PART 6 ATTACHMENT M10-M603 MECHANICAL CONTROLS.pdf

PDF 2 MB Posted

Attached to
Repair Nine Paradise Point BOQs
Solicitation number
N6247020R6019
Issued by

View the file

Other files

File Type Posted
20-0046 PART 3-- PPI RESPONSE 5_13AUG2020.pdf PDF
Amnd 0007 20R6019 FINAL.pdf PDF
Amnd 0006 20R6019 FINAL.pdf PDF
Amnd 0005 20R6019 FINAL.pdf PDF
20-0046 PART 3-- PPI RESPONSE 4_07AUG2020.pdf PDF
20-0046 PART 3-- PPI RESPONSE 3_06AUG2020.pdf PDF
Amnd 0004 20R6019 FINAL.pdf PDF
Amnd 0003 20R6019 FINAL.pdf PDF
Roof Louvers 2617.jpeg JPEG file
Amnd 0002 20R6019 FINAL.pdf PDF
PART 6 ATTACHMENT N-MCBCL Base-Wide MNS-FACP Construction Requirements 28 JAN 2015 Typical.pdf PDF
01 31 19.05 20 Post Award Meetings-Revised 20JUL2020.pdf PDF
20-0046 Paradise Point BOQs - REV SP1.pdf PDF
01 31 10.05 20 Design Submittal Procedure-Revised 20JUL2020.pdf PDF
23 73 33 HEATING VENTILATING AND COOLING SYSTEM.pdf PDF
20-0046 Paradise Point BOQs - REV A101.pdf PDF
20-0046 PART 3-- PPI RESPONSE 1_20JUL2020.pdf PDF
11 24 24 ROOF FALL PROTECTION 20 Nov 2019.pdf PDF
Amnd 0001 20R6006 FINAL.pdf PDF
PART 6 ATTACHMENT F-NPDES PERMIT NCS000290.pdf PDF
PART 5 FINAL-28MAY2020.pdf PDF
PART 6 ATTACHMENT M9-M602 MECHANICAL CONTROLS.pdf PDF
PART 6 ATTACHMENT I9-879291-2603-INT_EXT REPAIRS.pdf PDF
PART 6 TOC-20-0046.pdf PDF
PART 6 ATTACHMENT I3-85-6406 BOQ Improvements.pdf PDF
PART 6 ATTACHMENT H-BOQ FURNITURE INVENTORY.pdf PDF
PART 6 ATTACHMENT K- MCBCL Mech Design Guidance 7.17.pdf PDF
PART 6 ATTACHMENT M5-M105 BOQ 2603 THRU 2611 LEVEL 1.pdf PDF
PART 6 ATTACHMENT I5-91-7314 BOQs Sidewalks-2.pdf PDF
PART 3 FINAL-28MAY2020.pdf PDF
PART 6 ATTACHMENT A3-EXISTING BUILDING PICTURES PT2.pdf PDF
PART 6 ATTACHMENT E3-ES101 BOQ SITE PRIMARY O.H. POWER PLAN.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
PART 6 ATTACHMENT M2-M102 BOQ 2617 LEVEL 2.pdf PDF
PART 6 ATTACHMENT A1-BOQ FLOOR PLAN REFERENCES.pdf PDF
PART 6 ATTACHMENT I6-95-1430 HVAC BOQs.pdf PDF
PART 6 ATTACHMENT L-EXAMPLE SCREEN WALL.pdf PDF
PART 6 ATTACHMENT M3-M103 BOQ 2602 LEVEL 1.pdf PDF
PART 6 ATTACHMENT D2- Appendix D for DEMO.pdf PDF
RFP N6247020R6019.pdf PDF
PART 6 ATTACHMENT M4-M104 BOQ 2602 LEVEL 2.pdf PDF
PART 6 ATTACHMENT M7-M107 BOQ 2613 LEVEL 1.pdf PDF
PART 6 ATTACHMENT E1-Electrical Policies 2020.pdf PDF
PART 6 ATTACHMENT I10-994214 - 2603_2609_2611_2613-REPL HVAC.pdf PDF
PART 6 ATTACHMENT A2-BOQ FRONT DESK FLOOR PLANS.pdf PDF
PART 6 ATTACHMENT D1-BASE ASBESTOS REPORTS-ALL BUILDINGS.pdf PDF
PART 6 ATTACHMENT E2-TS101 BOQ SITE TELECOMM PLAN.pdf PDF
PART 6 ATTACHMENT E4-ES102 BOQ SITE SECONDARY O.H. POWER PLAN.pdf PDF
PART 6 ATTACHMENT I8-1942 BOQs.pdf PDF
PART 6 ATTACHMENT M8-M601 MECHANICAL CONTROLS.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROGRESS

