Amendment 0009 N4008526R0178.pdf

PDF 698 KB Posted

Attached to
P084 NEXT GENERATION TORPEDO INTEGRATION LAB, NAVAL STATION NEWPORT, NEWPORT RI
Solicitation number
N4008526R0178
Issued by

About this file

This is Amendment 0009 to Solicitation N4008526R0178, issued by NAVFACSYSCOM MID-ATLANTIC on 23 November 2026. The amendment extends the proposal due date from 24 November 2026 to 01 December 2026 at 2pm EST. Offerors must acknowledge receipt of this amendment prior to the submission deadline using one of three methods: completing items 8 and 15 and returning copies of the amendment, acknowledging receipt on each copy of the offer submitted, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt at the designated location by the specified deadline may result in rejection of the offer.

The amendment modifies Section 00 21 16 (Instructions to Proposers) to incorporate two items: an extension to the proposal due date and pre-proposal inquiry responses. The continuation page includes a Pre-Proposal Inquiry response addressing CMMC Level 2 requirements, clarifying that construction documents will remain non-CUI except for as-builts of areas within the "RF shielded controlled perimeter" and submittals and RFIs related to RF shielding. Only subcontractors working on or within the RF shielded controlled perimeter must meet CMMC Level 2 requirements. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.

View the file

Other files

File Type Posted
P-1016 Amendment 0008 - Continuation.pdf PDF
07 27 10 Building Air Barrier System.pdf PDF
Amendment 0008 N4008526R0178.pdf PDF
JA ML2681 26R0178 Redacted.pdf PDF
P1016-C-503.pdf PDF
Attachment H -Price Proposal Form_Rev 2.pdf PDF
P-084 Amendment 0008 - Drawings R1.pdf PDF
P-084 Amendment 0008 - Continuation Doc R1.pdf PDF
Amendment 0007 N4008526R0178.pdf PDF
P1016_Civil C-131.pdf PDF
02 82 00.pdf PDF
33 63 13.pdf PDF
01 33 00.pdf PDF
P-1016 Amendment 0006 - Continuation.pdf PDF
00 01 15.pdf PDF
Attachment H -Price Proposal Form_Rev 1.docx DOCX document
High Performance and Sustainable Building Checklist.pdf PDF
28 10 05.pdf PDF
Amendment 0006 PPI Responses.pdf PDF
01 30 00.pdf PDF
23 07 00.pdf PDF
P-084 Amendment 0006 - Continuation.pdf PDF
P084 - Amendment 006 Drawings.pdf PDF
Attachment J - WD RI20260001 10-1-26.pdf PDF
Amendment 0006 N4008526R0178.pdf PDF
23 22 26.00 20.pdf PDF
32 31 13.53.pdf PDF
Amendment 0005 N4008526R0178.pdf PDF
Amendment 0004 N4008526R0178.pdf PDF
Amendment 0004 PPI Responses.pdf PDF
Amendment 0003 N4008526R0178.pdf PDF
Amendment 0002 - N4008526R0178.pdf PDF
Amendment 0001 - N4008526R0178 .pdf PDF
Attachment I - SECNAV FORM 5512.pdf PDF
Solicitation - N4008526R0178.pdf PDF
Attachment E- Historical Small Business Utilization.docx DOCX document
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment J - WD RI20260001 7-30-2026.pdf PDF
NUWC P-1016 - Drawings.pdf PDF
NUWC P084 - Drawings.pdf PDF
NUWC P-1016 - Specifications.pdf PDF
Attachment D- Past Performance Questionnaire.docx DOCX document
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment H -Price Proposal Form.docx DOCX document
Attachment C- Construction Experience Project Data.docx DOCX document
NUWC P084 - Specifications.pdf PDF
Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Attachment F-Small Business Participation Commitment.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

PPI# Page Section Paragraph Question Response

246 7-Jan 00 07 00 Amendment 7 Please define the scopes of work falling under CUI that now require CMMC Level 2 (self) status based on Amendment 0007. Is the GC/Contractor now required to meet CMMC Level 2 (self) for all aspects of the project?

Do all subcontractors working on site, regardless of scope, have to meet CMMC Level 2 (self) requirements/status in order to perform work?

Construction documents will remain non-CUI with the exception of as-builts of the area related to and within the "RF shielded controlled perimeter" and submittals and RFIs related to RF shielding. any subcontractors working on or within the "RF shielded controlled perimeter" must meet the level 2 requirement.

File details come from the government source that posted it. Updated .