This is a Price Schedule for a federal construction contract covering two projects at Naval Undersea Warfare Center, Naval Station Newport: Project P-084 Next Generation Torpedo Integration Lab and Project P1016 Consolidated Research, Development, Test and Evaluation (RDTE) Systems Facility.

The base contract (Line Items 0001-0001E) addresses Project P-084 and includes a lump-sum price for complete work, unit prices for geotechnically unsuitable subgrade soil removal and replacement (3,000 cubic yards), handling and disposal of contaminated surplus soil media including PFAS and petroleum (8,000 tons), treatment and disposal of contaminated construction dewatering effluent (100,000 gallons), and demolition and disposal of buried concrete and debris greater than 1/2 cubic yard (500 tons). Option Items 0002-0005 include AV design services, audio-visual equipment procurement and installation with a government estimated price of $125,000, furniture, fixtures, and equipment (FF&E) with a government estimated price of $539,503, and steam modifications. All FF&E and AV line items allow for a Handling and Administration Rate (HAR) not to exceed 5 percent.

Option Items 0006-0011 mirror the same scope for Project P1016, with identical unit price line items for soil removal (3,000 CY), contaminated soil disposal (8,000 tons), dewatering effluent treatment (100,000 gallons), and buried debris removal (500 tons). Additional options for P1016 include AV design services, AV equipment with a government estimated price of $338,554, FF&E with a government estimated price of $855,715, demolition of Building 1272T, and construction of a paved parking lot with low-impact development stormwater system. The contract specifies a 901 calendar-day completion period, with the government reserving the right to exercise any or all option items within 120 calendar days after award. All estimated quantities marked with asterisks allow for equitable adjustments if actual quantities vary more than 15 percent from estimates. Bidders must provide firm fixed prices for all line items expressed to two decimal places, and failure to price any line item will result in proposal rejection. Performance bonds must reflect 100 percent of aggregate amounts if any options are exercised.

View the file

Other files

File Type Posted
Amendment 0009 N4008526R0178.pdf PDF
P-1016 Amendment 0008 - Continuation.pdf PDF
07 27 10 Building Air Barrier System.pdf PDF
Amendment 0008 N4008526R0178.pdf PDF
JA ML2681 26R0178 Redacted.pdf PDF
P1016-C-503.pdf PDF
P-084 Amendment 0008 - Drawings R1.pdf PDF
P-084 Amendment 0008 - Continuation Doc R1.pdf PDF
Amendment 0007 N4008526R0178.pdf PDF
P1016_Civil C-131.pdf PDF
02 82 00.pdf PDF
33 63 13.pdf PDF
01 33 00.pdf PDF
P-1016 Amendment 0006 - Continuation.pdf PDF
00 01 15.pdf PDF
Attachment H -Price Proposal Form_Rev 1.docx DOCX document
High Performance and Sustainable Building Checklist.pdf PDF
28 10 05.pdf PDF
Amendment 0006 PPI Responses.pdf PDF
01 30 00.pdf PDF
23 07 00.pdf PDF
P-084 Amendment 0006 - Continuation.pdf PDF
P084 - Amendment 006 Drawings.pdf PDF
Attachment J - WD RI20260001 10-1-26.pdf PDF
Amendment 0006 N4008526R0178.pdf PDF
23 22 26.00 20.pdf PDF
32 31 13.53.pdf PDF
Amendment 0005 N4008526R0178.pdf PDF
Amendment 0004 N4008526R0178.pdf PDF
Amendment 0004 PPI Responses.pdf PDF
Amendment 0003 N4008526R0178.pdf PDF
Amendment 0002 - N4008526R0178.pdf PDF
Amendment 0001 - N4008526R0178 .pdf PDF
Attachment I - SECNAV FORM 5512.pdf PDF
Solicitation - N4008526R0178.pdf PDF
Attachment E- Historical Small Business Utilization.docx DOCX document
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment J - WD RI20260001 7-30-2026.pdf PDF
NUWC P-1016 - Drawings.pdf PDF
NUWC P084 - Drawings.pdf PDF
NUWC P-1016 - Specifications.pdf PDF
Attachment D- Past Performance Questionnaire.docx DOCX document
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment H -Price Proposal Form.docx DOCX document
Attachment C- Construction Experience Project Data.docx DOCX document
NUWC P084 - Specifications.pdf PDF
Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Attachment F-Small Business Participation Commitment.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

