PART 6 ATTACHMENT M10-M603 MECHANICAL CONTROLS.pdf
PDF 2 MB Posted
- Attached to
- Repair Nine Paradise Point BOQs
- Solicitation number
- N6247020R6019
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROGRESS
DRAWING - DO NOT
USE FOR
CONSTRUCTION
2246 Yaupon Drive
Wilmington, NC 28401
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2019 CBHF Engineers, PLLC
Engineers, PLLC
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT
OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING
OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT.
SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR
TO THE CONTRACTING OFFICER.
THE RFP-DOCUMENTS (RFPD), INCLUDING BUT NOT LIMITED TO: THE DRAWINGS, PLANS, DESIGNS, REPORTS, SURVEYS, CALCULATIONS, COMPUTER PRINT-OUTS, ETC. ARE MADE AVAILABLE TO THE CONTRACTOR'S FOR REFERENCE PURPOSES ONLY IN RELATION TO THIS DESIGN-BID PROJECT. THE RFPD ARE THE PROPERTY OF THE GOVERNMENT.
THE RFPD ARE PROVIDED "AS-IS" WITHOUT ANY GUARANTEE, REPRESENTATION, CONDITION, OR WARRANTY OF ANY KIND, EITHER EXPRESSED OR IMPLIED, OR STATUTORY.
THE GOVERNMENT ASSUMES NO LIABILITY WITH RESPECT TO ANY RELIANCE THE CONTRACTOR(S) PLACE ON THESE RFPD. IF THE CONTRACTOR(S) RELY ON THESE RFPD IN ANY WAY, THE CONTRACTOR(S) ASSUME THE ENTIRE RISK AS TO THE TRUTH, ACCURACY, CURRENCY, OR COMPLETENESS OF THE INFORMATION CONTAINED IN THESE RFPD.
NOT TO SCALE1 CONTROL DIAGRAM - BOILER PLANT
B02
BO - BOILER 2 ENABLE
BI - BOILER 2 STATUS
OAT
BO - BOILER 1 ENABLE
BI - BOILER 1 STATUS
AI - PRIMARY HOT WATER RETURN TEMP
AI - PRIMARY HOT WATER SUPPLY TEMP
T
T
AO - BOILER 1 HOT WATER SUPPLY TEMP SETPOINT RESET
AO - BOILER 2 HOT WATER SUPPLY TEMP SETPOINT RESET
M
CT
STARTER
BO - CIRCULATION PUMP 1 START/STOP
BI - CIRCULATION PUMP 1 STATUS
M
CT
STARTER
BO - CIRCULATION PUMP 2 START/STOP
BI - CIRCULATION PUMP 2 STATUS
HWS
HWR
HWS
HWR
HWP01A
M
CT
VFD
CT
VFD
BO - HOT WATER PUMP 1 START/STOP
BI - HOT WATER PUMP 1 STATUS
BI - HOT WATER PUMP 2 STATUS
BO - HOT WATER PUMP 2 START/STOP
H L
AI - HOT WATER DIFFERENTIAL PRESSURE
AO - HOT WATER PUMP 1 VFD SPEED
BI - HOT WATER PUMP 1 VFD FAULT
AO - HOT WATER PUMP 2 VFD SPEED
BI - HOT WATER PUMP 2 VFD FAULT
M
SEQUENCE OF OPERATIONS
RUN CONDITIONS - SCHEDULED:
THE FAN SHALL RUN ACCORDING TO A USER DEFINABLE SCHEDULE.
FAN:
THE FAN SHALL HAVE A USER DEFINABLE (ADJ.) MINIMUM RUNTIME.
EXHAUST AIR DAMPER:
THE EXHAUST AIR DAMPER SHALL OPEN ANYTIME THE UNIT RUNS AND SHALL CLOSE ANYTIME THE UNIT STOPS. THE
EXHAUST AIR DAMPER SHALL CLOSE 30 SEC (ADJ.) AFTER THE FAN STOPS.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• DAMPER FAILURE: COMMANDED OPEN, BUT THE STATUS IS CLOSED.
