NUWC P-1016 - Specifications.pdf

PDF 18 MB Posted

Attached to
P084 NEXT GENERATION TORPEDO INTEGRATION LAB, NAVAL STATION NEWPORT, NEWPORT RI
Solicitation number
N4008526R0178
Issued by

About this file

This document is a 100% Final Specifications package for the NUWC P-1016 Consolidated RDTE Systems Facility construction project located at Naval Undersea Warfare Center, Newport, Rhode Island. The project involves construction of an 18,000 square foot, access-controlled, two-story building designed to house specialized high-bay test areas, integration labs, and a controlled area on level 1, with office areas on level 2 and mechanical penthouse on the roof level. The facility must meet DoD antiterrorism standards and UFC Security Engineering Planning requirements, with the controlled area requiring government accreditation for security classification.

The specifications encompass 41 divisions of construction work including site demolition and preparation, concrete, masonry, metals, thermal protection, openings, finishes, fire suppression, plumbing, HVAC, electrical, communications, security systems, and landscape work. Key contractual requirements include: a cost-loaded Network Analysis Schedule with Earned Value Reporting for payment processing; compliance with Construction Security Plan protocols including designated Construction Surveillance Technicians and strict site access controls; requirement that general construction and finish work in controlled areas be performed exclusively by U.S. firms and U.S. citizens; participation in Defense Biometrics Identification System (DBIDS) for base access; comprehensive project management including preconstruction meetings, partnering sessions, and Red Zone turnover meetings; and preparation of an audiovisual system design and procurement package as a separately priced option with a government estimated budget of $708,011 plus applicable Handling and Administration Rate. The specifications include provisions for optional bid items covering subgrade soil removal and replacement, contaminated soil disposal, dewatering effluent management, parking lot and stormwater infrastructure construction, and Building 1272T demolition. All work must be coordinated with government FF&E installers and NMCI contractors accessing the facility during final construction phases.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK ORDER NO. 1812040

SPECIFICATIONS

100% FINAL SUBMISSION JULY 2026

P-1016 Consolidated RDTE Systems Facility

At

Naval Undersea Warfare Center (NUWC), Newport, RI

SUBMITTED BY:

Colby Company Engineering 47A York Street

Portland, ME 04101 A/E Contract Number: N40085-22-D-0003

PREPARED BY:

Architectural: Elizabeth Coronado, NCARB, AIA, Colby Company Engineering

Structural: David Sheldrake, P.E., Colby Company Engineering Civil: David Manzo, P.E., Colby Company Engineering

Mechanical: David Brown, P.E., Colby Company Engineering Electrical: Bruce Goodwin, Colby Company Engineering

Fire Protection: Shannon Rice, P.E., Colby Company Engineering Interior Design: Lynn Pepin, CWS Architects Landscape Architect: Barry J. Hosmer, Landscape Architect

APPROVED BY:

For Commander, NAVFAC Mid-Atlantic

NUWC P-1016 100% FINAL SPECIFICATIONS

NEWPORT NAVAL STATION, NEWPORT, RI JULY 2026

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 02/24 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 02/24 SUMMARY OF WORK

01 14 00 11/22, CHG 1: 02/23 WORK RESTRICTIONS

01 20 00 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES

01 30 00 11/20, CHG 3: 08/23 ADMINISTRATIVE REQUIREMENTS

01 30 02.00 22 04/25 DESIGN, PROCUREMENT, AND INSTALLATION

OF AUDIOVISUAL EQUIPMENT

01 31 23.13 20 08/23, CHG 1: 02/24 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

(eCMS)

01 32 17.00 20 11/23 COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND

REPORTING

01 35 26 11/20, CHG 4: 08/23 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 08/23 QUALITY CONTROL

01 45 35 11/20 SPECIAL INSPECTIONS

01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS

01 78 23 05/23 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 05/23, CHG 1: 11/23 FACILITY DATA WORKBOOK (FDW)

01 91 00.15 22 08/24 TOTAL BUILDING COMMISSIONING

01 91 19 05/2023 BUILDING ENCLOSURE COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION

02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION

02 83 00 11/18 LEAD REMEDIATION

02 84 16 11/22 HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 8: 05/24 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 05 20 05/22, CHG 1: 08/24 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

PROJECT TABLE OF CONTENTS Page 1

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 00 08/23 METAL STAIRS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

05 52 00 08/23 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING

07 14 00 08/23 FLUID-APPLIED WATERPROOFING

07 21 13 08/23 BOARD AND BLOCK INSULATION

07 21 16 08/23 MINERAL FIBER BLANKET INSULATION

07 22 00 08/23 ROOF AND DECK INSULATION

07 27 10 08/23 BUILDING AIR BARRIER SYSTEM

07 27 19.01 08/23 SELF-ADHERING AIR BARRIERS

07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS

07 53 23 05/12, CHG 2: 08/18 ETHYLENE-PROPYLENE-DIENE-MONOMER

ROOFING

07 60 00 08/23 FLASHING AND SHEET METAL

07 61 15.00 20 08/16, CHG 2: 11/18 ALUMINUM STANDING SEAM ROOFING

07 80 00 05/10 ROOF SAFETY RAILINGS

07 84 00.00 22 07/24 FIRESTOPPING

07 92 00 08/23 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS

08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS

08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL AND DOOR LOUVERS

DIVISION 09 - FINISHES

09 22 00 08/24 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 67 23.13 11/19 STANDARD RESINOUS FLOORING