Line Item

Description Quantity Unit Unit Price

Sub-Total Total Price

0001 BASE PRICE: Total Price for the entire work for Project P-084 Next Generation Torpedo Integration Lab at Naval Undersea Warfare Center, Naval Station Newport, in Priced Line Items 0001A, 0001B, 0001C, 0001D and 0001E.

EA

0001A Subtotal of Base Price for the entire work for Project P-084 Next Generation Torpedo Integration Lab at Naval Undersea Warfare Center, Naval Station Newport, in accordance with the drawings and specifications, complete, but excluding work provided in another line item.

0001B Unit Price for undercut and temporary stockpiling of geotechnically unsuitable subgrade soils (including undercut shown on Sheet CD103) and replacement with imported Structural Fill material, complete in accordance with the drawings and specifications, but excluding work provided in another line item. Disposal of impacted surplus soil media will be covered under a separate line item.

3,000*

CY

0001C Unit Price for handling, temporary stockpiling, sampling, analysis, and disposal of non-hazardous contaminated surplus soil media (including but not limited to, PFAS, petroleum, asbestos, and metals) at a permitted licensed RCRA D facility that accepts PFAS impacted soil media or a RCRA C facility, if necessary, complete in accordance with the drawings and specifications, but excluding work provided in another line item.

8,000*

TONS

0001D Unit price for handling, containerizing, testing, management (including operation and oversight), offsite treatment and disposal of

100,000*

GAL

contaminant impacted construction dewatering effluent (including but not limited to, PFAS, petroleum, and metals) at a permitted facility. Price for providing work in connection with labor, material, equipment, transportation, spent treatment media characterization, transport, disposal, and supervision, complete in accordance with the drawings and specifications, but excluding work provided in another line item.

Quantities in gallons must be certified and approved by the Contracting Officer.

0001E Unit Price for demolition, excavation and disposal of buried concrete and debris greater than 1/2 cubic yard in size, encountered within planned excavation limits and not identified in the Contract Documents, complete in accordance with the drawings and specifications, but excluding work provided in another line item. (Note:

Pieces of buried concrete and debris encountered within the planned excavation limits smaller than 1/2 cubic yard in size shall be considered to be incidental to the work).

500*

0002 Option Item 1:

AV Design Services Option Price for providing the Professional Services of a Certified Technology Specialist - Design (CTS-D) detailed in Spec Section 01 30 02.00 22, but

0003 Option Item 2: Price for procuring Audio Visual System (A/V) Equipment, testing, and associated training in accordance with the drawings and specifications, but excluding work provided in another Priced line item.. Equipment includes, but is not limited to, items such as flat panel monitors, projectors, wall input boxes, touch screens, push button control panels, video teleconferencing codecs, microphones, speakers and the communication cabling connecting these devices together.

Include the price for supporting, permanent infrastructure under the Base Price. Interior supporting

Government Estimated Price:

$125,000

HAR

Percent

(NTE 5%)

Subtotal

Total FF&E Estimated Price infrastructure includes items such as conduit, junction boxes, mounting hardware, and power connections, but excluding work provided in another line item.

0004 Option Item 3: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another line item.

Govt.

$539,503

0005 Option Item 4: Price for providing steam modifications, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.

0006 Option Item 5: Total Price for the entire work for Project P1016 Consolidated Research, Development, Test and Evaluation (RDTE) Systems Facility at Naval Undersea Warfare Center, Naval Station Newport, in Priced Line Items 0006A, 0006B, 0006C, 0006D and 0006E.