• DAMPER IN HAND: COMMANDED CLOSED, BUT THE STATUS IS OPEN.
DAMPER STATUS:
THE FAN SHALL BE ENABLED AFTER THE DAMPER STATUS HAS PROVEN.
FAN STATUS:
THE CONTROLLER SHALL MONITOR THE FAN STATUS.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• FAN FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
• FAN IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
• FAN RUNTIME EXCEEDED: FAN STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT (ADJ.).
SEQUENCE OF OPERATION - SCHEDULED
NOT TO SCALE2 CONTROL DIAGRAM - SCHEDULED
EA
DO - FAN START/STOP
M
CT
DI - FAN STATUS
BP02
BP01
HWP01B
SEQUENCE OF OPERATION - BOILER PLANT
GENERAL DESCRIPTION:
THE HOT WATER SYSTEM CONSISTS OF MULTIPLE BOILERS AND ASSOCIATED PUMPS. THE BUILDING AUTOMATION SYSTEM (BAS) CONTROLLER SHALL PROVIDE STAND-ALONE CONTROL OR BAS WORKSTATION CONTROL OF THE SUPPLY HEATING WATER TEMPERATURE SETPOINT (ADJ.) BY CONTROLLING THE BOILER'S ENABLE/DISABLE BOILER SIGNAL. THE BAS CONTROLLER SHALL BE EQUIPPED WITH A HUMAN-INTERFACE PANEL THAT SHALL BE PASSWORD PROTECTED TO PREVENT UNAUTHORIZED ACCESS.
HEATING SYSTEM ENABLE/DISABLE:
THE HEATING SYSTEM SHALL BE ENABLED 24/7/365. WHEN ENABLED, THE BAS CONTROLLER SHALL START THE LEAD HOT WATER DISTRIBUTION PUMP, THE LEAD BOILER CIRCULATING PUMP, AND ENABLE THE LEAD BOILER. THE BOILER FACTORY CONTROL SHALL
OPERATE THE BOILER TO MAINTAIN ITS LOCAL SUPPLY SETPOINT.
BOILER CONTROL:
THE BOILER LEAD/LAG SEQUENCE SHALL ROTATE ON THE 1ST AND 15TH OF THE MONTH. FROM THE BAS CONTROLLER HUMAN-INTERFACE PANEL OR A BAS WORKSTATION, AN OPERATOR SHALL BE ABLE TO MANUALLY CHANGE THE LEAD/LAG SEQUENCE.
IF THE HOT WATER DISTRIBUTION SYSTEM SUPPLY TEMPERATURE FALLS MORE THAN 15.0 DEG. F (ADJ.) BELOW SETPOINT FOR A PERIOD LONGER THAN 15 MINUTES (ADJ.), OR IF AN ACTIVE BOILER SIGNALS A FAILURE ALARM, THE BAS CONTROLLER SHALL ENABLE THE LAG BOILER. IN ADDITION, THE BAS CONTROLLER SHALL SEND AN ALARM TO THE BAS WORKSTATION. WHEN A BOILER FAILURE EXISTS, LEAD/LAG AUTOMATION SHALL BE DISABLED AND THE CURRENTLY RUNNING BOILER SHALL BECOME THE LEAD BOILER. ONCE THE PROBLEM IS CORRECTED, THE OPERATOR SHALL BE ABLE TO CLEAR THE ALARM FAILURE FROM THE BAS CONTROLLER OR BAS
WORKSTATION. THIS SHALL RE-ENABLE THE LEAD/LAG SEQUENCE.
ONCE THE LEAD BOILER IS ENABLED, THE ADD SEQUENCE OF ADDITIONAL BOILERS SHALL BE DISABLED FOR A PERIOD OF 30 MINUTES (ADJ.). ADDITIONAL BOILERS ARE ADDED IF THE HOT WATER DISTRIBUTION SYSTEM SUPPLY TEMPERATURE FALLS 5.0 DEG. F (ADJ.) BELOW
THE HOT WATER SETPOINT FOR A PERIOD OF 10 MINUTES (ADJ.) OR MORE.