09 68 00 11/17, CHG 2: 08/20 CARPETING

09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS

09 90 00 02/21 PAINTS AND COATINGS

09 96 00 11/14 HIGH-PERFORMANCE COATINGS

09 96 59 05/11, CHG 1: 08/17 HIGH-BUILD GLAZE COATINGS

DIVISION 10 - SPECIALTIES

PROJECT TABLE OF CONTENTS Page 2

10 11 00 08/20 VISUAL DISPLAY UNITS

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 21 13 08/20 TOILET COMPARTMENTS

10 22 19 08/17, CHG 1: 08/18 DEMOUNTABLE AND MOVABLE PARTITIONS

10 22 39 08/20 FOLDING PANEL PARTITIONS

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

10 51 13 08/24 LOCKERS

DIVISION 12 - FURNISHINGS

12 00 01.00 20 02/23 FURNITURE, FIXTURES AND EQUIPMENT

(FF&E) PACKAGE

12 24 13 08/20 ROLLER WINDOW SHADES

12 48 13 08/23 ENTRANCE FLOOR MATS AND FRAMES

12 93 00 08/17, CHG 1: 08/18 SITE FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS

EQUIPMENT

13 49 20.00 10 10/07 RF SHIELDING

DIVISION 14 - CONVEYING EQUIPMENT

14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND AND VIBRATION CONTROL

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 05/22 COMMON PIPING FOR HVAC

23 05 48.19 05/18, CHG 2: 08/20 BRACING FOR PLUMBING AND HVAC

23 05 93.00 22 09/19 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 08/24 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 00 05/23, CHG 1: 08/24 COMMISSIONING OF MECHANICAL AND

PLUMBING SYSTEMS

23 09 00.00 22 08/20, CHG 1: 03/22 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13.00 22 08/20, CHG 1: 03/22 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 22 08/20, CHG 1: 03/22 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 21 13.00 20 04/06, CHG 2: 11/19 LOW TEMPERATURE WATER (LTW) HEATING

SYSTEM

23 21 23 08/17 HYDRONIC PUMPS

PROJECT TABLE OF CONTENTS Page 3

23 22 26.00 20 02/10, CHG 1: 05/15 STEAM SYSTEM

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09, CHG 6: 11/22 CHILLED WATER PIPING SYSTEMS

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS

23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 05/21, CHG 1: 08/23 CYBERSECURITY FOR UTILITY MONITORING

AND CONTROL SYSTEM

25 05 11.02 05/21, CHG 1: 08/23 CYBERSECURITY FOR BUILDING LIGHTING

SYSTEMS

25 05 11.03 05/21, CHG 1: 08/23 CYBERSECURITY FOR ELECTRICAL

DISTRIBUTION SYSTEMS

25 05 11.04 05/21, CHG 1: 08/23 CYBERSECURITY FOR ADVANCE METERING

INFRASTRUCTURE

25 05 11.05 05/21, CHG 1: 08/23 CYBERSECURITY FOR ELEVATOR CONTROL

SYSTEMS

25 05 11.06 05/21, CHG 1: 08/23 CYBERSECURITY FOR COMPRESSED AIR SYSTEM

25 05 11.07 05/21, CHG 1: 08/23 CYBERSECURITY FOR FIRE PROTECTION

SYSTEMS

25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM

TESTING

25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 05 73 08/23 POWER SYSTEM STUDIES

26 08 00 11/22 APPARATUS INSPECTION AND TESTING

26 12 19 05/24 PAD-MOUNTED, LIQUID-FILLED,

MEDIUM-VOLTAGE TRANSFORMERS

26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM

26 24 13 08/21 SWITCHBOARDS

26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 41 00 08/23 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

27 32 50 11/22 ELEVATOR LANDING TWO-WAY COMMUNICATION

SYSTEM

27 41 00 11/21 AUDIO-VISUAL SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 10 05 05/24 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

PROJECT TABLE OF CONTENTS Page 4

31 00 00 08/23 EARTHWORK

31 21 13 11/18 RADON MITIGATION

31 35 19.13 02/21 GEOGRID SLOPE PROTECTION

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 26 05/20 HOT-MIX BITUMINOUS BASE COURSE FOR

ROADS AND STREETS

32 12 13 05/24 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND

ORNAMENTAL) AND GATES

32 92 19 08/17, CHG 1: 08/21 SEEDING

32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 40 00 11/21 STORMWATER UTILITIES

33 61 13.19 02/16 VALVES, PIPING, AND EQUIPMENT ABOVE

GROUND

33 63 13 04/06 EXTERIOR UNDERGROUND STEAM

DISTRIBUTION SYSTEM

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 40 - PROCESS INTERCONNECTIONS

40 05 13.96 05/10 WELDING PROCESS PIPING

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.15 11/22, CHG 1: 02/23 BRIDGE CRANES, OVERHEAD ELECTRIC,

UNDER RUNNING TROLLEY

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 5

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/24

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows: Drawing list to be provided with Final Submission.

DRAWING NO. SHEET NAVFAC DWG.

NO.

