Amnd 0006 20R6019 FINAL.pdf

PDF 1 MB Posted

Attached to
Repair Nine Paradise Point BOQs
Solicitation number
N6247020R6019
Issued by

View the file

Other files

File Type Posted
20-0046 PART 3-- PPI RESPONSE 5_13AUG2020.pdf PDF
Amnd 0007 20R6019 FINAL.pdf PDF
Amnd 0005 20R6019 FINAL.pdf PDF
20-0046 PART 3-- PPI RESPONSE 4_07AUG2020.pdf PDF
20-0046 PART 3-- PPI RESPONSE 3_06AUG2020.pdf PDF
Amnd 0004 20R6019 FINAL.pdf PDF
Amnd 0003 20R6019 FINAL.pdf PDF
Roof Louvers 2617.jpeg JPEG file
Amnd 0002 20R6019 FINAL.pdf PDF
PART 6 ATTACHMENT N-MCBCL Base-Wide MNS-FACP Construction Requirements 28 JAN 2015 Typical.pdf PDF
01 31 19.05 20 Post Award Meetings-Revised 20JUL2020.pdf PDF
20-0046 Paradise Point BOQs - REV SP1.pdf PDF
01 31 10.05 20 Design Submittal Procedure-Revised 20JUL2020.pdf PDF
23 73 33 HEATING VENTILATING AND COOLING SYSTEM.pdf PDF
20-0046 Paradise Point BOQs - REV A101.pdf PDF
20-0046 PART 3-- PPI RESPONSE 1_20JUL2020.pdf PDF
11 24 24 ROOF FALL PROTECTION 20 Nov 2019.pdf PDF
Amnd 0001 20R6006 FINAL.pdf PDF
PART 6 ATTACHMENT F-NPDES PERMIT NCS000290.pdf PDF
PART 5 FINAL-28MAY2020.pdf PDF
PART 6 ATTACHMENT M9-M602 MECHANICAL CONTROLS.pdf PDF
PART 6 ATTACHMENT I9-879291-2603-INT_EXT REPAIRS.pdf PDF
PART 6 TOC-20-0046.pdf PDF
PART 6 ATTACHMENT I3-85-6406 BOQ Improvements.pdf PDF
PART 6 ATTACHMENT H-BOQ FURNITURE INVENTORY.pdf PDF
PART 6 ATTACHMENT K- MCBCL Mech Design Guidance 7.17.pdf PDF
PART 6 ATTACHMENT M5-M105 BOQ 2603 THRU 2611 LEVEL 1.pdf PDF
PART 6 ATTACHMENT I5-91-7314 BOQs Sidewalks-2.pdf PDF
PART 3 FINAL-28MAY2020.pdf PDF
PART 6 ATTACHMENT A3-EXISTING BUILDING PICTURES PT2.pdf PDF
PART 6 ATTACHMENT E3-ES101 BOQ SITE PRIMARY O.H. POWER PLAN.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
PART 6 ATTACHMENT M2-M102 BOQ 2617 LEVEL 2.pdf PDF
PART 6 ATTACHMENT A1-BOQ FLOOR PLAN REFERENCES.pdf PDF
PART 6 ATTACHMENT M10-M603 MECHANICAL CONTROLS.pdf PDF
PART 6 ATTACHMENT I6-95-1430 HVAC BOQs.pdf PDF
PART 6 ATTACHMENT L-EXAMPLE SCREEN WALL.pdf PDF
PART 6 ATTACHMENT M3-M103 BOQ 2602 LEVEL 1.pdf PDF
PART 6 ATTACHMENT D2- Appendix D for DEMO.pdf PDF
RFP N6247020R6019.pdf PDF
PART 6 ATTACHMENT M4-M104 BOQ 2602 LEVEL 2.pdf PDF
PART 6 ATTACHMENT M7-M107 BOQ 2613 LEVEL 1.pdf PDF
PART 6 ATTACHMENT E1-Electrical Policies 2020.pdf PDF
PART 6 ATTACHMENT I10-994214 - 2603_2609_2611_2613-REPL HVAC.pdf PDF
PART 6 ATTACHMENT A2-BOQ FRONT DESK FLOOR PLANS.pdf PDF
PART 6 ATTACHMENT D1-BASE ASBESTOS REPORTS-ALL BUILDINGS.pdf PDF
PART 6 ATTACHMENT E2-TS101 BOQ SITE TELECOMM PLAN.pdf PDF
PART 6 ATTACHMENT E4-ES102 BOQ SITE SECONDARY O.H. POWER PLAN.pdf PDF
PART 6 ATTACHMENT I8-1942 BOQs.pdf PDF
PART 6 ATTACHMENT M8-M601 MECHANICAL CONTROLS.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