THE LAST BOILER ENABLED SHALL BE DISABLED WHEN THE HOT WATER TEMPERATURE RISES 5.0 DEG. F (ADJ.) ABOVE THE HOT WATER SETPOINT FOR A PERIOD OF 10 MINUTES (ADJ.) OR MORE. ADDITIONAL BOILERS SHALL BE DISABLED FOLLOWING THE SAME SUBTRACTION SEQUENCE IF THE HOT WATER TEMPERATURE REMAINS 5.0 DEG. F (ADJ.) ABOVE THE HOT WATER SETPOINT FOR A PERIOD OF 10 MINUTES
(ADJ.) OR MORE.
HOT WATER RESET:
THE HOT WATER SUPPLY TEMPERATURE SETPOINT SHALL BE LINEARLY RESET FROM 100.0 DEG. F (ADJ.) TO 130.0 DEG. F (ADJ.) AS THE
OUTSIDE AIR TEMPERATURE FALLS FROM 60.0 DEG. F (ADJ.) TO 30.0 DEG. F (ADJ.)
HOT WATER DISTRIBUTION PUMP START/STOP:
THE BAS CONTROLLER SHALL START A HOT WATER PUMP THROUGH A CONTACT CLOSURE OF THE PUMP'S VARIABLE FREQUENCY DRIVE
(VFD) RUN-ENABLE CONTACTS.
HOT WATER DISTRIBUTION PUMP STATUS:
THE BAS CONTROLLER SHALL DETECT HOT WATER PUMP RUN STATUS BY A VFD CURRENT SWITCH.
HOT WATER DISTRIBUTION PUMP LEAD/LAG:
THE HOT WATER PUMP LEAD/LAG SEQUENCE SHALL ROTATE ON THE 1ST AND 15TH OF THE MONTH. FROM THE BAS CONTROLLER HUMAN-INTERFACE PANEL OR A BAS WORKSTATION, AN OPERATOR SHALL BE ABLE TO MANUALLY CHANGE THE LEAD/LAG SEQUENCE.
IF THE LEAD PUMP SPEED FALLS BELOW 40% (ADJ.) FOR FIVE MINUTES (ADJ.) THE LAG PUMP SHALL BE DISABLED.
HOT WATER DISTRIBUTION PUMP FAILURE:
IF THE LEAD START/STOP RELAY IS ENABLED AND THE CURRENT SWITCH STATUS IS OFF FOR MORE THAN 30 SECONDS (ADJ.), THE BAS CONTROLLER SHALL ANNUNCIATE A HOT WATER PUMP FAILURE ALARM TO THE BAS WORKSTATION AND STARTS THE LAG PUMP. WHEN A PUMP FAILURE EXISTS, LEAD/LAG AUTOMATION SHALL BE DISABLED AND THE CURRENTLY RUNNING PUMP BECOMES THE LEAD PUMP.
ONCE THE PROBLEM HAS BEEN CORRECTED, THE OPERATOR SHALL BE ABLE TO CLEAR THE ALARM FAILURE FROM THE BAS CONTROLLER
OR BAS WORKSTATION. THIS ACTION SHALL RE-ENABLE THE LEAD/LAG SEQUENCE.
HOT WATER DISTRIBUTION PUMP SPEED:
THE BAS CONTROLLER SHALL MONITOR THE HOT WATER SYSTEM DIFFERENTIAL PRESSURE SENSOR. WHEN THE PUMP VFD IS ENABLED, THE BAS CONTROLLER SHALL CONTROL THE ANALOG SPEED SIGNAL SENT TO THE PUMP VFD TO MAINTAIN A HOT WATER DIFFERENTIAL
PRESSURE SETPOINT OF 50.0 PSIG (ADJ.).
