PDX 2026-5 (49) E5.03.pdf

PDF 301 KB Posted

Attached to
Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation
Solicitation number
146992
Issued by
Multnomah County, Oregon

About this file

This is an electrical design detail document prepared for the Portland International Airport (PDX) in Oregon, specifically for the Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation project (PDX 2026-5). The document provides technical specifications and installation requirements for in-pavement lighting fixtures, including base cans, flange rings, extensions, and associated electrical components. The detailed drawings and specifications outline the configuration of two base can types (L-867 and L-868) in various diameters, reinforcing bar cage assemblies, conduit installations, and sealant applications. The project is registered under Professional Engineer Sergio Perry (Oregon PE #92070, expiration 12/31/2026) with a drawing date of January 7, 2026, and was last revised in October 2026.

The technical specifications establish mandatory installation standards for contractors, including the use of 3/4" fixtures and grooved flange rings, stainless steel hardware (Type 304 grade bolts marked F593C with anti-vibration washers), silicone sealant applications, and torque specifications using calibrated torque wrenches per manufacturer recommendations. The document provides sizing tables for base can diameters and core diameters, conduit extension requirements (2" into the can after backfilling), and junction can volume specifications for 5KV connector kits with maximum allowable quantities based on container size. Contractors are responsible for providing shims as needed to meet final grade requirements, with a maximum limit of three shims per installation, ensuring proper alignment and drainage of the in-pavement lighting system.

View the file

Other files

File Type Posted
PDX 2026-5 (20) C4.03.pdf PDF
PDX 2026-5 (11) C2.03.pdf PDF
PDX 2026-5 (10) C2.02.pdf PDF
PDX 2026-5 (48) E5.02.pdf PDF
PDX 2026-5 (08) C2.00.pdf PDF
PDX 2026-5 (24) C5.02.pdf PDF
PDX 2026-5 (33) C6.06.pdf PDF
PDX 2026-5 (36) C7.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-5 (18) C4.01.pdf PDF
PDX 2026-5 (41) C9.04.pdf PDF
PDX 2026-5 (16) C3.04.pdf PDF
PDX 2026-5 (55) E7.02.pdf PDF
PDX 2026-5 (06) C1.01.pdf PDF
PDX 2026-5 (25) C5.03.pdf PDF
PDX 2026-5 (28) C6.01.pdf PDF
PDX 2026-5 (37) C7.02.pdf PDF
PDX 2026-5 (32) C6.05.pdf PDF
PDX 2026-5 (27) C6.00.pdf PDF
PDX 2026-5 (47) E5.01.pdf PDF
PDX 2026-5 (40) C9.03.pdf PDF
PDX 2026-5 (39) C9.02.pdf PDF
PDX 2026-5 (44) E2.01.pdf PDF
PDX 2026-5 (35) C6.08.pdf PDF
2026-14617 Exhibit A - CSPP.pdf PDF
PDX 2026-5 (52) E5.06.pdf PDF
PDX 2026-5 (46) E4.01.pdf PDF
PDX 2026-5 (13) C3.01.pdf PDF
PDX 2026-5 (38) C9.01.pdf PDF
PDX 2026-5 (53) E6.01.pdf PDF
PDX 2026-5 (15) C3.03.pdf PDF
PDX 2026-5 (43) E1.02.pdf PDF
PDX 2026-5 (19) C4.02.pdf PDF
PDX 2026-5 (17) C4.00.pdf PDF
PDX 2026-5 (29) C6.02.pdf PDF
PDX 2026-5 (02) GI1.02.pdf PDF
PDX 2026-5 (30) C6.03.pdf PDF
PDX 2026-5 (05) C1.00.pdf PDF
PDX 2026-5 (21) C4.04.pdf PDF
PDX 2026-5 (42) E1.01.pdf PDF
PDX 2026-5 (54) E7.01.pdf PDF
PDX 2026-5 (50) E5.04.pdf PDF
PDX 2026-5 (12) C3.00.pdf PDF
PDX 2026-5 (04) GI1.04.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-5 (03) GI1.03.pdf PDF
PDX 2026-5 (01) GI1.00.pdf PDF
PDX 2026-5 (22) C5.00.pdf PDF
PDX 2026-5 (31) C6.04.pdf PDF
PDX 2026-5 (09) C2.01.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

" D

IA

M

ET

ER

2" PVC (TYP.) PER

LAYOUT DRAWINGS

5 #4 "L BARS" EQUALLY

SPACED TIE TO #4 CIRCLE BARS

3#4 BARS FORMED INTO

CIRCLE TIE TO #4 "L BARS"

BASE CAN

CF SHIMS

(AS NEEDED)

