This document is a project plan for the Massachusetts Vehicle Inspection and Maintenance Program, a state and local contract opportunity issued by the Massachusetts Department of Transportation. The project involves managing and implementing the vehicle emission and safety test program, including developing and managing the inspection station network, developing and implementing inspection protocols, and acquiring, providing, and maintaining inspection station equipment and data systems. The contractor will also be responsible for training program inspectors and providing communications to the public, inspectors, and repairers. The project plan outlines a multi-phased approach with key milestones such as implementing inspection equipment and data systems, performing acceptance testing, migrating legacy data, preparing systems for startup operations, manufacturing and installing workstations, implementing inspector training and FMCSA equivalency, and establishing motorist and industry communications. The contract is intended to commence on October 1, 2017.

The project plan provides details on the pricing structure, funding requirements and sources, and incumbent contractors, if any. It also addresses contingencies related to alternative approaches for providing workstations, which may impact the overall project timeline and implementation.

View the file

Other files

File Type Posted
Applus Technologies Volume 1_Technical Response_Applus.pdf PDF
Opus Ispection ProcessFlowDiagram.pdf PDF
SGS Interview Questions 6-20-16.docx DOCX document
Attachment C - Computing Environments FINAL 12 10 15.docx DOCX document
SGS RFR Cost Response.pdf PDF
NOTICE of Revised posting date for amended IM RFR documents 3 3 16.docx DOCX document
SGS MA_Final_Part7.pdf PDF
IMRFR Evaluation Process memo_3-21-16_for COMMBUYS.docx DOCX document
2017 Scope Exh H - Service Response Time FINAL 12 10 15.docx DOCX document
Applus Technologies eppform_Applus.doc DOC document
Commitment Letter Attachments.pdf PDF
Applus Technologies Microsoft Product Terms.docx DOCX document
Applus Technologies MA Cover Page-Volume2.pdf PDF
Applus Technologies CoreSite Data Center Agreement_Applus~1.pdf PDF
SGS MA_Final_Part1.pdf PDF
Parsons Cost Proposal for MASS17.pdf PDF
IM RFR Amendment no3_3 9 16.docx DOCX document
Attachment G - Program Costs FINAL 12 10 15.docx DOCX document
Applus Technologies Attachment 1 Cover Page.pdf PDF
Applus Technologies Microsoft Volume Licensing Agreement_Applus.pdf PDF
Parsons Attachment G - Program Costs_Parsons.docx DOCX document
IMRFR AMENDMENT 2 2 25 16.docx DOCX document
Bidders Conference Agenda_Handout_Attendees.doc DOC document
Attachment B - ALARS Interface FINAL 12 10 15.docx DOCX document
Attachment F - IM RFR Draft Scope of Services FINAL 12 10 15.docx DOCX document
QandA_vehicle_inspection_maintenance_Round2~1.xlsx XLSX spreadsheet
Parsons 3.2.2.8 prompt-pay-frm.docx DOCX document
Applus Bid Bond.pdf PDF
IM Evaluation Report 9-26-16.doc DOC document
Parsons 3.2.2.8.1 sdp-plan-form-1-commitment.docx DOCX document
Applus Technologies Attachment 3 Cover Page.pdf PDF
NOTICE TO BIDDERS REGARDING AMENDED DOCUMENT POSTING DATE 3.8.16.docx DOCX document
SGS MA_Final_Part3.pdf PDF
Attachment D - Management Application Spec FINAL 12 10 15.docx DOCX document
Parsons Attachment I - Bidders Cost Breakdown_Parsons.docx DOCX document
Notice of Applus as Apparent Successful Bidder.doc DOC document
SGS MA_Final_Part4.pdf PDF
QandA_vehicle_inspection_maintenance.xlsx XLSX spreadsheet
Parsons 3.2.2.8 Business Reference Form.doc DOC document
IMRFR AMENDMENT 1 1 25 16.docx DOCX document
Bidders 1 27 16 Conference Webinar and Training Information.doc DOC document
Parsons Attachment K - Bidders Response Checklist.docx DOCX document
Applus Technologies prompt-pay-frm_Applus.doc DOC document
Attachment L - Cloud Procurement Terms FINAL 12 10 15.docx DOCX document
MassDOT_Std_Contract_Form.doc DOC document
Parsons Attachment J - Bidders Financial Plan_Parsons.doc DOC document
SGS MA_Final_Part2.pdf PDF
Applus Technologies Amended Attachment K_Response Checklist_Applus.docx DOCX document
MassDOT_TandC.docx DOCX document
IMRFR Internal Scoring and Procedure doc 4.7.16.docx DOCX document
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID RFP Section RFP Date or Note Outline Number

Task Name

1 1 MASS17 Project Initiation Tasks

2 General General 1.1 Contract effective date

3 3.2.1.12.1 (in time to ensure Oct. 1, 2017 Startup) 2 Implement Inspection Equipment and Data Systems (Opus Inspection Provided Workstations)

