This document is an Amendment #1 to the Request for Response (IM RFR) issued by the Commonwealth of Massachusetts Registry of Motor Vehicles, a division of the Massachusetts Department of Transportation, for the Vehicle Inspection and Maintenance Program. The amendment modifies several sections of the RFR, including the overall program goal, inspection database requirements, workstation alternatives, documentation requirements, QA/test interruption requirements, and payment bond requirements. It also adds a new attachment on historic Motorist Assistance Center activity. Key changes include requiring the contractor to remain fully responsible for the VID system security and performance, modifying inspection documentation requirements, and increasing the payment bond amount to $3,000,000 to cover contract termination costs.

The IM RFR is for the management and implementation of the Vehicle Emission and Safety Test Program in Massachusetts, including developing and managing the inspection station network, inspection protocols, and equipment/data systems. The contractor will also be responsible for training inspectors and providing public communications. The contract term is not specified.

View the file

Other files

File Type Posted
Applus Technologies Volume 1_Technical Response_Applus.pdf PDF
Opus Ispection ProcessFlowDiagram.pdf PDF
SGS Interview Questions 6-20-16.docx DOCX document
Attachment C - Computing Environments FINAL 12 10 15.docx DOCX document
SGS RFR Cost Response.pdf PDF
NOTICE of Revised posting date for amended IM RFR documents 3 3 16.docx DOCX document
SGS MA_Final_Part7.pdf PDF
IMRFR Evaluation Process memo_3-21-16_for COMMBUYS.docx DOCX document
2017 Scope Exh H - Service Response Time FINAL 12 10 15.docx DOCX document
Applus Technologies eppform_Applus.doc DOC document
Commitment Letter Attachments.pdf PDF
Applus Technologies Microsoft Product Terms.docx DOCX document
Applus Technologies MA Cover Page-Volume2.pdf PDF
Applus Technologies CoreSite Data Center Agreement_Applus~1.pdf PDF
SGS MA_Final_Part1.pdf PDF
Parsons Cost Proposal for MASS17.pdf PDF
IM RFR Amendment no3_3 9 16.docx DOCX document
Attachment G - Program Costs FINAL 12 10 15.docx DOCX document
Applus Technologies Attachment 1 Cover Page.pdf PDF
Applus Technologies Microsoft Volume Licensing Agreement_Applus.pdf PDF
Parsons Attachment G - Program Costs_Parsons.docx DOCX document
IMRFR AMENDMENT 2 2 25 16.docx DOCX document
Bidders Conference Agenda_Handout_Attendees.doc DOC document
Attachment B - ALARS Interface FINAL 12 10 15.docx DOCX document
Attachment F - IM RFR Draft Scope of Services FINAL 12 10 15.docx DOCX document
QandA_vehicle_inspection_maintenance_Round2~1.xlsx XLSX spreadsheet
Parsons 3.2.2.8 prompt-pay-frm.docx DOCX document
Applus Bid Bond.pdf PDF
IM Evaluation Report 9-26-16.doc DOC document
Parsons 3.2.2.8.1 sdp-plan-form-1-commitment.docx DOCX document
Applus Technologies Attachment 3 Cover Page.pdf PDF
NOTICE TO BIDDERS REGARDING AMENDED DOCUMENT POSTING DATE 3.8.16.docx DOCX document
SGS MA_Final_Part3.pdf PDF
Attachment D - Management Application Spec FINAL 12 10 15.docx DOCX document
Parsons Attachment I - Bidders Cost Breakdown_Parsons.docx DOCX document
Notice of Applus as Apparent Successful Bidder.doc DOC document
SGS MA_Final_Part4.pdf PDF
QandA_vehicle_inspection_maintenance.xlsx XLSX spreadsheet
Parsons 3.2.2.8 Business Reference Form.doc DOC document
Bidders 1 27 16 Conference Webinar and Training Information.doc DOC document
Parsons Attachment K - Bidders Response Checklist.docx DOCX document
Applus Technologies prompt-pay-frm_Applus.doc DOC document
Attachment L - Cloud Procurement Terms FINAL 12 10 15.docx DOCX document
MassDOT_Std_Contract_Form.doc DOC document
Parsons Attachment J - Bidders Financial Plan_Parsons.doc DOC document
SGS MA_Final_Part2.pdf PDF
Applus Technologies Amended Attachment K_Response Checklist_Applus.docx DOCX document
Opus Inspection Project Plan r011.pdf PDF
MassDOT_TandC.docx DOCX document
IMRFR Internal Scoring and Procedure doc 4.7.16.docx DOCX document
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment #1 to the IM RFR January 25, 2016

COMMONWEALTH OF MASSACHUSETTS

REGISTRY OF MOTOR VEHICLES, A DIVISION OF

THE MASSACHUSETTS DEPARTMENT OF TRANSPORTATION

VEHICLE INSPECTION AND MAINTENANCE PROGRAM

REQUEST FOR RESPONSE (IM RFR)

RFR BD-16-1030-0R100-0R001-00000006553

AMENDMENT #1 TO THE IM RFR

Amendment Date: January 25, 2016

The IM RFR (RFR BD-16-1030-0R100-0R001-00000006553), which was originally posted on the Commonwealth’s COMMBUYS website on December 17, 2015, has been amended as follows:

1. RFR Section 3.0.1, entitled “The Overall Goal of this RFR:” THE FIRST TWO SENTENCES OF THE LAST PARAGRAPH OF RFR SECTION 3.0.1 HAVE BEEN DELETED IN THEIR ENTIRETY, AND REPLACED WITH THE FOLLOWING:

Finally, the Contractor must remain fully responsible for the operation of the VID, and must ensure the security of the data and the performance of the System, whether or not the System is hosted by a third party cloud provider.

2. RFR Section 3.2.1.5, entitled “Inspection Database,” Subsection A: THE THIRD SENTENCE OF SUBSECTION A IS DELETED IN ITS ENTIRETY, AND REPLACED WITH THE FOLLOWING:

Bidders shall include an overview of the System architecture and major components of the Database, including all redundancies and backup systems.

3. RFR Section 6.2.3, entitled “Alternative for Provision of Workstations:” THE FIRST SENTENCE OF THIS SECTION IS DELETED IN ITS ENTIRETY, AND REPLACED WITH THE FOLLOWING:

RFR Technical Response Section 3.2.1.2.B requires Bidders to include an alternative to the provision of Workstations detailed in RFR Section 6.2.2.

4. RFR Section 6.3.3.1, entitled “All Inspections,” subsection entitled “Documentation Using Cameras:” THE FOLLOWING SECOND SENTENCE IS HEREBY ADDED TO THE SECOND BULLET UNDER THE DOCUMENTATION SUBSECTION:

The 2 bay cameras assigned to capture still images during all inspection types (except motorcycle inspections) shall capture, at most, the following images: 1 image from each camera during inspector login; 1 image from each camera at the beginning of the emissions test (OBD or opacity, if applicable); 1 image from each camera at the beginning of the safety test, and 1 image from each camera at the end of the inspection prior to uploading the test record to the VID; for a total maximum of 8 images per inspection from the 2 bay cameras.

5. RFR Section 6.3.3.6, entitled “Real-time Inspection QA/Test Interruption:” THE LAST SENTENCE OF THIS SECTION IS DELETED IN ITS ENTIRETY, AND REPLACED WITH THE FOLLOWING:

The Contractor shall not exceed the maximum time to respond to QA failures, or fail to meet the percentage of QA failures that the Contractor agreed upon through its RFR Response, and as finalized in the Contract Award.

6. RFR Section 6.12.1.2, entitled “Payment Bond:” THIS SECTION IS DELETED IN ITS ENTIRETY, AND REPLACED WITH THE FOLLOWING:

Before the start of mandatory Inspections, the Contractor shall furnish the Commonwealth, on forms satisfactory to the Agencies, two (2) payment bonds, pursuant to which the Contractor and a Surety licensed to do business in the Commonwealth shall be jointly and severally liable for (1) the penal sum of $500,000.00, to cover the Contractor’s payment of Network Fees due to the Commonwealth and MassDOT/RMV under the Contract; and (2) the penal sum of $3,000,000.00 to cover the costs of termination of the Contract.

7. The IM RFR is further amended by added the following Attachment, entitled: RFR Attachment N: Historic Motorist Assistance Center (MAC) Activity

8. RFR Attachment A, Section 2.2.1, entitled “Workstation Cabinet:” THE THIRD BULLET IN THIS SECTION IS DELETED IN ITS ENTIRETY, AND REPLACED WITH THE FOLLOWING:

● Tray, holster, or other device to store and easily access the barcode scanner. The barcode scanner shall not be supported by its cable only;

9. RFR Attachment A, Section 2.2.2, entitled “Workstation Computer:” THE FOLLOWING BULLET IS HEREBY INSERTED AFTER THE BULLET IN THIS SECTION ENTITLED “I/O PORTS:”

● Ethernet port – the computer shall have an ethernet port that supports 10 Mbps, 100 Mbps, and 1000 Mbps network speeds for a wired internet connection;

10. RFR Attachment A, Section 2.2.5, entitled “Diesel Opacity Meter:” SENTENCE THREE (3) IN THIS SECTION IS DELETED IN ITS ENTIRETY.

11. RFR Attachment A, Section 2.2.7.3, entitled “Inspection Bay Cameras:” AFTER THE FIRST PARAGRAPH OF THIS SECTION, THE FOLLOWING SENTENCE IS INSERTED AS A NEW PARAGRAPH AS FOLLOWS:

The 3 inspection bay cameras must meet the following minimum requirements: 1) the cameras shall capture color images and video; 2) the cameras shall have a minimum resolution of 1280 x 720; and 3) the cameras shall have a minimum frame rate of 5 frames per second.

IN ALL OTHER RESPECTS, ALL TERMS AND CONDITIONS OF THE IM RFR REMAIN THE SAME AS OF THE DATE OF THE POSTING OF THIS AMENDMENT #1.

File details come from the government source that posted it. Updated .