3/4" FLANGE

RING AND FIXTURE

L867/L-868 BASE CAN

3" E

XT

EN

SI

O

N S

H O

W N

D

IM

EN

SI

O N

V

AR

IE

S

P-610 CONCRETE

CONDUIT BACKFILL

P-606 SEALANT

APPROX. 3/4"

P-605 SEALANT,

3/8" BELOW FINISH GRADE NOTES:

1. THE BASIC PACKAGE TO BE USED FOR PLANNING THE

INSTALLATION OF ALL BASE CANS SHALL BE: (1) 3/4"

FIXTURE, (1) 3/4" GROOVED FLANGE RING, AND (1)

EXTENSION ON TOP OF THE L-868 BASE CAN. EXTENSION

TO BE SIZED AS SHOWN ON THE LIGHTING PLANS.

2. TO MEET FINAL GRADE REQUIREMENTS SHOWN ON THIS

DETAIL, THE CONTRACTOR (AT THE CONTRACTORS

EXPENSE) WILL BE REQUIRED TO PROVIDE SHIMS. THE

FINAL INSTALLATION SHALL NOT USE MORE THAN 3 SHIMS.

3. APPLY SILICONE SEALANT BETWEEN LIGHT, FLANGE RING

AND EXTENSIONS.

4. PROVIDE AND INSTALL 3/8" X 16 TYPE 304 (18-8) STAINLESS

STEEL HEX CAP FULLY THREADED BOLTS MARKED F593C

WITH STAINLESS STEEL ANTI-VIBRATION WASHERS

(HELICO OR NORDLOCK) FOR ALL IN-PAVEMENT FIXTURES.

TORQUE BOLTS TO MANUFACTURER'S

RECOMMENDATIONS WITH A CALIBRATED TORQUE

WRENCH.

5. CONDUIT SHALL EXTEND INTO CAN 2" AFTER DUCT IS

BACKFILLED AND LENGTH HAS STABILIZED. GROMMETS

WILL BE FURNISHED WITH THE BASE CAN AND SHALL BE

USED FOR CONDUIT INSTALLATION INTO BASE CAN.

INSTALL END BELL ON CONDUIT.

ACP

FLUSH FIXTURE SHOWN. DETAIL ALSO

APPLICABLE TO ELEVATED LIGHT INSTALLATION

BASE CAN TYPE BASE CAN DIAMETER EXTENSION DIAMETER CORE DIAMETER REQUIRED

L-867 12" 13.5" 14.5"

L-867 16" 17.375" 18.5"

L-868 12" 12.5" 13.5"

L-868 15" 15.5" 16.5"

CORE DRILL

5KV CONNECTOR KITS FILL LIMITS

JUNCTION CAN VOLUME (CU. INCH) NUMBER OF KITS

12" DIA. 12" DEEP 1357 3

12" DIA 24" DEEP 2714 6

16" DIA. 24" DEEP 4825 10

BASED UPON 450 CUBIC INCHES PER KIT AND ONE CONSTANT CURRENT TRANSFORMER.

THE MAXIMUM NUMBER OF 5KV CONNECTOR KITS IN A SINGLE JUNCTION BASE CAN SHALL

NOT EXCEED THE ABOVE WITHOUT EXPRESS APPROVAL FROM THE PORT.

RE

GIS

TERED PROFESSIONAL

SERGIO LEGUIRE PERRY

MA RCH 14 , 2 017

EXP: 12/31/2026

OREGON

92070PE

ENGINEER

REINFORCING BAR CAGE

CF SHIMS (AS NEEDED)

CONDUIT SIZE AND DEPTH

VARIES. SEE LIGHTING PLANS.

1/7/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

4:52:53 PM DETTMM R:\Aviation\PDX\2026\0005 - Taxiway K West E3-E6 and VSR Rehab\SHEETS - ELEC\ELECTRICAL DETAILS - TWY K WEST.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

TAXIWAY K WEST GATES E3 TO E6 & VEHICLE SERVICE ROAD REHABILITATION

ELECTRICAL DETAILS 1

CHRIS EDWARDS

M. TIEASKIE

M. DETTMER

S. PERRY

OCT 2026

49 CD

PDX 2026-5 E5.032025D033 103134

SCALE:

PLAN VIEW-REINFORCING BAR CAGE

N.T.S.1 SCALE:

FLANGE RING AND IN-PAVEMENT LIGHT INSTALLATION IN ACP

N.T.S.2

SCALE:

CORE SIZE FOR BASE CAN AND LIGHT EXTENSIONS

NONE3

SCALE:

5KV CONNECTOR KITS FILL LIMITS

NONE4

DIGITALLY SIGNED
2026-09-24T06:44:11-0700
Sergio Perry

File details come from the government source that posted it. Updated .