4 2.1 Start Inspection Equipment and Data Systems Implementation

5 3.2.1.12.1.A.1 2.2 Prepare MASS17 Inspection Equipment & Data System Specifications

6 2.2.1 Start Specifications

7 2.2.2 Draft & Internally Review Specifications (Pre-JAD)

8 2.2.3 Joint Application Development (JAD) sessions (in coordination with Agencies)

9 2.2.4 Revise & Internally Review Specifications (Post-JAD)

10 2.2.5 Deliver Specifications for Approval

11 2.2.6 Review & Approve Specifications (incl. iterative revisions)

12 2.2.7 Complete Specifications

13 3.2.1.12.1.A.2 2.3 Prepare Acceptance Testing Protocols

14 2.3.1 Start Acceptance Testing Protocols Preparation

15 2.3.2 Interview Agency Stakeholders for Acceptance Testing Protocols Input

16 2.3.3 Draft & Internally Review Acceptance Testing Protocols

17 2.3.4 Deliver Acceptance Testing Protocols for Approval

18 2.3.5 Review & Approve Acceptance Testing Protocols (incl. iterative revisions)

19 2.3.6 Complete Acceptance Testing Protocols

20 2.4 Develop MASS17 Inspection Equipment & Data Systems

21 2.4.1 Start MASS17 Inspection Equipment & Data System Development

22 2.4.2 Develop MASS17 Inspection Equipment Hardware

23 2.4.2.1 Start MASS17 Inspection Equipment Hardware Development

24 2.4.2.2 Develop/Finalize MASS17 Inspection Equipment BOM

25 2.4.2.3 Procure Initial MASS17 Inspection Equipment Hardware

26 2.4.2.4 OBD Device Customization

27 2.4.2.5 Assemble & Review MASS17 First Article and Testing Prototypes

28 2.4.2.6 Document MASS17 Inspection Equipment Hardware

29 2.4.2.7 Incorporate Customized OBD Device to First Article and Testing Prototypes

30 2.4.2.8 Complete MASS17 Inspection Equipment Hardware Development

31 2.4.3 Develop MASS17 VISITS Hardware

32 2.4.3.1 Start MASS17 VISITS Hardware Development

33 2.4.3.2 Develop/Finalize MASS17 VISITS BOM

34 2.4.3.3 Procure Initial MASS17 VISITS Hardware

35 2.4.3.4 Assemble & Review MASS17 First Article and Testing Prototypes

36 2.4.3.5 Document MASS17 VISITS Hardware

37 2.4.3.6 Complete MASS17 VISITS Hardware Development

38 2.4.4 Develop MASS17 Data System Infrastructure (QA/UAT)

39 2.4.4.1 Start MASS17 Data System Infrastructure (QA/UAT)

40 2.4.4.2 Develop MASS17 Data System BOM

41 2.4.4.3 Procure/Provision MASS17 Data System Infrastructure

(QA/UAT)

42 2.4.4.4 Configure MASS17 Data System Infrastructure (VMs, VHDs)

(QA/UAT)

43 2.4.4.5 Install & Configure MASS17 Databases (QA/UAT)

44 2.4.4.6 Configure MASS17 Data System Mirroring, Failover, Load Balancing (as applicable) (QA/UAT)

45 2.4.4.7 Configure MASS17 Data System Monitoring Tools (QA/UAT)

46 2.4.4.8 Complete MASS17 Data System Infrastructure (QA/UAT)

47 2.4.5 Develop MASS17 Inspection Equipment & Data Systems Software

48 2.4.5.1 Start MASS17 Inspection Equipment & Data Systems Software Development Iterations

49 2.4.5.2 Development Iteration 1

50 2.4.5.2.1 Dev Iteration 1: Inspection Equipment Software

51 2.4.5.2.2 Dev Iteration 1: Data Systems Software

52 2.4.5.2.3 Dev Iteration 1: Team Review

53 2.4.5.3 Development Iteration 2

54 2.4.5.3.1 Dev Iteration 2: Inspection Equipment Software

55 2.4.5.3.2 Dev Iteration 2: Data Systems Software

56 2.4.5.3.3 Dev Iteration 2: Team Review

57 2.4.5.4 Development Iteration 3

58 2.4.5.4.1 Dev Iteration 3: Inspection Equipment Software

59 2.4.5.4.2 Dev Iteration 3: Data Systems Software

60 2.4.5.4.3 Dev Iteration 3: Team Review

61 2.4.5.5 Development Iteration 4

9/1

9/1

9/1

9/1

10/6

10/20

10/20

11/10

11/24

9/1

9/1

12/8

12/8

2/16

9/1

10/28

9/1

6/26 7/31 9/4 10/9 11/13 12/18 1/22 2/26 4/2 5/7 6/11 7/16 8/20 9/24 10/29 12/3 1/7 2/11 3/18 4/22 5/27 7/1 8/5 9/9 10/14 11/18 12/23 1/27 September January May September January May September January

