ASBESTOS INSPECTION REPORT of:
Building # 2602
MCB CAMP LEJEUNE
Thursday, May 21, 2020
Print Date
Thursday, May 21, 2020 Page 1 of 9Print Date:
INSPECTION SUMMARY
BLDG #:
OCCUPANT:
YEAR BUILT:
BUILDING COMMENTS:
MILITARY PERSONNEL BOQ
HAZ RANK 2A/YELLOW [AH DEC2013]
FRIABLE ACM SHIELDING IS COVERED, POTENTIAL EXPOSURE LOW IF UNDISTURBED.
DEC2013
PVS. ACM REMAINS, NO CHANGES
SEP2010
PVS. ACM REMAINS, ADDL SAMPLING, ACM INCLUDES:
12" WHITE FLOOR TILE
JUL08
TRANSITE PANEL, INSULATION DEBRIS, GASKET NOT IDENTIFIED, OTHER PVS. ACM REMAINS, ADDL SAMPLING, ACM INCLUDES:
ROOFING SEALANT, GRAY
EXTERIOR CAULKINGS
OCT03
PVS. ACM REMAINS, ABATEMENT ACTIONS ON TSI DEBRIS IN CRAWLSPACE
SEPT00
ACM INCLUDES:
RADIANT HEAT LINER MATERIAL
TAR SEALANT
GASKET MATERIAL
PIPE INSULATION DEBRIS
TRANSITE PANEL MATERIAL
ASBESTOS MANAGER: 910-451-5837
Friable ACM(s) identified
Non-friable ACM(s) identified
NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.
DESCRIPTION LOCATION Date Quantity
NOTIFICATION OF ACM IN BUILDING
RADIANT HEATER LINER MATERIAL 250 SFNORTH LOBBY RADIANT HEAT UNITS 10/4/2000
RADIANT HEATER LINER MATERIAL 250 SFNORTH LOBBY RADIANT HEAT UNITS 8/20/2002
RADIANT HEATER LINER MATERIAL 250 SFNORTH LOBBY RADIANT HEAT UNITS 9/16/2010
RADIANT HEATER LINER MATERIAL 250 SFLOBBY RADIANT HEAT UNITS 7/30/2008
RADIANT HEATER LINER MATERIAL 250 SFNORTH LOBBY RADIANT HEAT UNITS 12/5/2013
RADIANT HEATER LINER MATERIAL 250 SFNORTH LOBBY RADIANT HEAT UNITS 10/14/2015
ROOFING SEALANT, GRAY 32 LFROOF AT CENTER CHIMNEY; EAST AND
WEST VENTS (FROM ATTIC)
7/30/2008
Thursday, May 21, 2020 Page 2 of 9Print Date:
Tested Non ACM or REMOVED Materials
DESCRIPTION LOCATION Date
EXTERIOR CAULKING, 16 LFNORTHEAST AND NORTHWEST ENTRY
AWNINGS AT FLASHING
7/30/2008
EXTERIOR CAULKING, 34 LFENTRY DOORS 7/30/2008
TAR SEALANT 36 SFSTEAM PIT CEILING PERIMETER w/HM32
DEBRIS
10/3/2000
12" WHITE FLOOR TILE AND ADHESIVE 324 SFCENTRAL SOUTH KITCHEN/ BREAK
AREA (UNDER CARPET)
9/16/2010
TAR SEALANT 36 SFSTEAM PIT PERIMETER 7/30/2008
TAR SEALANT 36 SFSTEAM PIT CEILING PERIMETER w/HM32
DEBRIS
8/20/2002
EXTERIOR CAULKING, 16 LFNORTHEAST AND NORTHWEST ENTRY
AWNINGS AT FLASHING
9/16/2010
EXTERIOR CAULKING, 34 LFENTRY DOORS 9/16/2010
12" WHITE FLOOR TILE AND ADHESIVE 324 SFCENTRAL SOUTH KITCHEN/ BREAK
AREA (UNDER CARPET)
12/5/2013
ROOFING SEALANT, GRAY 32 LFROOF AT CENTER CHIMNEY; EAST AND
WEST VENTS (FROM ATTIC)
9/16/2010
TAR SEALANT 36 SFSTEAM PIT CEILING PERIMETER w/HM32
DEBRIS
9/16/2010
TAR SEALANT 36 SFSTEAM PIT CEILING PERIMETER w/HM32
DEBRIS
12/5/2013
ROOFING SEALANT, GRAY 32 LFROOF AT CENTER CHIMNEY; EAST AND
WEST VENTS (FROM ATTIC)
12/5/2013
EXTERIOR CAULKING, 16 LFNORTHEAST AND NORTHWEST ENTRY
AWNINGS AT FLASHING
12/5/2013
EXTERIOR CAULKING, 34 LFENTRY DOORS 12/5/2013
EXTERIOR CAULKING, 16 LFNORTHEAST AND NORTHWEST ENTRY
AWNINGS AT FLASHING
10/14/2015
TAR SEALANT 36 SFSTEAM PIT CEILING PERIMETER w/HM32
DEBRIS
10/14/2015
ROOFING SEALANT, GRAY 32 LFROOF AT CENTER CHIMNEY; EAST AND
WEST VENTS (FROM ATTIC)
10/14/2015
EXTERIOR CAULKING, 34 LFENTRY DOORS 10/14/2015
12" WHITE FLOOR TILE AND ADHESIVE 324 SFCENTRAL SOUTH KITCHEN/ BREAK
AREA (UNDER CARPET)
10/14/2015
PIPE INSULATION DEBRIS STEAM PIT PIPE PENETRATIONS
TRAPPED IN WALL
10/4/2000
Thursday, May 21, 2020 Page 3 of 9Print Date:
CRAWLSPACE CONTAMINATION CRAWLSPACE THROUGHOUT 10/3/2000
TRANSITE PANEL MATERIAL STEAM PIT CEILING PERIMETER DEBRIS
w/HM15 SEALANT
10/3/2000
SHINGLE ROOFING ATTIC DEBRIS 7/30/2008
ELECTRICAL WRAPPED WIRING ATTIC DEBRIS/ ABANDONED LINES 7/30/2008
PLASTER SMOOTHCOAT NON RENOVATED AREAS THROUGHOUT 10/4/2000
ROOFING MATERIAL, NORTH CENTRAL LOUNGE AREA ROOF
FLASHING
7/30/2008
EXTERIOR CAULKING, WINDOWS 7/30/2008
JOINT MATERIAL THROUGHOUT INTERIOR, INCLUDING
ATTIC (SEE ALSO HM02)
10/4/2000
DRYWALL AND JOINT MATERIAL ATTIC FIREWALLS, EAST AND WEST 7/30/2008
DRYWALL INTERIOR WALLS THROUGHOUT,
INCLUDING ATTIC (SEE ALSO HM07)
10/4/2000
12" WHITE w/ OLIVE FLOOR TILE AND
ADHESIVE
FOYER AND COMMON AREAS 10/4/2000
12" WHITE w/ GRAY FLOOR TILE AND
ADHESIVE
CENTER COMMON LAUNDRY AREA 10/4/2000
ROOFING FELT DEBRIS ATTIC DEBRIS 10/4/2000
GASKET MATERIAL CENTER STEAM PIT, BELOW LAUNDRY 10/3/2000
PLASTER MATERIAL NON RENOVATED WALLS, CEILINGS
THROUGHOUT
10/4/2000
STAIR TREAD AND ADHESIVE EAST AND WEST STAIRWELLS 10/4/2000
INTERIOR CAULKING, VINYL WINDOWS 9/16/2010
MISCELLANEOUS SEALANT CENTRAL SOUTHEAST STEAM PIT
PIPING
9/16/2010
TEXTURED CEILING MATERIAL INTERIOR CEILINGS THROUGHOUT 9/16/2010
EXTERIOR SURFACING MATERIAL, STUCCO TEXTURED COATING ON EXTERIOR
FOUNDATION WALLS
9/16/2010
TAR PAPER, BLACK EXTERIOR GROUND DEBRIS, BELIEVED
PREVIOUS ROOFING MATERIAL
9/16/2010
TRANSITE PANEL MATERIAL STEAM PIT CEILING PERIMETER DEBRIS
w/HM15 SEALANT
7/30/2008
12" WHITE w/ GRAY FLOOR TILE AND
ADHESIVE
CENTER COMMON LAUNDRY AREA 9/16/2010
12" WHITE w/ OLIVE FLOOR TILE AND
ADHESIVE
FOYER AND COMMON AREAS; SECOND
FLOOR CENTER SOUTH LOUNGE
9/16/2010
GASKET MATERIAL CENTER STEAM PIT, BELOW LAUNDRY 8/20/2002
CRAWLSPACE CONTAMINATION CRAWLSPACE 7/30/2008
DRYWALL AND JOINT MATERIAL ATTIC FIREWALLS, EAST AND WEST 9/16/2010
PIPE INSULATION DEBRIS STEAM PIT PIPE PENETRATIONS
TRAPPED IN WALL
8/20/2002
TRANSITE PANEL MATERIAL STEAM PIT CEILING PERIMETER DEBRIS
w/HM15 SEALANT
8/20/2002
EXTERIOR CAULKING, VINYL WINDOWS (RESIDUAL) 9/16/2010
Thursday, May 21, 2020 Page 4 of 9Print Date:
ACM only presents a health hazard when asbestos fibers are airborne and inhaled.
Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.
HEALTH ASPECTS:
Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.
CONDITIONS TO AVOID:
Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos Program Manager.
REPORTS OF DAMAGE:
Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:
ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:
The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.