PUMP OPTIMIZATION:
THE BAS SHALL CONTINUALLY MONITOR THE HOT WATER CONTROL VALVE POSITION OF ALL AHU'S IN THE HOT WATER SYSTEM.
AT HOT WATER SYSTEM STARTUP, THE HOT WATER PRESSURE SETPOINT IS 100% OF THE MAXIMUM PRESSURE SETPOINT. WHEN ALL HOT WATER VALVES ARE LESS THAN 85% OPEN, THE HOT WATER DIFFERENTIAL PRESSURE SETPOINT SHALL BE LOWERED BY 0.1 PSIG (ADJ.) OF THE CURRENT HOT WATER DIFFERENTIAL PRESSURE SETPOINT. THIS OCCURS EVERY 5 MINUTES UNTIL AT LEAST ONE VALVE IS MORE THAN 85% OPEN, OR IF THE SETPOINT IS EQUAL TO THE MINIMUM HOT WATER DIFFERENTIAL PRESSURE SETPOINT, OR IF THE PUMP VFD'S
ARE AT A MINIMUM SPEED SETTING (22 HZ).
WHEN ANY HOT WATER VALVE IS MORE THAN 95% OPEN, THE HOT WATER PRESSURE SETPOINT SHALL INCREASES BY 0.1 PSIG (ADJ.) OF THE CURRENT HOT WATER DIFFERENTIAL SETPOINT. THIS OCCURS EVERY 5 MINUTES UNTIL NO VALVE IS MORE THAN 95% OPEN, OR IF THE HOT WATER DIFFERENTIAL PRESSURE SETPOINT HAS RISEN TO THE SYSTEM'S MAXIMUM SETTING, OR IF THE PUMP VFD'S ARE AT THE
MAXIMUM SETTING (60 HZ).
FREEZE PROTECTION:
WHEN THE OUTDOOR AIR TEMPERATURE FALLS BELOW 35.0 DEG. F (ADJ.), THE HOT WATER DISTRIBUTION PUMP SHALL OPERATE CONTINUOUSLY TO PROVIDE HOT WATER CIRCULATION TO ALL ASSOCIATED HOT WATER COILS. IF THE HOT WATER SUPPLY TEMPERATURE FALLS BELOW 130.0 DEG. F (ADJ.) DURING UNOCCUPIED PERIODS, THE BOILER SEQUENCE SHALL BE ENABLED TO SAFEGUARD AGAINST
LOW WATER TEMPERATURE AND BOILER CONDENSATION.
HOT WATER ENERGY
HOT WATER-COOLING DEMAND - ENERGY METER:
THE CONTROLLER SHALL MONITOR THE HOT WATER SUPPLY TEMPERATURE, HOT WATER RETURN TEMPERATURE AND HOT WATER FLOW TO THE BUILDING AND CALCULATE CURRENT ENERGY DEMAND ON A CONTINUAL BASIS. THESE VALUES SHALL BE MADE AVAILABLE TO
THE SYSTEM AT ALL TIMES.
ALARM SHALL BE GENERATED AS FOLLOWS:
• INVALID READING: SENSOR READINGS INDICATE AN INVALID DEMAND VALUE.
PEAK DEMAND HISTORY:
THE CONTROLLER SHALL MONITOR AND RECORD THE PEAK (HIGH AND LOW) DEMAND READINGS FROM THE HOT WATER ENERGY METER. PEAK READINGS SHALL BE RECORDED ON A DAILY, MONTH-TO-DATE, AND YEAR-TO-DATE BASIS.
USAGE HISTORY:
THE CONTROLLER SHALL MONITOR AND RECORD HOT WATER ENERGY METER READINGS SO AS TO PROVIDE AN ENERGY CONSUMPTION HISTORY. USAGE READINGS SHALL BE RECORDED ON A DAILY, MONTH-TO-DATE, AND YEAR-TO-DATE BASIS.
