Amnd 0007 20R6019 FINAL.pdf

PDF 114 KB Posted

Attached to
Repair Nine Paradise Point BOQs
Solicitation number
N6247020R6019
Issued by

View the file

Other files

File Type Posted
20-0046 PART 3-- PPI RESPONSE 5_13AUG2020.pdf PDF
Amnd 0006 20R6019 FINAL.pdf PDF
Amnd 0005 20R6019 FINAL.pdf PDF
20-0046 PART 3-- PPI RESPONSE 4_07AUG2020.pdf PDF
20-0046 PART 3-- PPI RESPONSE 3_06AUG2020.pdf PDF
Amnd 0004 20R6019 FINAL.pdf PDF
Amnd 0003 20R6019 FINAL.pdf PDF
Roof Louvers 2617.jpeg JPEG file
Amnd 0002 20R6019 FINAL.pdf PDF
PART 6 ATTACHMENT N-MCBCL Base-Wide MNS-FACP Construction Requirements 28 JAN 2015 Typical.pdf PDF
01 31 19.05 20 Post Award Meetings-Revised 20JUL2020.pdf PDF
20-0046 Paradise Point BOQs - REV SP1.pdf PDF
01 31 10.05 20 Design Submittal Procedure-Revised 20JUL2020.pdf PDF
23 73 33 HEATING VENTILATING AND COOLING SYSTEM.pdf PDF
20-0046 Paradise Point BOQs - REV A101.pdf PDF
20-0046 PART 3-- PPI RESPONSE 1_20JUL2020.pdf PDF
11 24 24 ROOF FALL PROTECTION 20 Nov 2019.pdf PDF
Amnd 0001 20R6006 FINAL.pdf PDF
PART 6 ATTACHMENT F-NPDES PERMIT NCS000290.pdf PDF
PART 5 FINAL-28MAY2020.pdf PDF
PART 6 ATTACHMENT M9-M602 MECHANICAL CONTROLS.pdf PDF
PART 6 ATTACHMENT I9-879291-2603-INT_EXT REPAIRS.pdf PDF
PART 6 TOC-20-0046.pdf PDF
PART 6 ATTACHMENT I3-85-6406 BOQ Improvements.pdf PDF
PART 6 ATTACHMENT H-BOQ FURNITURE INVENTORY.pdf PDF
PART 6 ATTACHMENT K- MCBCL Mech Design Guidance 7.17.pdf PDF
PART 6 ATTACHMENT M5-M105 BOQ 2603 THRU 2611 LEVEL 1.pdf PDF
PART 6 ATTACHMENT I5-91-7314 BOQs Sidewalks-2.pdf PDF
PART 3 FINAL-28MAY2020.pdf PDF
PART 6 ATTACHMENT A3-EXISTING BUILDING PICTURES PT2.pdf PDF
PART 6 ATTACHMENT E3-ES101 BOQ SITE PRIMARY O.H. POWER PLAN.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
PART 6 ATTACHMENT M2-M102 BOQ 2617 LEVEL 2.pdf PDF
PART 6 ATTACHMENT A1-BOQ FLOOR PLAN REFERENCES.pdf PDF
PART 6 ATTACHMENT M10-M603 MECHANICAL CONTROLS.pdf PDF
PART 6 ATTACHMENT I6-95-1430 HVAC BOQs.pdf PDF
PART 6 ATTACHMENT L-EXAMPLE SCREEN WALL.pdf PDF
PART 6 ATTACHMENT M3-M103 BOQ 2602 LEVEL 1.pdf PDF
PART 6 ATTACHMENT D2- Appendix D for DEMO.pdf PDF
RFP N6247020R6019.pdf PDF
PART 6 ATTACHMENT M4-M104 BOQ 2602 LEVEL 2.pdf PDF
PART 6 ATTACHMENT M7-M107 BOQ 2613 LEVEL 1.pdf PDF
PART 6 ATTACHMENT E1-Electrical Policies 2020.pdf PDF
PART 6 ATTACHMENT I10-994214 - 2603_2609_2611_2613-REPL HVAC.pdf PDF
PART 6 ATTACHMENT A2-BOQ FRONT DESK FLOOR PLANS.pdf PDF
PART 6 ATTACHMENT D1-BASE ASBESTOS REPORTS-ALL BUILDINGS.pdf PDF
PART 6 ATTACHMENT E2-TS101 BOQ SITE TELECOMM PLAN.pdf PDF
PART 6 ATTACHMENT E4-ES102 BOQ SITE SECONDARY O.H. POWER PLAN.pdf PDF
PART 6 ATTACHMENT I8-1942 BOQs.pdf PDF
PART 6 ATTACHMENT M8-M601 MECHANICAL CONTROLS.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 8

