PROGRESS
DRAWING - DO NOT
USE FOR
CONSTRUCTION
2246 Yaupon Drive
Wilmington, NC 28401
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2019 CBHF Engineers, PLLC
Engineers, PLLC
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT
OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING
OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT.
SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR
TO THE CONTRACTING OFFICER.
THE RFP-DOCUMENTS (RFPD), INCLUDING BUT NOT LIMITED TO: THE DRAWINGS, PLANS, DESIGNS, REPORTS, SURVEYS, CALCULATIONS, COMPUTER PRINT-OUTS, ETC. ARE MADE AVAILABLE TO THE CONTRACTOR'S FOR REFERENCE PURPOSES ONLY IN RELATION TO THIS DESIGN-BID PROJECT. THE RFPD ARE THE PROPERTY OF THE GOVERNMENT.
THE RFPD ARE PROVIDED "AS-IS" WITHOUT ANY GUARANTEE, REPRESENTATION, CONDITION, OR WARRANTY OF ANY KIND, EITHER EXPRESSED OR IMPLIED, OR STATUTORY.
THE GOVERNMENT ASSUMES NO LIABILITY WITH RESPECT TO ANY RELIANCE THE CONTRACTOR(S) PLACE ON THESE RFPD. IF THE CONTRACTOR(S) RELY ON THESE RFPD IN ANY WAY, THE CONTRACTOR(S) ASSUME THE ENTIRE RISK AS TO THE TRUTH, ACCURACY, CURRENCY, OR COMPLETENESS OF THE INFORMATION CONTAINED IN THESE RFPD.
FAN COIL
RUN CONDITIONS - SCHEDULED:
THE UNIT SHALL RUN ACCORDING TO A USER DEFINABLE TIME SCHEDULE IN THE FOLLOWING MODES:
• OCCUPIED MODE: THE UNIT SHALL MAINTAIN
• A 75°F (ADJ.) COOLING SETPOINT
• A 70°F (ADJ.) HEATING SETPOINT.
• UNOCCUPIED MODE (NIGHT SETBACK): THE UNIT SHALL MAINTAIN
• A 80°F (ADJ.) COOLING SETPOINT.
• A 60°F (ADJ.) HEATING SETPOINT.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH ZONE TEMP: IF THE ZONE TEMPERATURE IS GREATER THAN THE COOLING SETPOINT BY A
USER DEFINABLE AMOUNT (ADJ.).
• LOW ZONE TEMP: IF THE ZONE TEMPERATURE IS LESS THAN THE HEATING SETPOINT BY A USER
DEFINABLE AMOUNT (ADJ.).
ZONE SETPOINT ADJUST:
THE OCCUPANT SHALL BE ABLE TO ADJUST THE ZONE TEMPERATURE HEATING AND COOLING
SETPOINTS AT THE ZONE SENSOR.
ZONE OPTIMAL START:
THE UNIT SHALL USE AN OPTIMAL START ALGORITHM FOR MORNING START-UP. THIS ALGORITHM SHALL MINIMIZE THE UNOCCUPIED WARM-UP OR COOL-DOWN PERIOD WHILE STILL ACHIEVING COMFORT
CONDITIONS BY THE START OF SCHEDULED OCCUPIED PERIOD.
ZONE UNOCCUPIED OVERRIDE:
A TIMED LOCAL OVERRIDE CONTROL SHALL ALLOW AN OCCUPANT TO OVERRIDE THE SCHEDULE AND PLACE THE UNIT INTO AN OCCUPIED MODE FOR AN ADJUSTABLE PERIOD OF TIME. AT THE EXPIRATION
OF THIS TIME, CONTROL OF THE UNIT SHALL AUTOMATICALLY RETURN TO THE SCHEDULE.
SUPPLY FAN:
THE SUPPLY FAN SHALL RUN ANYTIME THE UNIT IS COMMANDED TO RUN, UNLESS SHUTDOWN ON SAFETIES. TO PREVENT SHORT CYCLING, THE SUPPLY FAN SHALL HAVE A USER DEFINABLE (ADJ.)
MINIMUM RUNTIME.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• SUPPLY FAN FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
• SUPPLY FAN IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
• SUPPLY FAN RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT (ADJ.).
COOLING COIL VALVE:
THE CONTROLLER SHALL MEASURE THE ZONE TEMPERATURE AND MODULATE THE COOLING COIL VALVE
TO MAINTAIN ITS COOLING SETPOINT.
