PDX 2026-5 (27) C6.00.pdf
PDF 2 MB Posted
- Attached to
- Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation
- Solicitation number
- 146992
- Issued by
- Multnomah County, Oregon
About this file
This is an Erosion Control Cover Sheet for the Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation project, prepared for the Port of Portland. The project involves the rehabilitation of existing asphalt pavement on Taxiway K and the Vehicle Service Road at Portland International Airport located at 7200 NE Airport Way, Portland, Oregon. The work encompasses earthwork, asphalt concrete paving, utilities installation, and erosion control measures across a total site area of 5.24 acres, with 2.74 acres of disturbed area. The project is scheduled for bidding in November 2026, with construction anticipated to occur from May 2027 through September 2027. The existing site conditions consist of paved taxiway and vehicle service road surfaces, which will be fully rehabilitated with new asphalt paving. No engineered soils will be used on-site; all fill material will be sourced from on-site excavation and approved import borrow sites.
The receiving water body within one mile of the project site is the Columbia Slough, which contains Category 4 and 5 wetlands with documented impairments including DDE, iron, dissolved oxygen, chlorophyll A, bacteria, dieldrin, PFOS, and temperature. Erosion and sediment control measures include sediment fence for perimeter and interior areas, straw wattles, filter berms, inlet protection, dewatering, construction entrance installation, pipe slope drains, outlet protection, surface roughening, and check dams. Additional pollution prevention measures include proper signage, hazardous waste management, on-site spill kits, and a concrete washout area. The site inspector designated for this project is Jeremiah Sonne of the Port of Portland, who holds a Certified Erosion and Sediment Control Lead certification expiring August 5, 2027, and possesses 12 years of construction oversight experience related to environmental permit compliance. The design professional is Brent Nielsen, a registered professional engineer in Oregon (PE #82697), with professional liability dated June 2, 2010, expiring December 31, 2026.
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B7
A2A1 A3
B5 B6 B8B1 B2 B3 B4 B9 B10
C6 C5 C4 C3
NO PARKING
LANE
ONLY
OPS PARKING
POLI
CE
PARK
ING
O N L Y
LANEONLY
LANEONLY
2 3 4 5
STOP
VISITOR
VISITOR
ONLY
ONLY
STOP
KEEP CLEAR
KEEP CLEAR
KEEP CLEAR
KEEP CLEAR
CRDC
PORT PORT PORT PORT PORT HSS
ONLY
7A
7B
STOP
STOP
M
PH
M
PH
M
PH
10 M
PH
GSE PARKING GSE PARKING GSE PARKING
GSE PARKING
DELTAUS GOVTUS GOVTUS GOVTUS GOVT
US GOVT
THRU
THRU
THRU
STOP
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
R
G
R
G
G
G
G
R
G
G
G
G
G
G
G
GG
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
FP
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
G
R
G sp
G
G
G
G
G
G
G
G
R
G
G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
R
G
G
G
G
R
G
G
R
G
G
G
G
G
G
G
R
G
G
FP
R
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
R
G
G
G
G
G
R
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
R
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
R
G
R
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