20-0046 Repair Nine Paradise Point BOQs Solicitation N6247020R6019 Marine Corps Base Camp Lejeune, North Carolina Amendment 0006

Block 14. DESCRIPTION OF AMENDMENT (cont.)

A. The following provides the Government’s responses to preaward inquiries:

REFERENCE

Page Section Para.

QUESTION GOVERNMENT RESPONSE

Page 3, No

RFI #

Amendment 4 & Part 3 -Page 4 D. Workflow

Process.

The new RFP states " The contractor will remove, transport, and store all moveable furniture to a humidity controlled environment (i.e. off-site storage facility and/or on-site conex boxes with built-in dehumidification and/or desiccant systems or other suitable method that meets these objectives." Provide a SF of environmentally controlled space needed as there is not enough information or detail to price this scope. This could be a single tractor trailer load or 15 loads for all we can assume and having to store and transport this wide range of disparity in qty needs to be addressed.

Responsibility of the DOR based on the documents provided in Part 6.

Refer to Amendment 0002 for additional information on furniture inventory.

Page 4, No

RFI #

Amendment 4 It is stated in the new RFP that brick veneer is not to be replaced with building 2617 other than to infill for items removed like mechanical systems.

Thus no window lintels are to be replaced, weep holes installed or any other masonry cleaning, patching or alteration is to take place via the latest revised RFP, Part 3. Confirm this in detail, since this scope has now changed 3x.

The existing brick veneer shall remain on Building 2617. Brick infills are required as necessitated by the project conditions. All exterior wall penetrations that are created as a result of the project shall be properly infilled to match adjacent finishes (i.e.

mechanical equipment removal, conduit penetrations, window opening infills, etc.). Window lintel and weep hole replacement and/or installation is the responsibility of the General Contractor. All exterior building surfaces shall be properly cleaned, patched, and painted (where applicable) as necessitated by the project conditions.

Page 6-9, No

RFI #

Amendment 4, Pricing

Schedule

The A' la carte options being presented are only going to lead to higher pricing for the government. Consider issuing a schedule with a BOD for phase 1 (CLIN 0001) and a additional schedule and BOD for phase 2 which is CLINs 2 or 3, 4, 5 & 6.

See updated language for Factor 2 - Management Approach.

If options are awarded, the Contractor will be required to submit an updated schedule to encompass all awarded work.

Amendment 0003 and

Amendment

0005 PPI

Responses

Amendment 0003 provides response to several PPIs as, “Contractor shall not submit conceptual drawings.” In Amendment 0005, the last PPI response on page 4 of 4 states within the response, “The aesthetics of the new stairs will be the main factor that the Government will evaluate in the option(s) provided in the conceptual drawings.” Please confirm that conceptual drawings are NOT required and that this response language was in error.

Statement in Amendment 0003 stands;

conceptual drawings are not required or desired. Additional information regarding the exterior finish on the new stair towers is forthcoming.