RECORDKEEPING:
CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837
ROOFING FELT DEBRIS ATTIC 7/30/2008
EXTERIOR CAULKING, WINDOWS 10/14/2015
Thursday, May 21, 2020 Page 5 of 9Print Date:
SAMPLES COLLECTED
Sample Sample Date
HA Sample Location Chr
Amo
Oth
Description
2602-02-09 10/4/200002 1ST FL CNTR ELECTRIC
CLOSET
0 0 0DRYWALL
2602-03-00ri02 8/20/200203 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2602-03-00ri07 7/30/200803 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2602-03-00ri10 9/16/201003 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2602-03-00ri13 12/5/201303 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2602-03-00ri15 10/14/201503 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2602-03-05 10/4/200003 NORTH CNTR LOBBY, CNTR 20 0 0RADIANT HEATER
LINER MATERIAL
2602-05-03 10/4/200005 CNTR FOYER CLOSET 0 0 012" WHITE w/ OLIVE
FLOOR TILE AND
ADHESIVE
2602-05-30 9/16/201005 2ND FL, CNTR CLOSET 0 0 012" WHITE w/ OLIVE
FLOOR TILE AND
ADHESIVE
2602-06-03 10/4/200006 LAUNDRY ROOM 0 0 012" WHITE w/ GRAY
FLOOR TILE AND
ADHESIVE
2602-06-30 9/16/201006 WEST WING, NORTH STAIR
CLOSET
0 0 012" WHITE w/ GRAY
FLOOR TILE AND
ADHESIVE
2602-07-09 10/4/200007 1ST FL CNTR ELECTRIC
CLOSET
0 0 0JOINT MATERIAL
2602-10-04 10/4/200010 ATTIC, CNTR EAST 0 0 0ROOFING FELT DEBRIS
2602-10-20 7/30/200810 ATTIC 0 0 0ROOFING FELT DEBRIS
2602-10-21 7/30/200810 ATTIC 0 0 0ROOFING FELT DEBRIS
2602-15-00ri02 8/20/200215 N/A 9 9 9TAR SEALANT
2602-15-00ri07 7/30/200815 N/A 9 9 9TAR SEALANT
2602-15-00ri10 9/16/201015 N/A 9 9 9TAR SEALANT
2602-15-00ri13 12/5/201315 N/A 9 9 9TAR SEALANT
Thursday, May 21, 2020 Page 6 of 9Print Date:
HA Sample Location Chr
Amo
Oth
Description
2602-15-00ri15 10/14/201515 N/A 9 9 9TAR SEALANT
2603-15-01 10/3/200015 BLDG 2603 STEAM PIT 15 0 0TAR SEALANT
2602-16-00ri02 8/20/200216 N/A 1 1 1GASKET MATERIAL WHITE
2602-16-00RI07 7/30/200816 N/A 9 9 9GASKET MATERIAL WHITE
2603-16-01 10/3/200016 BLDG 2603 STEAM PIT 80 0 0GASKET MATERIAL WHITE
2602-19-00ri07 7/30/200819 N/A 9 9 9PIPE INSULATION
DEBRIS
2602-19-03 10/4/200019 EXT. PIPE TO PIT 0 0 0PIPE INSULATION
DEBRIS
2603-19-02 10/3/200019 FROM BLDG 2603 65 0 0PIPE INSULATION
DEBRIS
2602-22-05 10/4/200022 FOYER CLOSET 0 0 0PLASTER MATERIAL
2602-22-05 10/4/200022 1ST FL CNTR CLOSET 0 0 0PLASTER MATERIAL
2602-26-05 10/4/200026 CNTR FOYER CLOSET 0 0 0PLASTER SMOOTHCOAT
2602-27-03 10/4/200027 EAST CNTR STAIRWELL 0 0 0STAIR TREAD AND
ADHESIVE
BLACK
2602-32-00ri02 8/20/200232 N/A 9 9 9TRANSITE PANEL
MATERIAL
GRAY
2603-32-01 10/3/200032 BLDG 2603 STEAM PIT 15 0 0TRANSITE PANEL
MATERIAL
GRAY
2602-40-20 7/30/200840 ATTIC, WEST WING CNTR 0 0 0SHINGLE ROOFING
2602-41-20 7/30/200841 ATTIC, CNTR EAST 0 0 0ELECTRICAL WRAPPED
WIRING
2602-42-20 7/30/200842 ATTIC, WEST FIREWALL 0 0 0DRYWALL AND JOINT
MATERIAL
2602-42-30 9/16/201042 EAST WING, SOUTH CNTR
RM HEAD
0 0 0DRYWALL AND JOINT
MATERIAL
2602-42-31 9/16/201042 WEST WING, NW ROOM HEAD 0 0 0DRYWALL AND JOINT
MATERIAL
2602-42-32 9/16/201042 2ND FL WEST WING, SW RM
HEAD
0 0 0DRYWALL AND JOINT
MATERIAL
2602-42-33 9/16/201042 2ND FL EAST WING, NE RM 0 0 0DRYWALL AND JOINT
MATERIAL
Thursday, May 21, 2020 Page 7 of 9Print Date:
HA Sample Location Chr
Amo
Oth
Description
2602-43-00ri10 9/16/201043 N/A 9 9 9ROOFING SEALANT, GRAY
2602-43-00ri13 12/5/201343 N/A 9 9 9ROOFING SEALANT, GRAY
2602-43-00ri15 10/14/201543 N/A 9 9 9ROOFING SEALANT, GRAY
2602-43-20 7/30/200843 ROOF (FR. ATTIC), EAST
CNTR VENT
10 0 0ROOFING SEALANT,
GRAY
2602-44-00ri10 9/16/201044 N/A 9 9 9EXTERIOR CAULKING, WHITE
2602-44-00ri13 12/5/201344 N/A 9 9 9EXTERIOR CAULKING, WHITE
2602-44-00ri15 10/14/201544 N/A 9 9 9EXTERIOR CAULKING, WHITE
2602-44-20 7/30/200844 NW AWNING 6 0 0EXTERIOR CAULKING, WHITE
2602-45-20 7/30/200845 NORTH LOUNGE ROOF, EAST 0 0 0ROOFING MATERIAL, TAR
2602-46-00ri10 9/16/201046 N/A 9 9 9EXTERIOR CAULKING, WHITE
2602-46-00ri13 12/5/201346 N/A 9 9 9EXTERIOR CAULKING, WHITE
2602-46-00ri15 10/14/201546 N/A 9 9 9EXTERIOR CAULKING, WHITE
2602-46-20 7/30/200846 NW SINGLE ENTRY DOOR 6 0 0EXTERIOR CAULKING, WHITE
2602-46-21 7/30/200846 NE SINGLE ENTRY DOOR 4 0 0EXTERIOR CAULKING, WHITE
2602-47-20 7/30/200847 EAST WING, NORTH CNTR
WINDOW
0 0 0EXTERIOR CAULKING, WHITE
2602-47-21 7/30/200847 WEST WING, NORTH CNTR
WINDOW
0 0 0EXTERIOR CAULKING, WHITE
2602-47-30 9/16/201047 WEST WING, NORTH CNTR 0 0 0EXTERIOR CAULKING, WHITE
2602-47-31 9/16/201047 EAST WING, SOUTH CNTR 0 0 0EXTERIOR CAULKING, WHITE
2602-47-40 10/14/201547 EAST WING, NORTH CNTR 0 0 0EXTERIOR CAULKING, WHITE
2602-50-30 9/16/201050 EAST WING, SOUTH CNTR
RM HEAD
0 0 0TEXTURED CEILING
MATERIAL
2602-50-31 9/16/201050 WEST WING, NW RM HEAD 0 0 0TEXTURED CEILING
MATERIAL
2602-50-32 9/16/201050 2ND FL WEST WING, SOUTH
CNTR RM
0 0 0TEXTURED CEILING
Thursday, May 21, 2020 Page 8 of 9Print Date:
HA Sample Location Chr
Amo
Oth
Description
2602-50-33 9/16/201050 2ND FL EAST WING, NE RM 0 0 0TEXTURED CEILING
MATERIAL
2602-51-30 9/16/201051 WEST WING, NW RM HEAD 0 0 0INTERIOR CAULKING, WHITE
2602-51-31 9/16/201051 EAST WING, NW COMMON
HEAD
0 0 0INTERIOR CAULKING, WHITE
2602-52-00ri13 12/5/201352 N/A 9 9 912" WHITE FLOOR TILE
AND ADHESIVE
2602-52-00ri15 10/14/201552 N/A 9 9 912" WHITE FLOOR TILE
AND ADHESIVE
2602-52-30 9/16/201052 SOUTH CNTR KITCHEN, SW 3 0 012" WHITE FLOOR TILE
AND ADHESIVE
2602-52-30tem 9/16/201052 SOUTH CNTR KITCHEN, SW 8.9 0 012" WHITE FLOOR TILE
AND ADHESIVE
2602-53-30 9/16/201053 CNTR SE STEAM PIT 0 0 0MISCELLANEOUS
SEALANT
WHITE
2602-54-30 9/16/201054 EXT. NE CORNER 0 0 0EXTERIOR SURFACING
MATERIAL, STUCCO
2602-55-30 9/16/201055 NORTH CNTR EAST
EXTERIOR
0 0 0TAR PAPER, BLACK
2602-66-00 10/3/200066 CRAWLSPACE 25 0 0CRAWLSPACE
CONTAMINATION
2602-66-00ri07 7/30/200866 UNDER POLY BARRIER 1 1 1CRAWLSPACE
CONTAMINATION
Thursday, May 21, 2020 Page 9 of 9Print Date:
CHECKED BY:
DRAWN BY:
SCALE: GRAPHIC
SHEET OF
DATE:
D E
S C
R I P
T I O
N
R E
V I S
I O
N S
A H
E n v i r o n m e n t a l
C o n s u l t a n t s
S Y
M
A P
P R
O V
E D
D A
T E
M C
B
C
A M
P
L
E J E
U N
E
N
C
01-01 (+,-)
SAMPLE IDENTIFICATION
HOMOGENOUS MATERIAL
POSITIVE (+), NEGATIVE (-), OR TRACE
(TR) FOR THE PRESENCE OF ASBESTOS
SAMPLE LEGEND ID
BUILDING 2602
SECOND FLOOR
C Y
S B
E S
T O
S
I N
S P
E C
T I O
N
M C
B
C
A M
P
L
E J E
U E
N E
N
C
DD
ARD
FEBRUARY 2016
2 3
0'0'0'0'0'0'8' 16'8' 32'
A ATTIC ACCESS
[HM] HOMOGENOUS MATERIAL NUMBER
C CARPET
NO ACM IDENTIFIED
Building # 2603
MCB CAMP LEJEUNE
Thursday, May 21, 2020
Thursday, May 21, 2020 Page 1 of 12Print Date:
OCCUPANT:
YEAR BUILT:
BUILDING COMMENTS:
MILITARY PERSONNEL BOQ
HAZ RANK 2A/YELLOW [AH OCT2015]
ACM INSULATION RENDERED STABLE
OCT2015
ACM REMAINS, STABLE
DEC2013
PVS. ACM REMAINS UNCHANGED
MAY2011 SSSD
TSI DEBRIS REMOVED, EXISTING LINES IN PIT SEALED/ ISOLATED, CRAWLSPACE LINES ENCAPSULATED
SEP2010 1B
TSI DEBRIS IN STEAM PIT ON LEDGE, RADIANT HEATERS ALWAYS A CONCERN
LTD. CHANGES, PVS. ACM REMAINS
AUG09 ACM INCLUDES:
RADIANT HEAT LINER
TAR SEALANT
GASKET MATERIAL
PIPE INSULATION and DEBRIS
TRANSITE PANEL MATERIAL
EXTERIOR CAULKING
ROOF SEALANT
FELT UNDERLAYMENT
OCT03:
CRAWLSPACE ABATEMENTS/ CLEANUP CONDUCTED, HAZARD LOWERED, PVS. ACM REMAINS
SEP00/ 2603 HOMOGENOUS w/2602-2613 BOQs; ACM INCLUDES:
RADIANT HEAT LINER MATERIAL
TAR SEALANT
GASKET MATERIAL
PIPE INSULATION and DEBRIS MUDDED FITTINGS and DEBRIS
CONTAMINATED SOIL
TRANSITE PANEL MATERIAL
ASBESTOS MANAGER: 910-451-5837
Friable ACM(s) identified
NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.