R
G
GG
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G sp
G
R
G
R
G
G
G
G
FP
G
G
R
G
G
G
G
G
G
G
G
G
G
G
R
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
R
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
FP
R
G
G
GG
G
G
G
FP
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
G
G
G
G
G
G
R
G
R
G
G
G
G
G
G
G
G
GG
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
FP
G
G
G
R
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
R
R
G
G
G
G
G
G
G
G
G
GG
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
R
G
G
G
FP
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
R
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G
G
G
G
G
G
R
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
R
G
G
G
G
G
R
R
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
FP
G
G
G
G
G
G
G
G
G
R
G
G
G
GG
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
R
G
G
G
G
R
G
G
G
G
G
G
G
G
R
G
FP
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
R
R
G
G
G
G
G
G
R
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
G
G
G
G
G
G
G
G
G
G
G
GG
G G G G
G
G
G
G
G
G
G
G
G
G
G
GG
G
G
G
G
GG
GG
G G
G G GG
GGG
GGG
G
GG
GGGGG
GG
G G
G G
G G
G G
GG
G G
G
G
G
G G G G G G
G G G
G
G
G
GG
G G
G G G
G G
G
G
GG
G G
G
G G
G G G
GG
G G
G
G G
G G G
G G
G G
G G G
G G G
G
G G
G G
G G
G G G G
G G
G G
G G G G
G G
G
G G
G
G G
G
G G G
G
G
G G G
G G
GG G G G G GG G G
G G G G G G G G G
G G G
G
G
G
GGGGG
G G G G G G G G G G G GG G GG
GG
G
G
G G
G
GG
G
G GG
G
GG
G G
G
G G GG
GG G G
G G G
G G
G
G
G G
GG
G
G G G G
GG G G
G
G
G
G
G
G G G G
G
G GG
GG
G
GG
G G
G G
G G G G G G G G G
G
G G G G G
GG
G G
G G G G G G G G G G
G G
G G
G
GGG
G
G
GG
G G G G
G
G G
G G G
G G G G
G G
G G G G G
G
G
G G G G G
G G
G
G
G
G
G
G
G G
G G
G
G
G
G
G
G
G
G
G G
G G GGG
GGGGG
GG
GG G G
G
G
G
G
G G
G G G
G
G G
G G
G G G G
G
G
G
G
G
G
G
G
GG
G
G G G
G GGGGG
G G
G
G
G
G
7802-
8922-8934 BUILDING F
8940-8960
8904-8916 BUILDING E
8720-8830 BUILDING D
8564-8592 BUILDING C
8530-8542 BUILDING A
8548-8560 BUILDING B
78007710-
71197111, 7113,7115
254 253 252 251
9500 9600
WALKWAY
COVERED
7108-1
D3 E1 E5E4E3
D4
C4
D6
C6
3A
4A
C 23A
B11
B10
B9
B8
B7
B6
B5
B4
12 11
11 - 12
2 4A
E13AE13BE12E11E10E9E8E7E6
C20
B3
14A
1A
3A
E2D5D7D9D11D13
D
D
D12 D10 D8
C8C10C 12C14
C16
C18
C22
C
C21
C19 C17 C15 C13 C11 C9 C7 C5 C3 B2
1A 1
MPH
STOP
12/11/2024
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
10:38:06 AM EBERTP R:\Aviation\PDX\2026\0005 - Taxiway K West E3-E6 and VSR Rehab\SHEETS - CIVIL\EROSION CONTOL COVER AND NOTES.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
PORTLAND INTERNATIONAL AIRPORT
TAXIWAY K WEST GATES E3 TO E6 & VEHICLE SERVICE ROAD REHABILITATION
EROSION CONTROL COVER SHEET
CHRIS EDWARDS
B. NIELSEN
P. EBERT
B. NIELSEN
OCT 2026
27 CD
PDX 2026-5 C6.002025D033 103134
EROSION AND SEDIMENT
CONTROL PLANS
ATTENTION EXCAVATORS
OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY
THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE
SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090.
YOU MAY OBTAIN COPIES OF THESE RULES FROM THE CENTER BY
CALLING (503) 232-1987. IF YOU HAVE ANY QUESTIONS ABOUT
THE RULES, YOU MAY CONTACT THE CENTER. YOU MUST NOTIFY
THE CENTER, AT LEAST TWO BUSINESS DAYS, BEFORE
COMMENCING AN EXCAVATION. CALL (800) 332-2344 OR 811.
