASBR
AE
C
Lb
AE
C
La
AECLb
AECLa
AECLbAECLa
LW
W
10LWW
10LWW
AE
AE
G S1
0L
GS10L
GS10L
AHBY
AH
B
Y
AHBY
AHBY
GSA
GSA
G
SA
GSA
GSA
GSA
G
SA
G
SA
10LB
RT
LB
R T
10LBRT
10LBRT
T
T
T
T
E-BRT
E-BRT
K C
Lb
K C
La
K C
Lb
K C
La
K C
Lb
K C
La
K C
Lb
K C
La
K C
Lb
K C
La
K C
Lb
K C
La
K C
Lb
K C
La
K C
Lb
K C
La
K C
Lb K
C La
K C
La K
C Lb
K C
La K
C Lb
K C
La K
C Lb
K C
La K
C Lb
K C
La K
C Lb
K C
La K
C Lb
K C
La K
C Lb
K
K
K
K
K K
K
K K K K K K K K K
K
K
K G
SK
AC
W
ACW
AC
W
AC
W
G
SA
ACW
KC
Lb
KC
La
KCLb KCLa
KC
Lb
KC
La
KCLb KCLaACW
ACW
ACW
ACW
GSK
GSK
K
K
K
K
K
K
AW
C
La
AW
C Lb
K C
Lb
K C
Lb
K C
Lb
K C
Lb
K C
Lb
K C
Lb
K C
Lb
K C
Lb
K C
Lb
K C
Lb
K C
Lb
K C
Lb
K C
Lb
K C
La
K C
La
K C
La
K C
La
K C
La
K C
La
K C
La
K C
La
K C
La
K C
La
K C
La
K C
La
K C
La
℄ TAXIWAY K
TAXIWAY A6
E EE
TAXIWAY A5
+0
+0
TAXIWAY A
N
SCALE: IN Feet
100500 25 150
KEY NOTES:
1. AT POINT INDICATED IS AN EXISTING ELEVATED TAXIWAY EDGE
LIGHT. REMOVE AND PROTECT THE LIGHT FOR REINSTALLATION
AFTER PAVING WORK. BASE CAN, EXTENSION AND FLANGE RING
TO REMAIN IN PLACE. INSTALL CF SHORTING DEVICE ON
TRANSFORMER SECONDARY. INSTALL PF COVER PLATE TO
ACCOMMODATE PAVING WORK. REMOVE COVER PLATE AND
REINSTALL THE LIGHT AFTER PAVING WORK IS COMPLETE.
RETURN COVER PLATE TO THE PORT.
2. AT POINT INDICATED, REINSTALL TAXIWAY CENTERLINE LIGHT ON
PF L-868, 12” DIAMETER, 24” DEEP BASE CAN, PF 3” EXTENSION, PF
3/4” THICK FLANGE RING AND CF 45-WATT, 6.6/6.6 AMP ISOLATION
TRANSFORMER AS SHOWN ON SHEET E5.02.
3. PROVIDE AND INSTALL 4 #8, 5KV CONDUCTORS (2 FOR KCLa AND 2 FOR KCLb) IN ENCASED 2” PVC BETWEEN LIGHTS. SEE DETAIL 1, SHEET E5.04.
4. AT POINT INDICATED IS AN EXISTING 2” PVC CONDUIT
APPROXIMATELY 24” DEEP CONTAINING #8, 5KV AIRFIELD LIGHTING
CONDUCTORS FOR CIRCUITS SHOWN. INTERCEPT AND REMOVE
CONDUCTORS AND CONDUIT AT PAVEMENT REMOVAL LIMIT AND
DISPOSE OF OFF PORT PROPERTY. EXTEND A NEW 2” PVC
CONDUIT BETWEEN NEW LIGHT CANS AND EXISTING CONDUIT.
PROVIDE AND INSTALL NEW #8, 5KV CONDUCTORS FOR CIRCUITS
AS SHOWN.
5. IN LIGHT BASE INDICATED, CONNECT NEW CONDUCTORS TO
EXISTING CONDUCTORS AND MAKE CONNECTIONS NECESSARY TO
REESTABLISH THE CIRCUITS.
6. AT POINT INDICATED IS AN EXISTING CENTERLINE LIGHT. REMOVE
AND PROTECT THE LIGHT FOR REINSTALLATION AFTER PAVING
WORK. BASE CAN, EXTENSION AND FLANGE RING TO REMAIN IN
PLACE. INSTALL CF SHORTING DEVICE ON TRANSFORMER
SECONDARY. INSTALL PF COVER PLATE TO ACCOMMODATE
PAVING WORK. REMOVE COVER PLATE AND REINSTALL THE LIGHT
AFTER PAVING WORK IS COMPLETE. RETURN COVER PLATE TO
THE PORT.
7. AT POINT INDICATED IS AN EXISTING 1-1/2" IMC CONDUIT.
APPROXIMATELY 6-10" DEEP. INTERCEPT THE CONDUIT AT
PAVEMENT REMOVAL LIMIT AND REMOVE AND DISPOSE OF OFF
PORT PROPERTY. CAP AND SEAL REMAINING CONDUIT.
8. UPON COMPLETION OF MILLING OPERATIONS, SAWCUT TO
REINSTALL TAXIWAY CENTERLINE LIGHT ON PF L-868, 12"
DIAMETER, 24" DEEP BASE CAN, PF 3" EXTENSION, PF 3/4" THICK
FLANGE RING AND CF-45 WATT, 6.6/6/6 AMP ISOLATION
TRANSFORMERS SHOWN ON SHEET E5.02.
9. UPON COMPLETION OF MILLING OPERATIONS, SAWCUT TO INSTALL
FOUR #8, 5KV CONDUCTORS (2 FOR KCLa AND 2 FOR KCLb) IN
ENCASED 2" PVC CONDUIT BETWEEN LIGHTS. SEE DETAIL 2, SHEET
E5.04.
RE
GIS
TERED PROFESSIONAL
SERGIO LEGUIRE PERRY
MA RCH 14 , 2 017
EXP: 12/31/2026
OREGON
92070PE
ENGINEER
SCALE:
ELECTRICAL LIGHTING PLAN TAXIWAY K
1" = 50'1
NOTES:
1. STATION AND OFFSETS ON THIS SHEET ARE
BASED ON TAXIWAY K CENTERLINE ALIGNMENT.
2. FOR REMOVAL INFORMATION ASSOCIATED WITH
THIS DRAWING, SEE SHEET E2.01.
3. FOR GEOMETRY INFORMATION ASSOCIATED
WITH THIS DRAWING, SEE SHEET E3.01.
LIMIT OF
PAVING
1/7/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
4:52:09 PM DETTMM R:\Aviation\PDX\2026\0005 - Taxiway K West E3-E6 and VSR Rehab\SHEETS - ELEC\ELECTRICAL LIGHTING - TWY K WEST.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
PORTLAND INTERNATIONAL AIRPORT
TAXIWAY K WEST GATES E3 TO E6 & VEHICLE SERVICE ROAD REHABILITATION
ELECTRICAL LIGHTING PLAN TAXIWAY K
CHRIS EDWARDS
M. TIEASKIE
M. DETTMER
S. PERRY
OCT 2026
46 CD
PDX 2026-5 E4.012025D033 103134
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
| DIGITALLY SIGNED | |
| 2026-09-24T06:39:31-0700 | |
| Sergio Perry |
File details come from the government source that posted it. Updated .