DRAWING - DO NOT

USE FOR

CONSTRUCTION

2246 Yaupon Drive

Wilmington, NC 28401

Phone: 910.791.4000

Fax: 910.791.5266 www.cbhfengineers.com

NC# P-0506

c

Copyright 2019 CBHF Engineers, PLLC

Engineers, PLLC

DISCLOSURE OF INFORMATION:

CONTRACTOR SHALL COMPLY AS FOLLOWS:

A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT

OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-

1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR

2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.

B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING

OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR RELEASE.

C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT.

SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR

TO THE CONTRACTING OFFICER.

THE RFP-DOCUMENTS (RFPD), INCLUDING BUT NOT LIMITED TO: THE DRAWINGS, PLANS, DESIGNS, REPORTS, SURVEYS, CALCULATIONS, COMPUTER PRINT-OUTS, ETC. ARE MADE AVAILABLE TO THE CONTRACTOR'S FOR REFERENCE PURPOSES ONLY IN RELATION TO THIS DESIGN-BID PROJECT. THE RFPD ARE THE PROPERTY OF THE GOVERNMENT.

THE RFPD ARE PROVIDED "AS-IS" WITHOUT ANY GUARANTEE, REPRESENTATION, CONDITION, OR WARRANTY OF ANY KIND, EITHER EXPRESSED OR IMPLIED, OR STATUTORY.

THE GOVERNMENT ASSUMES NO LIABILITY WITH RESPECT TO ANY RELIANCE THE CONTRACTOR(S) PLACE ON THESE RFPD. IF THE CONTRACTOR(S) RELY ON THESE RFPD IN ANY WAY, THE CONTRACTOR(S) ASSUME THE ENTIRE RISK AS TO THE TRUTH, ACCURACY, CURRENCY, OR COMPLETENESS OF THE INFORMATION CONTAINED IN THESE RFPD.

NOT TO SCALE1 CONTROL DIAGRAM - BOILER PLANT

B02

BO - BOILER 2 ENABLE

BI - BOILER 2 STATUS

OAT

BO - BOILER 1 ENABLE

BI - BOILER 1 STATUS

AI - PRIMARY HOT WATER RETURN TEMP

AI - PRIMARY HOT WATER SUPPLY TEMP

T

T

AO - BOILER 1 HOT WATER SUPPLY TEMP SETPOINT RESET

AO - BOILER 2 HOT WATER SUPPLY TEMP SETPOINT RESET

M

CT

STARTER

BO - CIRCULATION PUMP 1 START/STOP

BI - CIRCULATION PUMP 1 STATUS

M

CT

STARTER

BO - CIRCULATION PUMP 2 START/STOP

BI - CIRCULATION PUMP 2 STATUS

HWS

HWR

HWS

HWR

HWP01A

M

CT

VFD

CT

VFD

BO - HOT WATER PUMP 1 START/STOP

BI - HOT WATER PUMP 1 STATUS

BI - HOT WATER PUMP 2 STATUS

BO - HOT WATER PUMP 2 START/STOP

H L

AI - HOT WATER DIFFERENTIAL PRESSURE

AO - HOT WATER PUMP 1 VFD SPEED

BI - HOT WATER PUMP 1 VFD FAULT

AO - HOT WATER PUMP 2 VFD SPEED

BI - HOT WATER PUMP 2 VFD FAULT

M

SEQUENCE OF OPERATIONS

RUN CONDITIONS - SCHEDULED:

THE FAN SHALL RUN ACCORDING TO A USER DEFINABLE SCHEDULE.