RADIANT HEATER LINER MATERIAL 250 SFLOUNGE AREA RADIANT HEATERS 10/2/2000
PIPE INSULATION, AIRCELL 6 LFCRAWLSPACE STEAM PIT, SOUTH WALL
PENETRATION DEBRIS
8/5/2009
RADIANT HEATER LINER MATERIAL 250 SFLOUNGE AREA RADIANT HEATERS 8/5/2009
RADIANT HEATER LINER MATERIAL 250 SFLOUNGE AREA RADIANT HEATERS 9/16/2010
RADIANT HEATER LINER MATERIAL 250 SFLOUNGE AREA RADIANT HEATERS 10/15/2003
RADIANT HEATER LINER MATERIAL 250 SFLOUNGE AREA RADIANT HEATERS 12/6/2013
Thursday, May 21, 2020 Page 2 of 12Print Date:
Non-friable ACM(s) identified
PIPE INSULATION, AIRCELL 4 LFCRAWLSPACE STEAM PIT, SOUTH WALL
PENETRATION DEBRIS
12/6/2013
RADIANT HEATER LINER MATERIAL 250 SFLOUNGE AREA RADIANT HEATERS 10/14/2015
PIPE INSULATION, AIRCELL 2 LFCRAWLSPACE STEAM PIT, SOUTH WALL
PENETRATION DEBRIS
10/14/2015
TAR SEALANT 36 LFSTEAM PIT CEILING PERIMETER (SEE
ALSO HM22, w/HM21)
10/2/2000
TAR SEALANT 8 SFROOF VENTS (ACCESSIBLE VIA ATTIC) 8/5/2009
EXTERIOR CAULKING, 200 LFWINDOWS, NEW AND RESIDUAL OLD
MATERIAL
8/5/2009
ROOFING SEALANT, GRAY 30 LFWEST LOUNGE ROOF FLASHING
(SECOND FLOOR LEVEL)
8/5/2009
EXTERIOR CAULKING, 20 LFWEST SIDE ENTRY AWNINGS; LOUNGE
ROOF FLASHING
8/5/2009
EXTERIOR CAULKING, 25 LFDOORS, NEW AND OLD/ RESIDUAL
MATERIALS
8/5/2009
TAR SEALANT 36 LFSTEAM PIT CEILING PERIMETER
(w/HM32)
8/5/2009
TAR SEALANT 8 SFROOF VENTS (ACCESSIBLE VIA ATTIC) 12/6/2013
EXTERIOR CAULKING, 200 LFWINDOWS, NEW AND RESIDUAL OLD
MATERIAL
12/6/2013
EXTERIOR CAULKING, 25 LFDOORS, NEW AND OLD/ RESIDUAL
MATERIALS
12/6/2013
EXTERIOR CAULKING, 20 LFWEST SIDE ENTRY AWNINGS; LOUNGE
ROOF FLASHING
12/6/2013
ROOFING SEALANT, GRAY 30 LFWEST LOUNGE ROOF FLASHING
(SECOND FLOOR LEVEL)
12/6/2013
TAR SEALANT 36 LFSTEAM PIT CEILING PERIMETER (SEE
ALSO HM22, w/HM21)
9/16/2010
TAR SEALANT 36 LFSTEAM PIT CEILING PERIMETER (SEE
ALSO HM22, w/HM21)
10/15/2003
TAR SEALANT 36 LFSTEAM PIT CEILING PERIMETER (SEE
ALSO HM22, w/HM21)
12/6/2013
TAR SEALANT 8 SFROOF VENTS (ACCESSIBLE VIA ATTIC) 9/16/2010
EXTERIOR CAULKING, 200 LFWINDOWS, NEW AND RESIDUAL OLD
MATERIAL
9/16/2010
EXTERIOR CAULKING, 25 LFDOORS, NEW AND OLD/ RESIDUAL
MATERIALS (SEE ALSO HM47)
9/16/2010
Thursday, May 21, 2020 Page 3 of 12Print Date:
EXTERIOR CAULKING, 20 LFWEST SIDE ENTRY AWNINGS; LOUNGE
ROOF FLASHING
9/16/2010
ROOFING SEALANT, GRAY 30 LFWEST LOUNGE ROOF FLASHING
(SECOND FLOOR LEVEL)
9/16/2010
TAR SEALANT 36 LFSTEAM PIT CEILING PERIMETER (SEE
ALSO HM22, w/HM21)
10/14/2015
TAR SEALANT 8 SFROOF VENTS (ACCESSIBLE VIA ATTIC) 10/14/2015
EXTERIOR CAULKING, 200 LFWINDOWS, NEW AND RESIDUAL OLD
MATERIAL
10/14/2015
EXTERIOR CAULKING, 25 LFDOORS, NEW AND OLD/ RESIDUAL
MATERIALS
10/14/2015
EXTERIOR CAULKING, 20 LFWEST SIDE ENTRY AWNINGS; LOUNGE
ROOF FLASHING
10/14/2015
ROOFING SEALANT, GRAY 30 LFWEST LOUNGE ROOF FLASHING
(SECOND FLOOR LEVEL)
10/14/2015
PIPE INSULATION DEBRIS STEAM PIT SOUTH WALL, REMNANTS
OF OLD STEAM SYSTEM (SEE ALSO
HM36)
10/2/2000
12" WHITE w/ OLIVE FLOOR TILE AND
ADHESIVE
LAUNDRY AND CLOSET SPACES 10/2/2000
12" WHITE w/ GRAY FLOOR TILE AND
ADHESIVE
LAUNDRY AND STORAGE CLOSETS 10/2/2000
CLOTH EXPANSION JOINT MATERIAL, THIN VENTALATION DUCT SYSTEM, ATTIC
AND CRAWLSPACES
10/2/2000
ROOFING FELT DEBRIS ATTIC, PREVIOUS ROOFING 10/2/2000
STAIR TREAD AND ADHESIVE NORTH AND SOUTH STAIRWELLS 10/2/2000
TRANSITE PANEL MATERIAL STEAM PIT CEILING PERIMETER,
REMNANTS (SEE ALSO HM15, 21)
10/2/2000
LINOLEUM AND ADHESIVE, FIRST FLOOR BAR AND ROOM
KITCHENETTES THROUGHOUT
10/2/2000
CHIMNEY LINER MATERIAL ATTIC, CHIMNEY CHASE 10/2/2000
SOIL CRAWLSPACE THROUGHOUT 10/2/2000
TANK INSULATION CRAWLSPACE STEAM PIT WATER TANK 10/2/2000
PIPE INSULATION CRAWLSPACE PERIMETER REMNANTS
OF OLD STEAM SYSTEM (SEE ALSO
HM36)
10/2/2000
GASKET MATERIAL CRAWLSPACE STEAM PIT 10/2/2000
GASKET MATERIAL CRAWLSPACE STEAM PIT (SEE ALSO
HM17)
10/2/2000
Thursday, May 21, 2020 Page 4 of 12Print Date:
DRYWALL THROUGHOUT INTERIOR AND ATTIC
(SEE ALSO HM07, 30)
10/2/2000
FELT PAPER FLOORING UNDERLAYMENT
ACCESSIBLE FROM CRAWLSPACE
10/2/2000
GASKET MATERIAL CRAWLSPACE STEAM PIT DEBRIS (SEE
ALSO HM16)
10/2/2000
LINOLEUM AND ADHESIVE, FIRST FLOOR BAR AND ROOM
KITCHENETTES
10/2/2000
INTERIOR CAULKING, ATTIC, FIREWALL JOINTS AT ROOFING 8/5/2009
TEXTURED CEILING MATERIAL LOUNGE CEILINGS 10/2/2000
JOINT MATERIAL THROUGHOUT INTERIOR AND ATTIC
(SEE ALSO HM02, 30)
10/2/2000
LINOLEUM AND ADHESIVE, FIRST FLOOR BAR AND ROOM
KITCHENETTES
10/2/2000
PLASTER MATERIAL CRAWLSPACE WALL 8/5/2009
ASPHALT SHINGLE AND TAR PAPER ATTIC DEBRIS, PREVIOUS ROOFING 8/5/2009
FIBERGLASS INSULATION SEALANT CRAWLSPACE STEAM PIT PIPING 8/5/2009
FIBERGLASS INSULATION SEALANT CRAWLSPACE STEAM PIT PIPING 8/5/2009
MISCELLANEOUS SEALANT FIRST FLOOR ELECTRICAL ROOM;
OVERHEAD ELECTRICAL CONDUIT,
CABLE PENETRATIONS THROUGH
WALLS
8/5/2009
12" TAN w/BROWN FLOOR TILE AND
ADHESIVE
FIRST FLOOR LAUNDRY ROOM 8/5/2009
12" GRAY w/ GRAY FLOOR TILE AND
ADHESIVE
FIRST FLOOR LAUNDRY ROOM 8/5/2009
12" CREAM FLOOR TILE AND ADHESIVE FIRST FLOOR LAUNDRY ROOM 8/5/2009
INTERIOR CAULKING, FIRST FLOOR LAUNDRY/ STORAGE AT
ELECTRICAL PANEL; WINDOWS AND
SILLS
8/5/2009
FIBROUS DEBRIS CRAWLSPACE STEAM PIT NORTH LEDGE 8/5/2009
BUILT-UP ROOFING WEST LOUNGE ROOFING 8/5/2009
TEXTURED CEILING MATERIAL WEST CENTER LOUNGE/ CONFERENCE
ROOM CEILING
9/16/2010
12" TAN FLOOR TILE AND ADHESIVE EAST CENTER LAUNDRY ROOM
(PATCHING)
9/16/2010
SINK UNDERCOATING, SECOND FLOOR EAST CENTER BREAK
ROOM
9/16/2010
SHINGLE ROOFING SECOND FLOOR, USED AS SPACER FOR
CEILING GRID INSTALLATION
8/5/2009
DRYWALL AND JOINT MATERIAL ABOVE DROP CEILINGS, HEAD AREAS;
ATTIC FIREWALLS (SEE ALSO HM02, 07)
8/5/2009
JOINT MATERIAL THROUGHOUT INTERIOR AND ATTIC
(SEE ALSO HM02, 30)
8/5/2009
ROOFING FELT DEBRIS ATTIC, PREVIOUS ROOFING 8/5/2009
CLOTH EXPANSION JOINT MATERIAL, THIN VENTALATION DUCT SYSTEM, ATTIC
AND CRAWLSPACES
8/5/2009
Thursday, May 21, 2020 Page 5 of 12Print Date:
constitute a health hazard.