HOT WATER FLOW METER SEQUENCE
T
AI - HOT WATER
BRIDGE TEMP
A I -
M E
TE
R
IN
P
U T
A. ROOM THERMOSTAT I BV: COMMENT USED ON FOLLOWER BOILERS AS
DEFAULT SETTING ON LOSS OF CASCADE
B. FLOW SWITCH BI
C. GAS PRESSURE SWITCH BI
D. AIR PRESSURE SWITCH BI
E. BLOCKED DRAIN SWITCH BI
F. AUTO RESET HIGH LIMIT BI
G. FLAME BI
H. ROOM THERMOSTAT 1 BI
I. RUN-TIME CONTACTS BI
J. ALARM CONTACTS BI
K. GAS VALVE BI
L. SYSTEM CASCADE SETPOINT AI
M. CASCADE TOTAL POWER AI
N. CASCADE CURRENT POWER AI
O. OUTLET SETPOINT AI
P. OUTLET TEMPERATURE AI
Q. INLET TEMPERATURE AI
R. FLUE TEMPERATURE AI
S. FIRING RATE AI
T. BOILER STATUS CODE AI
U. BOILER BLOCKING CODE AI
V. BOILER LOCKOUT CODE AI
W. 0-10 VOLT INPUT/RATE CMD/SP CMD (IF SYSTEM CASCADE SETPOINT RESET
PERFORMED BY DDC CONTROLLER)
X. AVOUTDOOR TEMPERATURE (IF SYSTEM CASCADE SETPOINT RESET
PERFORMED BY LEAD BOILER WITH DIRECT CONNECT OUTSIDE AIR SENSOR)
AV
Y. SYSTEM SUPPLY TEMPERATURE AV
Z. SYSTEM RETURN TEMPERATURE AV
BOILER I/O
T
- AI - PRIMARY HOT WATER SUPPLY TEMP
- SUPPLIED WITH BOILER*
**INDEPENDENT OF
DDC SYSTEM
POINTS LIST - BOILER PLANT
HARDWARE POINTS SOFTWARE POINTS
POINT NAME AI AO BI BO AV BV LOOP SCHED TREND ALARM SHOW ON
GRAPHIC
BOILER 1 HOT WATER RETURN TEMP X X X
BOILER 1 HOT WATER SUPPLY TEMP X X X
BOILER 2 HOT WATER RETURN TEMP X X X
BOILER 2 HOT WATER SUPPLY TEMP X X X
HOT WATER DIFFERENTIAL PRESSURE X X X
PRIMARY HOT WATER RETURN TEMP X X X
PRIMARY HOT WATER SUPPLY TEMP X X X
HOT WATER BRIDGE TEMP X X X
BOILER 1 HOT WATER SUPPLY TEMP SETPOINT RESET X X X
BOILER 2 HOT WATER SUPPLY TEMP SETPOINT RESET X X X
HOT WATER PUMP 1 VFD SPEED X X X
HOT WATER PUMP 2 VFD SPEED X X X
BOILER 1 STATUS X X X
BOILER 2 STATUS X X
CIRCULATION PUMP 1 STATUS X X X
CIRCULATION PUMP 2 STATUS X X X
HOT WATER PUMP 1 STATUS X X X
HOT WATER PUMP 1 VFD FAULT X X X
HOT WATER PUMP 2 STATUS X X X
HOT WATER PUMP 2 VFD FAULT X X X
BOILER 1 ENABLE X X
BOILER 2 ENABLE X X
CIRCULATION PUMP 1 START/STOP X X X
CIRCULATION PUMP 2 START/STOP X X X
HOT WATER PUMP 1 START/STOP X X
HOT WATER PUMP 2 START/STOP X X
HOT WATER DIFFERENTIAL PRESSURE SETPOINT X X X
OUTSIDE AIR TEMP X X
BOILER 1 FAILURE X
BOILER 1 HIGH HOT WATER SUPPLY TEMP X
BOILER 1 LOW HOT WATER SUPPLY TEMP X
BOILER 1 RUNNING IN HAND X
BOILER 1 RUNTIME EXCEEDED X
BOILER 2 FAILURE X
BOILER 2 HIGH HOT WATER SUPPLY TEMP X