TITLE

1 G-001 12929816 COVER SHEET

2 G-002 12929817 SHEET INDEX

3 G-003 12929818 SHEET INDEX CONT.

4 G-101 12929819 SITE ACCESS PLAN

5 G-102 12929820 SHEET LAYOUT & STORAGE AREA PLAN

6 LS001 12929821 LIFE SAFETY SUMMARY

7 LS002 12929822 OCCUPANCY PLANS

8 LS101 12929823 LEVEL 1 AND MEZZANINE LIFE SAFETY

PLANS

9 LS102 12929824 LEVEL 2 AND PENTHOUSE LIFE SAFETY

PLANS

10 LS103 12929825 LIFE SAFETY SITE PLAN

11 C-001 12929826 CIVIL NOTES

12 C-002 12929827 CIVIL ABBREVIATIONS AND LEGEND

13 CJ101 12929828 EXISTING CONDITIONS

14 CD101 12929829 DEMOLITION PLAN

DOCUMENT 00 01 15 Page 1

DRAWING NO. SHEET NAVFAC DWG.

NO.

TITLE

15 CD102 12929830 UNDERCUT GRADING PLAN

16 C-101 12929831 SITE LAYOUT PLAN

17 C-102 12929832 SITE UTILITY PLAN

18 C-103 12929833 SITE GRADING PLAN

19 C-104 12929834 EROSION AND SEDIMENTATION CONTROL

PLAN

20 C-301 12929835 STORM DRAIN PROFILE STA 30+00 TO

32+70

21 C-302 12929836 STORM DRAIN PROFILE STA 40+00 TO

41+75

22 C-501 12929837 EROSION AND SEDIMENTATION CONTROL

NOTES AND DETAILS

23 C-502 12929838 CIVIL CONSTRUCTION DETAILS (1 OF 3)

24 C-503 12929839 CIVIL CONSTRUCTION DETAILS (2 OF 3)

25 C-504 12929840 CIVIL CONSTRUCTION DETAILS (3 OF 3)

26 C-505 12929841 ELECTRICAL & COMMUNICATIONS DETAILS

27 C-506 12929842 UTILITY DETAILS

28 C-507 12929843 STORMWATER DETAILS (1 OF 4)

29 C-508 12929844 STORMWATER DETAILS (2 OF 4)

30 C-509 12929845 STORMWATER DETAILS (3 OF 4)

31 C-510 12929846 STORMWATER DETAILS (4 OF 4)

32 C-511 12929847 STEAM AND CONDENSATE DETAILS

33 B-101 12929848 BORING LOGS (1 OF 4)

34 B-102 12929849 BORING LOGS (2 OF 4)

DOCUMENT 00 01 15 Page 2

DRAWING NO. SHEET NAVFAC DWG.

NO.

TITLE

35 B-103 12929850 BORING LOGS (3 OF 4)

36 B-104 12929851 BORING LOGS (4 OF 4)

37 B-105 12929852 BORING SOILS TABLE

38 L-101 12929853 LANDSCAPE PLAN

39 S-001 12929854 STRUCTURAL NOTES AND ABBREVIATIONS

40 S-002 12929855 STRUCTURAL NOTES

41 S-003 12929856 STRUCTURAL NOTES

42 S-101 12929857 FOUNDATION PLAN

43 S-102 12929858 FLOOR SLAB PLAN

44 S-103 12929859 MEZZANINE AND CRANE LEVEL FRAMING

PLANS

45 S-104 12929860 LEVEL 2 AND PENTHOUSE FLOOR FRAMING

PLANS

46 S-105 12929861 ROOF FRAMING PLANS

47 S-201 12929862 EXTERIOR CMU WALL ELEVATIONS

48 S-202 12929863 EXTERIOR CMU WALL ELEVATIONS

49 S-203 12929864 INTERIOR CMU WALL ELEVATIONS

50 S-204 12929865 FRAMING ELEVATIONS

51 S-401 12929866 ENLARGED PART PLANS AND SECTIONS

52 S-501 12929867 TYPICAL FOUNDATION DETAILS

53 S-502 12929868 TYPICAL FOUNDATION DETAILS

54 S-503 12929869 FOUNDATION DETAILS

55 S-504 12929870 FOUNDATION DETAILS

56 S-505 12929871 TYPICAL STRUCTURAL DETAILS

57 S-506 12929872 TYPICAL STRUCTURAL DETAILS

58 S-507 12929873 TYPICAL STRUCTURAL DETAILS

DOCUMENT 00 01 15 Page 3

DRAWING NO. SHEET NAVFAC DWG.

NO.

TITLE

59 S-508 12929874 STRUCTURAL DETAILS

60 S-509 12929875 STRUCTURAL DETAILS

61 S-510 12929876 STRUCTURAL DETAILS

62 S-511 12929877 STRUCTURAL DETAILS

63 S-512 12929878 STRUCTURAL DETAILS

64 S-513 12929879 STRUCTURAL DETAILS

65 S-514 12929880 TYPICAL CMU DETAILS

66 S-515 12929881 TYPICAL CMU DETAILS

67 S-516 12929882 TYPICAL CMU DETAILS

68 S-517 12929883 TYPICAL CMU DETAILS

69 S-518 12929884 CMU DETAILS

70 S-601 12929885 COLUMN SCHEDULE

71 A-001 12929886 ARCHITECTURAL NOTES AND SYMBOLS

72 A-002 12929887 TYPICAL MOUNTING HEIGHTS AND

CLEARANCES

73 A-003 12929888 GENERAL ELEVATOR AND SITE

ACCESSIBILITY REQUIREMENTS

74 A-004 12929889 AIR BARRIER LOCATIONS AND ENVELOPE

REQUIREMENTS

75 A-005 12929890 AIR BARRIER LOCATIONS AND ENVELOPE

REQUIREMENTS CONT.