FAN:

THE FAN SHALL HAVE A USER DEFINABLE (ADJ.) MINIMUM RUNTIME.

EXHAUST AIR DAMPER:

THE EXHAUST AIR DAMPER SHALL OPEN ANYTIME THE UNIT RUNS AND SHALL CLOSE ANYTIME THE UNIT STOPS. THE

EXHAUST AIR DAMPER SHALL CLOSE 30 SEC (ADJ.) AFTER THE FAN STOPS.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

• DAMPER FAILURE: COMMANDED OPEN, BUT THE STATUS IS CLOSED.

• DAMPER IN HAND: COMMANDED CLOSED, BUT THE STATUS IS OPEN.

DAMPER STATUS:

THE FAN SHALL BE ENABLED AFTER THE DAMPER STATUS HAS PROVEN.

FAN STATUS:

THE CONTROLLER SHALL MONITOR THE FAN STATUS.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

• FAN FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.

• FAN IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.

• FAN RUNTIME EXCEEDED: FAN STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT (ADJ.).

SEQUENCE OF OPERATION - SCHEDULED

NOT TO SCALE2 CONTROL DIAGRAM - SCHEDULED

EA

DO - FAN START/STOP

M

CT

DI - FAN STATUS

BP02

BP01

HWP01B

SEQUENCE OF OPERATION - BOILER PLANT

GENERAL DESCRIPTION:

THE HOT WATER SYSTEM CONSISTS OF MULTIPLE BOILERS AND ASSOCIATED PUMPS. THE BUILDING AUTOMATION SYSTEM (BAS) CONTROLLER SHALL PROVIDE STAND-ALONE CONTROL OR BAS WORKSTATION CONTROL OF THE SUPPLY HEATING WATER TEMPERATURE SETPOINT (ADJ.) BY CONTROLLING THE BOILER'S ENABLE/DISABLE BOILER SIGNAL. THE BAS CONTROLLER SHALL BE EQUIPPED WITH A HUMAN-INTERFACE PANEL THAT SHALL BE PASSWORD PROTECTED TO PREVENT UNAUTHORIZED ACCESS.

HEATING SYSTEM ENABLE/DISABLE:

THE HEATING SYSTEM SHALL BE ENABLED 24/7/365. WHEN ENABLED, THE BAS CONTROLLER SHALL START THE LEAD HOT WATER DISTRIBUTION PUMP, THE LEAD BOILER CIRCULATING PUMP, AND ENABLE THE LEAD BOILER. THE BOILER FACTORY CONTROL SHALL

OPERATE THE BOILER TO MAINTAIN ITS LOCAL SUPPLY SETPOINT.

BOILER CONTROL:

THE BOILER LEAD/LAG SEQUENCE SHALL ROTATE ON THE 1ST AND 15TH OF THE MONTH. FROM THE BAS CONTROLLER HUMAN-INTERFACE PANEL OR A BAS WORKSTATION, AN OPERATOR SHALL BE ABLE TO MANUALLY CHANGE THE LEAD/LAG SEQUENCE.

IF THE HOT WATER DISTRIBUTION SYSTEM SUPPLY TEMPERATURE FALLS MORE THAN 15.0 DEG. F (ADJ.) BELOW SETPOINT FOR A PERIOD LONGER THAN 15 MINUTES (ADJ.), OR IF AN ACTIVE BOILER SIGNALS A FAILURE ALARM, THE BAS CONTROLLER SHALL ENABLE THE LAG BOILER. IN ADDITION, THE BAS CONTROLLER SHALL SEND AN ALARM TO THE BAS WORKSTATION. WHEN A BOILER FAILURE EXISTS, LEAD/LAG AUTOMATION SHALL BE DISABLED AND THE CURRENTLY RUNNING BOILER SHALL BECOME THE LEAD BOILER. ONCE THE PROBLEM IS CORRECTED, THE OPERATOR SHALL BE ABLE TO CLEAR THE ALARM FAILURE FROM THE BAS CONTROLLER OR BAS

WORKSTATION. THIS SHALL RE-ENABLE THE LEAD/LAG SEQUENCE.