Massachusetts Vehicle Inspection and Maintenance Program, COMMBUYS Bid#: BD-16-1030-0R100-0R001-00000006553, Agency Document Number: MDOTBOSTON-IM

Task Name

62 2.4.5.5.1 Dev Iteration 4: Inspection Equipment Software

63 2.4.5.5.2 Dev Iteration 4: Data Systems Software

64 2.4.5.5.3 Dev Iteration 4: Team Review

65 2.4.5.6 (Workstation Prototype Available to Incorporate Baseline Image into Dev Iteration Content)

66 2.4.5.7 Development Iteration 5

67 2.4.5.7.1 Dev Iteration 5: Inspection Equipment Software (Incorporating Baseline Image)

68 2.4.5.7.2 Dev Iteration 5: Data Systems Software

69 2.4.5.7.3 Dev Iteration 5: Team Review

70 2.4.5.8 (OBD Device Customizations Available to Incorporate into Baseline Image & Dev Iteration)

71 2.4.5.9 Development Iteration 6

72 2.4.5.9.1 Dev Iteration 6: Inspection Equipment Software

73 2.4.5.9.2 Dev Iteration 6: Data Systems Software

74 2.4.5.9.3 Dev Iteration 6: Team Review

75 2.4.5.10 Development Iteration 7

76 2.4.5.10.1 Dev Iteration 7: Inspection Equipment Software

77 2.4.5.10.2 Dev Iteration 7: Data Systems Software

78 2.4.5.10.3 Dev Iteration 7: Team Review

79 2.4.5.11 (Covert Audit DB Specification Developed)

80 2.4.5.12 Development Iteration 8

81 2.4.5.12.1 Dev Iteration 8: Inspection Equipment Software

82 2.4.5.12.2 Dev Iteration 8: Data Systems Software

83 2.4.5.12.3 Dev Iteration 8: Team Review

84 2.4.5.13 (VISITS Prototype Available to Incorporate into Dev Iteration Content)

85 2.4.5.14 Development Iteration 9

86 2.4.5.14.1 Dev Iteration 9: Inspection Equipment Software

87 2.4.5.14.2 Dev Iteration 9: Data Systems Software

88 2.4.5.14.3 Dev Iteration 9: Team Review

89 2.4.5.15 Development Iteration 10

90 2.4.5.15.1 Dev Iteration 10: Inspection Equipment Software

91 2.4.5.15.2 Dev Iteration 10: Data Systems Software

92 2.4.5.15.3 Dev Iteration 10: Team Review

93 2.4.5.16 Development Iteration 11

94 2.4.5.16.1 Dev Iteration 11: Inspection Equipment Software

95 2.4.5.16.2 Dev Iteration 11: Data Systems Software

96 2.4.5.16.3 Dev Iteration 11: Team Review

97 2.4.5.17 Development Iteration 12

98 2.4.5.17.1 Dev Iteration 12: Inspection Equipment Software

99 2.4.5.17.2 Dev Iteration 12: Data Systems Software

100 2.4.5.17.3 Dev Iteration 12: Team Review

101 2.4.5.18 Development Team Assesses Completion

102 2.4.5.19 Complete MASS17 Inspection Equipment & Data Systems Development Iterations

103 2.4.5.20 (((Contingency Buffer)))

104 2.4.5.21 System Ready for QA

105 2.5 Integration Test MASS17 Inspection Equipment & Data Systems (Internal QA)

106 2.5.1 Start QA Integration Testing MASS17 Inspection Equipment & Data Systems

107 2.5.2 QA Integration Test Iteration 1

108 2.5.2.1 QA Iteration 1: Review Integrated Systems

109 2.5.2.2 QA Iteration 1: Variance Resolution

110 2.5.3 QA Integration Test Iteration 2

111 2.5.3.1 QA Iteration 2: Review Integrated Systems

112 2.5.3.2 QA Iteration 2: Variance Resolution

113 2.5.4 QA Integration Test Iteration 3

114 2.5.4.1 QA Iteration 3: Review Integrated Systems

115 2.5.4.2 QA Iteration 3: Variance Resolution

116 2.6 QA Team Assesses Completion

117 2.7 Complete QA Integration Testing MASS17 Inspection Equipment & Data Systems

118 2.8 (((Contingency Buffer)))

119 2.9 System Ready for ATP

120 3.2.1.12.1.A.3 2.10 Perform Acceptance Testing Protocols (ATP)

121 2.10.1 Start ATP

122 2.10.2 Ensure ATP Units Delivered to ATP Site

123 2.10.3 ATP Iteration 1

124 2.10.3.1 ATP Iteration 1: Review System

125 2.10.3.2 ATP Iteration 1: Variance Resolution

126 2.10.4 ATP Iteration 2

127 2.10.4.1 ATP Iteration 2: Review System

128 2.10.4.2 ATP Iteration 2: Variance Resolution

129 2.10.5 Complete ATP

130 3.2.1.12.1.A.5 2.11 Migrate Legacy Data

131 2.11.1 Start Migrate Legacy Data

132 2.11.2 Perform Migrate Legacy Data

11/3

12/8

1/23

2/16

5/16

5/23

5/23

7/18

8/1

8/1

9/12

9/22

6/26 7/31 9/4 10/9 11/13 12/18 1/22 2/26 4/2 5/7 6/11 7/16 8/20 9/24 10/29 12/3 1/7 2/11 3/18 4/22 5/27 7/1 8/5 9/9 10/14 11/18 12/23 1/27