HEALTH ASPECTS:
Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.
CONDITIONS TO AVOID:
Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos Program Manager.
REPORTS OF DAMAGE:
Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:
ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:
The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.
RECORDKEEPING:
CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837
FELT PAPER LAUNDRY ROOM FLOORING
UNDERLAYMENT ACCESSIBLE FROM
CRAWLSPACE (SEE ALSO 15)
8/5/2009
FIBROUS DEBRIS CRAWLSPACE STEAM PIT NORTH LEDGE 5/28/2011
12" WHITE w/ OLIVE FLOOR TILE AND
ADHESIVE
LAUNDRY AND CLOSET SPACES 8/5/2009
TANK INSULATION CRAWLSPACE STEAM PIT WATER TANK 8/5/2009
GASKET MATERIAL CRAWLSPACE STEAM PIT (SEE ALSO
HM17)
10/15/2003
TANK INSULATION CRAWLSPACE STEAM PIT WATER TANK 10/15/2003
GASKET MATERIAL CRAWLSPACE STEAM PIT DEBRIS (SEE
ALSO HM16)
8/5/2009
TRANSITE PANEL MATERIAL STEAM PIT PERIMETER AT CEILING 8/5/2009
12" WHITE w/ GRAY FLOOR TILE AND
ADHESIVE
LAUNDRY AND STORAGE CLOSETS 8/5/2009
PIPE INSULATION CRAWLSPACE PERIMETER REMNANTS
OF OLD STEAM SYSTEM
10/15/2003
PIPE INSULATION STEAM PIT SOUTH WALL, REMNANTS
OF OLD STEAM SYSTEM (SEE ALSO
HM36)
10/15/2003
TRANSITE PANEL MATERIAL STEAM PIT CEILING PERIMETER,
REMNANTS (SEE ALSO HM15, 21)
10/15/2003
FIBROUS DEBRIS CRAWLSPACE STEAM PIT NORTH LEDGE 9/16/2010
DRYWALL AND JOINT MATERIAL ABOVE DROP CEILINGS, HEAD AREAS;
ATTIC FIREWALLS (SEE ALSO HM02, 07)
9/16/2010
INTERIOR CAULKING, FIRST FLOOR LAUNDRY/ STORAGE AT
ELECTRICAL PANEL; WINDOWS AND
SILLS
9/16/2010
Thursday, May 21, 2020 Page 6 of 12Print Date:
HA Sample Location Chr
Amo
Oth
Description
2603-01-01 10/2/200001 LOUNGE 0 0 0TEXTURED CEILING
MATERIAL
2603-01-02 10/2/200001 LOUNGE 0 0 0TEXTURED CEILING
MATERIAL
2603-02-01 10/2/200002 LOUNGE CEILING 0 0 0DRYWALL
2603-02-02 10/2/200002 ROOM 314 0 0 0DRYWALL
2603-02-03 10/2/200002 ROOM 318 0 0 0DRYWALL
2603-02-04 10/2/200002 2ND FLOOR STORAGE 0 0 0DRYWALL
2603-02-05 10/2/200002 2ND FLOOR CORRIDOR
CEILING
0 0 0DRYWALL
2603-03-00ri03 10/15/200303 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2603-03-00ri10 9/16/201003 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2603-03-00ri13 12/6/201303 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2603-03-00ri15 10/14/201503 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2603-03-01 10/2/200003 LOUNGE 60 0 0RADIANT HEATER
LINER MATERIAL
2603-03-02 10/2/200003 LOUNGE 50 0 0RADIANT HEATER
LINER MATERIAL
2603-03-10 8/5/200903 1ST FL WEST LOUNGE 45 0 0RADIANT HEATER
LINER MATERIAL
2603-04-01 10/2/200004 1ST FLOOR BAR 0 0 0LINOLEUM AND
ADHESIVE,
WHITE w/ GRAY
2603-04-02 10/2/200004 ROOM 324 0 0 0LINOLEUM AND
ADHESIVE,
WHITE w/ GRAY
2603-05-01 10/2/200005 ELECTRIC CLOSET 0 0 012" WHITE w/ OLIVE
FLOOR TILE AND
ADHESIVE
2603-05-02 10/2/200005 2ND FLOOR STORAGE
CLOSET
0 0 012" WHITE w/ OLIVE
FLOOR TILE AND
ADHESIVE
Thursday, May 21, 2020 Page 7 of 12Print Date:
HA Sample Location Chr
Amo
Oth
Description
2603-05-10 8/5/200905 1ST FL WEST STORAGE 0 0 012" WHITE w/ OLIVE
FLOOR TILE AND
ADHESIVE
2603-06-01 10/2/200006 LAUNDRY ROOM 0 0 012" WHITE w/ GRAY
FLOOR TILE AND
ADHESIVE
2603-06-10 8/5/200906 WEST CNTR LAUNDRY/STRGE 0 0 012" WHITE w/ GRAY
FLOOR TILE AND
ADHESIVE
2603-06-11 8/5/200906 2ND FL STRGE 0 0 012" WHITE w/ GRAY
FLOOR TILE AND
ADHESIVE
2603-07-01 10/2/200007 LAUNDRY ROOM 0 0 0JOINT MATERIAL
2603-07-02 10/2/200007 ROOM 314 0 0 0JOINT MATERIAL
2603-07-03 10/2/200007 ROOM 318 0 0 0JOINT MATERIAL
2603-07-04 10/2/200007 ROOM 324 0 0 0JOINT MATERIAL
2603-07-05 10/2/200007 2ND FL HALL 0 0 0JOINT MATERIAL
2603-07-10 8/5/200907 2ND FL STORAGE 0 0 0JOINT MATERIAL
2603-07-11 8/5/200907 2ND FL RM, SE 0 0 0JOINT MATERIAL
2603-07-12 8/5/200907 ATTIC, SOUTH CENTER 0 0 0JOINT MATERIAL
2603-08-01 10/2/200008 ROOM 318 0 0 0LINOLEUM AND
ADHESIVE,
WHITE w/GRAY
2603-09-01 10/2/200009 ATTIC NORTH CNTR 0 0 0CLOTH EXPANSION
JOINT MATERIAL, THIN
2603-09-02 10/2/200009 ATTIC SOUTH CNTR 0 0 0CLOTH EXPANSION
JOINT MATERIAL, THIN
2603-09-10 8/5/200909 ATTIC, SOUTH CNTR 0 0 0CLOTH EXPANSION
JOINT MATERIAL, THIN
2306-10-10 8/5/200910 ATTIC NORTH 0 0 0ROOFING FELT DEBRIS
2603-10-01 10/2/200010 ATTIC CENTER SECTION 0 0 0ROOFING FELT DEBRIS
2603-10-11 8/5/200910 ATTIC CNTR 0 0 0ROOFING FELT DEBRIS
2603-11-01 10/2/200011 ATTIC CNTR CHIMNEY 0 0 0CHIMNEY LINER
Thursday, May 21, 2020 Page 8 of 12Print Date:
HA Sample Location Chr
Amo
Oth
Description
2603-12-01 10/2/200012 SOUTH STAIRWELL 0 0 0STAIR TREAD AND
ADHESIVE
BLACK
2603-13-01 10/2/200013 STEAM PIT TANK 0 0 0TANK INSULATION
2603-13-02 10/2/200013 STEAM PIT TANK 0 0 0TANK INSULATION
2603-13-10 10/15/200313 CS STEAM PIT 0 0 0TANK INSULATION
2603-13-10 8/5/200913 STEAM PIT TANK 0 0 0TANK INSULATION
2603-13-11 8/5/200913 STEAM PIT TANK 0 0 0TANK INSULATION
2603-14-01 10/2/200014 STEAM PIT 0 0 0GASKET MATERIAL GREEN
2603-15-00ri03 10/15/200315 N/A 9 9 9TAR SEALANT BLACK
2603-15-00ri10 9/16/201015 N/A 9 9 9TAR SEALANT BLACK
2603-15-00ri13 12/6/201315 N/A 9 9 9TAR SEALANT BLACK
2603-15-00ri15 10/14/201515 N/A 9 9 9TAR SEALANT BLACK
2603-15-01 10/2/200015 STEAM PIT 15 0 0TAR SEALANT BLACK
2603-15-10 8/5/200915 STEAM PIT NORTH 15 0 0TAR SEALANT BLACK
2603-16-01 10/2/200016 STEAM PIT 80 0 0GASKET MATERIAL WHITE
2603-16-10 10/15/200316 CS STEAM PIT TANK FLANGE 65 0 0GASKET MATERIAL WHITE
2603-17-01 10/2/200017 STEAM PIT 80 0 0GASKET MATERIAL BROWN
2603-17-1610 8/5/200917 STEAM PIT CNTR 20 0 0GASKET MATERIAL BROWN
2603-18-01 10/2/200018 CS, SE AT WALL 10 30 0PIPE INSULATION
2603-19-00ri03 10/15/200319 N/A 9 9 9PIPE INSULATION
DEBRIS
2603-19-01 10/2/200019 CS, SOUTH CNTR WALL 65 0 0PIPE INSULATION
DEBRIS
2603-20-01 10/2/200020 CRAWLSPACE NORTH WEST 0 0 0SOIL
2603-20-02 10/2/200020 CRAWLSPACE WEST 0 0 0SOIL