0006A Option Item 5A: Total Price for the entire work for Project P1016 Consolidated Research, Development, Test and Evaluation (RDTE) Systems Facility at Naval Undersea Warfare Center, Naval Station Newport, in accordance with the drawings and specifications, complete, but excluding work provided in another line item.

0006B Option Item 5B: P1016 - Unit Price for undercut and temporary stockpiling of geotechnically unsuitable subgrade soils (including undercut shown on Sheet CD102) and replacement with imported Structural Fill material, complete in accordance with the drawings and specifications, but excluding work provided in another line item.

Disposal of impacted surplus soil media will be covered under a separate CLIN.

3,000*

CY

0006C Option Item 5C: P1016 Unit Price for handling, temporary stockpiling, sampling, analysis, and disposal of non-hazardous contaminated surplus soil media (including but not limited to, PFAS, petroleum, and metals) at a permitted licensed RCRA D facility that accepts PFAS impacted soil media or a RCRA C facility if necessary, complete in accordance with the drawings and specifications, but excluding work provided in another line item.

8,000*

0006D Option Item 5D: P1016 - Unit price for handling, containerizing, testing, management (including operation and oversight), offsite treatment and disposal of contaminant impacted construction dewatering effluent (including but not limited to, PFAS, petroleum, and metals) at a permitted facility. Price for providing work in connection with labor, material, equipment, transportation, spent treatment media characterization, transport, disposal, and supervision, complete in accordance with the drawings and specifications, but excluding work provided in another line item. Quantities in gallons must be certified and approved by the Contracting Officer.

100,000*

GAL

0006E Option Item 5E: P1016 Unit Price for demolition, excavation and disposal of buried concrete and debris greater than 1/2 cubic yard in size, encountered within planned excavation limits and not identified in the Contract Documents for the P- 1016 Project, complete in accordance with the drawings and specifications, but excluding work provided in another line item. (Note: Pieces of buried concrete and debris encountered within the planned excavation limits smaller than 1/2 cubic yard in size shall be considered to be incidental to the work).

500*

0007 Option Item 6: P1016 AV Design Services Option Price for providing the Professional Services of a Certified Technology Specialist - Design (CTS-D) detailed in Spec Section 01 30 02.00 22, but

0008 Option Item 7: P1016 Price for procuring Audio Visual System (A/V) Equipment, testing, and associated training in accordance with the drawings and specifications, but excluding work provided in another line item. Equipment includes, but is not limited to, items such as flat panel monitors, projectors, wall input boxes, touch screens, push button control panels, video teleconferencing codecs, microphones, speakers and the communication cabling connecting these devices together.

Include the price for supporting, permanent infrastructure under the Base Price. Interior supporting infrastructure includes items such as conduit, junction boxes, mounting hardware, and power connections.

Government

$338,554

0009 Option Item 8: P1016 Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another line item.

Government

$855,715

0010 Option Item 9: P1016 Price for the demolition of Building 1272T, including the concrete pad and foundations. The site will be backfilled and finished with crushed gravel. The site will be graded to provide positive drainage towards nearby catch basins. Provide the scope complete in accordance with the drawings and specifications, but

0011 Option Item 10: P1016 Price for a paved parking lot and LID stormwater system to be constructed after the demolition of Building 1272T, in lieu of the crushed gravel.

Provide the scope complete in accordance with the drawings and specifications, but excluding work provided in another line item.