Massachusetts Vehicle Inspection and Maintenance Program, COMMBUYS Bid#: BD-16-1030-0R100-0R001-00000006553, Agency Document Number: MDOTBOSTON-IM

Task Name

133 2.11.2.1 Finalize decision for ongoing migration or "at-once" cutover (revise plan accordingly)

134 2.11.2.2 Obtain data design specifications

135 2.11.2.3 Data Mapping Research & Documentation

136 2.11.2.4 Develop Data Migration & Verification Plan

137 2.11.2.5 Submit Data Migration & Verification Plan for Approval

138 2.11.2.6 Review & Approve Plan (incl. iterative revisions)

139 2.11.2.7 Data Migration Application Development & Documentation

140 2.11.2.8 Receive Sample

141 2.11.2.9 Iterative Validation of Data Migration (Using Sample Data Export)

142 2.11.2.10 Task 1 - Initial migration and verification of legacy data

143 2.11.2.10.1 Full Data Export Received

144 2.11.2.10.2 Verification of Received Data

145 2.11.2.10.3 Migration of Received Data (Load)

146 2.11.2.10.4 Verification of Migrated Data

147 2.11.2.11 Task 2 - Subsequent migration and verification of legacy data

148 2.11.2.11.1 Subsequent Data Export Received

149 2.11.2.11.2 Verification of Received Data

150 2.11.2.11.3 Migration of Received Data (Load)

151 2.11.2.11.4 Verification of Migrated Data

152 2.11.2.12 Task 3 - Ongoing migration of legacy data

153 2.11.2.12.1 Subsequent Data Export Received Daily (Continue Until Transition)

154 2.11.2.12.2 Migration of Received Data (Load) (Continue Until Transition)

155 2.11.2.13 Complete transfer of approved legacy program data

156 2.11.2.14 Apply Migrated Legacy Data to UAT Environment

157 2.11.2.15 Complete UAT Data Migration

158 2.11.3 Complete Migrate Legacy Data (QA/UAT Environment)

159 2.12 Prepare MASS17 Systems for Startup Operations

160 2.12.1 Start Preparation of MASS17 Systems for Startup

161 2.12.2 Develop MASS17 Data System Infrastructure (PROD)

162 2.12.2.1 Start MASS17 Data System Infrastructure (PROD)

163 2.12.2.2 Revise MASS17 Data System BOM

164 2.12.2.3 Procure/Provision MASS17 Data System Infrastructure

(PROD)

165 2.12.2.4 Configure MASS17 Data System Infrastructure (VMs, VHDs)

(PROD)

166 2.12.2.5 Install & Configure MASS17 Databases (PROD)

167 2.12.2.6 Configure MASS17 Data System Mirroring, Failover, Load Balancing (PROD)

168 2.12.2.7 Configure MASS17 Data System Monitoring Tools (PROD)

169 2.12.2.8 Complete MASS17 Data System Infrastructure (PROD)

170 2.12.3 Install MASS17 Databases & Applications (PROD)

171 2.12.3.1 Start Install MASS17 Databases & Applications (PROD)

172 2.12.3.2 (((Contingency Buffer)))

173 2.12.3.3 Install & Configure MASS17 Data System Applications

(PROD)

174 2.12.3.4 Upload MASS17 Workstation Software to Data System

(PROD)

175 2.12.3.5 Complete Install MASS17 Databases & Applications (PROD)

176 2.12.4 Apply Migrated Legacy Data to PROD Environment

177 2.12.5 Confirm Preparation of MASS17 Systems for Startup

178 2.12.6 Final Legacy Data Migration

179 2.12.7 Complete Preparation of MASS17 Systems for Startup

180 2.12.8 System Ready for Startup Operations

181 3.2.1.12.1.A.4 2.13 Manufacture Workstations & Install in Inspection Stations

182 2.13.1 Start Manufacture Workstations & Install in Inspection Stations

183 2.13.2 Procure Workstation Hardware

184 2.13.3 Initial System/Software Baseline Image Ready for Workstation Computers

185 2.13.4 Manufacture Workstations (1,900)

186 2.13.5 Initial Workstations Ready for ATP Supply

187 2.13.6 Deliver Manufactured Workstations to Staging Area

188 2.13.7 Distribute & Install Workstations in Inspection Stations (incl. all peripherals; cameras; etc.)