PROJECT LOCATION:
PROJECT ADDRESS: ACTUAL LOCATION:
7200 NE AIRPORT WAY TAXIWAY K
PORTLAND, OR 97208
WORK AREA:
LATITUDE = 45° 34' 33.6" N, LONGITUDE = 122° 34' 43.3"W
ACCESS TO SITE: FROM NE AIRPORT WAY
LATITUDE = 45° 35' 26.4" N, LONGITUDE =122° 35' 27.1" W
PROPERTY DESCRIPTION:
TAX LOT: 1N2E07-00100, 1N2E06-00300, AND 1N2E05-00200
PORT OF PORTLAND
CONTACT: CHRISTINE EDWARDS
7200 NE AIRPORT WAY
PORTLAND, OR 97218
PHONE: 503-415-6395
EMAIL: CHRISTINE.EDWARDS@PORTOFPORTLAND.COM
UTILITY
INSTALLATION
PAVEMENT
CONSTRUCTION
FINAL
STABILIZATION
EROSION PREVENTION
PRESERVE NATURAL VEGETATION X X X
GROUND COVER
HYDRAULIC APPLICATIONS
PLASTIC SHEETING
MATTING
DUST CONTROL X X
OTHER:
SEDIMENT CONTROL
SEDIMENT FENCE (PERIMETER)
SEDIMENT FENCE (INTERIOR)
STRAW WATTLES
FILTER BERM
INLET PROTECTION X X
DEWATERING X
SEDIMENT TRAP
OTHER:
RUN OFF CONTROL
CONSTRUCTION ENTRANCE
PIPE SLOPE DRAIN
OUTLET PROTECTION
SURFACE ROUGHENING
CHECK DAMS
OTHER:
POLLUTION PREVENTION
PROPER SIGNAGE X X
HAZ WASTE MANAGEMENT X X
SPILL KIT ON-SITE X X
CONCRETE WASHOUT AREA X X
OTHER:
ST. HELENS
ROAD
W illa m et te R iv er
LO
M
BA
R
D S
T
AN TO
W
N RD
SKYLINE
BLVD
Forest
Park
ST. JO
HNS
BRIDGE
BARNES RD
CORNELL
CORNELL
RD
RD
THOMPSON
RD
SKYLINE
BLVD
BARNES RD
MILLER
RD
LEAHY RD
Willamette River
FRONT AVE
KI
TR
ID
GE
AV
E
ST HELENS
RD
ST
FR
EMONT
MARQUAM
BRID
GE
BRID
GE
th
A
VE
rd
A
VE
st
A
VE
BURNSIDE ST
th
A
VE ALDER ST
FR
O
NT
A
VE
4t h
AV
E
BR
O
AD
W
AY
VI
ST
A D
R
BROADW
DRAY
WALKER RD
CANYON ROAD
st
A
VE
SC
HO
LL
SF
ERRY
RD
PATTON RD
HUMPHREYBLVD
HAMILTON ST
DOSCH
RD
TALROT
RD
FAIRMONT
BLVD
GIBBS
ST
RWILL IG
ER
BL
VD
Hayden Island
LOW
ER
RIVER
RD
FR
U
IT
VA
LL
EY
R
D
FOURTH PLAIN BLVD
39th ST
33rd ST
KA
U
FM
AN
A
VE
FR
AN
KL
IN
S T
M
AI
N
ST
ST. JO
HNS
BLV
D
FOURTH
PLAIN
BLVD
BLVD
AN
D
R
ES
EN
R
D
BURTON RDColumbia River
Columbia River
Terminal 6Term ina l 5
Term inal 4
Bybee Lake
Smith Lake
MARINE DR
COLUMBIA BLVD
BURGARD
ST
LO
M
BARD ST
ST LOUIS
AVE
PORTL
AND A
VE
FESSENDEN STSMITH ST
WILLAMETE BLVD
LOMBARD ST
COLUMBIA BLVD
99E
IN
TE
R
ST
AT
E
AV
E
D
EN
VE
R
A
VE
G R
EE
LE
Y
AV
E
PO
RT
SM
O
UT
H
AV
E
BASIN
AVE
LAGOON AVE
CHANNEL AVE
GOING ST
C H
AU
TA
U Q
U A
BL
VD
99W
WILLAMETTE
BLVD
WILLIS BLVD
GREELEY
AVE
COLUMBIA BLVD
LOMBARD ST
PORTLAND BLVD
AINSWORTH ST
KILLINGSWORTH ST
ALBERTA ST
AL