Total Price for CLIN 0001 - 0011

GENERAL BID NOTES

a) Award will be evaluated on the price proposed for Line Items 0001 – 0011, Base Price and the sum of all Option Item prices.

b) The Government reserves the unilateral right to award any or all Line Items 0002-0011 (excluding 0003, 0004, 0008 and 0009) to the Contractor at the proposed price within 120 calendar days after the contract award and in accordance with all bid notes. A firm fixed proposed price is required for all Line Items. No provision is made for economic price adjustment. If the Option(s) are exercised, the contract completion date remains 901 calendar days after award of the contract.

c) Quantities on the bid schedule that are followed by an asterisk (*) are estimated quantities. Contractor shall only be paid for quantities/units of work actually performed. If the estimated quantity used in the bid schedule is not reached, a deductive modification shall be taken at the end of contract for quantities/units not performed. If the estimated quantity is exceeded, an equitable adjustment shall be made to the contract price for work performed over the estimated quantity. If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 15 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.

d) Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.202 (b) (DEVIATION 2026-O0027) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for Line Items 0002 - 0011 to the total price for the Base Bid, (Line Item 0001). Evaluation of options will not obligate the Government to exercise the Option(s). (FAR 52.217-5

DEVIATION 2026-O0038).

e) The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

f) Failure to enter a price for any Line Item will result in a proposal being rejected.

g) For bid items where unit prices are indicated as required, bidders shall enter unit prices and extended totals in spaces provided. Bidders shall enter unit prices expressed in U.S. Dollars and cents (to exactly two decimal places, e.g., $X.XX) and calculate extended totals accordingly. Unit prices and extended totals must reflect the actual calculated rate in dollars and cents; and shall not be rounded to the nearest whole dollar unless the unit price is naturally an even dollar amount. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price..

h) If any or all of Line Items 0002 - 0011 is exercised, additional bonding and consent of surety is required.

Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all items.

ADDITIONAL BID NOTES

a) For LINE ITEMS 0001B and 0006B: Geotechnically Unsuitable Subgrade Soil Removal, temporary stockpiling, and Replacement: Unit price for all work in connection with the removal, disposal, and replacement of Geotechnically unsuitable subgrade soil with imported Structural Fill as specified. Unsuitable subgrade soil determinations must be made by the Government Geotechnical Engineer and approved by the Contracting Officer.

The price must include removal of geotechnically unsuitable soils shown on drawings indicated, or identified during proof rolling of planned subgrades, and backfilling the excavation with compacted imported Structural Fill. Soils disturbed by the contractor’s Construction activities, or that are excessively wet and soft due to lack of proper site maintenance and protection measures, and lack of specified drainage or excavation dewatering will not be considered unsuitable. Unit price must include all handling and transportation. The volume of material removed and imported backfill required must be neat quantities determined based on field measurements (length x width x depth) of the completed excavation to remove the unsuitable soil as approved by the Contracting Officer.

Any work under this CLIN will not proceed without prior written approval of the Contracting Officer and direction of the Government Geotechnical Engineer.

b) For Line Items 0001C and 0006C: Unit price for providing all work in connection with excavation, handling, temporary stockpiling, sampling, analysis, transportation, and disposal of non-hazardous contaminated surplus soil media at a permitted licensed facility. Sampling must be performed in accordance with Specification Section 01 57 19, plus any other analytes required by the treatment/disposal facility. Unit price must include all work in connection with removal, testing, treatment and disposal of non-hazardous contaminated surplus soils encountered within planned excavations and soils removed under Line-Items 0001B and 0006B, at a permitted licensed treatment/disposal facility as specified. Unit price must include all work in connection with evaluation and handling, any necessary storage, stockpiling and related storage maintenance and transportation, and all that entails. The volume of contaminated soil removed will be based on approved truck scale measurement at the receiving facility and the quantity must be approved by the Contracting Officer. Any work under this Line Item will not proceed without prior written approval and field verification from the Contracting Officer.