AMENDMENT NO. 0007 08/13/20 1661575

ROICC81

OFFICER IN CHARGE OF CONSTRUCTION FLORENCE

NAVAL FACILITIES ENGINEERING COMMAND ATLANTIC

1121 HAMMOND ROAD

CAMP LEJEUNE, NC 28547-2521

See Item 6

✘ N6247020R6019

06/15/20

N6247020R6019 Repair Nine Paradise Point BOQs, Marine Corps Base Camp Lejeune, NC

The date and the hour for the receipt of proposals is extended to 21 August 2020 no later than 2:00 pm (EDT).

See continuation page(s).

20-0046 Repair Nine Paradise Point BOQs Solicitation N6247020R6019 Marine Corps Base Camp Lejeune, North Carolina Amendment 0007

Block 14. DESCRIPTION OF AMENDMENT (cont.)

A. The following provides the Government’s responses to preaward inquiries:

REFERENCE

Page Section Para.

QUESTION GOVERNMENT RESPONSE

Page 6-9, No

RFI #

Amendment 4, Pricing

Schedule

Where are the site or 5' outside the building line #'s being carried if it is an item like the new parking lot and paver area that coincides with both buildings 2609 & 2611. For instance if CLIN 0003AB is exercised over CLIN 0002AB does the parking lot and paver area go away as well? There are other considerations such as exterior mechanical yards, storm drainage systems and dumpster pads that could be shared between sites and are not directly related to one building.

See the revised Price Proposal Form, below. Each CLIN should be a standalone, complete and usable project.

B. The following provides corrections to the Government’s previously provided preaward inquiry responses:

REFERENCE

Page Section Para.

QUESTION GOVERNMENT RESPONSE

Part 3 Part 3 2.G &.F

Refers to Extended and Expanded Suite Requirements; FC 4-721-10N indicates that O1 suites are designed for double occupancy. Please clarify whether these identified in Part 3 2(Project Objectives).F(Suite Requirements) and .G (Kitchenette) Extended and Expanded Suites are single occupancy or greater.

Reference to UFC 4-721-10N is incorrect. Use UFC 4-720-01 Lodging Facilities for requirements.

Part 3 Part 3 2.G &.F

Room Requirement s

FC 4-721-10N indicates that each bedroom should have an accompanying closet; however, there are no closet requirements listed in suite descriptions in Part 3 Project Objectives nor Room Requirements. Please indicate if this is required.

Reference to UFC 4-721-10N is incorrect. Use UFC 4-720-01 Lodging Facilities for Suite Closet requirements.

Part 3 Room Requirement s

Neither Part 3 Room Requirements for

"TYPICAL SUITE

BATHROOM/SHOWER" nor Part 3 D201005 SHOWERS/TUBS" provide required size of shower; FC 4-721-10N indicates that 9SF shower is required minimum for rennovations. Please verify whether this is acceptable.

Reference to UFC 4-721-10N is incorrect. Use UFC 4-720-01 Lodging Facilities for TYPICAL

SUITE BATHROOM/SHOWER

room requirements.

Part 3 D201003

LAVATORI

ES

Part 3 D201003 LAVATORIES indicates "Provide wall mounted lavatories made of vitreous china, with manual single lever faucet in private restroom spaces." while Part 3 Room Requirements for "TYPICAL SUITE BATHROOM/SHOWER" state " ...full length of the counter over the lavatories." FC 4-721-10N indicates that "Cabinets shall be provided with a lavatory with a minimum four drawers, and a pair of doors with a minimum 36 inch (91.44 cm) width with centered bowl." Please clarify whether sinks should be wall mounted or require counter with casework.

Reference to UFC 4-721-10N is incorrect. Use UFC 4-720-01 Lodging Facilities for TYPICAL

SUITE BATHROOM/SHOWER

room requirements.

Part 3 Room Requirement s

Part 3 Room Requirements for

"TYPICAL SUITE

BATHROOM/SHOWER" indicate that the lavatory shall be included in space;

FC 4-721-10N indicates that seperates spaces are preferred for lavatories.

Please clarify if lavatories shall be accommodated outside of "TYPICAL

SUITE BATHROOM/SHOWER" .

UFC 4-721-10N is incorrect UFC.

The correct UFC is 4-720-01 Lodging Facilities. The Government doesn't have a preference for separated versus non-separated lavatories. DOR is to determine.