BI
N A
AV
E
VA
N
C O
U
VE
R A
VE
W
IL
LI
AM
S
AV
E
M
AR
TI
N
L U
TH
ER
K
IN
G J
R B
LV
D th
A
VE
DEKUM ST
PRESCOTT ST
FREMONT ST
rd
D R rd
A
VE
nd
A
VE
th
A
VE
CORNFOOT
RD
AL
DER WOOD
RD
nd
A
VE
CU
LL
Y
BL
VD
nd
A
VE
th
A ve
SANDY BLVD
MARINE DR
AIRPORT WAY
Terminal 1
Terminal 2
BANFIELD
FREEWAY
KNOTT ST
BROADWAY ST
st
A ve th
A ve
HALSEY ST
nd
A
VE
nd
A
VE
FREMONT DR
DIVISION ST
POWELL BLVD
CLINTON ST
LINCOLN ST
HAWTHORNE ST
BELMONT ST
STARK ST
BURNSIDE ST
GLISAN STM
AR
TI
N
L U
TH
ER
K
IN
G J
R B
LV
D th
A
VE
SANDY BLVD
th
A
VE
th
A
VE
th
A
VE
th
A
VE
th
A
VE
nd
A
VE
nd
A
VE
TH
O
RBURN
ST
YAMHILL ST
MORRISON ST
BURNSIDE ST
Columbia Slough
Sand Island
Lemon Island
PRESCOTT ST
2n d
AV
E
2n d
AV
E
2s nd A
VE
2t h
AV
E
CHERRYBLOSSOM DR
0t h
AV
E
MARKET ST
DIVISION ST
GHER RD
2t h
AV
E
28th ST
18th ST
49th ST
44th ST
2n d
AV
E
4t h
AV
E
GLADSTONE ST
HOLGATE BLVD
th
A
VE
2t h
AV
E
YEON AVE
th
A
VE
NICOLAI ST
VAUGHIN
th
A
VE
th
A
VE LOVEJOY
MILL PLAIN
54th ST
ST
J
AM
ES
R D
ST JO
H
N S R
D
COLUMBIA
WAY
EVERGREEN
McARTHER
LI
ES
ER
R
O
AD
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
VICINITY MAP
Portland
Vancouver
Portland International
Airport
N
SCALE: N.T.S.
PROJECT AREA
SCALE: N.T.S.
SITE MAP
PROJECT SITE
COLUMBIA RIVER
RUNWAY 10R-28L
R U
N W
AY
-2
· HOLD A PRE-CONSTRUSTION MEETING OF PROJECT CONSTRUCTION PERSONNEL THAT INCLUDES THE INSPECTOR TO DISCUSS EROSION AND
SEDIMENT CONTROL MEASURES AND CONSTRUCTION LIMITS.
· ALL INSPECTIONS MUST BE MADE IN ACCORDANCE WITH DEQ 1200-CA PERMIT REQUIREMENTS.
· INSPECTION LOGS MUST BE KEPT IN ACCORDANCE WITH DEQ 1200-CA PERMIT REQUIREMENTS.
· RETAIN A COPY OF THE ESCP AND ALL REVISIONS ON SITE AND MAKE IT AVAILABLE ON REQUEST TO DEQ, AGENT, OR THE LOCAL MUNICIPALITY.
DURING INACTIVE PERIODS OF GREATER THAN SEVEN (7) CONSECUTIVE DAYS, RETAIN THE ESCP AT THE CONSTRUCTION SITE OR AT ANOTHER
LOCATION.
INSPECTION FREQUENCY:
EXISTING SITE CONDITIONS:
EXISTING CONDITIONS INCLUDE PAVED TAXIWAY K AND VEHICLE SERVICE ROAD.
DEVELOPED CONDITIONS:
PAVED AIRPORT TAXIWAY K AND VEHICLE SERVICE ROAD
NARRATIVE DESCIRPTIONS
NATURE OF CONSTRUCTION ACTIVITY AND ESTIMATED TIME TABLE
PROJECT BID DATE: NOVEMBER 2026
CONSTRUCTION: MAY 2027 TO SEPTEMBER 2027
PROJECT INVOLVES EARTHWORK, ASPHALT CONCRETE PAVING, UTILITIES, EROSION
CONTROL MEASURES.