c) For Line Items 0001D and 0006D: Unit price for providing all work in connection with handling, containerizing, testing, storage, management (including operation and oversight), and offsite treatment and disposal of contaminant impacted construction dewatering effluent (including but not limited to, PFAS, petroleum, and metals) at a permitted licensed facility. Sampling must be performed in accordance with Specification Section 01 57 19, plus any other analytes required by the treatment/disposal facility. The quantity of contaminant impacted construction dewatering effluent treated and discharged in gallons must be based on certified logs and the quantity must be approved by the Contracting Officer. Any work under this CLIN will not proceed without prior written approval and field verification from the Contracting Officer. The Contractor must select means and methods to minimize the volume of construction dewatering effluent to the greatest extent possible.

d) For Line Items 0001E and 0006E: Unit price for providing all work in connection with demolition, removal and disposal of unknown buried concrete, pipes and debris (including creosote treated timber) encountered within planned excavation limits and not identified in the Contract Documents. Buried concrete and debris meeting the specified criteria must be field verified by the Contracting Officer prior to removal and must be segregated from the surrounding soil during demolition and excavation operations. Buried concrete and debris encountered within the planned excavation limits smaller than 1/2 cubic yard in size must be considered to be incidental to the work (i.e., at no cost to the Government). Unit price must include all work in connection with buried concrete and debris removal and disposal and replacement with clean imported structural backfill or other material specified.

Unit price must include handling and transportation. The volume of buried concrete and debris removed will be based on approved truck scale measurement at the receiving facility and the quantity must be approved by the Contracting Officer. Any work under this Line Item will not proceed without prior written approval and field verification from the Contracting Officer.

BID NOTES FOR FFE & AV (LINE ITEMS 0003, 0004, 0008 and 0009).

1) The estimated amount for FF&E and A/V has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E and A/V including freight and installation charges. The Government FF&E and A/V Estimate is only an estimated amount.

2) If awarded, line items will be funded separately after completion of FF&E and A/V design package review by the Government, and receipt of appropriate funding by the Government, and receipt of appropriate funding by the Government. Requirements and details for FF&E are provided in Section 12 00 01.00 20 FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) PACKAGE. Requirements and details for AV are provided in Section 01 30 02.00 22 DESIGN, PROCUREMENT, AND

INSTALLATION OF AUDIOVISUAL EQUIPMENT.

3) Bonding

i) Bonding is not required for the design, procurement and installation of FF&E and AV at time of Construction Contract Award.

FAR 28.102-1(a) (DEVIATION 2026-O0005) requires that performance and payment bonds be included in all construction contracts exceeding the SAT, except under the conditions listed. Since the FF&E & AV Option Item is not part of the original contract award, the Construction Contractor must not be required to secure bond for the FF&E & AV at the time the basic contract is awarded.

ii) Additional Bond at FF&E Option Item Award

FAR 28.102-2(d) (DEVIATION 2026-O0005) requires the Government to secure additional bond from the Construction Contractor for any contract price increases. Therefore, an increase to the original contract bond is required at the time of the FF&E Option Items award, to protect the Government against the Construction Contractor not providing FF&E ordered and to ensure that the vendor(s) receive payment if the Construction Contractor goes out of business. The increased cost of the bond must come from the FF&E funding source and is not a part of the Construction Contractor’s HAR.

iii) Bonds Required by the Construction Contractor

If the Construction Contractor requires bonding from the FF&E subcontractor(s), the cost must be covered in the Construction Contractor’s HAR.

4) Offerors may propose a Handling and Administration Rate (HAR) for the FF&E and A/V not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E and A/V. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E and A/V. The proposed HAR is a fixed rate.

5) The Government is not obligated to award CLINs 0003, 0004, 0008 and 0009. Should the Government choose to award the Option Item, the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E and A/V.

6) If awarded, the FF&E and A/V modifications will be awarded at least six months prior to the contract completion date. A minimum of six months is required for the Contractor to purchase, deliver and install the FF&E and A/V without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E and A/V as an option. No schedule extensions will be granted if the option is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture option with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted final FF&E and A/V packages were submitted within the approved schedule deadlines and sufficient lead time for the FF&E and A/V is not available and the Government's award of the option is in the last six months of the contract.