76 A-101 12929891 LEVEL 1 AND MEZZANINE FLOOR PLANS

77 A-102 12929892 LEVEL 2 FLOOR PLAN

78 A-103 12929893 PENTHOUSE FLOOR PLAN

79 A-104 12929894 ROOF PLAN

80 A-105 12929895 LEVEL 1 AND MEZZANINE REFLECTED

CEILING PLANS

DOCUMENT 00 01 15 Page 4

DRAWING NO. SHEET NAVFAC DWG.

NO.

TITLE

81 A-106 12929896 LEVEL 2 REFLECTED CEILING PLAN

82 A-107 12929897 PENTHOUSE REFLECTED CEILING PLAN

83 A-201 12929898 NORTH AND SOUTH EXTERIOR ELEVATIONS

84 A-202 12929899 EAST AND WEST EXTERIOR ELEVATIONS

85 A-301 12929900 BUILDING SECTIONS

86 A-302 12929901 BUILDING SECTIONS

87 A-303 12929902 WALL SECTIONS

88 A-304 12929903 WALL SECTIONS

89 A-401 12929904 ENLARGED PLANS AND ELEVATIONS

90 A-402 12929905 STAIR ENLARGED PLANS

91 A-403 12929906 STAIR ENLARGED SECTIONS

92 A-404 12929907 STAIR ENLARGED SECTIONS

93 A-405 12929908 ELEVATOR ENLARGED PLANS SECTIONS

AND DETAILS

94 A-501 12929909 PARTITION TYPES

95 A-502 12929910 EXTERIOR DETAILS

96 A-503 12929911 EXTERIOR DETAILS

97 A-504 12929912 PLAN DETAILS

98 A-505 12929913 SECTION DETAILS

99 A-506 12929914 SECTION DETAILS

100 A-507 12929915 FIRE RATED DETAILS

101 A-508 12929916 RF SHIELDING DETAILS

102 A-509 12929917 RF SHIELDING DETAILS

103 A-510 12929918 STAIR DETAILS

DOCUMENT 00 01 15 Page 5

DRAWING NO. SHEET NAVFAC DWG.

NO.

TITLE

104 A-511 12929919 MILLWORK DETAILS

105 A-601 12929920 DOOR SCHEDULE AND DETAILS

106 A-602 12929921 DOOR DETAILS

107 A-603 12929922 DOOR DETAILS CONT.

108 A-604 12929923 WINDOW SCHEDULE AND DETAILS

109 I-001 12929924 INTERIOR FINISH LEGEND

110 I-101 12929925 LEVEL 1 AND MEZZANINE FINISH PLANS

111 I-102 12929926 LEVEL 2 AND PENTHOUSE FINISH PLANS

112 I-103 12929927 LEVEL 1 AND MEZZANINE INTERIOR

SIGNAGE PLANS

113 I-104 12929928 LEVEL 2 AND PENTHOUSE INTERIOR

SIGNAGE PLANS

114 I-105 12929929 INTERIOR SIGNAGE TYPES

115 I-106 12929930 INTERIOR SIGNAGE TYPES

116 I-107 12929931 INTERIOR SIGNAGE INSTALLATION

LOCATIONS AND HEIGHT

117 I-108 12929932 INTERIOR ELEVATIONS

118 I-109 12929933 INTERIOR ELEVATIONS

119 I-110 12929934 DEMOUNTABLE WALL ELEVATIONS

120 I-501 12929935 FLOORING TRANSITION DETAILS

121 I-502 12929936 FLOORING TRANSITION DETAILS

122 I-503 12929937 WALL TRANSITION DETAILS

123 I-504 12929938 DEMOUNTABLE WALL SYSTEM DETAILS

124 I-601 12929939 INTERIOR FINISH SCHEDULE

125 I-602 12929940 INTERIOR SIGNAGE SCHEDULE

DOCUMENT 00 01 15 Page 6

DRAWING NO. SHEET NAVFAC DWG.

NO.

TITLE

126 IF101 12929941 LEVEL 1 AND MEZZANINE FURNITURE

FOOTPRINT PLANS

127 IF102 12929942 LEVEL 2 FURNITURE FOOTPRINT PLANS

128 IF103 12929943 LEVEL 1 FURNITURE FOOTPRINT PLAN -

CFCI FFE

129 FP001 12929944 FIRE PROTECTION LEGENDS

ABBREVIATIONS AND NOTES

130 FP101 12929945 FIRE PROTECTION LEVEL 1 AND

MEZZANINE PLAN

131 FP102 12929946 FIRE PROTECTION LEVEL 2 AND

PENTHOUSE PLAN

132 FP501 12929947 FIRE PROTECTION DETAILS

133 FA001 12929948 FIRE ALARM LEGENDS ABBREVIATIONS

AND NOTES

134 FA101 12929949 FIRE ALARM LEVEL 1 AND MEZZANINE

PLAN

135 FA102 12929950 FIRE ALARM LEVEL 2 AND PENTHOUSE

PLAN

136 FA501 12929951 FIRE ALARM DETAILS

137 FA502 12929952 FIRE ALARM RISER DETAIL

138 P-001 12929953 PLUMBING LEGEND ABBREVIATIONS AND

NOTES

139 P-101 12929954 LEVEL 1 UNDERSLAB AND LEVEL 1

SANITARY PLANS

140 P-102 12929955 LEVEL 2 AND PENTHOUSE SANITARY PLANS

141 P-103 12929956 LEVEL 1 WATER AND AIR PLANS

142 P-104 12929957 LEVEL 2 AND PENTHOUSE WATER AND AIR

PLANS

143 P-501 12929958 PLUMBING DETAILS

DOCUMENT 00 01 15 Page 7

DRAWING NO. SHEET NAVFAC DWG.

