Amendment 0008 N4008526R0178.pdf
PDF 822 KB Posted
- Solicitation number
- N4008526R0178
About this file
This is Amendment 0008 to Solicitation N4008526R0178, issued by NAVFACSYSCOM Mid-Atlantic on November 20, 2026. The amendment modifies Section 00 21 16 (Instructions to Proposers) and incorporates three key requirements: Justification & Approval (J&A), attachments, and pre-proposal inquiry responses.
The amendment includes supporting documents: P-084 Amendment 0008 Continuation Doc R1, P-084 Amendment 0008 Drawings R1, P-1016 Amendment 0008 Continuation Sheet, P-1016-C-503, Attachment H (Price Proposal Form_rev2), and 07 27 10 Building Air Barrier System specifications. Pre-proposal inquiry responses address technical clarifications across multiple drawing and specification sections, including interior finishes coding (CPT2 to be provided as CPT3), material substitutions (MCA treated wood acceptable for dumpster enclosure CCA posts), metal panel joint configurations (24" x 96" for P-084 and 16" x 32" for P-1016 in running bond pattern), electrical ductbank details (3-way conduit detail added to C-505), reflected ceiling plan corrections, steel floor plate removal from requirements, excavation and undercut specifications for line items 0001B, 0006B, 0001C, and 0006C, and Controlled Unclassified Information (CUI) classification clarifications limiting CUI designation to RF-shielded controlled perimeter areas and related submittals. The amendment confirms that construction documents remain non-CUI except as-builts within the RF-shielded area, that the controlled area applies only to P1016, and that US persons (excluding SCI cabling and ESS work) are permitted on the project.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
PPI# Page Section Paragraph Question Response
I-601 & I-
Ref. P-1016 I-601 and I-001. CPT2 appears on interior finish schedule but does not have a corresponding entry on interior finish legend. Please identify CPT2 material, manufacturer, style, size, color, flame/smoke rating requirement, contact, and any remarks or notes.
Interior finishes code CPT2 is not used on P- 1016 Interior Finishes Legend. CPT2 shown on Interior Finishes Schedule to be provided as CPT3.
C-503 A1
Subcontractors have indicated the CCA posts required for the dumpster enclosure are harder to find in relevant quantities due to EPA restrictions.
Please consider allowing the use of MCA treated wood in place of CCA treated wood for dumpster enclosure.
MCA treated wood is acceptable.
A-505/A-504
PPI-0195 stated that the joint configuration for the metal wall panels could be found on A-505 for P-084 and A-505 for P-1016. These drawings do not contain the joint configuration required for the metal panels. Please provide accurate drawing reference or detail.
For joint configurations of metal panels, see exterior elevations on A-201 and A-202. Panel sizes for P-084 are 24" wide by 96" high as shown, in a running bond pattern with joints at third points; Panel sizes for P-1016 are 16" wide by 32" high as shown, in a running bond pattern with joints at third points.
C103, B2/C505
C103 Keynote #15 describes 3-way 5" conduit and to refer to detail B2 on C505. However, detail B2 on C505 shows 6-way 4" conduit. Please clarify and or provide correct detail, 3-Way Electrical Ductbank Trench Detail C4 has been added to sheet C-505.
A-104/A-
Multiple conflicts were identified between the reflected ceiling plans and the interior finish shcedule I-601. Room 110, 113, 114, 208, 222, 301 are idenfitied at exposed painted ceiling, however the reflected ceiling plan shows ACT. Please provide an updated reflected ceiling plan and finish schedule.
The reflective ceiling plan is correct. I-601 the interior finish schedule is updated to match the reflective ceiling plan.
Ref PPI 146. Amendment #4 lists the response to PPI 146 as "Exterior wall sections vary, The response included in Amendment #6 is correct.
232 identified locations are referenced on A- 301 & A-302,and detailed on A-303 & A-304." On Amendment #6, PPI 146 has a response of "RF shielded door with the specified STC
233 rating may be achieved through a manufacturer such as Krieger Specialty Products (https://www.kriegerproducts.com/)."
Please clarify what response corresponds with PPI 146.
pg.47 S-003
P-084 Steel Floor Plates are noted on S- 003, however there are no steel floor plates shown on drawings. Please
There is currently no steel floor plate required.
confirm there are no steel floor plates or identify their locations on the plans or details.
Attachme nt H
Line-Items 0001B and 0006B state that they include unit price for undercut and temporary stockpiling of unsuitable soils (including undercut shown on CD103).
Please clarify that this only includes the undercuts shown on CD-103 and C- 504/A1 and not other excavations, e.g.
ductbank, piping, etc. There are no other undercuts referenced on the drawings or details and the phrase 'including undercut shown on CD103' eludes to more undercut soils on the project.
This unit price does not only include the undercuts shown on CD-103 and C-504/A1, but all site excavation for the project.
Line-Item 0001B and 0006B descriptions state it includes unit price for undercut and temporary stockpiling of unsuitable soils (including undercut shown on CD103). Please clarify if by undercut it is meant to represent the 5 foot overburden removal beneath footing depth or is it all excavated soils as shown on CD103 and C-504/A1. C-504 appears to remove all soils within the building footprint to a depth of 5 feet below the footing depth at a volume greater than the CLIN quantity.
These line items are meant to represent the 5-foot undercut beneath the proposed footing transitioning to 5-feet below the slab at a 1H:1V slope. Detail A1/C-503 (P1016) & A1/C-504 (P084) have been revised to reflect this.
Line-Item 0001B and 0006B state that disposal of impact surplus soil will be covered under a separate line item.
However, additional bid note a) states that unit price shall include all work in connection with removal, disposal, and replacement. Please confirm that disposal should not be included within 0001B and 0006B but instead 0001C and 0006C.
Attachment H has been updated. Please see Amendment 0008
Line-Item 0006B includes undercut on CD-103, however correct drawing reference for P1016 is CD102. Please correct price form.
CD-102 for P1016 is correct. Attachment H has been updated to reflect the correct sheet.
Please see Amendment 0008
CSP
Document 6.1
Paragraph 6.1 of the CSP notes �All construction pans for this project shall be marked �Controlled Unclassified Information (CUI)� and disseminated to only those approved to work on this project according to this CSP�. Outside of the CSP, no other documents to date have been labeled as CUI.
Construction documents should remain non- CUI with the exception of as-builts of the area related to and within the "RF shielded controlled perimeter" and submittals and RFIs related to RF shielding
242 a. Please confirm the Project Documents will maintain their current non-CUI designation.
243 b. If the documents are to become CUI, does that mean the project now requires a CMMC Level 2 (self) certification from all primes?
CSP
Document + A101
The CSP does not provide clarification on what exact locations are considered the secure area and are under the CSP umbrella. Can you please confirm the �Controlled Area� is limited to only the areas within the �RF Shielded Controlled Perimeter� as denoted by the blue line in drawing A101 for Building P1016? Given the P084 Building has no RF Shielding the CSP should not apply to the P084 building or site.
"Controlled Area" is limited to areas related to and within the "RF shielded controlled perimeter" of P1016. Other areas of construction must follow NUWC requirements in specifications.
CSP
Document
The CSP also notes that US Persons are able to perform work (outside of the SCI Cabling and ESS work) but the Specs and PPI responses provided previously limited work to only US Citizens. Please confirm that US Persons are allowed to complete the project except for the SCI Cabling and ESS scope of work as noted in the CSP.
Per the CSP, US persons are allowed to work on the project, excepting the SCI cabling and ESS work