ONCE THE LEAD BOILER IS ENABLED, THE ADD SEQUENCE OF ADDITIONAL BOILERS SHALL BE DISABLED FOR A PERIOD OF 30 MINUTES (ADJ.). ADDITIONAL BOILERS ARE ADDED IF THE HOT WATER DISTRIBUTION SYSTEM SUPPLY TEMPERATURE FALLS 5.0 DEG. F (ADJ.) BELOW

THE HOT WATER SETPOINT FOR A PERIOD OF 10 MINUTES (ADJ.) OR MORE.

THE LAST BOILER ENABLED SHALL BE DISABLED WHEN THE HOT WATER TEMPERATURE RISES 5.0 DEG. F (ADJ.) ABOVE THE HOT WATER SETPOINT FOR A PERIOD OF 10 MINUTES (ADJ.) OR MORE. ADDITIONAL BOILERS SHALL BE DISABLED FOLLOWING THE SAME SUBTRACTION SEQUENCE IF THE HOT WATER TEMPERATURE REMAINS 5.0 DEG. F (ADJ.) ABOVE THE HOT WATER SETPOINT FOR A PERIOD OF 10 MINUTES

(ADJ.) OR MORE.

HOT WATER RESET:

THE HOT WATER SUPPLY TEMPERATURE SETPOINT SHALL BE LINEARLY RESET FROM 100.0 DEG. F (ADJ.) TO 130.0 DEG. F (ADJ.) AS THE

OUTSIDE AIR TEMPERATURE FALLS FROM 60.0 DEG. F (ADJ.) TO 30.0 DEG. F (ADJ.)

HOT WATER DISTRIBUTION PUMP START/STOP:

THE BAS CONTROLLER SHALL START A HOT WATER PUMP THROUGH A CONTACT CLOSURE OF THE PUMP'S VARIABLE FREQUENCY DRIVE

(VFD) RUN-ENABLE CONTACTS.

HOT WATER DISTRIBUTION PUMP STATUS:

THE BAS CONTROLLER SHALL DETECT HOT WATER PUMP RUN STATUS BY A VFD CURRENT SWITCH.

HOT WATER DISTRIBUTION PUMP LEAD/LAG:

THE HOT WATER PUMP LEAD/LAG SEQUENCE SHALL ROTATE ON THE 1ST AND 15TH OF THE MONTH. FROM THE BAS CONTROLLER HUMAN-INTERFACE PANEL OR A BAS WORKSTATION, AN OPERATOR SHALL BE ABLE TO MANUALLY CHANGE THE LEAD/LAG SEQUENCE.

IF THE LEAD PUMP SPEED FALLS BELOW 40% (ADJ.) FOR FIVE MINUTES (ADJ.) THE LAG PUMP SHALL BE DISABLED.

HOT WATER DISTRIBUTION PUMP FAILURE:

IF THE LEAD START/STOP RELAY IS ENABLED AND THE CURRENT SWITCH STATUS IS OFF FOR MORE THAN 30 SECONDS (ADJ.), THE BAS CONTROLLER SHALL ANNUNCIATE A HOT WATER PUMP FAILURE ALARM TO THE BAS WORKSTATION AND STARTS THE LAG PUMP. WHEN A PUMP FAILURE EXISTS, LEAD/LAG AUTOMATION SHALL BE DISABLED AND THE CURRENTLY RUNNING PUMP BECOMES THE LEAD PUMP.

ONCE THE PROBLEM HAS BEEN CORRECTED, THE OPERATOR SHALL BE ABLE TO CLEAR THE ALARM FAILURE FROM THE BAS CONTROLLER

OR BAS WORKSTATION. THIS ACTION SHALL RE-ENABLE THE LEAD/LAG SEQUENCE.