NO.

TITLE

144 P-502 12929959 PLUMBING DETAILS

145 P-503 12929960 PLUMBING DETAILS

146 P-601 12929961 PLUMBING SCHEDULES

147 P-602 12929962 PLUMBING SCHEDULES

148 P-701 12929963 PLUMBING SCHEMATICS

149 P-702 12929964 PLUMBING SCHEMATICS

150 M-001 12929965 MECHANICAL LEGEND ABBREVIATIONS AND

NOTES

151 MH101 12929966 LEVEL 1 AND MEZZANINE DUCTWORK PLANS

152 MH102 12929967 LEVEL 2 AND PENTHOUSE DUCTWORK PLANS

153 MP101 12929968 LEVEL 1 AND MEZZANINE PIPING PLANS

154 MP102 12929969 LEVEL 2 AND PENTHOUSE PIPING PLANS

155 M-301 12929970 MECHANICAL SECTIONS

156 M-401 12929971 ENLARGED MECHANICAL PLAN

157 M-501 12929972 MECHANICAL DETAILS

158 M-502 12929973 MECHANICAL DETAILS

159 M-503 12929974 MECHANICAL DETAILS

160 M-504 12929975 MECHANICAL DETAILS

161 M-505 12929976 MECHANICAL DETAILS

162 M-601 12929977 MECHANICAL SCHEDULES

163 M-602 12929978 MECHANICAL SCHEDULES

164 M-603 12929979 MECHANICAL SCHEDULES

165 M-604 12929980 MECHANICAL SCHEDULES

DOCUMENT 00 01 15 Page 8

DRAWING NO. SHEET NAVFAC DWG.

NO.

TITLE

166 M-605 12929981 MECHANICAL SCHEDULES

167 M-606 12929982 MECHANICAL SCHEDULES

168 M-701 12929983 CONTROLS SYSTEM ARCHITECTURE

169 M-702 12929984 MECHANICAL SEQUENCES

170 M-703 12929985 MECHANICAL SEQUENCES

171 M-704 12929986 MECHANICAL SEQUENCES

172 M-705 12929987 MECHANICAL SEQUENCES

173 M-706 12929988 MECHANICAL SEQUENCES

174 M-707 12929989 MECHANICAL SEQUENCES

175 M-708 12929990 MECHANICAL SEQUENCES

176 M-709 12929991 MECHANICAL SEQUENCES

177 M-710 12929992 MECHANICAL SEQUENCES

178 M-711 12929993 MECHANICAL SEQUENCES

179 M-712 12929994 MECHANICAL SEQUENCES

180 M-713 12929995 MECHANICAL SEQUENCES

181 M-714 12929996 MECHANICAL SEQUENCES

182 E-001 12929997 ELECTRICAL LEGEND ABBREVIATIONS AND

GENERAL NOTES

183 ES101 12929998 ELECTRICAL SITE PLAN

184 E-101 12929999 ELECTRICAL LIGHTNING PROTECTION

ROOF PLAN

185 EP101 12930000 ELECTRICAL POWER FIRST FLOOR &

MEZZANINE PLAN

186 EP102 12930001 ELECTRICAL POWER SECOND FLOOR PLAN

187 EP401 12930002 ELECTRICAL POWER ENLARGED PLANS

188 EP402 12930003 ELECTRICAL POWER ENLARGED PLANS

DOCUMENT 00 01 15 Page 9

DRAWING NO. SHEET NAVFAC DWG.

NO.

TITLE

189 EP403 12930004 ELECTRICAL POWER ENLARGED PLANS

190 EL101 12930005 ELECTRICAL LIGHTING FIRST FLOOR &

MEZZANINE PLAN

191 EL102 12930006 ELECTRICAL LIGHTING SECOND FLOOR

PLAN

192 EL301 12930007 ELECTRICAL LIGHTING STAIR AND

ELEVATOR SHAFT SECTIONS

193 E-501 12930008 DETAILS

194 E-502 12930009 DETAILS

195 E-601 12930010 ELECTRICAL ONE-LINE DIAGRAM

196 E-602 12930011 DIAGRAMS

197 E-603 12930012 SCHEDULE - LIGHTING FIXTURES

198 E-604 12930013 SCHEDULE - LIGHTING CONTROL SCHEDULE

199 E-605 12930014 PANEL SCHEDULES - PP1 & PP3

200 E-606 12930015 PANEL SCHEDULES - PP4 & PP5

201 E-607 12930016 PANEL SCHEDULES - LP1 & LP2

202 E-608 12930017 PANEL SCHEDULES - LP3 & LP4B

203 E-609 12930018 PANEL SCHEDULES - LP4A & LP5

204 E-610 12930019 PANEL SCHEDULES - LP6 & LP7

205 E-611 12930020 PANEL SCHEDULES - LP8 & LP9

206 E-612 12930021 PANEL SCHEDULES - LP10 & LP11

207 E-613 12930022 PANEL SCHEDULES - SP1 & UPS1

208 E-614 12930023 PANEL SCHEDULES - FA & IT1

209 E-615 12930024 PANEL SCHEDULES - IT2 & IT3

210 E-616 12930025 PANEL SCHEDULES - IT4 & BLP12

DOCUMENT 00 01 15 Page 10

DRAWING NO. SHEET NAVFAC DWG.