· NO ENGINEERED SOILS WILL BE USED.
· ALL LOCATIONS WITHIN THE PROJECT ARE EXISTING ASPHALT AND BEING
REHABILITATED WITH NEW ASPHALT.
PROJECT INVOLVES
TOTAL SITE AREA = 5.24 AC
TOTAL DISTURBED AREA = 2.74 AC
EXISTING IMPERVIOUS AREA = 5.24 AC
TOTAL IMPERVIOUS AREA = 5.24 AC
SITE SOIL CLASSIFICATION
COLUMBIA RIVER SAND WITH LAYERS OF SANDY LOAM. ON-SITE SOILS HAVE A
MODERATE EROSION POTENTIAL. FILL SHALL BE PROVIDED FROM ON-SITE
EXCAVATION AND APPROVED IMPORT BORROW SITES.
NO ENGINEERED SOILS WILL BE USED ON SITE.
RECEIVING WATER BODIES WITHIN 1 MILE:
COLUMBIA SLOUGH, WETLANDS
CATEGORY 4 AND 5 IMPAIRMENTS: DDE 4, 4, IRON (FE), DISSOLVED OXYGEN,
CHLOROPHYLL A, BACTERIA, DIELDRIN, PFOS, TEMPERATURE.
RATIONALE STATEMENT:
A COMPREHENSIVE LIST OF AVAILABLE BEST
MANAGEMENT PRACTICES (BMP) OPTIONS BASED ON
DEQ GUIDANCE MANUAL HAS BEEN REVIEWED TO
COMPLETE THIS EROSION AND SEDIMENT CONTROL
PLAN. SOME OF THE ABOVE LISTED BMPs WERE NOT
CHOSEN BECAUSE THEY WERE DETERMINED TO NOT
EFFECTIVELY MANAGE EROSION PREVENTION AND
SEDIMENT CONTROL FOR THIS PROJECT BASED ON
SPECIFIC SITE CONDITIONS: INCLUDING SOIL
CONDITIONS, TOPOGRAPHIC CONSTRAINTS,
ACCESSIBILITY TO THE SITE, AND OTHER RELATED
CONDITIONS. AS THE PROJECT PROGRESSES AND
THERE IS A NEED TO REVISE THE ESC PLAN, AN ACTION
PLAN WILL BE SUBMITTED.
SHEET INDEX:
INITIAL
POLLUTANT GENERATING MATERIALS:
PETROLEUM, SEDIMENT FROM EXCAVATIONS, CONCRETE, ASPHALT, PAVEMENT
MARKINGS.
NON-STORMWATER DISCHARGES:
POSSIBLE WATER TO CONTROL DUST, UNCONTAMINATED, NON-TURBID
DISCHARGES OF GROUNDWATER OR SPRING WATER, NON-CONTAMINATED
BYPASS OF SWALE WATER AND/OR STORMWATER, POTABLE WATER, AND/OR
UNCONTAMINATED WATER LINE FLUSHING.
PHASES OF CONSTRUCTION:
· INITIAL EARTHWORK INCLUDING PAVEMENT
REMOVAL, TRENCHING AND EXCAVATING.
· UTILITIES CONSTRUCTION
· TAXIWAY K AND VEHICLE SERVICE ROAD
PAVEMENT CONSTRUCTION
STAGING AREAS:
STAGING AREAS INCLUDE SANITARY FACILITIES AND WASTE RECEPTACLE
WITH LID. THE CONTRACTOR SHALL PROVIDE CONCRETE CLEANOUT.
PERMITEE'S SITE INSPECTOR:
NAME: JEREMIAH SONNE
COMPANY/AGENCY: PORT OF PORTLAND
CESCL: ECO-3-8051411 - EXPIRES 8/5/2027
PHONE: 503.415.6722
FAX: 503.548.5507
EMAIL: JEREMIAH.SONNE@PORTOFPORTLAND.COM
DESCRIPTION OF EXPERIENCE: 12 YEARS OF
CONSTRUCTION OVERSIGHT AS IT RELATES TO
ENVIRONMENTAL PERMIT COMPLIANCE.
WASHINGTON STATE CERTIFIED EROSION AND
SEDIMENT CONTROL LEAD (CESCL).
RAIN GAUGE: PDX POST OFFICE PUMP STATION
HTTPS://AQUARIUS.PORTLANDOREGON.GOV/DATA/DATASET/CHART/LOCATION/HYDRA-159/DATASET/PRECIP%20INCREM/PRIMARY/INTERVAL/LATESTPORT OF PORTLAND
CONTACT: BRENT NIELSEN
7200 NE AIRPORT WAY
PORTLAND, OR 97218
PHONE: 503-415-6361
EMAIL: BRENT.NIELSEN@PORTOFPORTLAND.COM
JUNE 2 , 2 0 10BRENT DA NIEL NIELSEN
EXP: 12/31/2026
ENGINEER
RE
GIS
TERED PROFESSIONAL
OREGON
82697PE
SITE CONDITION MINIMUM FREQUENCY
1. ACTIVE PERIOD ON INITIAL DATE THAT LAND DISTURBANCE ACTIVITIES COMMENCE.
WITHIN 24 HOURS OF ANY STORM EVENT, INCLUDING RUNOFF FROM SNOW MELT, THAT RESULTS IN
DISCHARGE FROM THE SITE. AT LEAST ONCE EVERY 14 DAYS, REGARDLESS OF WHETHER
STORMWATER RUNOFF IS OCCURRING.
2. INACTIVE PERIODS GREATER THAN FOURTEEN
(14) CONSECUTIVE CALENDAR DAYS
THE INSPECTOR MAY REDUCE THE FREQUENCY OF INSPECTIONS IN ANY AREA OF THE SITE WHERE THE STABALIZATION STEPS IN SECTION 2.2.20 HAVE BEEN COMPLETED TO TWICE PER MONTH FOR
THE FIRST MONTH, NO LESS THAN 14 CALENDAR DAYS APART, THEN ONCE PER MONTH.
3. PERIODS DURING WHICH THE SITE IS
INACCESSIBLE DUE TO INCLEMENT WEATHER
IF SAFE, ACCESSIBLE, AND PRACTICAL, INSPECTIONS MUST OCCUR DAILY AT A RELEVANT
DISCHARGE POINT OR DOWNSTREAM LOCATION OF THE RECEIVING WATERBODY.
4. PERIODS DURING WHICH CONSTRUCTION
ACTIVITIES ARE SUSPENDED AND RUNOFF IS
UNLIKELY DUE TO FROZEN CONDITIONS.
VISUAL MONITORING INSPECTIONS MAY BE TEMPORARILY SUSPENDED. IMMEDIATELY RESUME
MONITORING UPON THAWING, OR WHEN WEATHER CONDITIONS MAKE DISCHARGES LIKELY.
5. PERIODS DURING WHICH CONSTRUCTION
ACTIVITIES ARE CONDUCTED AND RUNOFF IS
UNLIKELY DUE TO FROZEN CONDITIONS.
VISUAL MONITORING INSPECTIONS MAY BE REDUCED TO ONCE A MONTH. IMMEDIATELY RESUME
MONITORING UPON THAWING, OR WHEN WEATHER CONDITIONS MAKE DISCHARGES LIKELY.
EROSION CONTROL PLANS
SHEET NUMBER DESCRIPTION
1 C6.00 EROSION CONTROL COVER SHEET
2 C6.01 EROSION CONTROL NOTES
3 C6.02 EROSION CONTROL KEY PLAN
4 C6.03 PAVING EROSION CONTROL PLAN - WEST
5 C6.04 PAVING EROSION CONTROL PLAN - EAST
6 C6.05 EROSION CONTROL PLAN - STAGING AREA
7 C6.06 FINAL STABILIZATION PLAN - WEST
8 C6.07 FINAL STABILIZATION PLAN - EAST
9 C6.08 EROSION CONTROL DETAILS
| 2026-09-30T11:10:50-0700 | |
| Brent Nielsen | |
| I am the author of this document. |
File details come from the government source that posted it. Updated .