HOT WATER DISTRIBUTION PUMP SPEED:

THE BAS CONTROLLER SHALL MONITOR THE HOT WATER SYSTEM DIFFERENTIAL PRESSURE SENSOR. WHEN THE PUMP VFD IS ENABLED, THE BAS CONTROLLER SHALL CONTROL THE ANALOG SPEED SIGNAL SENT TO THE PUMP VFD TO MAINTAIN A HOT WATER DIFFERENTIAL

PRESSURE SETPOINT OF 50.0 PSIG (ADJ.).

PUMP OPTIMIZATION:

THE BAS SHALL CONTINUALLY MONITOR THE HOT WATER CONTROL VALVE POSITION OF ALL AHU'S IN THE HOT WATER SYSTEM.

AT HOT WATER SYSTEM STARTUP, THE HOT WATER PRESSURE SETPOINT IS 100% OF THE MAXIMUM PRESSURE SETPOINT. WHEN ALL HOT WATER VALVES ARE LESS THAN 85% OPEN, THE HOT WATER DIFFERENTIAL PRESSURE SETPOINT SHALL BE LOWERED BY 0.1 PSIG (ADJ.) OF THE CURRENT HOT WATER DIFFERENTIAL PRESSURE SETPOINT. THIS OCCURS EVERY 5 MINUTES UNTIL AT LEAST ONE VALVE IS MORE THAN 85% OPEN, OR IF THE SETPOINT IS EQUAL TO THE MINIMUM HOT WATER DIFFERENTIAL PRESSURE SETPOINT, OR IF THE PUMP VFD'S

ARE AT A MINIMUM SPEED SETTING (22 HZ).

WHEN ANY HOT WATER VALVE IS MORE THAN 95% OPEN, THE HOT WATER PRESSURE SETPOINT SHALL INCREASES BY 0.1 PSIG (ADJ.) OF THE CURRENT HOT WATER DIFFERENTIAL SETPOINT. THIS OCCURS EVERY 5 MINUTES UNTIL NO VALVE IS MORE THAN 95% OPEN, OR IF THE HOT WATER DIFFERENTIAL PRESSURE SETPOINT HAS RISEN TO THE SYSTEM'S MAXIMUM SETTING, OR IF THE PUMP VFD'S ARE AT THE

MAXIMUM SETTING (60 HZ).

FREEZE PROTECTION:

WHEN THE OUTDOOR AIR TEMPERATURE FALLS BELOW 35.0 DEG. F (ADJ.), THE HOT WATER DISTRIBUTION PUMP SHALL OPERATE CONTINUOUSLY TO PROVIDE HOT WATER CIRCULATION TO ALL ASSOCIATED HOT WATER COILS. IF THE HOT WATER SUPPLY TEMPERATURE FALLS BELOW 130.0 DEG. F (ADJ.) DURING UNOCCUPIED PERIODS, THE BOILER SEQUENCE SHALL BE ENABLED TO SAFEGUARD AGAINST

LOW WATER TEMPERATURE AND BOILER CONDENSATION.

HOT WATER ENERGY

HOT WATER-COOLING DEMAND - ENERGY METER:

THE CONTROLLER SHALL MONITOR THE HOT WATER SUPPLY TEMPERATURE, HOT WATER RETURN TEMPERATURE AND HOT WATER FLOW TO THE BUILDING AND CALCULATE CURRENT ENERGY DEMAND ON A CONTINUAL BASIS. THESE VALUES SHALL BE MADE AVAILABLE TO

THE SYSTEM AT ALL TIMES.

ALARM SHALL BE GENERATED AS FOLLOWS:

• INVALID READING: SENSOR READINGS INDICATE AN INVALID DEMAND VALUE.

PEAK DEMAND HISTORY:

THE CONTROLLER SHALL MONITOR AND RECORD THE PEAK (HIGH AND LOW) DEMAND READINGS FROM THE HOT WATER ENERGY METER. PEAK READINGS SHALL BE RECORDED ON A DAILY, MONTH-TO-DATE, AND YEAR-TO-DATE BASIS.

