PDX 2026-5 (28) C6.01.pdf
PDF 226 KB Posted
- Attached to
- Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation
- Solicitation number
- 146992
- Issued by
- Multnomah County, Oregon
About this file
This document is an Erosion Control Notes and Cover Sheet prepared by the Port of Portland for the Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation project (PDX 2026-5). The project involves construction and rehabilitation activities at Portland International Airport, with work scheduled for completion by October 2026. The document outlines comprehensive erosion and sediment control plan (ESCP) requirements that contractors must implement throughout the project duration. Key requirements include daily inspections and logs of active construction sites, installation of sediment control measures prior to land disturbance, and establishment of permanent vegetative cover using approved seed mixes conforming to FAA Specification T-901. All base erosion and sediment control (ESC) measures, including inlet protection, perimeter sediment control, and gravel construction entrances, must be in place, functional, and approved in an initial inspection prior to commencement of construction activities. Long-term slope stabilization measures, including erosion control matting, must be in place over all exposed soils by October 1.
The Port of Portland maintains a National Pollutant Discharge Elimination System (NPDES) General Permit 1200-CA and requires strict compliance with all permit conditions. The contractor is responsible for providing a certified Erosion and Sediment Control Inspector meeting acceptable certifications required by the 1200-CA permit and must transfer permit ownership from the Port of Portland to the contractor's representative prior to construction start. All ESC measures must remain functional and in place until permanent vegetation or other cover is established, with the contractor responsible for removal and restoration of these measures upon project completion. ESC measures on inactive sites require inspection and maintenance every two weeks or within 24 hours following storm events of 0.5 inches or more rainfall. The document specifies that all erosion control measures, associated upgrades, and removal and restoration efforts are considered incidental to other work items on the project.
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12/11/2024
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
10:38:08 AM EBERTP R:\Aviation\PDX\2026\0005 - Taxiway K West E3-E6 and VSR Rehab\SHEETS - CIVIL\EROSION CONTOL COVER AND NOTES.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
PORTLAND INTERNATIONAL AIRPORT
TAXIWAY K WEST GATES E3 TO E6 & VEHICLE SERVICE ROAD REHABILITATION
EROSION CONTROL NOTES
CHRIS EDWARDS
B. NIELSEN
P. EBERT
B. NIELSEN
OCT 2026
28 CD
PDX 2026-5 C6.012025D033 103134
JUNE 2 , 2 0 10BRENT DA NIEL NIELSEN
EXP: 12/31/2026
ENGINEER
RE
GIS
TERED PROFESSIONAL
OREGON
82697PE
1 12/11/2025 PRE AS BID BN
LOCAL AGENCY-SPECIFIC EROSION CONTROL NOTES:
1. PORT REQUIRES DAILY INSPECTIONS AND LOGS OF ACTIVE
CONSTRUCTION SITES.
2. IF VEGETATIVE SEED MIXES ARE SPECIFIED, SEEDING MUST TAKE PLACE
NO LATER THAN OCTOBER 15; THE TYPE AND PERCENTAGES OF SEED
SHALL CONFORM TO FAA SPECIFICATION T-901.
3. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE DISCHARGED OVER
AN UNDISTURBED, PREFERABLY VEGETATED AREA, AND THROUGH A
SEDIMENT CONTROL BMP I.E. (FILTER BAG).
STANDARD EROSION/ SEDIMENT CONTROL (ESCP) NOTES:
1. INCLUDE A LIST OF ALL PERSONNEL (BY NAME AND POSITION) THAT ARE RESPONSIBLE FOR
THE DESIGN, INSTALLATION, AND MAINTENANCE OF STORMWATER CONTROL MEASURES
(E.G. ESCP DEVELOPER, BMP INSTALLER (SEE SECTION 15.4.c.ii), AS WELL AS THEIR INDIVIDUAL RESPONSIBILITIES. (SECTION 15.4.c.ii)
2. VISUAL MONITORING INSPECTION REPORTS MUST BE MADE IN ACCORDANCE WITH DEQ
1200-CA PERMIT REQUIREMENTS. (SECTION 17.5)
3. INSPECTION LOGS MUST BE KEPT IN ACCORDANCE WITH DEQ'S 1200-CA PERMIT
REQUIREMENTS. (SECTION 17.5.p.)