2603-21-01 10/2/200021 CS, SOUTH CNTR 0 0 0FELT PAPER BLACK
2603-21-10 8/5/200921 STEAM PIT 8 0 0FELT PAPER BLACK
Thursday, May 21, 2020 Page 9 of 12Print Date:
HA Sample Location Chr
Amo
Oth
Description
2603-30-10 8/5/200930 1ST FL RM, NE 0 0 0DRYWALL AND JOINT
MATERIAL
2603-30-11 8/5/200930 1ST FL RM, SW 0 0 0DRYWALL AND JOINT
MATERIAL
2603-30-12 8/5/200930 2ND FL RM, NW 0 0 0DRYWALL AND JOINT
MATERIAL
2603-30-13 8/5/200930 ATTIC NORTH FIREWALL 0 0 0DRYWALL AND JOINT
MATERIAL
2603-30-20 9/16/201030 1ST FL SOUTH WING, WEST
CNTR HEAD CEILING
0 0 0DRYWALL AND JOINT
MATERIAL
2603-30-21 9/16/201030 2ND FL NORTH WING, EAST
CNTR HEAD CEILING
0 0 0DRYWALL AND JOINT
MATERIAL
2603-30-22 9/16/201030 2ND FL CNTR, EAST HEAD
OVHD
0 0 0DRYWALL AND JOINT
MATERIAL
2603-31-10 8/5/200931 1ST FL. LAUNDRY 0 0 0INTERIOR CAULKING, WHITE
2603-31-20 9/16/201031 SOUTH WING, WEST CNTR
HEAD CEILING
0 0 0INTERIOR CAULKING, WHITE
2603-31-21 9/16/201031 2ND FL NORTH WING, EAST
CNTR HEAD
0 0 0INTERIOR CAULKING, WHITE
2603-32-00 10/2/200032 N/A 9 9 9TRANSITE PANEL
MATERIAL
2603-32-00ri03 10/15/200332 N/A 9 9 9TRANSITE PANEL
MATERIAL
2603-32-4010 8/5/200932 STEAM PIT EAST 20 0 0TRANSITE PANEL
MATERIAL
2603-32b-10 8/5/200932b 1ST FL. ELECTRICAL 0 0 0MISCELLANEOUS
SEALANT
RED
2603-33b-10 8/5/200933b 1ST FL. LAUNDRY 0 0 012" TAN w/BROWN
FLOOR TILE AND
ADHESIVE
2603-34-10 8/5/200934 1ST FL LAUNDRY 0 0 012" GRAY w/ GRAY
FLOOR TILE AND
ADHESIVE
2603-35-10 8/5/200935 1ST FL LAUNDRY 0 0 012" CREAM FLOOR TILE
AND ADHESIVE
w/BROWN
2360-36-10 8/5/200936 STEAM PIT, SOUTH WALL 45 0 0PIPE INSULATION,
AIRCELL
2603-36-00ri13 12/6/201336 N/A 9 9 9PIPE INSULATION, AIRCELL
Thursday, May 21, 2020 Page 10 of 12Print Date:
HA Sample Location Chr
Amo
Oth
Description
2603-36-00ri15 10/14/201536 N/A 9 9 9PIPE INSULATION, AIRCELL
2603-37-10 8/5/200937 STEAM PIT SOUTH 0 0 0FIBERGLASS
INSULATION SEALANT
GRAY
2603-38-10 8/5/200938 STEAM PIT SOUTH 0 0 0FIBERGLASS
INSULATION SEALANT
WHITE
2603-39-00ri10 9/16/201039 N/A 9 9 9FIBROUS DEBRIS TAN
2603-39-10 8/5/200939 STEAM PIT NORTH LEDGE 4 0 0FIBROUS DEBRIS TAN
2603-41-10 8/5/200941 2ND FL RM SE 0 0 0SHINGLE ROOFING
2603-42-00ri10 9/16/201042 N/A 9 9 9TAR SEALANT BLACK
2603-42-00ri13 12/6/201342 N/A 9 9 9TAR SEALANT BLACK
2603-42-00ri15 10/14/201542 N/A 9 9 9TAR SEALANT BLACK
2603-42-10 8/5/200942 ROOF (FR. ATTIC) NW SMALL
VENT
10 0 0TAR SEALANT BLACK
2603-42-11 8/5/200942 ROOF (FR. ATTIC) CNTR
CHMNEY
0 0 0TAR SEALANT BLACK
2603-43-10 8/5/200943 CRAWLSPACE SW 0 0 0PLASTER MATERIAL
2603-43a-10 8/5/200943a ATTIC NORTH END 0 0 0ASPHALT SHINGLE AND
TAR PAPER
2603-44-00ri13 12/6/201344 N/A 9 9 9EXTERIOR CAULKING, WHITE/ BEIGE
2603-44-00ri15 10/14/201544 N/A 9 9 9EXTERIOR CAULKING, WHITE/ BEIGE
2603-44-10 8/5/200944 WINDOW, SW 0 0 0EXTERIOR CAULKING, WHITE/ BEIGE
2603-44-11 8/5/200944 BAY WINDOW, SOUTH 0 0 0EXTERIOR CAULKING, WHITE/ BEIGE
2603-44-12 8/5/200944 BAY WINDOW, SOUTH 3 0 0EXTERIOR CAULKING, WHITE/ BEIGE
2603-44-13 8/5/200944 BAY WINDOW, WEST 0 0 0EXTERIOR CAULKING, WHITE/ BEIGE
2603-44-14 8/5/200944 WINDOW, NW 0 0 0EXTERIOR CAULKING, WHITE/ BEIGE
2603-44-4720 9/16/201044 WESTSIDE, SW WINDOW 10 0 0EXTERIOR CAULKING, WHITE/ BEIGE
2603-44-4721 9/16/201044 EASTSIDE, NE WINDOW 8 0 0EXTERIOR CAULKING, WHITE/ BEIGE
2603-44a-10 8/5/200944a ATTIC, NORTH FIREWALL 0 0 0INTERIOR CAULKING, WHITE
Thursday, May 21, 2020 Page 11 of 12Print Date:
HA Sample Location Chr
Amo
Oth
Description
2603-45-00ri10 9/16/201045 N/A 9 9 9EXTERIOR CAULKING, WHITE/ BEIGE
2603-45-00ri13 12/6/201345 N/A 9 9 9EXTERIOR CAULKING, WHITE/ BEIGE
2603-45-00ri15 10/14/201545 N/A 9 9 9EXTERIOR CAULKING, WHITE/ BEIGE
2603-45-10 8/5/200945 SW DOOR 3 0 0EXTERIOR CAULKING, WHITE/ BEIGE
2603-46-00ri10 9/16/201046 N/A 9 9 9EXTERIOR CAULKING, WHITE
2603-46-00ri13 12/6/201346 N/A 9 9 9EXTERIOR CAULKING, WHITE
2603-46-00ri15 10/14/201546 N/A 9 9 9EXTERIOR CAULKING, WHITE
2603-46-10 8/5/200946 AWNING, NW 3 0 0EXTERIOR CAULKING, WHITE
2603-46-11 8/5/200946 LOUNGE ROOF FLASH, WEST 4 0 0EXTERIOR CAULKING, WHITE
2603-47-00ri10 9/16/201047 N/A 9 9 9ROOFING SEALANT, GRAY
2603-47-00ri13 12/6/201347 N/A 9 9 9ROOFING SEALANT, GRAY
2603-47-00ri15 10/14/201547 N/A 9 9 9ROOFING SEALANT, GRAY
2603-47-10 8/5/200947 WEST LOUNGE ROOF 10 0 0ROOFING SEALANT,
GRAY
2603-48-10 8/5/200948 WEST LOUNGE ROOF SW 0 0 0BUILT-UP ROOFING
2603-50-20 9/16/201050 WEST CNTR CONF. RM 0 0 0TEXTURED CEILING
MATERIAL
2603-51-20 9/16/201051 EAST CNTR LAUNDRY
(PATCH)
0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/BEIGE STREAKS
2603-52-20 9/16/201052 2ND FL EAST CNTR BREAK
RM
0 0 0SINK UNDERCOATING, BLACK
Thursday, May 21, 2020 Page 12 of 12Print Date:
Building # 2604
MCB CAMP LEJEUNE
Thursday, May 21, 2020
Thursday, May 21, 2020 Page 1 of 11Print Date:
OCCUPANT:
YEAR BUILT:
BUILDING COMMENTS:
MILITARY PERSONNEL BOQ
HAZ RANK 2A/YELLOW [AH OCT2015]
ACM LINER MATERIAL AT RADIANT HEATERS
OCT2015
ACM REMAINS, STABLE
DEC2013
PVS. ACM REMAINS, NO CHANGES
JAN2013
ACM TILE AND INSULATION DEBRIS REMOVED, MASTIC CONFIRMATION SAMPLING NON ACM, ACM INCLUDES:
RADIANT HEATER LINER
RESIDUAL CAULKING
MISC. SEALANT, BLACK
OCT2010 1B
PVS. ACM REMAINS, ADDL SAMPLING, ACM INCLUDES:
RESIDUAL MASTIC
ROOFING SEALANT, BLACK
12" WHITE TILE (VERIFIED TEM)
JUL08
GASKET AND TRANSITE NOT IDENTIFIED, OTHER PVS. ACM REMAINS, ADDL SAMPLING, ACM INCLUDES:
EXTERIOR RESIDUAL CAULKINGS
OCT03
PVS. ACM REMAINS, ABATEMENT/ CLEAN-UP IN CRAWLSPACE
SEP00/ 2604 HOMOGENOUS w/2602-2613 BOQs; ACM INCLUDES:
RADIANT HEAT LINER MATERIAL
TAR SEALANT
GASKET MATERIAL
PIPE INSULATION and DEBRIS MUDDED FITTINGS and DEBRIS
CONTAMINATED SOIL
TRANSITE PANEL MATERIAL
ASBESTOS MANAGER: 910-451-5837
Friable ACM(s) identified
NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not
RADIANT HEATER LINER MATERIAL 250 SFNORTH CENTER LOUNGE RADIANT
HEATERS