USAGE HISTORY:

THE CONTROLLER SHALL MONITOR AND RECORD HOT WATER ENERGY METER READINGS SO AS TO PROVIDE AN ENERGY CONSUMPTION HISTORY. USAGE READINGS SHALL BE RECORDED ON A DAILY, MONTH-TO-DATE, AND YEAR-TO-DATE BASIS.

HOT WATER FLOW METER SEQUENCE

T

AI - HOT WATER

BRIDGE TEMP

A I -

M E

TE

R

IN

P

U T

A. ROOM THERMOSTAT I BV: COMMENT USED ON FOLLOWER BOILERS AS

DEFAULT SETTING ON LOSS OF CASCADE

B. FLOW SWITCH BI

C. GAS PRESSURE SWITCH BI

D. AIR PRESSURE SWITCH BI

E. BLOCKED DRAIN SWITCH BI

F. AUTO RESET HIGH LIMIT BI

G. FLAME BI

H. ROOM THERMOSTAT 1 BI

I. RUN-TIME CONTACTS BI

J. ALARM CONTACTS BI

K. GAS VALVE BI

L. SYSTEM CASCADE SETPOINT AI

M. CASCADE TOTAL POWER AI

N. CASCADE CURRENT POWER AI

O. OUTLET SETPOINT AI

P. OUTLET TEMPERATURE AI

Q. INLET TEMPERATURE AI

R. FLUE TEMPERATURE AI

S. FIRING RATE AI

T. BOILER STATUS CODE AI

U. BOILER BLOCKING CODE AI

V. BOILER LOCKOUT CODE AI

W. 0-10 VOLT INPUT/RATE CMD/SP CMD (IF SYSTEM CASCADE SETPOINT RESET

PERFORMED BY DDC CONTROLLER)

X. AVOUTDOOR TEMPERATURE (IF SYSTEM CASCADE SETPOINT RESET

PERFORMED BY LEAD BOILER WITH DIRECT CONNECT OUTSIDE AIR SENSOR)

AV

Y. SYSTEM SUPPLY TEMPERATURE AV

Z. SYSTEM RETURN TEMPERATURE AV

BOILER I/O

T

- AI - PRIMARY HOT WATER SUPPLY TEMP

- SUPPLIED WITH BOILER*

**INDEPENDENT OF

DDC SYSTEM

POINTS LIST - BOILER PLANT

HARDWARE POINTS SOFTWARE POINTS

POINT NAME AI AO BI BO AV BV LOOP SCHED TREND ALARM SHOW ON

GRAPHIC

BOILER 1 HOT WATER RETURN TEMP X X X

BOILER 1 HOT WATER SUPPLY TEMP X X X

BOILER 2 HOT WATER RETURN TEMP X X X

BOILER 2 HOT WATER SUPPLY TEMP X X X

HOT WATER DIFFERENTIAL PRESSURE X X X

PRIMARY HOT WATER RETURN TEMP X X X

PRIMARY HOT WATER SUPPLY TEMP X X X

HOT WATER BRIDGE TEMP X X X

BOILER 1 HOT WATER SUPPLY TEMP SETPOINT RESET X X X

BOILER 2 HOT WATER SUPPLY TEMP SETPOINT RESET X X X

HOT WATER PUMP 1 VFD SPEED X X X

HOT WATER PUMP 2 VFD SPEED X X X

BOILER 1 STATUS X X X

BOILER 2 STATUS X X

CIRCULATION PUMP 1 STATUS X X X

CIRCULATION PUMP 2 STATUS X X X

HOT WATER PUMP 1 STATUS X X X

HOT WATER PUMP 1 VFD FAULT X X X

HOT WATER PUMP 2 STATUS X X X

HOT WATER PUMP 2 VFD FAULT X X X

BOILER 1 ENABLE X X

BOILER 2 ENABLE X X

CIRCULATION PUMP 1 START/STOP X X X

CIRCULATION PUMP 2 START/STOP X X X

HOT WATER PUMP 1 START/STOP X X

HOT WATER PUMP 2 START/STOP X X

HOT WATER DIFFERENTIAL PRESSURE SETPOINT X X X

OUTSIDE AIR TEMP X X

BOILER 1 FAILURE X

BOILER 1 HIGH HOT WATER SUPPLY TEMP X

BOILER 1 LOW HOT WATER SUPPLY TEMP X

BOILER 1 RUNNING IN HAND X

BOILER 1 RUNTIME EXCEEDED X

BOILER 2 FAILURE X

BOILER 2 HIGH HOT WATER SUPPLY TEMP X

BOILER 2 LOW HOT WATER SUPPLY TEMP X

BOILER 2 RUNNING IN HAND X

BOILER 2 RUNTIME EXCEEDED X

CIRCULATION PUMP 1 FAILURE X

CIRCULATION PUMP 1 RUNNING IN HAND X

CIRCULATION PUMP 1 RUNTIME EXCEEDED X

CIRCULATION PUMP 2 FAILURE X

CIRCULATION PUMP 2 RUNNING IN HAND X

CIRCULATION PUMP 2 RUNTIME EXCEEDED X

HIGH HOT WATER DIFFERENTIAL PRESSURE X

HIGH PRIMARY HOT WATER SUPPLY TEMP X

HOT WATER PUMP 1 FAILURE X

HOT WATER PUMP 1 RUNNING IN HAND X

HOT WATER PUMP 1 RUNTIME EXCEEDED X

HOT WATER PUMP 2 FAILURE X

HOT WATER PUMP 2 RUNNING IN HAND X

HOT WATER PUMP 2 RUNTIME EXCEEDED X

LEAD BOILER FAILURE X X

LOW HOT WATER DIFFERENTIAL PRESSURE X

LOW PRIMARY HOT WATER SUPPLY TEMP X

HOT WATER FLOW METER POINTS

HARDWARE POINTS SOFTWARE POINTS

POINT NAME AI AO BI BO AV BV LOOP SCHED TREND ALARM SHOW ON

GRAPHIC

HOT WATER FLOW X X X

HOT WATER RETURN TEMP X X X

HOT WATER SUPPLY TEMP X X X

DEMAND X X X

PEAK MONTH-TO-DATE X X

PEAK TODAY X X

PEAK YEAR-TO-DATE X X

USAGE MONTH-TO-DATE X X

USAGE TODAY X X

USAGE YEAR-TO-DATE X X

POINTS LIST - SCHEDULED

HARDWARE POINTS SOFTWARE POINTS

POINT NAME AI AO BI BO AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC

FAN STATUS X X X

FAN START/STOP X X X

SCHEDULE X

FAN FAILURE X

FAN IN HAND X

FAN RUNTIME EXCEEDED X

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

SATISFACTORY TO: DATE

AutoCAD SHX Text

APPROVED: PWO OR OICC DATE

AutoCAD SHX Text

DESIGN DIR.

AutoCAD SHX Text

SUBMITTED BY:

AutoCAD SHX Text

DR.

AutoCAD SHX Text

CHK.

AutoCAD SHX Text

DES.

AutoCAD SHX Text

CAMP LEJEUNE, NORTH CAROLINA

AutoCAD SHX Text

CONST. CONTR.

AutoCAD SHX Text

MARINE CORPS BASE

AutoCAD SHX Text

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text E1

AutoCAD SHX Text

SIZE

AutoCAD SHX Text 80091

AutoCAD SHX Text

SPEC.

AutoCAD SHX Text

CODE IDENT. NO

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text 18168

AutoCAD SHX Text BOQs 2602, 2603, 2604, 2605

AutoCAD SHX Text 2607, 2609, 2611, 2613, 2617

AutoCAD SHX Text 20-0046

AutoCAD SHX Text

NA

AutoCAD SHX Text

NOTED

AutoCAD SHX Text

FINAL 21MAY 2020

AutoCAD SHX Text

T H BURTON, PE

AutoCAD SHX Text M-603

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

SCHEDULES

AutoCAD SHX Text

AutoCAD SHX Text

GRM

AutoCAD SHX Text

GRM

AutoCAD SHX Text

DMH

AutoCAD SHX Text

Sheets and Views
M603
OLE1

File details come from the government source that posted it. Updated .