4. RETAIN A COPY OF THE ESCP AND ALL REVISIONS ON SITE AND MAKE IT AVAILABLE ON
REQUEST TO DEQ, AGENT, OR THE LOCAL MUNICIPALITY. (SECTION 17.5.p.)
5. THE PERMIT REGISTRANT MUST IMPLEMENT THE ESCP. FAILURE TO IMPLEMENT ANY OF THE
CONTROL MEASURES OR PRACTICE DESCRIBED IN THE ESCP IS A VIOLATION OF THE
PERMIT. (SECTION 15)
6. THE ESCP MUST BE ACCURATE AND REFLECT SITE CONDITIONS. (SECTION 15.)
7. SUBMISSION OF ALL ESCP REVISIONS IS NOT REQUIRED. SUBMITTAL OF THE ESCP
REVISIONS IS ONLY UNDER SPECIFIC CONDITIONS. SUBMIT ALL NECESSARY REVISION TO
DEQ OR AGENT WITHIN 30 DAYS. REVISIONS MUST BE ADDED TO FIELD PLANS WITHIN 7
DAYS. (SECTION 15.9)
8. SEQUENCE CLEARING AND GRADING TO THE MAXIMUM EXTENT PRACTICAL TO PREVENT
EXPOSED INACTIVE AREAS FROM BECOMING A SOURCE OF EROSION. (SECTION 13.2.2.)
9. CREATE SMOOTH SURFACES BETWEEN SOIL SURFACE AND EROSION AND SEDIMENT
CONTROLS TO PREVENT STORMWATER FROM BYPASSING CONTROLS AND PONDING.
(SECTION 13.2.3)
10. IDENTIFY, MARK, AND PROTECT (BY CONSTRUCTION FENCING OR OTHER MEANS) CRITICAL
RIPARIAN AREAS AND VEGETATION INCLUDING IMPORTANT TREES AND ASSOCIATED
ROOTING ZONES, AND VEGETATION AREAS TO BE PRESERVED. IDENTIFY VEGETATIVE
BUFFER ZONES BETWEEN THE SITE AND SENSITIVE AREAS (E.G., WETLANDS), AND OTHER
AREAS TO BE PRESERVED, ESPECIALLY IN PERIMETER AREAS. (SECTION 13.2.1.a & b.)
11. PRESERVE EXISTING VEGETATION WHEN PRACTICAL AND RE-VEGETATE OPEN AREAS.
RE-VEGETATE OPEN AREAS WHEN PRACTICABLE BEFORE AND AFTER GRADING OR
CONSTRUCTION. IDENTIFY THE TYPE OF VEGETATIVE SEED MIX USED. (SECTION 13.2.5.a., b., c., d.)
12. INSTALL PERIMETER SEDIMENT CONTROL, INCLUDING STORM DRAIN INLET CONTROL AS
WELL AS SEDIMENT BASINS, TRAPS AND BARRIERS PRIOR TO LAND DISTURBANCE. (SECTION
13.1.3.a.)