189 2.13.8 Deploy Workstation Software (VID Distribution) for Inspection Startup Readiness

190 2.13.9 Complete Manufacture Workstations & Install in Inspection Stations

191 2.14 Complete Inspection Equipment and Data Systems Implementation

192 3.2.1.12.1.A.4 2.15 Assemble/Configure/Supply VISITS Units

193 2.15.1 Start Assemble/Configure VISITS Units

194 2.15.2 Procure VISITS Components

9/22

9/22

11/17

12/22

3/24

3/24

3/24

3/24

4/7

4/7

7/18

7/18

8/29

9/12

9/26

10/1

10/1

1/5

2/2

4/13

9/30

10/1

3/27

6/26 7/31 9/4 10/9 11/13 12/18 1/22 2/26 4/2 5/7 6/11 7/16 8/20 9/24 10/29 12/3 1/7 2/11 3/18 4/22 5/27 7/1 8/5 9/9 10/14 11/18 12/23 1/27

Massachusetts Vehicle Inspection and Maintenance Program, COMMBUYS Bid#: BD-16-1030-0R100-0R001-00000006553, Agency Document Number: MDOTBOSTON-IM

Task Name

195 2.15.3 Initial System/Software Baseline Image Ready for VISITS Tablets

196 2.15.4 Assemble/Configure VISITS Units

197 2.15.5 Evaluate VISITS Units

198 2.15.6 Supply VISITS Units

199 2.15.7 Complete Assemble/Configure/Supply VISITS Units

201 3.2.1.12.2 (in time to ensure Oct. 1, 2017 Startup) 3 Implement Inspector Training and FMCSA Equivalency

202 3.1 Start Inspector Training & FMCSA Equivalency Implementation

203 3.2.1.12.2.A.1 3.2 Evaluate Existing Inspector Training Courses & Design Updated Courses

204 3.2.1 Inspector Training Course Design: Non-commercial

205 3.2.1.1 Evaluate & Design Course

206 3.2.1.2 Submit for Approval

207 3.2.1.3 Review & Approve (incl. iterative revisions)

208 3.2.2 Inspector Training Course Design: Commercial

209 3.2.2.1 Evaluate & Design Course

210 3.2.2.2 Submit for Approval

211 3.2.2.3 Review & Approve (incl. iterative revisions)

212 3.2.3 Inspector Training Course Design: 7D

213 3.2.3.1 Evaluate & Design Course

214 3.2.3.2 Submit for Approval

215 3.2.3.3 Review & Approve (incl. iterative revisions)

216 3.2.4 Inspector Training Course Design: Motorcycle

217 3.2.4.1 Evaluate & Design Course

218 3.2.4.2 Submit for Approval

219 3.2.4.3 Review & Approve (incl. iterative revisions)

220 3.2.1.12.2.A.1 3.3 Produce Training Course Materials

221 3.3.1 Inspector Training Course Materials: Non-commercial

222 3.3.1.1 Prepare Training Course Materials

223 3.3.1.2 Submit for Approval

224 3.3.1.3 Review & Approve (incl. iterative revisions)

225 3.3.2 Inspector Training Course Materials: Commercial

226 3.3.2.1 Prepare Training Course Materials

227 3.3.2.2 Submit for Approval

228 3.3.2.3 Review & Approve (incl. iterative revisions)

229 3.3.3 Inspector Training Course Materials: 7D

230 3.3.3.1 Prepare Training Course Materials

231 3.3.3.2 Submit for Approval

232 3.3.3.3 Review & Approve (incl. iterative revisions)

233 3.3.4 Inspector Training Course Materials: Motorcycle

234 3.3.4.1 Prepare Training Course Materials

235 3.3.4.2 Submit for Approval

236 3.3.4.3 Review & Approve (incl. iterative revisions)

237 3.4 Recertification Course Design

238 3.4.1 Tailor Inspector Training Courses for Recertification

239 3.4.2 Submit for Approval

240 3.4.3 Review & Approve (incl. iterative revisions)

241 3.5 Recertification Course Materials

242 3.5.1 Prepare Supplemental Materials (as needed to support initial training courses)

243 3.5.2 Submit for Approval

244 3.5.3 Review & Approve (incl. iterative revisions)

245 3.6 Training Readiness Tasks

246 3.6.1 Evaluate Courses (Dry Run with MACs & Stakeholders), Revising as Needed

247 3.6.2 Perform Train-the-Trainer Courses

248 3.6.3 Update Materials as Necessary for Near-Final Software

249 3.6.4 Submit Updated Final Materials for Approval

250 3.6.5 Review & Approve Updated Materials (incl. iterative revisions)

251 3.6.6 Ready to Begin Training Inspectors

252 3.7 Transition Orientation

253 3.7.1 Prepare Transition Orientation Materials

254 3.2.1.12.2.A.2 3.7.2 Perform Transition Orientation for noncommercial and commercial vehicle inspector training, motorcycle inspector training, and 7D inspector training

255 3.8 Inspector Training and Enrollment

256 3.2.1.12.2.A.3 3.8.1 Begin Advertising Inspector Training and Enrollment

257 3.8.2 Begin Performing Inspector Training and Enrollment

259 3.2.1.12.3 (in time to ensure Oct. 1, 2017 Startup) 4 Implement Motorist and Industry Communications