30 Part 3 C101001 Fixed

Partitions

Sound rated partition assemblies shall have a minimum STC of 42, however FC 4-721-10N requires STC 50 between units, and cooridors, and STC 45 at walls within living units. Please clarifiy if Part 3 ESR requirement allows for a lower STC value.

UFC 4-721-10N is the incorrect UFC.

Comply with UFC 4-720-01 Lodging Facilities.

What is the exterior fininsh required on the new stair towers attached to the ends of each building? We believe that a nice architectural precast finish would work well, is that acceptable?

Contractor to provide per the RFP.

Stairwell to match existing conditions as found in Building 2617.

C. This amendment also updates the Price Proposal Form, below.

D. All other contract terms and conditions remain unchanged.

PRICE PROPOSAL FORM

DOCUMENT 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

02/14

PART 1 GENERAL

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Contract Line Item (CLIN) lump sum price for the following items:

CLIN 0001 - BASE PRICE. Price includes the following for Project 20-0046, Repair Nine Paradise Point BOQs:

CLIN 0001.

CLIN DESCRIPTION PRICE FOR CLIN

0001AA Price for the entire work associated with Building 2603 Renovation, in accordance with drawings, specifications, and RFP documents, but excluding work described in all other specified Contract Line Items (CLIN).

0001AB Price for the entire work associated with Building 2613 Renovation, in accordance with drawings, specifications, other specified CLINs.

0001AC Price for the entire work associated with Building 2607 Demolition, in accordance with drawings, specifications, 0001AD Price for the entire work associated with Building 2609 Demolition, in accordance with drawings, specifications, Total Price for CLIN 0001:

CLIN 0002 – OPTION ITEM. Price includes the following for Project 20-0046, Repair Nine

CLIN 0002.

0002AA Price for the entire work associated with Building 2605

Renovation, in accordance with drawings, specifications, 0002AB Price for the entire work associated with Building 2611 Renovation, including the parking lot and pavers, in accordance with drawings, specifications, and RFP documents, but excluding work described in all other specified CLINs.

Total Price for CLIN 0002:

CLIN 0003 – OPTION ITEM. Price includes the following for Project 20-0046, Repair Nine

CLIN 0003.

0003AA Price for the entire work associated with Building 2605 Demolition, in accordance with drawings, specifications, 0003AB Price for the entire work associated with Building 2611 Demolition, in accordance with drawings, specifications, and RFP documents, but excluding work described in all other specified CLINs. Exercise of this option also deletes the requirements to construct associated parking lot and pavers.

Total Price for CLIN 0003:

CLIN 0004 – OPTION ITEM. Price includes the following for Project 20-0046, Repair Nine

CLIN 0004.

0004 Price for the entire work associated with Building 2602 Renovation, in accordance with drawings, specifications, Total Price for CLIN 0004:

CLIN 0005 – OPTION ITEM. Price includes the following for Project 20-0046, Repair Nine

CLIN 0005.

0005 Price for the entire work associated with Building 2604 Renovation, in accordance with drawings, specifications, Total Price for CLIN 0005:

CLIN 0006 – OPTION ITEM. Price includes the following for Project 20-0046, Repair Nine

CLIN 0006.

0006 Price for the entire work associated with Building 2617 Renovation, in accordance with drawings, specifications, Total Price for CLIN 0006:

Total Price for CLINs 0001 – 0006: $______________________________________________

1.2 GENERAL BID NOTES

a. Award will be made on the total sum of Contract Line Items (CLINs) 0001-0006.

b. The Government may reject an offer as nonresponsive if it is materially unbalanced. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

c. The Government intends to award the base items, as well as option items to the maximum extent possible, at the time of initial award. The Government reserves the right to exercise the remaining option items within 120 calendar days of contract award. If the Government elects to exercise the remaining option items, it will do so via only one modification; the Government will not exercise each option independently. If any of the options are exercised via the modification, the Government will extend the CCD 365 calendar days from the current CCD.

d. 52.217-5 -- Evaluation of Options.

As prescribed in 17.208(c), insert a provision substantially the same as the following:

Evaluation of Options (Jul 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of Provision)

e. 52.217-7 -- Option for Increased Quantity -- Separately Priced Line Item.

As prescribed in 17.208(e), insert a clause substantially the same as the following:

Option for Increased Quantity -- Separately Priced Line Item (Mar 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 365 calendar days of contract award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of Clause)

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Document

Amendments Acknowledged:

Amendment No. Date Amendment

No.

Date Amendment

No.

Date

Submitted by:

Offeror: _________________________________

Signature: _________________________________

Amnd 0007 20R6019 FINAL
Pg2 Amnd 0007 20R6019