13. CONTROL BOTH PEAK FLOW RATES AND TOTAL STORMWATER VOLUME, TO MINIMIZE
EROSION AT OUTLETS AND DOWNSTREAM CHANNELS AND STREAMBANKS. (SECTION 13.2.16)
14. CONTROL SEDIMENT AS NEEDED ALONG THE SITE PERIMETER AND AT ALL OPERATIONAL
INTERNAL STORM DRAIN INLETS AT ALL TIMES DURING CONSTRUCTION, BOTH INTERNALLY
AND AT THE SITE BOUNDARY. (SECTIONS 13.1.3a)
15. ESTABLISH CONCRETE TRUCK AND OTHER CONCRETE EQUIPMENT WASHOUT BEFORE
BEGINNING CONCRETE WORK. (SECTION 13.2.14)
16. APPLY TEMPORARY AND/OR PERMANENT SOIL STABILIZATION MEASURES IMMEDIATELY ON
ALL DISTURBED AREAS AS GRADING PROGRESSES. TEMPORARY OR PERMANENT
STABILIZATION MEASURES ARE NOT REQUIRED FOR AREAS THAT ARE INTENDED TO BE LEFT
UNVEGETATED, SUCH AS DIRT ACCESS ROADS OR UTILITY POLE PADS. (SECTIONS 13.2.20
AND 13.2.21)
17. ESTABLISH MATERIAL AND WASTE STORAGE AREAS, AND OTHER NON-STORMWATER
CONTROLS. (SECTION 13.3.7)
18. KEEP WASTE CONTAINER LIDS CLOSED WHEN NOT IN USE AND CLOSE LIDS AT THE END OF
THE BUSINESS DAY FOR THOSE CONTAINERS THAT ARE ACTIVELY USED THROUGHOUT THE
DAY. FOR WASTE CONTAINERS THAT DO NOT HAVE LIDS, PROVIDE EITHER (1) COVER (E.G., A
TARP, PLASTIC SHEETING, TEMPORARY ROOF) TO PREVENT EXPOSURE OF WASTES TO
PRECIPITATION, OR (2) A SIMILARLY EFFECTIVE MEANS DESIGNED TO PREVENT THE
DISCHARGE OF POLLUTANTS (E.G., SECONDARY CONTAINMENT). (SECTION 13.3.7)
19. PREVENT TRACKING OF SEDIMENT ONTO PUBLIC OR PRIVATE ROADS USING BMPS SUCH AS:
CONSTRUCTION ENTRANCE, GRAVELED (OR PAVED) EXITS AND PARKING AREAS, GRAVEL
ALL UNPAVED ROADS LOCATED ONSITE, OR USE AN EXIT TIRE WASH. THESE BMPS MUST BE
IN PLACE PRIOR TO LAND-DISTURBING ACTIVITIES. (SECTION 13.2.7)
20. WHEN TRUCKING SATURATED SOILS FROM THE SITE, EITHER USE WATER-TIGHT TRUCKS OR
DRAIN LOADS ON SITE. (SECTION 13.2.7.F)
21. CONTROL PROHIBITED DISCHARGES FROM LEAVING THE CONSTRUCTION SITE, I.E.,
CONCRETE WASH-OUT, WASTEWATER FROM CLEANOUT OF STUCCO, PAINT AND CURING
COMPOUNDS. (SECTIONS 12.d AND 13.3.9)
22. ENSURE THAT STEEP SLOPE AREAS WHERE CONSTRUCTION ACTIVITIES ARE NOT
OCCURRING ARE NOT DISTURBED. (SECTION 13.2.10)
23. PREVENT SOIL COMPACTION IN AREAS WHERE POST-CONSTRUCTION INFILTRATION
FACILITIES ARE TO BE INSTALLED. (SECTION 13.2.12)
24. USE BMPS TO PREVENT OR MINIMIZE STORMWATER EXPOSURE TO POLLUTANTS FROM
SPILLS; VEHICLE AND EQUIPMENT FUELING, MAINTENANCE, AND STORAGE; OTHER
CLEANING AND MAINTENANCE ACTIVITIES; AND WASTE HANDLING ACTIVITIES. THESE
POLLUTANTS INCLUDE FUEL, HYDRAULIC FLUID, AND OTHER OILS FROM VEHICLES AND
MACHINERY, AS WELL AS DEBRIS, FERTILIZERS, PESTICIDES AND HERBICIDES, PAINTS,
SOLVENTS, CURING COMPOUNDS AND ADHESIVES FROM CONSTRUCTION OPERATIONS.
(SECTION 13.3)
25. IMPLEMENT THE FOLLOWING BMPS WHEN APPLICABLE: WRITTEN SPILL PREVENTION AND
RESPONSE PROCEDURES, EMPLOYEE TRAINING ON SPILL PREVENTION AND PROPER
DISPOSAL PROCEDURES, SPILL KITS IN ALL VEHICLES, REGULAR MAINTENANCE SCHEDULE
FOR VEHICLES AND MACHINERY, MATERIAL DELIVERY AND STORAGE CONTROLS, TRAINING
AND SIGNAGE, AND COVERED STORAGE AREAS FOR WASTE AND SUPPLIES. (SECTION 13.3)
26. USE WATER, SOIL-BINDING AGENT OR OTHER DUST CONTROL TECHNIQUES AS NEEDED TO
AVOID WIND-BLOWN SOIL. (SECTION 13.2.9)
27. THE APPLICATION RATE OF FERTILIZERS USED TO REESTABLISH VEGETATION MUST FOLLOW
MANUFACTURER'S RECOMMENDATIONS TO MINIMIZE NUTRIENT RELEASES TO SURFACE
WATERS. EXERCISE CAUTION WHEN USING TIME-RELEASE FERTILIZERS WITHIN ANY
WATERWAY RIPARIAN ZONE. (SECTION 13.3.5)
28. TEMPORARILY STABILIZE SOILS AT THE END OF THE SHIFT BEFORE HOLIDAYS AND
WEEKENDS, IF NEEDED. THE REGISTRANT IS RESPONSIBLE FOR ENSURING THAT SOILS ARE
STABLE DURING RAIN EVENTS AT ALL TIMES OF THE YEAR. (SECTION 13.2.8)
29. AS NEEDED BASED ON WEATHER CONDITIONS, AT THE END OF EACH WORKDAY SOIL
STOCKPILES MUST BE STABILIZED OR COVERED, OR OTHER BMPS MUST BE IMPLEMENTED
TO PREVENT DISCHARGES TO SURFACE WATERS OR CONVEYANCE SYSTEMS LEADING TO
SURFACE WATERS. (SECTION 13.2.8)
30. OTHER SEDIMENT BARRIERS (SUCH AS BIOBAGS): REMOVE SEDIMENT BEFORE IT REACHES
TWO INCHES DEPTH ABOVE GROUND HEIGHT AND BEFORE BMP REMOVAL. (SECTION 13.1.5)
31. CATCH BASINS: CLEAN BEFORE RETENTION CAPACITY HAS BEEN REDUCED BY FIFTY
PERCENT. SEDIMENT BASINS AND SEDIMENT TRAPS: REMOVE TRAPPED SEDIMENTS BEFORE
DESIGN CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT AND AT THE COMPLETION OF
THE PROJECT. (SECTION 13.1.5.d)
32. WITHIN 24 HOURS, SIGNIFICANT SEDIMENT THAT HAS LEFT THE CONSTRUCTION SITE, MUST
BE REMEDIATED. INVESTIGATE THE CAUSE OF THE SEDIMENT RELEASE AND IMPLEMENT
STEPS TO PREVENT A RECURRENCE OF THE DISCHARGE WITHIN THE SAME 24 HOURS. ANY
IN-STREAM CLEAN-UP OF SEDIMENT SHALL BE PERFORMED ACCORDING TO THE OREGON
DEPARTMENT OF STATE LANDS REQUIRED TIMEFRAME. (SECTION 13.2.19.a)
33. THE INTENTIONAL WASHING OF SEDIMENT INTO STORM SEWERS OR DRAINAGE WAYS MUST
NOT OCCUR. VACUUMING OR DRY SWEEPING AND MATERIAL PICKUP MUST BE USED TO
CLEANUP RELEASED SEDIMENTS. (SECTION 13.2.19.b)
34. DOCUMENT ANY PORTION(S) OF THE SITE WHERE LAND DISTURBING ACTIVITIES HAVE
PERMANENTLY CEASED OR WILL BE TEMPORARILY INACTIVE FOR 14 OR MORE CALENDAR
DAYS. (SECTION 17.5.f)
35. PROVIDE TEMPORARY STABILIZATION FOR THAT PORTION OF THE SITE WHERE
CONSTRUCTION ACTIVITIES CEASE FOR 14 DAYS OR MORE WITH A COVERING OF BLOWN
STRAW AND A TACKIFIER, LOOSE STRAW, OR AN ADEQUATE COVERING OF COMPOST MULCH
UNTIL WORK RESUMES ON THAT PORTION OF THE SITE. (SECTIONS 13.2.20.b and 13.2.20.c)
36. DO NOT REMOVE TEMPORARY SEDIMENT CONTROL PRACTICES UNTIL PERMANENT
VEGETATION OR OTHER COVER OF EXPOSED AREAS IS ESTABLISHED. ONCE
CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED, ALL TEMPORARY EROSION
CONTROLS, AND RETAINED SOILS MUST BE REMOVED AND DISPOSED OF PROPERLY,
UNLESS NEEDED FOR LONG TERM USE FOLLOWING TERMINATION OF PERMIT COVERAGE.