THE COOLING SHALL BE ENABLED WHENEVER:
• THE ZONE TEMPERATURE IS ABOVE COOLING SETPOINT.
• AND THE SUPPLY FAN STATUS IS ON.
• AND THE HEATING IS NOT ACTIVE.
HEATING COIL VALVE:
THE CONTROLLER SHALL MEASURE THE ZONE TEMPERATURE AND MODULATE THE HEATING COIL VALVE
TO MAINTAIN ITS HEATING SETPOINT.
THE HEATING SHALL BE ENABLED WHENEVER:
• THE ZONE TEMPERATURE IS BELOW HEATING SETPOINT.
• AND THE SUPPLY FAN STATUS IS ON.
• AND THE COOLING IS NOT ACTIVE.
DEHUMIDIFICATION:
THE CONTROLLER SHALL MEASURE THE ZONE HUMIDITY AND OVERRIDE THE COOLING SEQUENCE TO
MAINTAIN RETURN AIR HUMIDITY AT OR BELOW 60% RH (ADJ.).
DURING DEHUMIDIFICATION, THE HEATING SHALL MODULATE TO MAINTAIN A SETPOINT 1°F (ADJ.) LESS
THAN THE ZONE COOLING SETPOINT.
DEHUMIDIFICATION SHALL BE ENABLED WHENEVER:
• THE SUPPLY FAN STATUS IS ON.
• AND ZONE TEMPERATURE IS GREATER THAN THE COOLING SETPOINT.
FINAL FILTER HOURS:
THE CONTROLLER SHALL MONITOR THE FAN RUNTIME.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• FINAL FILTER CHANGE REQUIRED: FINAL FILTER HAS BEEN IN USE FOR MORE THAN
2200 HRS (ADJ.).
ZONE HUMIDITY:
THE CONTROLLER SHALL MONITOR THE ZONE HUMIDITY AND USE AS REQUIRED FOR HUMIDITY
CONTROL.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH ZONE HUMIDITY: IF THE ZONE HUMIDITY IS GREATER THAN 70% (ADJ.).
• LOW ZONE HUMIDITY: IF THE ZONE HUMIDITY IS LESS THAN 35% (ADJ.).
SEQUENCE OF OPERATIONS
NOT TO SCALE1 FAN COIL CONTROLS DETAIL
T
SA AI - ZONE TEMP
AI - ZONE SETPOINT ADJUST
BI - ZONE OVERRIDE
M
CT
STARTERBO - SUPPLY FAN START/STOP
BI - SUPPLY FAN STATUS
AO - COOLING VALVE AO - HEATING VALVE
CHWS
CHWR
M
HWS
HWR
M
SF CHW HW
H
AI - ZONE HUMIDITY
NOT TO SCALE2 ECMS NETWORK DIAGRAM
FIELD
SERVER
CASCADE
LOYTEC
ROUTER
BASE
LAN
BUILDING
SUPERVISORY
CONTROLLER
LEAD
BOILER BOILER
MSTP
*OAT
*SYSTEM SUPPLY
TEMP
FIELD
CONTROLLER
*SUPPLIED WITH
BOILER
CHILLERWATER
HEATER
BUILDING RETURN TEMP
BUILDING SUPPLY TEMP
ELECTRIC METER:
THE CONTROLLER SHALL MONITOR THE ELECTRIC METER FOR ELECTRIC CONSUMPTION ON A CONTINUAL BASIS.
THESE VALUES SHALL BE MADE AVAILABLE TO THE SYSTEM AT ALL TIMES.
ALARM SHALL BE GENERATED AS FOLLOWS:
• METER FAILURE: SENSOR READING INDICATES A LOSS OF PULSE OUTPUT FROM THE ELECTRIC METER.
PEAK DEMAND HISTORY:
THE CONTROLLER SHALL MONITOR AND RECORD THE PEAK (HIGH AND LOW) DEMAND READINGS FROM THE ELECTRIC METER. PEAK READINGS SHALL BE RECORDED ON A DAILY, MONTH-TO-DATE, AND YEAR-TO-DATE BASIS.
USAGE HISTORY:
THE CONTROLLER SHALL MONITOR AND RECORD ELECTRIC METER READINGS SO AS TO PROVIDE A POWER CONSUMPTION HISTORY. USAGE READINGS SHALL BE RECORDED ON A DAILY, MONTH-TO-DATE, AND YEAR-TO-DATE
BASIS.