BOILER 2 LOW HOT WATER SUPPLY TEMP X
BOILER 2 RUNNING IN HAND X
BOILER 2 RUNTIME EXCEEDED X
CIRCULATION PUMP 1 FAILURE X
CIRCULATION PUMP 1 RUNNING IN HAND X
CIRCULATION PUMP 1 RUNTIME EXCEEDED X
CIRCULATION PUMP 2 FAILURE X
CIRCULATION PUMP 2 RUNNING IN HAND X
CIRCULATION PUMP 2 RUNTIME EXCEEDED X
HIGH HOT WATER DIFFERENTIAL PRESSURE X
HIGH PRIMARY HOT WATER SUPPLY TEMP X
HOT WATER PUMP 1 FAILURE X
HOT WATER PUMP 1 RUNNING IN HAND X
HOT WATER PUMP 1 RUNTIME EXCEEDED X
HOT WATER PUMP 2 FAILURE X
HOT WATER PUMP 2 RUNNING IN HAND X
HOT WATER PUMP 2 RUNTIME EXCEEDED X
LEAD BOILER FAILURE X X
LOW HOT WATER DIFFERENTIAL PRESSURE X
LOW PRIMARY HOT WATER SUPPLY TEMP X
HOT WATER FLOW METER POINTS
HARDWARE POINTS SOFTWARE POINTS
POINT NAME AI AO BI BO AV BV LOOP SCHED TREND ALARM SHOW ON
GRAPHIC
HOT WATER FLOW X X X
HOT WATER RETURN TEMP X X X
HOT WATER SUPPLY TEMP X X X
DEMAND X X X
PEAK MONTH-TO-DATE X X
PEAK TODAY X X
PEAK YEAR-TO-DATE X X
USAGE MONTH-TO-DATE X X
USAGE TODAY X X
USAGE YEAR-TO-DATE X X
POINTS LIST - SCHEDULED
HARDWARE POINTS SOFTWARE POINTS
POINT NAME AI AO BI BO AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC
FAN STATUS X X X
FAN START/STOP X X X
SCHEDULE X
FAN FAILURE X
FAN IN HAND X
FAN RUNTIME EXCEEDED X
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SATISFACTORY TO: DATE
AutoCAD SHX Text
APPROVED: PWO OR OICC DATE
AutoCAD SHX Text
DESIGN DIR.
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
DR.
AutoCAD SHX Text
CHK.
AutoCAD SHX Text
DES.
AutoCAD SHX Text
CAMP LEJEUNE, NORTH CAROLINA
AutoCAD SHX Text
CONST. CONTR.
AutoCAD SHX Text
MARINE CORPS BASE
AutoCAD SHX Text
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text E1
AutoCAD SHX Text
SIZE
AutoCAD SHX Text 80091
AutoCAD SHX Text
SPEC.
AutoCAD SHX Text
CODE IDENT. NO
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text 18168
AutoCAD SHX Text BOQs 2602, 2603, 2604, 2605
AutoCAD SHX Text 2607, 2609, 2611, 2613, 2617
AutoCAD SHX Text 20-0046
AutoCAD SHX Text
NA
AutoCAD SHX Text
NOTED
AutoCAD SHX Text
FINAL 21MAY 2020
AutoCAD SHX Text
T H BURTON, PE
AutoCAD SHX Text M-603
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
SCHEDULES
AutoCAD SHX Text
AutoCAD SHX Text
GRM
AutoCAD SHX Text
GRM
AutoCAD SHX Text
DMH
AutoCAD SHX Text
| Sheets and Views |
| M603 |
| OLE1 |
File details come from the government source that posted it. Updated .