(SECTION 13.2.21.c)
EROSION AND SEDIMENT CONTROL BMP IMPLEMENTATION:
1. ALL BASE ESC MEASURES (INLET PROTECTION, PERIMETER SEDIMENT
CONTROL, GRAVEL CONSTRUCTION ENTRANCES, ETC.) MUST BE IN
PLACE, FUNCTIONAL, AND APPROVED IN AN INITIAL INSPECTION, PRIOR
TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES.
2. ALL "SEDIMENT BARRIERS (TO BE INSTALLED AFTER GRADING)" SHALL BE
INSTALLED IMMEDIATELY FOLLOWING ESTABLISHMENT OF FINISHED
GRADE AS SHOWN ON THESE PLANS.
3. LONG TERM SLOPE STABILIZATION MEASURES "INCLUDING MATTING"
SHALL BE IN PLACE OVER ALL EXPOSED SOILS BY OCTOBER 1.
PRE-CONSTRUCTION, CLEARING, AND DEMOLITION NOTES:
1. ALL BASE ESC MEASURES (INLET PROTECTION, PERIMETER SEDIMENT
CONTROL, GRAVEL CONSTRUCTION ENTRANCES, ETC.) MUST BE IN
PLACE, FUNCTIONAL, AND APPROVED IN AN INITIAL INSPECTION, PRIOR
TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES.
2. SEDIMENT BARRIERS APPROVED FOR USE INCLUDE SEDIMENT FENCE,
BERMS CONSTRUCTED OUT OF MULCH, CHIPPINGS, OR OTHER SUITABLE
MATERIAL, STRAW WATTLES, OR OTHER APPROVED MATERIALS.
3. SENSITIVE RESOURCES INCLUDING, BUT NOT LIMITED TO, TREES,
WETLANDS, AND RIPARIAN PROTECTION AREAS SHALL BE CLEARLY
DELINEATED WITH ORANGE CONSTRUCTION FENCING OR CHAIN LINK
FENCING IN A MANNER THAT IS CLEARLY VISIBLE TO ANYONE IN THE
AREA. NO ACTIVITIES ARE PERMITTED TO OCCUR BEYOND THE
CONSTRUCTION BARRIER.
4. CONSTRUCTION ENTRANCES SHALL BE MAINTAINED FOR THE DURATION
OF THE PROJECT. ADDITIONAL MEASURES INCLUDING, BUT NOT LIMITED
TO, STREET SWEEPING, AND VACUUMING, MAY BE REQUIRED TO INSURE
THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE
PROJECT.
GRADING, UTILITY, EROSION, AND SEDIMENT
CONSTRUCTION NOTES:
1. LONG TERM SLOPE STABILIZATION MEASURES SHALL INCLUDE THE
ESTABLISHMENT OF PERMANENT VEGETATIVE COVER VIA SEEDING WITH
APPROVED MIX AND APPLICATION RATE.
2. TEMPORARY SLOPE STABILIZATION MEASURES SHALL INCLUDE: COVERING
EXPOSED SOILS WITH PLASTIC SHEETING, STRAW MULCHING, WOOD CHIPS, OR
OTHER APPROVED MEASURES.
3. STOCKPILED SOIL OR STRIPPINGS SHALL BE PLACED IN A STABLE LOCATION
AND CONFIGURATION. SEDIMENT FENCE IS REQUIRED AROUND THE PERIMETER
OF THE STOCKPILE.
4. EXPOSED CUT OR FILL AREAS SHALL BE STABILIZED THROUGH THE USE OF
TEMPORARY SEEDING AND MULCHING, EROSION CONTROL BLANKETS OR MATS,
MID-SLOPE SEDIMENT FENCES OR WATTLES, OR OHER APPROPRIATE
MEASURES. SLOPES EXCEEDING 25% MAY REQUIRE ADDITIONAL EROSION
CONTROL MEASURES.
5. AREAS SUBJECT TO WIND EROSION SHALL USE APPROPRIATE DUST CONTROL
MEASURES INCLUDING THE APPLICATION OF A FINE SPRAY OF WATER, PLASTIC
SHEETING, STRAW MULCHING, OR OTHER APPROVED MEASURES.
6. CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT.
ADDITIONAL MEASURES INCLUDING, BUT NOT LIMITED TO STREET SWEEPING,
AND VACUUMING WILL BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE
KEPT CLEAN FOR THE DURATION OF THE PROJECT.
7. ACTIVE INLETS TO STORMWATER SYSTEMS SHALL BE PROTECTED THROUGH
THE USE OF APPROVED INLET PROTECTION MEASURES. ALL INLET PROTECTION
MEASURES ARE TO BE REGULARLY INSPECTED AND MAINTAINED AS NEEDED.
8. SATURATED MATERIALS THAT ARE HAULED OFF-SITE MUST BE TRANSPORTED IN
WATER-TIGHT TRUCKS TO ELIMINATE SPILLAGE OF SEDIMENT AND
SEDIMENT-LADEN WATER.
9. AN AREA SHALL BE PROVIDED FOR THE WASHING OUT OF CONCRETE TRUCKS IN
A LOCATION THAT DOES NOT PROVIDE RUN-OFF THAT CAN ENTER THE
STORMWATER SYSTEM. IF THE CONCRETE WASH-OUT AREA CAN NOT BE
CONSTRUCTED GREATER THAN 50' FROM ANY DISCHARGE POINT, SECONDARY
MEASURES SUCH AS BERMS OR TEMPORARY SETTLING PITS MAY BE REQUIRED.
THE WASH-OUT SHALL BE LOCATED WITHIN SIX FEET OF TRUCK ACCESS AND BE
CLEANED WHEN IT REACHES 50% OF THE CAPACITY.
10. SWEEPINGS FROM EXPOSED AGGREGATE CONCRETE SHALL NOT BE
TRANSFERRED TO THE STORMWATER SYSTEM, SWEEPINGS SHALL BE PICKED
UP AND DISPOSED IN THE TRASH.
11. AVOID PAVING IN WET WEATHER WHEN PAVING CHEMICALS CAN RUN-OFF INTO
THE STORMWATER SYSTEM.
12. USE BMPS SUCH AS CHECK-DAMS, BERMS, AND INLET PROTECTION TO
PREVENT RUN-OFF FROM REACHING DISCHARGE POINTS.
13. COVER CATCH BASINS, MANHOLES, AND OTHER DISCHARGE POINTS WHEN
APPLYING SEAL COAT, TACK COAT, ETC. TO PREVENT INTRODUCING THESE
MATERIALS TO THE STORMWATER SYSTEM.
GENERAL NOTES:
1. THE PORT HAS A NPDES GENERAL PERMIT 1200-CA.
2. THE PERMITTEE IS REQUIRED TO MEET ALL THE CONDITIONS OF THE
1200-CA PERMIT. THIS ESCP AND GENERAL CONDITIONS HAVE BEEN
DEVELOPED TO FACILITATE COMPLIANCE WITH THE 1200-CA PERMIT
REQUIREMENTS. IN CASES OF DISCREPANCIES OR OMISSIONS, THE
1200-CA PERMIT REQUIREMENTS SUPERCEDE REQUIREMENTS OF THIS
PLAN.
3. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AN EROSION AND
SEDIMENT CONTROL INSPECTOR THAT SHALL BE CERTIFIED IN ONE OF
THE ACCEPTABLE CERTIFICATIONS REQUIRED IN THE 1200-CA PERMIT.
4. PRIOR TO THE START OF CONSTRUCTION THE CONTRACTOR SHALL
TRANSFER OWNERSHIP OF 1200-CA PERMIT FROM PORT OF PORTLAND TO
THE CONTRACTOR'S REPRESENTATIVE.
5. THE EROSION AND SEDIMENTATION CONTROL ESC MEASURES SHALL REMAIN
FUNCTIONAL AND IN PLACE UNTIL THEY HAVE SERVED THEIR INTENDED
PURPOSE AND THE WORK AREA HAS BEEN PERMANENTLY PROTECTED AND
STABILIZED. CONTRACTOR TO RETURN TO SITE AND REMOVE ALL ESC
MEASURES WHEN NO LONGER NEEDED. RESTORE ALL AREAS DISTURBED BY
REMOVAL OF THE ESC MEASURES. REMOVED ESC MEASURES SHALL BECOME
PROPERTY OF THE CONTRACTOR.
6. THE EROSION AND SEDIMENTATION CONTROL PLANS SHOWN ARE FOR
GENERAL GUIDANCE PURPOSES ONLY. IMPLEMENTATION OF THE ESC PLAN
AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF
ESC FACILITIES WHICH CONFORM TO PORT OF PORTLAND (PORT) ESC
REQUIREMENTS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL
CONSTRUCTION IS COMPLETED AND APPROVED. STAGE EROSION CONTROL
WITH CONSTRUCTION PHASING.
7. THE ESC MEASURES SHOWN ON THESE PLANS ARE MINIMUM REQUIREMENTS
FOR THE ANTICIPATED SITE CONDITIONS. CONSTRUCT MEASURES IN
CONJUNCTION WITH ALL EXCAVATION AND GRADING ACTIVITIES. DURING THE
CONSTRUCTION PERIOD THESE MEASURES SHALL BE UPGRADED AS NEEDED
TO INSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DOES NOT LEAVE
THE CONSTRUCTION SITE, ENTER THE DRAINAGE SYSTEM, BE TRACKED ON
ROADWAYS, OR VIOLATE APPLICABLE WATER STANDARDS.
8. INSPECT ESC MEASURES DAILY AND MAINTAIN AS NECESSARY TO ENSURE
THEIR CONTINUED FUNCTIONING.
9. ESC MEASURES ON AN INACTIVE SITE(S) SHALL BE INSPECTED AND MAINTAINED
A MINIMUM OF EVERY 2 WEEKS OR WITHIN 24 HOURS FOLLOWING A STORM
EVENT (DEFINED AS 1/2" OF RAIN OR MORE DURING A 24 HOUR PERIOD).
10. ALL CATCH BASINS, INLETS, AND STORM LINES SHALL BE CLEANED PRIOR TO
ACCEPTANCE OF THE PROJECT. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM.
11. IMPLEMENT ESC MEASURES AS REQUIRED OR DIRECTED BY THE PORT TO
CONTROL EROSION AND SEDIMENT FROM DEWATERING OPERATIONS.
12. EROSION CONTROL MEASURES, ANY ASSOCIATED UPGRADES, AND REMOVAL
AND RESTORATION EFFORTS SHALL BE CONSIDERED INCIDENTAL TO OTHER
ITEMS OF WORK ON THE PROJECT.
13. INCLUDE SEED WITH JET BLAST CONTROL MATERIAL. APPLY SEED AND MULCH
TO REMAINING AREAS BEFORE LEAVING EACH WORK AREA UNLESS OTHERWISE
DIRECTED BY PORT.
14. NEW STORM INFRASTRUCTURE SHALL BE PROTECTED UPON INSTALLATION.
| 2026-09-30T11:10:56-0700 | |
| Brent Nielsen | |
| I am the author of this document. |
File details come from the government source that posted it. Updated .