260 4.1 PI&E kickoff meeting

261 4.2 Quarterly Industry Communications

262 4.2.1 Issue First Quarterly Newsletter

263 3.2.1.12.3.A.1 4.3 Prepare Collateral Public Information Material

264 4.3.1 Establish Program E-Mail Address(es)

4/13

9/11

9/1

9/22

9/22

9/22

9/22

2/2

2/2

2/2

2/2

3/30

5/16

7/4

7/13

9/7

9/21

6/26 7/31 9/4 10/9 11/13 12/18 1/22 2/26 4/2 5/7 6/11 7/16 8/20 9/24 10/29 12/3 1/7 2/11 3/18 4/22 5/27 7/1 8/5 9/9 10/14 11/18 12/23 1/27

Massachusetts Vehicle Inspection and Maintenance Program, COMMBUYS Bid#: BD-16-1030-0R100-0R001-00000006553, Agency Document Number: MDOTBOSTON-IM

Task Name

265 4.3.2 Establish Program Mailing Address(es)

266 4.3.3 Establish VIR Design

267 4.3.3.1 Design VIR for Analyzer Equipment and Website

268 4.3.3.2 Submit VIR Design for Approval

269 4.3.3.3 Review & Approve (incl. iterative revisions)

270 4.3.4 Establish Brochure Design

271 4.3.4.1 Design Brochure

272 4.3.4.2 Submit Brochure for Approval

273 4.3.4.3 Review & Approve (incl. iterative revisions)

274 4.3.4.4 Supply Brochures to Stations

275 3.2.1.12.3.A.2 4.4 Establish Motorist Communications Resources

276 4.4.1 Prepare Toll-Free Hotline for Motorists

277 4.4.1.1 Motorist Hotline Training Manual

278 4.4.1.1.1 Prepare Motorist Hotline Training Manual

279 4.4.1.1.2 Submit Motorist Hotline Training Manual to Agencies

280 4.4.1.1.3 Review & Approve (incl. iterative revisions)

281 4.4.1.2 Train Call Center Staff for Motorist Support

282 4.4.1.3 Configure Hotline to Add MASS17 Motorist Support to IVR

283 October 1, 2017 4.4.1.4 Motorist Hotline Goes Live

284 4.4.2 Prepare Public Website (Motorist-facing content)

285 4.4.2.1 Design Public Website

286 4.4.2.2 Submit Public Website Design for Approval

287 4.4.2.3 Review & Approve Design (incl. iterative revisions)

288 4.4.2.4 Iteratively Develop/Configure Public Website

289 4.4.2.5 Public Website Designed, Complete (Ready for URL transfer)

290 4.4.2.6 Public Website Address Transferred; Website Goes Live

291 3.2.1.12.3.A.3 4.5 Establish Inspector & Station Communications Resources

292 4.5.1 Prepare Toll-Free Hotline & Support System for Stations & Inspectors

293 4.5.1.1 Station & Inspector Hotline & Support System Design

294 4.5.1.1.1 Design Station & Inspector Hotline & Support System

295 4.5.1.1.2 Submit Station & Inspector Hotline & Support System Design to Agencies

296 4.5.1.1.3 Review & Approve (incl. iterative revisions)

297 4.5.1.2 Configure Station & Inspector Support System to Add

MASS17

298 4.5.1.3 Train Call Center Staff for Station & Inspector Support

299 4.5.1.4 Configure Hotline to Add MASS17 Station & Inspector Support to IVR

300 6.8.2 At least 90 days before startup 4.5.1.5 Station & Inspector Hotline & Support System Goes Live

301 4.5.2 Prepare Public Website (Station & Inspector-facing content)

302 4.5.2.1 Design Public Website (Station & Inspector-facing content)

303 4.5.2.2 Submit Public Website (Station & Inspector-facing content) Design for Approval

304 4.5.2.3 Review & Approve Design (incl. iterative revisions)

305 4.5.2.4 Iteratively Develop/Configure Public Website (Station & Inspector-facing content)

306 4.5.2.5 Public Website Designed, Complete (Station & Inspector-facing content)

307 4.5.2.6 Public Website (Station & Inspector-facing content) Goes Live on Preliminary URL

308 4.6 Establish Repair Technician Communications Resources

309 4.6.1 Prepare Toll-Free Hotline & Support System for Repair Technicians

310 4.6.1.1 Repair Technician Hotline & Support System Design

311 4.6.1.1.1 Design Repair Technician Hotline & Support System

312 4.6.1.1.2 Submit Repair Technician Hotline & Support System Design to Agencies

313 4.6.1.1.3 Review & Approve (incl. iterative revisions)

314 4.6.1.2 Configure Repair Technician Support System to Add MASS17

315 4.6.1.3 Train Call Center Staff for Repair Technician Support

316 4.6.1.4 Configure Hotline to Add MASS17 Repairer Support to IVR

317 4.6.1.5 Repair Technician Hotline & Support System Goes Live

318 4.6.2 Prepare Public Website/Forum (Repair Technician-facing content)