10/3/2000
RADIANT HEATER LINER MATERIAL 250 SFNORTH CENTER LOUNGE RADIANT
HEATERS
12/5/2013
RADIANT HEATER LINER MATERIAL 250 SFLOUNGE RADIANT HEATERS 7/30/2008
RADIANT HEATER LINER MATERIAL 250 SFNORTH CENTER LOUNGE RADIANT
HEATERS
1/16/2013
RADIANT HEATER LINER MATERIAL 250 SFLOUNGE RADIANT HEATERS 10/15/2003
Thursday, May 21, 2020 Page 2 of 11Print Date:
RADIANT HEATER LINER MATERIAL 250 SFNORTH CENTER LOUNGE RADIANT
HEATERS
10/6/2010
RADIANT HEATER LINER MATERIAL 250 SFNORTH CENTER LOUNGE RADIANT
HEATERS
10/14/2015
EXTERIOR CAULKING, 2,655 LFWINDOWS, RESIDUAL 7/30/2008
EXTERIOR CAULKING, 34 LFEAST AND WEST WING, NORTHSIDE
ENTRY DOORS
7/30/2008
TAR SEALANT 35 LFCENTER SOUTHEAST STEAM PIT
CEILING PERIMETER (UNDER LAUNDRY)
10/3/2000
ROOFING SEALANT, BLACK 4 SFEAST AND WEST ATTIC/ ROOF VENTS
(ACCESSIBLE FROM ATTIC); ATTIC
PIPING SEALANT
10/6/2010
TAR SEALANT 35 LFCENTER SOUTHEAST STEAM PIT
CEILING PERIMETER (UNDER LAUNDRY)
12/5/2013
TAR SEALANT 35 LFCENTER SOUTHEAST STEAM PIT
CEILING PERIMETER (UNDER LAUNDRY)
7/30/2008
TAR SEALANT 35 LFCENTER SOUTHEAST STEAM PIT
CEILING PERIMETER (UNDER LAUNDRY)
10/6/2010
ROOFING SEALANT, BLACK 4 SFEAST AND WEST ATTIC/ ROOF VENTS
(ACCESSIBLE FROM ATTIC); ATTIC
PIPING SEALANT
12/5/2013
EXTERIOR CAULKING, 2,655 LFWINDOWS, RESIDUAL 12/5/2013
EXTERIOR CAULKING, 34 LFEAST AND WEST WING, NORTHSIDE
ENTRY DOORS
12/5/2013
TAR SEALANT 35 LFCENTER SOUTHEAST STEAM PIT
CEILING PERIMETER (UNDER LAUNDRY)
1/16/2013
TAR SEALANT 35 LFCENTER SOUTHEAST STEAM PIT
CEILING PERIMETER (UNDER LAUNDRY)
10/15/2003
EXTERIOR CAULKING, 2,655 LFWINDOWS, RESIDUAL 10/6/2010
EXTERIOR CAULKING, 34 LFEAST AND WEST WING, NORTHSIDE
ENTRY DOORS
10/6/2010
EXTERIOR CAULKING, 2,655 LFWINDOWS, RESIDUAL 1/16/2013
EXTERIOR CAULKING, 34 LFEAST AND WEST WING, NORTHSIDE
ENTRY DOORS
1/16/2013
ROOFING SEALANT, BLACK 4 SFEAST AND WEST ATTIC/ ROOF VENTS
(ACCESSIBLE FROM ATTIC); ATTIC
PIPING SEALANT
1/16/2013
TAR SEALANT 35 LFCENTER SOUTHEAST STEAM PIT
CEILING PERIMETER (UNDER LAUNDRY)
10/14/2015
Thursday, May 21, 2020 Page 3 of 11Print Date:
EXTERIOR CAULKING, 2,655 LFWINDOWS, RESIDUAL 10/14/2015
EXTERIOR CAULKING, 34 LFEAST AND WEST WING, NORTHSIDE
ENTRY DOORS
10/14/2015
ROOFING SEALANT, BLACK 4 SFEAST AND WEST ATTIC/ ROOF VENTS
(ACCESSIBLE FROM ATTIC); ATTIC
PIPING SEALANT
10/14/2015
STAIR TREAD AND ADHESIVE EAST AND WEST STAIRWELLS 10/3/2000
DUCT SEALANT, BLACK HVAC UNITS IN ATTIC AND
CRAWLSPACE
10/3/2000
TRANSITE PANEL MATERIAL STEAM PIT DEBRIS, PERIMETER w/HM15 10/2/2000
ASPHALT SHINGLE AND TAR PAPER ATTIC DEBRIS, PREVIOUS ROOFING 7/30/2008
FELT PAPER ATTIC DEBRIS, PREVIOUS ROOFING 7/30/2008
DRYWALL THROUGHOUT INTERIOR (SEE ALSO
HM07)
10/3/2000
LINOLEUM AND ADHESIVE, FIRST FLOOR BAR AND ROOM
KITCHENETTES
10/3/2000
PIPE INSULATION CRAWLSPACE REMANANT MATERIAL
OF ABANDONED STEAM LINES
(PERIMETER); STEAM PIT PIPE
PENETRATIONS THROUGH WALL
10/3/2000
PIPE INSULATION DEBRIS AREAS THROUGHOUT CRAWLSPACE
(SEE ALSO HM18)
10/3/2000
MISCELLANEOUS SAMPLES THROUGHOUT 5/18/2001
JOINT MATERIAL THROUGHOUT INTERIOR AND ATTIC
(SEE ALSO HM02)
10/3/2000
CHIMNEY LINER MATERIAL ATTIC, CHIMNEY CHASE 10/3/2000
GASKET MATERIAL STEAM PIT DEBRIS AND TANK FLANGE 10/3/2000
ROOFING FELT DEBRIS ATTIC DEBRIS, PREVIOUS ROOFING 10/3/2000
CLOTH EXPANSION JOINT MATERIAL, THIN ATTIC AND CRAWLSPACE
VENTILATION DUCTS
10/3/2000
TANK INSULATION CENTER SOUTHEAST STEAM PIT
(UNDER LAUNDRY)
10/3/2000
12" GRAY w/ GRAY FLOOR TILE AND
ADHESIVE
CLOSET AND STORAGE AREAS 10/3/2000
DRYWALL AND JOINT MATERIAL ATTIC DEBRIS, PREVIOUS FIREWALLS 7/30/2008
12" WHITE w/ GRAY FLOOR TILE AND
ADHESIVE
LAUNDRY AND CLOSETS THROUGHOUT 10/3/2000
ASPHALT SHINGLE AND TAR PAPER ATTIC DEBRIS, PREVIOUS ROOFING 7/30/2008
EXTERIOR CAULKING, EXTERIOR NORTH AWNINGS AND
LOUNGE ROOF (METAL TO BRICK
JOINTS)
Thursday, May 21, 2020 Page 4 of 11Print Date:
constitute a health hazard.
HEALTH ASPECTS:
Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.
CONDITIONS TO AVOID:
Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos Program Manager.
REPORTS OF DAMAGE:
C ti ti i iti t d t i i i fib l d t t lRESPONSE ACTION
ROOFING MATERIAL, NORTH CENTER LOUNGE ROOF
COATING
7/30/2008
ROOFING MATERIAL, NORTH CENTER LOUNGE ROOF,
PATCHING AT METAL FLASHING TO
BRICK WALL
7/30/2008
12" WHITE FLOOR TILE AND ADHESIVE CENTER SOUTHWEST KITCHEN AREA
UNDER CARPET
10/6/2010
ROOFING MATERIAL, EXTERIOR GROUND DEBRIS, NORTH
CENTER EAST (PREVIOUS ROOFING OF
LOUNGE?)
10/6/2010
INTERIOR CAULKING, METAL REPLACEMENT WINDOWS AND
SILLS
10/6/2010
PIPE INSULATION CRAWLSPACE REMANANT MATERIAL
OF ABANDONED STEAM LINES
(PERIMETER); STEAM PIT PIPE
PENETRATIONS THROUGH WALL
10/15/2003
TRANSITE PANEL MATERIAL STEAM PIT DEBRIS, PERIMETER w/HM15 7/30/2008
TRANSITE PANEL MATERIAL STEAM PIT DEBRIS, PERIMETER w/HM15 10/15/2003
DRYWALL AND JOINT MATERIAL THROUGHOUT INTERIOR (SEE ALSO
HM07)
10/6/2010
PIPE INSULATION CRAWLSPACE AT STEAM PIT 7/30/2008
12" GRAY w/ GRAY FLOOR TILE AND
ADHESIVE
CLOSET AND STORAGE AREAS 10/6/2010
12" WHITE w/ GRAY FLOOR TILE AND
ADHESIVE
LAUNDRY AND CLOSETS THROUGHOUT 10/6/2010
CLOTH EXPANSION JOINT MATERIAL, THIN ATTIC AND CRAWLSPACE
VENTILATION DUCTS
10/6/2010
EXTERIOR CAULKING, EXTERIOR NORTH AWNINGS AND
LOUNGE ROOF (METAL TO BRICK
JOINTS)
10/6/2010
ROOFING MATERIAL, NORTH CENTER LOUNGE ROOF,
PATCHING AT METAL FLASHING TO
BRICK WALL
10/6/2010
STAIR TREAD AND ADHESIVE EAST AND WEST STAIRWELLS 10/6/2010
PIPE INSULATION CRAWLSPACE REMANANT MATERIAL
OF ABANDONED STEAM LINES
(PERIMETER); STEAM PIT PIPE
PENETRATIONS THROUGH WALL
10/6/2010
RESIDUAL MASTIC CLOSET AND STORAGE AREAS 1/16/2013
Thursday, May 21, 2020 Page 5 of 11Print Date:
Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:
ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:
The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.
RECORDKEEPING:
CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837
Thursday, May 21, 2020 Page 6 of 11Print Date:
HA Sample Location Chr
Amo
Oth
Description
2604-02-07 10/3/200002 1ST FL EAST, NORTH CNTR
HEAD
0 0 0DRYWALL
2604-02-08 10/3/200002 ATTIC, CNTR WEST 0 0 0DRYWALL
2604-02-30 10/6/201002 EAST WING, SOUTH CNTR
WALL
0 0 0DRYWALL
2604-02-31 10/6/201002 WEST WING, NW WALL 0 0 0DRYWALL
2604-02-32 10/6/201002 2ND FL WEST WING, NORTH
CNTR WALL
0 0 0DRYWALL
2604-02-33 10/6/201002 2ND FL EAST WING, NORTH
CNTR WALL
0 0 0DRYWALL
2604-02-34 10/6/201002 CNTR NORTH GAME RM,
CEILING
0 0 0DRYWALL
2603-03-00ri03 10/15/200303 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2604-03-00ri07 7/30/200803 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2604-03-00ri10 10/6/201003 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2604-03-00ri12 1/16/201303 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2604-03-00ri13 12/5/201303 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2604-03-00ri15 10/14/201503 N/A 9 9 9RADIANT HEATER
LINER MATERIAL
2604-03-04 10/3/200003 NORTH CNTR LOUNGE 50 0 0RADIANT HEATER
LINER MATERIAL
2604-04-03 10/3/200004 1ST FL CNTR SE BAR 0 0 0LINOLEUM AND
ADHESIVE,
WHITE w/ Gray
2604-06-02 10/3/200006 CNTR SE LAUNDRY 0 0 012" WHITE w/ GRAY
FLOOR TILE AND
ADHESIVE
2604-06-30 10/6/201006 CNTR SE LAUNDRY 0 0 012" WHITE w/ GRAY
FLOOR TILE AND
ADHESIVE
2604-06-30tem 10/6/201006 CNTR SE LAUNDRY 0 0 012" WHITE w/ GRAY
FLOOR TILE AND
Thursday, May 21, 2020 Page 7 of 11Print Date:
HA Sample Location Chr
Amo
Oth
Description
2604-07-07 10/3/200007 1ST FL EAST, NORTH CNTR
HEAD
0 0 0JOINT MATERIAL
2604-07-08 10/3/200007 ATTIC, CNTR WEST 0 0 0JOINT MATERIAL
2604-09-05 10/3/200009 ATTIC, EAST SIDE, NW 0 0 0CLOTH EXPANSION
JOINT MATERIAL, THIN
2604-09-30 10/6/201009 ATTIC, EAST WING, WEST
CNTR
0 0 0CLOTH EXPANSION
JOINT MATERIAL, THIN
2604-10-03 10/3/200010 ATTIC, CNTR 0 0 0ROOFING FELT DEBRIS
2604-11-02 10/3/200011 ATTIC, CNTR CHIMNEY 0 0 0CHIMNEY LINER
MATERIAL
2604-13-04 10/3/200013 CNTR SE STEAM PIT TANK 0 0 0TANK INSULATION
2604-13-05 10/3/200013 CNTR SE STEAM PIT TANK 0 0 0TANK INSULATION
2604-15-00ri03 10/15/200315 N/A 9 9 9TAR SEALANT
2604-15-00ri07 7/30/200815 N/A 9 9 9TAR SEALANT
2604-15-00ri10 10/6/201015 N/A 9 9 9TAR SEALANT
2604-15-00ri12 1/16/201315 N/A 9 9 9TAR SEALANT
2604-15-00ri13 12/5/201315 N/A 9 9 9TAR SEALANT
2604-15-00ri15 10/14/201515 N/A 9 9 9TAR SEALANT
2604-15-03 10/3/200015 CNTR SE STEAM PIT 8 0 0TAR SEALANT
2604-16-00RI07 7/30/200816 N/A 9 9 9GASKET MATERIAL WHITE
2604-16-03 10/3/200016 STEAM PIT 0 0 0GASKET MATERIAL WHITE
2604-18-00ri03 10/15/200318 N/A 9 9 9PIPE INSULATION
2604-18-00ri07 7/30/200818 N/A 9 9 9PIPE INSULATION
2604-18-00ri10 10/6/201018 N/A 9 9 9PIPE INSULATION
2604-18-04 10/3/200018 CRAWLSPACE, NORTH CNTR 5 25 0PIPE INSULATION
2604-19-02 10/3/200019 CRAWLSPACE, EAST SIDE
NORTH CNTR
5 30 0PIPE INSULATION
DEBRIS
2604-23-02 10/3/200023 NORTH CNTR HOUSEKEEPER
STRGE
0 0 012" GRAY w/ GRAY
FLOOR TILE AND
Thursday, May 21, 2020 Page 8 of 11Print Date:
HA Sample Location Chr
Amo
Oth
Description
2604-23-03 10/3/200023 2ND FL CNTR SE STRGE 0 0 012" GRAY w/ GRAY
FLOOR TILE AND
ADHESIVE
2604-23-30 10/6/201023 EAST WING, NORTH CNTR
STAIR CLOSET
3 0 012" GRAY w/ GRAY
FLOOR TILE AND
ADHESIVE
2604-23-40 1/16/201323 1ST FL EAST STAIR CLOSET 0 0 012" GRAY w/ GRAY
FLOOR TILE AND
ADHESIVE
2604-27-02 10/3/200027 WEST STAIRWELL 0 0 0STAIR TREAD AND
ADHESIVE
BLACK
2604-27-30 10/6/201027 EAST WING, NORTH CNTR
STAIRS
0 0 0STAIR TREAD AND
ADHESIVE
BLACK
2604-30-01 10/3/200030 ATTIC, WEST CNTR 0 0 0DUCT SEALANT, BLACK WRAP STYLE
2604-30-02 10/3/200030 CRAWLSPACE, EAST CNTR 0 0 0DUCT SEALANT, BLACK WRAP STYLE
2603-32-00 10/2/200032 N/A 9 9 9TRANSITE PANEL
MATERIAL
GRAY
2604-32-00ri03 10/15/200332 N/A 9 9 9TRANSITE PANEL
MATERIAL
GRAY
2604-32-00ri07 7/30/200832 N/A 9 9 9TRANSITE PANEL
MATERIAL
GRAY
2604-40-00ri10 10/6/201040 N/A 9 9 9EXTERIOR CAULKING, WHITE
2604-40-00ri12 1/16/201340 N/A 9 9 9EXTERIOR CAULKING, WHITE
2604-40-00ri13 12/5/201340 N/A 9 9 9EXTERIOR CAULKING, WHITE
2604-40-00ri15 10/14/201540 N/A 9 9 9EXTERIOR CAULKING, WHITE
2604-40-20 7/30/200840 EAST WING, NORTH CNTR 3 0 0EXTERIOR CAULKING, WHITE
2604-40-21 7/30/200840 WEST WING, NE 3 0 0EXTERIOR CAULKING, WHITE
2604-41-00ri10 10/6/201041 N/A 9 9 9EXTERIOR CAULKING, WHITE
2604-41-00ri12 1/16/201341 N/A 9 9 9EXTERIOR CAULKING, WHITE
2604-41-00ri13 12/5/201341 N/A 9 9 9EXTERIOR CAULKING, WHITE
2604-41-00ri15 10/14/201541 N/A 9 9 9EXTERIOR CAULKING, WHITE
2604-41-20 7/30/200841 EAST WING, NORTH CNTR
ENTRY
3 0 0EXTERIOR CAULKING, WHITE
Thursday, May 21, 2020 Page 9 of 11Print Date:
HA Sample Location Chr
Amo
Oth
Description
2604-42-20 7/30/200842 ATTIC, CNTR WEST 0 0 0ASPHALT SHINGLE AND
TAR PAPER
W/FELT PAPER/ON ROOF
2604-43-20 7/30/200843 ATTIC, CNTR AT CHIMNEY 0 0 0FELT PAPER BLACK
2604-44-20 7/30/200844 ATTIC, CNTR 0 0 0ASPHALT SHINGLE AND
TAR PAPER
2604-45-20 7/30/200845 ATTIC, WEST FIREWALL 0 0 0DRYWALL AND JOINT
MATERIAL
2604-46-20 7/30/200846 NORTH CNTR LOUNGE ROOF 0 0 0EXTERIOR CAULKING, WHITE
2604-46-30 10/6/201046 NORTHSIDE, EAST AWNING 0 0 0EXTERIOR CAULKING, WHITE
2604-47-20 7/30/200847 NORTH CNTR LOUNGE ROOF,
SE
0 0 0ROOFING MATERIAL, TAR
2604-47-21 7/30/200847 NORTH CNTR LOUNGE ROOF,
SW
0 0 0ROOFING MATERIAL, TAR
2604-48-20 7/30/200848 NORTH CNTR LOUNGE ROOF,
SW
0 0 0ROOFING MATERIAL, TAR
2604-48-30 10/6/201048 NORTH CNTR ROOF, EAST 0 0 0ROOFING MATERIAL, TAR
2604-50-30 10/6/201050 EAST WING, SOUTH CNTR 0 0 0INTERIOR CAULKING, WHITE
2604-50-31 10/6/201050 WEST WING, NORTH CNTR 0 0 0INTERIOR CAULKING, WHITE
2604-50-32 10/6/201050 2ND FL WEST WING, NORTH
CNTR
0 0 0INTERIOR CAULKING, WHITE
2604-50-33 10/6/201050 2ND FL EAST WING, NORTH
CNTR
0 0 0INTERIOR CAULKING, WHITE
2604-51-30 10/6/201051 CNTR SW KITCHEN, SW 0 0 012" WHITE FLOOR TILE
AND ADHESIVE
2604-51-30tem 10/6/201051 CNTR SW KITCHEN, SW 7.75 0 012" WHITE FLOOR TILE
AND ADHESIVE
2604-52-00ri12 1/16/201352 N/A 9 9 9ROOFING SEALANT, BLACK
2604-52-00ri13 12/5/201352 N/A 9 9 9ROOFING SEALANT, BLACK
2604-52-00ri15 10/14/201552 N/A 9 9 9ROOFING SEALANT, BLACK
2604-52-30 10/6/201052 ROOF (FR. ATTIC), EAST
WING CNTR VENT
5 0 0ROOFING SEALANT,
BLACK
Thursday, May 21, 2020 Page 10 of 11Print Date:
HA Sample Location Chr
Amo
Oth
Description
2604-52-31 10/6/201052 ATTIC, EAST WING, NE 0 0 0ROOFING SEALANT,
BLACK
2604-53-30 10/6/201053 NORTH CNTR EAST, EXT.
GROUND
0 0 0ROOFING MATERIAL, BLACK, FIBROUS
Thursday, May 21, 2020 Page 11 of 11Print Date:
Building # 2605
MCB CAMP LEJEUNE
Thursday, May 21, 2020
OCCUPANT:
YEAR BUILT:
BUILDING COMMENTS:
MILITARY PERSONNEL BOQ
HAZ RANK 2A/YELLOW [AH OCT2015]
ACM HEAT SHIELD IN LOBBY/ LOUNGE AREA
OCT2015
ACM REMAINS, STABLE
DEC2013
PVS. ACM REMAINS, NO CHANGES
AUG2011
ACM TSI DEBRIS REMOVED FROM STEAM PIT; CRAWLSPACE PVS. ABATEMENTS
JAN2011 1C
ACM TSI DEBRIS IN CRAWLSPACE/ STEAM PIT;
PVS. ACM REMAINS, ADDL SAMPLING, ACM INCLUDES:
LINER/ HEAT SHIELD (LIMTED)
CAULKING
MASTIC UNDER 12" BEIGE TILE
ROOFING TAR
TAR SEALANT
MUDDED FITTING
AUG09
QA/QC INSPECT, FINDINGS CONSISTENT
JUL08:
ACM REMAINS, ADDL ACM INCLUDES:
INTERIOR CAULKING
ROOFING MATERIAL,TAR
EXTERIOR CAULKING, WINDOW
EXTERIOR CAULKING at FLASHING
OCT03:
ACM REMAINS, NO SIGNIFICANT CHANGES.
OCT00/ 2605 HOMOGENOUS w/2602-2613 BOQs; ACM INCLUDES:
RADIANT HEAT LINER MATERIAL
TAR SEALANT
GASKET MATERIAL
PIPE INSULATION and DEBRIS MUDDED FITTINGS and DEBRIS
CONTAMINATED SOIL
TRANSITE PANEL MATERIAL
ASBESTOS MANAGER: 910-451-5837
Friable ACM(s) identified
NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not
RADIANT HEATER LINER MATERIAL 250 SFWEST CENTER LOUNGE RADIANT
HEATERS
10/2/2000
RADIANT HEATER LINER MATERIAL 250 SFLOUNGE RADIANT HEATERS 7/31/2008
RADIANT HEATER LINER MATERIAL 250 SFLOUNGE RADIANT HEATERS 10/15/2003
RADIANT HEATER LINER MATERIAL 125 SFWEST CENTER LOUNGE RADIANT
HEATERS
1/7/2011
RADIANT HEATER LINER MATERIAL 250 SFWEST CENTER LOUNGE RADIANT
HEATERS
12/6/2013
RADIANT HEATER LINER MATERIAL 250 SFWEST CENTER LOUNGE RADIANT
HEATERS
10/14/2015
INTERIOR CAULKING, 2 LFEAST CENTER STEAM PIT, BRICK WALL
AT OLD CEILING PERIMETER [SEE ALSO
HM15]
7/31/2008
TAR SEALANT 35 LFCENTER EAST LAUNDRY ROOM STEAM
PIT, OLD CEILING PERIMETER
10/2/2000
ROOFING MATERIAL, 16 LFATTIC/ ROOF AT CENTER CHIMNEY 7/31/2008
EXTERIOR CAULKING, 2,655 LFRESIDUAL ON BRICK AT WINDOWS 7/31/2008
EXTERIOR CAULKING, 16 LFWESTSIDE ENTRY AWNINGS METAL
FLASHING TO BRICK
7/31/2008
12" BEIGE FLOOR TILE AND ADHESIVE 20 SFWESTSIDE, NORTH AND SOUTH
STAIRWELL CLOSETS; SECOND FLOOR
EAST CENTER BREAKROOM
1/7/2011
TAR SEALANT 35 LFSTEAM PIT 10/15/2003
TAR SEALANT 35 LFSTEAM PIT 7/31/2008
INTERIOR CAULKING, 2 LFEAST CENTER STEAM PIT, BRICK WALL
AT OLD CEILING PERIMETER [SEE ALSO
HM15]
1/7/2011
ROOFING MATERIAL, 16 LFATTIC/ ROOF AT CENTER CHIMNEY 1/7/2011
EXTERIOR CAULKING, 2,655 LFRESIDUAL ON BRICK AT WINDOWS 1/7/2011
EXTERIOR CAULKING, 16 LFWESTSIDE ENTRY AWNINGS METAL
FLASHING TO BRICK
1/7/2011
TAR SEALANT 35 LFCENTER EAST LAUNDRY ROOM STEAM
PIT, OLD CEILING PERIMETER
1/7/2011
ROOFING MATERIAL, 16 LFATTIC/ ROOF AT CENTER CHIMNEY 12/6/2013
EXTERIOR CAULKING, 2,655 LFRESIDUAL ON BRICK AT WINDOWS 12/6/2013
EXTERIOR CAULKING, 16 LFWESTSIDE ENTRY AWNINGS METAL
FLASHING TO BRICK
12/6/2013
12" BEIGE FLOOR TILE AND ADHESIVE 20 SFWESTSIDE, NORTH AND SOUTH
STAIRWELL CLOSETS
12/6/2013
12" BEIGE FLOOR TILE AND ADHESIVE 20 SFWESTSIDE, NORTH AND SOUTH
STAIRWELL CLOSETS; SECOND FLOOR
EAST CENTER BREAKROOM
TAR SEALANT 35 LFCENTER EAST LAUNDRY ROOM STEAM
PIT, OLD CEILING PERIMETER
12/6/2013
INTERIOR CAULKING, 2 LFEAST CENTER STEAM PIT, BRICK WALL
AT OLD CEILING PERIMETER [SEE ALSO
HM15]
12/6/2013
TAR SEALANT 35 LFCENTER EAST LAUNDRY ROOM STEAM
PIT, OLD CEILING PERIMETER
10/14/2015
INTERIOR CAULKING, 2 LFEAST CENTER STEAM PIT, BRICK WALL
AT OLD CEILING PERIMETER [SEE ALSO
HM15]
10/14/2015
ROOFING MATERIAL, 16 LFATTIC/ ROOF AT CENTER CHIMNEY 10/14/2015
EXTERIOR CAULKING, 2,655 LFRESIDUAL ON BRICK AT WINDOWS 10/14/2015
EXTERIOR CAULKING, 16 LFWESTSIDE ENTRY AWNINGS METAL
FLASHING TO BRICK
10/14/2015
ROOFING MATERIAL, WEST LOUNGE ROOF, ASPHALT
FLASHING/ ROOFING SEAMS AND
PERIMETER
7/31/2008
TEXTURED CEILING MATERIAL WEST CENTER LOUNGE AREA 10/2/2000
TRANSITE PANEL MATERIAL EAST CENTER STEAM PIT, REMNANTS
OF ORIGINAL CEILING w/HM15
10/2/2000
ASPHALT SHINGLE AND TAR PAPER ATTIC DEBRIS, PREVIOUS ROOFING 7/31/2008
PLASTER MATERIAL DEBRIS CRAWLSPACE DEBRIS, FORMER
INTERIOR WALLS (SEE ALSO HM26)
10/2/2000
PLASTER SMOOTHCOAT ORIGINAL INTERIOR WALLS (SEE ALSO
HM22)
10/2/2000
ROOFING FELT DEBRIS ATTIC DEBRIS, PREVIOUS ROOFING 10/2/2000
TANK INSULATION CENTER EAST LAUNDRY ROOM STEAM
PIT TANK
10/2/2000
PIPE INSULATION DEBRIS CRAWLSPACE DEBRIS 10/2/2000
PIPE INSULATION, AIRCELL CENTER EAST STEAM PIT, SOUTH
WALL AT PENETRATIONS
10/2/2000
JOINT MATERIAL WALLS AND CEILINGS THROUGHOUT
INTERIOR; ATTIC FIREWALLS (SEE
ALSO HM02)
10/2/2000
STAIR TREAD AND ADHESIVE WESTSIDE, NORTH AND SOUTH
STAIRWELLS
10/2/2000
DRYWALL WALLS AND CEILINGS THROUGHOUT
INTERIOR; ATTIC FIREWALLS (SEE
ALSO HM07)
10/2/2000
ASPHALT SHINGLE AND TAR PAPER ATTIC DEBRIS, PREVIOUS ROOFING 7/31/2008
GASKET MATERIAL CENTER EAST STEAM PIT 10/2/2000
PIPE INSULATION CRAWLSPACE PERIMETER AT OLD PIPE
PENETRATIONS THROUGH FLOOR;
SOME BURRIED IN CENTER (SEE HM19)
10/2/2000
12" GRAY w/ GRAY FLOOR TILE AND
ADHESIVE
AREA CLOSETS, STORAGE, AND
COMMON ROOMS
10/2/2000
LINOLEUM AND ADHESIVE, FIRST FLOOR BAR AND ROOM
KITCHENETTE AREAS
10/2/2000
CLOTH EXPANSION JOINT MATERIAL, THIN VENTILATION DUCTS IN ATTIC AND
CRAWLSPACE
10/2/2000
BUILT-UP ROOFING WEST LOUNGE ROOF TOP COATING 7/31/2008
DRYWALL AND JOINT MATERIAL ATTIC DEBRIS, OLD FIREWALL
MATERIAL
7/31/2008
ASPHALT SHINGLE AND TAR PAPER ATTIC DEBRIS, PREVIOUS ROOFING 7/31/2008
SHINGLE ROOFING ATTIC DEBRIS, PREVIOUS ROOFING 7/31/2008
EXTERIOR CAULKING, DOORS 7/31/2008
ROOFING SEALANT, BLACK WEST CENTER LOUNGE ROOF METAL
FLASHING TO BRICK
7/31/2008
FIBROUS DEBRIS CENTER EAST STEAM PIT, SOUTHEAST
WALL
8/5/2009
MUDDED FITTING(S) EAST CENTER STEAM PIT, OVERHEAD
WEST OF TANK AT FLOOR JOISTS
8/5/2009
TEXTURED CEILING MATERIAL WEST CENTER LOUNGE CEILING 1/7/2011
INTERIOR CAULKING, METAL WINDOWS AND SILLS 1/7/2011
GASKET MATERIAL CENTER EAST STEAM PIT 7/31/2008
CLOTH EXPANSION JOINT MATERIAL, THIN VENTILATION DUCTS IN ATTIC AND
CRAWLSPACE
7/31/2008
PIPE INSULATION DEBRIS CRAWLSPACE 7/31/2008
TANK INSULATION STEAM PIT 7/31/2008
PIPE INSULATION CRAWLSPACE PERIMETER AT OLD PIPE
PENETRATIONS THROUGH FLOOR;
SOME BURRIED IN CENTER (SEE HM19)
7/31/2008
PIPE INSULATION, AIRCELL CENTER EAST STEAM PIT, SOUTH
WALL AT PENETRATIONS
7/31/2008
TRANSITE PANEL MATERIAL EAST CENTER STEAM PIT, REMNANTS
OF ORIGINAL CEILING w/HM15
7/31/2008
PIPE INSULATION, AIRCELL CENTER EAST STEAM PIT, SOUTH
WALL AT PENETRATIONS
1/7/2011
PIPE INSULATION CRAWLSPACE PERIMETER AT OLD PIPE
PENETRATIONS THROUGH FLOOR;
SOME BURRIED IN CENTER (SEE HM19)
1/7/2011
12" GRAY w/ GRAY FLOOR TILE AND
ADHESIVE
AREA CLOSETS, STORAGE, AND
COMMON ROOMS
1/7/2011
LINOLEUM AND ADHESIVE, FIRST FLOOR BAR AND ROOM
KITCHENETTE AREAS
1/7/2011
ROOFING MATERIAL, WEST LOUNGE ROOF, ASPHALT
FLASHING/ ROOFING SEAMS AND
PERIMETER
1/7/2011 constitute a health hazard.
HEALTH ASPECTS:
Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.
CONDITIONS TO AVOID:
Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in…