DEMAND LEVELS:
THE CONTROLLER SHALL SET THE SYSTEM DEMAND LEVEL (ADJ.) BASED ON THE CURRENT POWER CONSUMPTION READINGS FROM THE ELECTRIC METER. THERE SHALL BE SIX DAILY TIME PERIODS IN WHICH THE DEMAND SHALL BE ADJUSTED ON THREE LEVELS. THESE DEMAND LEVELS SHALL BE AVAILABLE FOR FACILITY EQUIPMENT TO UTILIZE
FOR DEMAND LIMITING.
• DEMAND LEVEL 1: POWER CONSUMPTION HAS EXCEEDED THE FIRST DEMAND LEVEL THRESHOLD (ADJ.).
• DEMAND LEVEL 2: POWER CONSUMPTION HAS EXCEEDED THE SECOND DEMAND LEVEL THRESHOLD (ADJ.).
• DEMAND LEVEL 3: POWER CONSUMPTION HAS EXCEEDED THE THIRD DEMAND LEVEL THRESHOLD (ADJ.).
SEQUENCE OF OPERATION - ELECTRIC METER
AI - KW PULSE
NOT TO SCALE3 ELECTRIC METER CONTROL SCHEMATIC
RA
ELECTRIC METER POINTS
HARDWARE POINTS SOFTWARE POINTS
POINT NAME AI AO BI BO AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC
KW PULSE X X
CURRENT DEMAND LEVEL X X X
KW DEMAND X X
KW PEAK MONTH-TO-DATE X X
KW PEAK TODAY X X
KW PEAK YEAR-TO-DATE X X
KWH TODAY X X
MWH MONTH-TO-DATE X X
MWH YEAR-TO-DATE X X
DEMAND LEVEL 1 X
DEMAND LEVEL 2 X
DEMAND LEVEL 3 X
METER FAILURE X
FAN COIL POINTS LIST
HARDWARE POINTS SOFTWARE POINTS
POINT NAME AI AO BI BO AV BV LOOP SCHED TREND ALARM SHOW ON
GRAPHIC
ZONE MIXED AIR TEMP X X X
ZONE HUMIDITY X X X
ZONE RETURN AIR TEMP X X X
ZONE SETPOINT ADJUST X X
ZONE TEMP X X X
COOLING VALVE X X X
HEATING VALVE X X X
SUPPLY FAN STATUS X X X
ZONE OVERRIDE X X X
SUPPLY FAN START/STOP X X X
COOLING SETPOINT X X X
DEHUMIDIFICATION SETPOINT X X X
HEATING SETPOINT X X X
SCHEDULE X
FINAL FILTER CHANGE REQUIRED X X
HIGH ZONE HUMIDITY X
HIGH ZONE TEMP X
LOW ZONE TEMP X
SUPPLY FAN FAILURE X
SUPPLY FAN IN HAND X
SUPPLY FAN RUNTIME EXCEEDED X
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SATISFACTORY TO: DATE
AutoCAD SHX Text
APPROVED: PWO OR OICC DATE
AutoCAD SHX Text
DESIGN DIR.
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
DR.
AutoCAD SHX Text
CHK.
AutoCAD SHX Text
DES.
AutoCAD SHX Text
CAMP LEJEUNE, NORTH CAROLINA
AutoCAD SHX Text
CONST. CONTR.
AutoCAD SHX Text
MARINE CORPS BASE
AutoCAD SHX Text
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text E1
AutoCAD SHX Text
SIZE
AutoCAD SHX Text 80091
AutoCAD SHX Text
SPEC.
AutoCAD SHX Text
CODE IDENT. NO
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text 18168
AutoCAD SHX Text BOQs 2602, 2603, 2604, 2605
AutoCAD SHX Text 2607, 2609, 2611, 2613, 2617
AutoCAD SHX Text 20-0046
AutoCAD SHX Text
NA
AutoCAD SHX Text
NOTED
AutoCAD SHX Text
FINAL 21MAY 2020
AutoCAD SHX Text
T H BURTON, PE
AutoCAD SHX Text M-601
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
CONTROLS
AutoCAD SHX Text
AutoCAD SHX Text
GRM
AutoCAD SHX Text
GRM
AutoCAD SHX Text
DMH
AutoCAD SHX Text
| Sheets and Views |
| M601 |
| OLE1 |
File details come from the government source that posted it. Updated .