319 4.6.2.1 Design Public Website/Forum (Repair Technician-facing content)

320 4.6.2.2 Submit Public Website/Forum (Repair Technician-facing content) Design for Approval

321 4.6.2.3 Review & Approve Design (incl. iterative revisions)

322 4.6.2.4 Iteratively Develop/Configure Public Website/Forum (Repair Technician-facing content)

2/16

4/6

6/8

10/1

3/16

8/31

9/30

3/16

7/3

3/16

6/8

7/3

3/16

7/3

3/16

6/26 7/31 9/4 10/9 11/13 12/18 1/22 2/26 4/2 5/7 6/11 7/16 8/20 9/24 10/29 12/3 1/7 2/11 3/18 4/22 5/27 7/1 8/5 9/9 10/14 11/18 12/23 1/27

Massachusetts Vehicle Inspection and Maintenance Program, COMMBUYS Bid#: BD-16-1030-0R100-0R001-00000006553, Agency Document Number: MDOTBOSTON-IM

Task Name

323 4.6.2.5 Public Website/Forum Designed, Complete (Repair Technician-facing content)

324 4.6.2.6 Public Website/Forum (Repair Technician-facing content) Goes Live on Preliminary URL

326 3.2.1.12.4 5 Implement Motorist Assistance Centers (MACs) and VMI

327 5.1 Start MAC & VMI Implementation

328 3.2.1.12.4.A.1 5.2 Prepare MAC & VMI Plan

329 5.2.1 MAC & VMI Plan Kickoff Meeting

330 5.2.2 Create MAC & VMI Plan

331 5.2.3 Submit for Approval

332 5.2.4 Review & Approve (incl. iterative revisions)

333 3.2.1.12.4.A.2 5.3 Procure MAC Infrastructure (Sites, Equipment, Personnel, etc.)

334 5.3.1 MAC Site Planning & Preparation

335 5.3.1.1 Review & Evaluate Proposed MAC Sites

336 5.3.1.2 Purchase Sites

337 5.3.1.3 Establish Site Improvement Plan (where appropriate)

338 5.3.1.4 Prepare Sites for Use

339 5.3.1.5 Procure & Install MAC Equipment (incl. Diagnostic & Repair Equipment & Systems)

340 5.3.2 Hire MAC Personnel

341 3.2.1.12.4.A.3 5.4 Establish MAC & VMI Public Communication Resources

342 5.4.1 (Established in coordination with the Motorist and Industry Communications Plan)

343 3.2.1.12.4.A.4 5.5 Emissions Repairer Registration & Associated Outreach

344 3.2.1.12.4.A.5 5.6 Implement Emissions Repairer Training (and other VMI Initiatives)

345 5.6.1 Establish OBDII Root Cause Awareness Campaign & Outreach Program

346 5.6.2 Design Supplemental OBD Training Course

347 5.6.2.1 Design Course

348 5.6.2.2 Submit for Approval

349 5.6.2.3 Review & Approve (incl. iterative revisions)

350 5.6.3 Produce Training Course Materials

351 5.6.3.1 Prepare Training Course Materials

352 5.6.3.2 Submit for Approval

353 5.6.3.3 Review & Approve (incl. iterative revisions)

354 5.6.4 Training Readiness Tasks

355 5.6.4.1 Evaluate Courses (Dry Run with MACs & Stakeholders), Revising as Needed

356 5.6.4.2 Perform Train-the-Trainer Courses

357 5.6.4.3 Ready to Begin Training Repairers

358 5.6.5 Repairer Training and Enrollment

359 5.6.5.1 Begin Advertising Repairer Training

360 5.6.5.2 Begin Performing Repairer Training

361 3.2.1.12.4 October 1, 2017 5.7 Commence MACs and VMI

362 5.8 Complete MAC & VMI Implementation

364 3.2.1.12.5 6 Implement Covert Auditing

365 6.1 Start Covert Auditing Implementation

366 3.2.1.12.5.A.1 6.2 Prepare Covert Audit Operations Manual

367 6.2.1 Design Manual

368 6.2.2 Submit for Approval

369 6.2.3 Review & Approve (incl. iterative revisions)

370 3.2.1.12.5.A.2 6.3 Prepare Covert Audit Database Specification

371 6.3.1 Develop Specification

372 6.3.2 Submit for Approval

373 6.3.3 Review & Approve (incl. iterative revisions)

374 6.4 Implement Covert Visual Auditing

375 6.4.1 Integrate Covert Visual Audit (developed & QA'd in coordination workstation & database timeline)

376 6.4.2 Hire Covert Auditors

377 3.2.1.12.5.A.3 6.4.3 Train Covert Visual Auditors

378 3.2.1.12.5.A.5 October 1, 2017 6.4.4 Commence Covert Visual Auditing

379 6.5 Implement Covert Vehicle Auditing

380 6.5.1 Iteratively Extend Applications for Covert Vehicle Auditing

381 6.5.2 Submit for Approval

382 6.5.3 Review & Approve (incl. iterative revisions)