NO.

TITLE

211 E-617 12930026 PANEL SCHEDULE - LP1A

212 T-001 12930027 LOW VOLTAGE SYMBOLS ABBREVIATIONS

AND GENERAL NOTES

213 TA101 12930028 AUDIO VISUAL LEVEL 1 PLAN

214 TA102 12930029 AUDIO VISUAL LEVEL 2 PLAN

215 TA201 12930030 AUDION VISUAL ELEVATIONS

216 TA401 12930031 AUDIO VISUAL ENLARGED PLANS

217 TA501 12930032 AUDIO VISUAL DETAILS

218 TA601 12930033 AUDIO VISUAL SYSTEM FLOW DIAGRAM

219 TA602 12930034 AUDIO VISUAL SYSTEM FLOW DIAGRAM

220 TA603 12930035 AUDIO VISUAL SYSTEM FLOW DIAGRAM

221 TA604 12930036 AUDIO VISUAL SYSTEM FLOW DIAGRAM

222 TA605 12930037 AUDIO VISUAL SYSTEM FLOW DIAGRAM

223 TA606 12930038 AUDIO VISUAL SYSTEM FLOW DIAGRAM

224 TA701 12930039 AUDIO VISUAL EQUIPMENTS SCHEDULE

225 TY101 12930040 SECURITY LEVEL 1 AND MEZZANINE PLANS

226 TY102 12930041 SECURITY LEVEL 2 PLAN

227 TY103 12930042 SECURITY PENTHOUSE PLAN

228 TY501 12930043 SECURITY DETAILS

229 TY502 12930044 SECURITY DETAILS

230 TY503 12930045 SECURITY DETAILS

231 TY601 12930046 SECURITY RISER DIAGRAM

232 TT101 12930047 TELCOM LEVEL 1 AND MEZZANINE PLANS

233 TT102 12930048 TELCOM LEVEL 2 PLAN

DOCUMENT 00 01 15 Page 11

DRAWING NO. SHEET NAVFAC DWG.

NO.

TITLE

234 TT103 12930049 TELCOM PENTHOUSE PLAN

235 TT201 12930050 TELCOM ELEVATIONS

236 TT202 12930051 TELCOM ELEVATIONS

237 TT401 12930052 TELCOM ENLARGED PLANS

238 TT501 12930053 TELCOM DETAILS

239 TT502 12930054 TELCOM DETAILS

240 TT601 12930055 TELCOM RISER DIAGRAM

241 H-101 12930056 B1272T HAZMAT PLAN

242 CJ121 12930057 1272T SITE EXISTING CONDITIONS

243 CD121 12930058 1272T SITE DEMOLITION PLAN - BID

OPTION 1

244 CD131 12930059 1272T SITE DEMOLITION PLAN - BID

OPTION 2

245 C-121 12930060 1272T SITE LAYOUT PLAN - BID OPTION

246 C-122 12930061 1272T EROSION AND SEDIMENTATION

CONTROL PLAN - BID OPTION 1

247 C-131 12930062 1272T SITE LAYOUT PLAN - BID OPTION

248 C-132 12930063 1272T SITE GRADING AND DRAINAGE

PLAN - BID OPTION 2

249 C-133 12930064 1272T SITE EROSION & SEDIMENTATION

CONTROL PLAN - BID OPTION 2

250 C-331 12930065 1272T SITE STORM DRAIN PROFILES -

BID OPTION 2

251 L-102 12930066 1272T SITE LANDSCAPING PLAN

252 AD101 12930067 B1272T LEVEL 1 DEMOLITION PLAN

253 AD102 12930068 B1272T LEVEL 2 DEMOLITION PLAN

DOCUMENT 00 01 15 Page 12

DRAWING NO. SHEET NAVFAC DWG.

NO.

TITLE

254 FD101 12930069 B1272T FIRST FLOOR FIRE PROTECTION

DEMOLITION PLANS

255 MD101 12930070 B1272T MECHANICAL DEMOLITION PLANS

256 ED101 12930071 B1272T ELECTRICAL DEMOLITION PLANS

1.3 SUPPLEMENTARY DRAWINGS

1.3.1 Boring Logs

The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.

1.3.2 Subsurface Data

Subsurface data, not specified or indicated, have been obtained by the Government at the station. The data are available for examination by prospective bidders. The soils report is included as part of the solicitation.

-- End of Document --

DOCUMENT 00 01 15 Page 13

SECTION 01 11 00

SUMMARY OF WORK

02/24

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes construction of a new Research, Development, Test and Evaluation Facility. The general layout of this facility is to be an access-controlled, two-story, 18,000 square foot building to house specialized high-bay test areas, integration labs and a controlled area on level 1, with office areas on level 2 and a mechanical penthouse on the roof level. The building design will meet the DoD antiterrorism standards and UFC Security Engineering Planning requirements. the controlled area will require government accreditation for security classification requirements. The project also includes the demolition of a nearby existing building, B1272T. The bid documents for the construction contract solicitation will also include bid options for the construction of a paved parking lot and subgrafde stormwater infiltration system at the new building site, and construction of a second paved parking lot and stormwter system at the former B1272T site.