B. Delete the “Factor 2 – Management Approach” evaluation language provided in Amendment 0001 and replace with the below:

Factor 2 – Management Approach

(a) Solicitation Submittal Requirements:

Provide a narrative describing the project management approach that meets the requirements of the RFP. Organize the narrative into three parts to address the following:

(1) Management Team

- Provide a description of the proposed team members, including a) Offeror’s key personnel and b) proposed major subcontractors and their respective experience in executing requirements similar to the RFP.

- Address plan for securing, managing, and maintaining subcontracted labor for this RFP.

- Provide a chart and accompanying narrative to demonstrate the management hierarchy

(by position) to include both the design and construction teams. This narrative shall include authorities; roles; responsibilities; and a brief synopsis of the names, education, training and experience of key individuals based on the proposed management structure.

(Note: key personnel may vary among Offerors based on the proposed management structure.)

(2) Safety Program

- Describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors.

- Fully describe the safety management system that they will use to oversee the safety compliance and performance of self-performed and subcontractor performed work.

- Describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and/or all subcontractor levels.

- Describe methodology to execute an effective safety program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.

(3) Schedule

- Describe the key elements of your scheduling/phasing plan to demonstrate understanding of the project requirements for CLIN 0001. The schedule and narrative shall address potential impacts of submittals, reviews, and permits and detail a logical sequence of events to accomplish the scope of work as described in the RFP.

- Address, at a minimum, the ability to complete all the work within the provided timeframe or earlier. Offerors may propose a shorter duration in their schedule; however, the proposed duration will be incorporated into the contract and liquidated damages shall start the day following the completion date included the Offeror’s proposal.

The Narrative for elements (1) Management Team and (2) Safety Program as detailed above shall not exceed four (4) double-sided pages (or eight (8) single-sided pages). Up to three (3) organizational charts may be provided to supplement the narrative. The Government will not consider information submitted beyond this page limit (which does not include the organizational charts).

The Narrative for element (3) Schedule detailed above shall not exceed two (2) double-sided pages (or four (4) single-sided pages) and one (1) 11x17 sheet for the schedule.

(b) Basis of Evaluation:

(1) Management Team: The Government is seeking to determine that the Offeror has a defined management team identified to properly manage the project. A project management approach that creatively puts people or processes in place to minimize potential construction delays may be considered more favorably. The narrative does not require the identification of specific subcontractors. However, if the Offeror identifies a specific subcontractor to perform major or critical aspects of the requirement to demonstrate an acceptable technical solution under Factor 1, the proposal must provide a letter of commitment and explanation of the meaningful involvement that the subcontractor will have in performance of this contract.

Any provided letters will be exempt from the page count.

(2) Safety Program: The board will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The board will evaluate the narrative to determine the degree to which the safety management system described ensure safety compliance and performance of self-performed and subcontractor performed work. The board will evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement and validate the contractor has addressed methodology to be used in the execution of an effective program that facilitates sound mishap prevention techniques/processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.

(3) Schedule: The Government will evaluate the Offeror’s proposed schedule to ensure it is technically feasible within the designated construction completion date and adequately addresses significant phasing while not impacting on-going operations.

C. Delete “1.2 GENERAL BID NOTES” provided in Amendment 0004 and replace with the below:

1.2 GENERAL BID NOTES

a. Award will be made on the total sum of Contract Line Items (CLINs) 0001-0006.

b. The Government may reject an offer as nonresponsive if it is materially unbalanced.

An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

c. The Government intends to award the base items, as well as option items to the maximum extent possible, at the time of initial award. The Government reserves the right to exercise the remaining option items within 120 calendar days of contract award. If the Government elects to exercise the remaining option items, it will do so via only one modification; the Government will not exercise each option independently. If any of the options are exercised via the modification, the Government will extend the CCD 365 calendar days from the current CCD.

D. All other contract terms and conditions remain unchanged.

Amnd 0006 20R6019 FINAL
Pg2 Amnd 0006 20R6019

File details come from the government source that posted it. Updated .