383 3.2.1.12.5.A.3 6.5.4 Train Covert Vehicle Auditors

384 3.2.1.12.5.A.4 6.5.5 Acquire Covert Audit Vehicles & Establish Vehicle Modification Procedures

385 3.2.1.12.5.A.5 April 1, 2018 6.5.6 Commence Covert Vehicle Auditing

386 6.6 Complete Covert Auditing Implementation

388 General October 1, 2017 7 Commence Inspections (Safety and Emissions Tests)

6/8

7/3

10/31

11/28

4/13

7/20

9/16

9/16

9/30

10/1

10/1

10/31

11/28

1/23

2/20

10/1

2/20

4/1

4/1

10/1

6/26 7/31 9/4 10/9 11/13 12/18 1/22 2/26 4/2 5/7 6/11 7/16 8/20 9/24 10/29 12/3 1/7 2/11 3/18 4/22 5/27 7/1 8/5 9/9 10/14 11/18 12/23 1/27

Massachusetts Vehicle Inspection and Maintenance Program, COMMBUYS Bid#: BD-16-1030-0R100-0R001-00000006553, Agency Document Number: MDOTBOSTON-IM

Task Name

395 6.2.3, 3.2.1.2 B, 3.2.1.12.1

(*Third Party Dates are Assumed.)

(Alternative provision of workstations would be expected to extend the

8 (Alternate Implementation Schedule Reflecting Alternative Provision of Workstations*)

396 (*Third Party Dates are Assumed.) 8.1 (Initiate Alternative Provision of Workstations*)

397 (*Third Party Dates are Assumed.) 8.2 (Establish Third Party Workstation Provider Agreement*)

398 (*Third Party Dates are Assumed.) 8.3 (Establish (& Re-Establish) Manufacturing Forecasts*)

399 (*Third Party Dates are Assumed.) 8.4 (Establish Third Party Workstation Provider Schedule*)

400 (*Third Party Dates are Assumed.) 8.5 (Review Overall Schedule for Impacted Tasks*)

401 (*Third Party Dates are Assumed.) 8.6 (Establish Third Party Workstation Agreement*)

402 (*Third Party Dates are Assumed.) 8.7 (Third Party Workstation Specification Supplement*)

403 (*Third Party Dates are Assumed.) 8.7.1 (Develop Specification Supplement*)

404 (*Third Party Dates are Assumed.) 8.7.2 (Submit for Approval*)

405 (*Third Party Dates are Assumed.) 8.7.3 (Review & Approve (incl. iterative revisions)*)

406 (*Third Party Dates are Assumed.) 8.8 (Third Party Workstation Design*)

407 (*Third Party Dates are Assumed.) 8.9 (Third Party Workstation Development & QA*)

408 (*Third Party Dates are Assumed.) 8.10 (Third Party Workstation Integration*)

409 8.11 (Third Party Workstation ATP*)

410 (*Third Party Dates are Assumed.) 8.11.1 (Third Party Delivers ATP Workstations*)

411 (*Third Party Dates are Assumed.) (ATP is desired to occur in parallel; however, requires shortening of Development & QA times, thus increasing project risk. May increase ATP & rework times for all parties.)8.11.2 (ATP with Third Party Workstations*)

412 (*Third Party Dates are Assumed.) 8.11.3 (Extended ATP Time Needed with Third Party Alternate Provision)

413 (*Third Party Dates are Assumed.) 8.12 (Third Party Station Setup)

414 (*Third Party Dates are Assumed.) 8.12.1 (Stations Complete Third Party Agreements to Enroll*)

415 (*Third Party Dates are Assumed.) 8.12.2 (Third Party Workstation Procurement & Manufacturing*)

416 (*Third Party Dates are Assumed.) 8.12.3 (Third Party Workstation Delivery & Installations*)

417 (*Third Party Dates are Assumed.) 8.12.4 (FSR Pre-Connectivity Audit of Third Party Inspection Stations*)

418 (*Third Party Dates are Assumed.) 8.13 (Third Party Workstations Ready for Operation*)

419 (*Third Party Dates are Assumed.) 8.14 (Intended Go-Live Date per Contract is October 1, 2017)

420 (*Third Party Dates are Assumed.) 8.15 (Complete Alternative Provision of Third Party Workstations*)

9/1

11/17

7/31

10/1

7/31

6/26 7/31 9/4 10/9 11/13 12/18 1/22 2/26 4/2 5/7 6/11 7/16 8/20 9/24 10/29 12/3 1/7 2/11 3/18 4/22 5/27 7/1 8/5 9/9 10/14 11/18 12/23 1/27

Massachusetts Vehicle Inspection and Maintenance Program, COMMBUYS Bid#: BD-16-1030-0R100-0R001-00000006553, Agency Document Number: MDOTBOSTON-IM