1.2.2 Location

The work is located at the Naval Undersea Warfare Center (NUWC) in Newport, Rhode Island, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.3 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to

SECTION 01 11 00 Page 1 be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.3.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

1.4 GOVERNMENT-INSTALLED WORK

Allow the Government access to the facility towards the end of construction to provide Furniture, Fixtures and Equipment (FF&E) in the building. Coordinate efforts with Government FF&E installers to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the FF&E installers into the construction schedule to demonstrate a plan for maintaining the contract duration.

1.5 NAVY AND MARINE CORPS INTRANET (NMCI) COORDINATION REQUIREMENTS

1.5.1 NMCI Contractor Access

Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.

Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 2

SECTION 01 14 00

WORK RESTRICTIONS

11/22, CHG 1: 02/23

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel

1.2 CONTRACTOR ACCESS AND USE OF PREMISES

1.2.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.

1.2.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.2.1.2 Additional Personnel Requirements

1.2.1.2.1 General Construction

General construction of the controlled area must be performed by U.S.

firms using U.S. citizens. General construction includes construction activities such as building sitework, utilities, foundations, structure, and enclosure or shell, including doors, windows and façade work. Utility work that penetrates the controlled area and installation of doors in these areas are not general construction.

1.2.1.2.2 Finish Work

Finish Work within the controlled area must be accomplished by personnel who are United States Citizens. Finish Work includes construction activities such as insulation, floor, partition, and ceiling systems;

cabinet work; conveyor systems; specialties; building furnishings, fixtures, equipment; and mechanical and electrical services and equipment including those specialized for fire protection, security, communication, control, energy conservation, safety, comfort, convenience, and similar purposes.

SECTION 01 14 00 Page 1

1.2.1.2.3 Electronic Security Systems Equipment

Electronic Security Systems equipment such as processing control units, workstations, field panels, sensors, high security locks, card readers, cable installation, and system programming, testing and training must be performed by U.S. companies using U.S. citizens who have been subjected to a trustworthiness determination .

1.2.1.3 Installation Access

Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

1.2.1.3.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.2.1.3.2 DBIDS Eligibility Requirements

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure

SECTION 01 14 00 Page 2 results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.

The Government is the final authority.

1.2.1.3.3 DBIDS Notification Requirements

a. Immediately report instances of lost or stolen badges to the Contracting Officer.

b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.2.1.3.4 One-Day Passes

Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.2.1.4 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.2.2 Working Hours

Regular working hours will consist of an 8 1/2 hour period established by the Contracting Officer, between 7 a.m. and 3:30 p.m., a.m. and p.m., Monday through Friday, exluding weekends and Government holidays.

1.2.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.2.4 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures

SECTION 01 14 00 Page 3 required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.

d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain. Obtain Installation's Sanitary Sewer Connection Permit 2 weeks prior to connection and in accordance with Section 33 30 00 SANITARY SEWERAGE.

1.3 SECURITY REQUIREMENTS

Contract Clause FAR 52.204-2 Security Requirements and Alternate II and the following apply:

1.4 SPECIAL CONSTRUCTION REQUIREMENTS

All construction activities associated with the secure area construction must be in accordance with the requirements below.

This project has a Construction Security Plan (CSP) prepared by NUWCDIVNPT Security that will be followed by the Contractor in the execution of the work. The NAVY will have designated Construction Surveillance Technicians (CST) that will ensure the CSP is followed and will perform periodic inspections of materials and installed work elements at various milestones as the project progresses. The CSP will establish specific jobsite access controls and restrictions to be in place and enforced for the duration of this project.

A. Construction Security Plan (CSP). This plan is prepared by NUWC Security and will be followed by the contractor in the execution of the work.

B. Construction Surveillance Technician (CST). A NUWC Security person or persons that will monitor the work progress and will ensure conformance to the CSP. The CST will perform periodic inspections of the jobsite, site access, the stored materials, and the work completed to date. The Contractor shall cooperate with the CST and provide access for inspection. The CST will also establish and monitor site access controls and contractor personnel access.

SECTION 01 14 00 Page 4

C. Site Access Controls. In addition to base access at an entry gate, a single point of entry and exit will be established for site specific access at secure areas within the new faclity.

Control measures will include worker identity verification; random security searches at the entry and exit points; physical barriers to deny unauthorized access; signage identifying prohibited or restricted items. All tools and equipment used in the execution of the work shall be inspected by the CST when first brought to the jobsite. A daily visitor log shall be kept and maintained by the Contractor with check-in/check-out times of each person accessing the site. Cameras, cell phones, personal computers, and other similar electronic devices will not be permitted at NUWCDIVNPT or in the controlled work area.

D. Work Area. The work area of the jobsite will be controlled by use of barriers to segregate the construction workers and activities from NUWC operational activities. Temporary barriers shall be installed and maintained by the Contractor in accordance with the CSP to protect against unauthorized access or visual observation of the jobsite. Barriers will be maintained by the Contractor and monitored by the CST.

E. Material Storage. A specific secured storage area (SSA) will be established at or near the jobsite in accordance with the CSP, and designated by the CST, for all construction material storage to be used for the project. This secured storage location will be of limited access in order to protect the construction material after inspection and acceptance by the CST. The storage area will be locked or secured at all times.

F. Conformance Inspections. NUWC or NAVY Security personnel will conduct periodic inspections of work elements to determine conformance with the contract plans and specifications. These sequential, periodic progress inspections require that specific Definable Features of Work (DFOW) be inspected and accepted prior to being concealed or otherwise covered by subsequent work (DFOW). DFOW that is covered or concealed prior to acceptance by NUWC or NAVY Security will result in re-work or re-install.

The contractor shall provide a detailed schedule of work activities to the Government at the weekly project meeting the week prior so the Government can schedule inspections with the contractor. If the contractor fails to schedule the inspections with the Government, any work covered up or concealed prior to the Government performing the inspection shall be removed at the contractor's expense to permit the Government to inspect the work. The contractor will be allowed to proceed with the next sequential work element only after the Government informs the contractor the work is acceptable and subsequent work may proceed. Any non-conforming work shall be placed on the re-work items list .

G. Escort Requirements. All contractors issued NUWC access badges will require NUWC escort when entering a NUWC Building. NUWC access badges are for 'Exterior Work Only'. The NUWC escort procedures will be established at the post-award kickoff meeting. A NUWC government employee is required to accompany and escort contractor personnel when entering and working in any building at NUWCDIVNPT. All contractor personnel require a NUWC

SECTION 01 14 00 Page 5 employee escort at all times when entering and working in buildings.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 14 00 Page 6

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

11/20, CHG 3: 02/23

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Earned Value Report ; G

1.3 EARNED VALUE REPORT

1.3.1 Data Required

This Contract requires the use of a cost-loaded Network Analysis Schedule (NAS). Schedule of Prices must not be used with cost-loaded Network Analysis Schedule (NAS). Use Earned Value Report derived from cost-loaded NAS. Within 15 calendar days of Contract Award, prepare and deliver to the Contracting Officer a Earned Value Report (construction Contract) as directed by the Contracting Officer. Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices and extended prices. Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items.

1.3.2 Payment Schedule Instructions

Payments will not be made until the Earned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contracting Officer.

Additionally, the Earned Value Report must be separated as follows:

a. Primary Facilities Cost Breakdown:

Defined as work on the primary facilities out to the 5 foot line.

Work out to the 5 foot line includes construction encompassed within a

SECTION 01 20 00 Page 1 theoretical line 5 foot from the face of exterior walls and includes attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 foot line.

b. Supporting Facilities Cost Breakdown:

Defined as site work, including incidental work, outside the 5 foot line.

1.3.3 Schedule Requirements for HVAC TAB

The field work requirements in Section 23 05 93.00 22 TESTING, ADJUSTING, AND BALANCING FOR HVAC must be broken down in the Earned Value Report from the cost-loaded NAS by separate line items which reflect measurable deliverables. The value for each pay item listed below will be established on a case by case basis for each Contract. The line items are as follows:

a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. Submit the resulting findings to the Government to allow correction of the design. The progress payment will not be issued until the report is reviewed and approved.

b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report must contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.

c. Season I field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data must be collected for one seasonal condition (either summer or winter depending on project timing).

d. Approval of Season I report: On completion of the Season I field work, the data is compiled into a report and submitted to the Government. The report is reviewed, and approved, after ensuring compliance with the pre-field engineering report scope of work.

e. Completion of Season I field QA check: Contract QC and Government representatives meet the TABS Agency at the jobsite to retest portions of the systems reported in the Season I report. The purpose of these tests are to validate the accuracy and completeness of the previously submitted Season I report.

f. Approval of Season II report: The TABS Agency completes all Season II field work, which is normally comprised mainly of taking heat transfer temperature readings, in the season opposite of that under which Season I performance data was compiled. Compile this data into a report and submit to the Government. On completion of submittal review to ensure compliance with the pre-field engineering report scope, progress payment is issued. Progress payment is less than that issued for the Season I report since most of the water and air

SECTION 01 20 00 Page 2 balancing work effort is completed under Season I.

1.4 CONTRACT MODIFICATIONS

In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, base equipment use rates upon the applicable provisions of the

EP 1110-1-8 .

1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT

1.5.1 Content of Invoice

Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies. The requests for payment shall include the documents listed below.

a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 must include certification by Quality Control (QC) Manager as required by the Contract.

b. The Earned Value Report from the cost-loaded NAS.

c. Contractor's Monthly Estimate for Voucher and Contractors Certification (NAVFAC Form 4330) with Subcontractor and supplier payment certification. Other documents, including but not limited to, that need to be received prior to processing payment include the following submittals as required. These items are still required monthly even when a pay voucher is not submitted.

d. Monthly Work-hour report.

e. Updated Construction Progress Schedule and tabular reports required by the contract.

f. Contractor Safety Self Evaluation Checklist.

g. Updated submittal register.

h. Solid Waste Disposal Report.

i. Certified payrolls.

j. Updated testing logs.

k. Other supporting documents as requested.

1.5.2 Submission of Invoices

If DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions is included in the Contract, provide the documents listed in above paragraph CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of

SECTION 01 20 00 Page 3 attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.

Monthly invoices and supporting forms for work performed through the anniversary award date of the Contract must be submitted to the Contracting Officer within 5 calendar days of the date of invoice. For example, if Contract award date is the 7th of the month, the date of each monthly invoice must be the 7th and the invoice must be submitted by the 12th of the month.

1.5.3 Final Invoice

a. A final invoice must be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release must contain the corporate seal. An officer of the corporation must sign and the corporate secretary must certify the Final Release.

b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor must then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.

c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.

1.6 PAYMENTS TO THE CONTRACTOR

Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.

1.6.1 Obligation of Government Payments

The obligation of the Government to make payments required under the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .