This document is a comprehensive set of design drawings and specifications for the P-084 Next Generation Torpedo Integration Lab facility at Portsmouth Naval Shipyard, a Naval Facilities Engineering Command (NAVFAC) project under the Department of the Navy.
The project encompasses a full site development and building construction package totaling approximately 6,500 square feet with utility infrastructure integration. Key deliverables include site utility plans (C-103/C-104) showing 4-inch sanitary sewer service, 8-inch water service, 2-inch domestic and 6-inch fire water services, stormwater infiltration systems, electrical duct banks (2-way, 3-way, 4-way, and 6-way configurations), communications infrastructure, and steam/condensate piping connections to existing systems. Structural components feature an elevator pit with stepped mat design, foundation requirements for 14-inch concrete mats, and utility penetrations. Building systems include two air handling units (AHU-1 and AHU-2) with variable frequency drives, energy recovery wheels, and 4,500 CFM capacity; a four-module 120-ton chiller plant with lead-lag pump configuration; hydronic heating from steam heat exchangers rated 180°F supply; and exhaust systems serving electronics fabrication, data rooms, and standard office spaces. The electrical infrastructure requires a pad-mounted transformer, 480/120V distribution, grounding busbars, lightning protection with counterpoise loop, and medium-voltage switch replacement. Interior finishes include stainless steel panels in specialized rooms, varied flooring by occupancy type, and acoustic ceilings. The project incorporates ATFP (Anti-Terrorism Force Protection) requirements including 7-foot chain link perimeter fencing with barbed wire and controlled access gates. All work must comply with RIDOT standards and National Grid utility requirements; steam and condensate connections must occur during summer shutdown (May-September). The design documentation was last revised on November 19, 2026 (Amendment 008).
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
C C
EM
MH
MH
WV
WV
TBM 7932A
BOX CUT IN
TRANFORMER PAD
ELEV.=20.05'
TBM 7933B
BOX CUT IN
CONC PAD
ELEV.=19.81'
19"
45078
WV
WV
WV
W V
C
EHH
EHH
WV
WV
C
C
7' CHAIN LINK FENCE
W/BARBED WIRE
3-101
EP
EP
EP
EP
EP
EP
EP
SW
L
SBBSBBSBB
VGC
VGC
VGC
VGC
B U R M A R O A D
11"
W W
W W
W W
W W W W W W W W
W
O H
W
OHW
OHW
OHW
W W
W W
W W
W
W W
W W
W
W
W W W W W W W W
W W W W W
W
W W
W W
G G G G G G G G G
STST
E
ST
ST
ST
ST
ST
C
W
C C
E E E E E EE E E E E E
C
C
EE
E
E E
W
E
E
E E
E
E
E E E E E E
C C C C C
C
E E
E E
E C
C C
C C
C C C C C C
GRASS MOUND
HUNT STREET
(B)
D
(A)
(B)
(A)
(B)
SD
D
(A)
SS
D
SS
SS
S
(A)
SS
SS
SS
(A)
(B)
SD
D
DD(A)
(C)
D
D
(A)
D (B)
D
SD
SD
SD
SD
SD
D
D
DD(A)
(C)
(B)
SD
D
D
(A)
(A)
D
D
(A)
(A)
D D D D D
(A)
(B)
DMH 1761
SS
S
S (A)
(B)
SMH 1760
D D D D D D D D D D D D D D
DMH 1759
SS SS SS SS SS
SMH 1745
(A)
(A)
(C)
(A) (B)
SMH 1646
DMH 1644
DMH 1467
CB 1953
DMH 2082
CB 2033
CB 1983
CB 1766
DMH 1765
CB 1764
CB 1706
CB 1710
8" 8"
SMH
SMH
CB
DMH 2165 DMH 2152
E
DMH 338
CB
DMH 1371
33' TYP
EXISTING CONCRETE
WALKWAYEXISTING SW 513
D
SD
D
SD
SD SD SD
SD SD SD
UGE UGE UGE
UGE UGE UGE
UG
E
U G
E
U G
E
SD
SD
M
SS
SD
ST ST
ST
CR CR
CR
SD SD SD
SD
SD
WV
SD
SD
D
SD
U G
C
UG
C
UG
C
C
UG
C
UGE
U G
E
UGE UGE
UGE
E
W V
P1016
FUTURE SITE
UGEUGE
U G
E
UGE
ST
ST
W
RD RD
RD
RDRD
SD
FD
SD
D
E
BUILDING 33'
ATFP STANDOFF
CB 8
CB 11
HDS 2
12 29
CB 10
CB 7
OCS 2
CB 6
LANDSCAPING
DMH 5
LANDSCAPING
13 28
CB 12
SUBSURFACE
SYSTEM
CB 9
PAVED
CONDENSATE DRAIN
TO CB9, INV 14.75
P084
6,500 SF
FFE: 19.0
DMH 3
CMH 1
MATCH C-103
LINE C-104
ANCHORS (TYPx4), SEE DETAIL A4/C-510
EMH 1
BUILDING UTILITY SERVICE DESIGN WILL
BE UPDATED DURING STEAM AND
CONDENSATE DESIGN PROJECT
EMH 2
/19
/20
:51
:58 A
M C:
\C
CE
D
RO
PB
OX
\C
OL
BY
C
OM
PA
NY
E
NG
IN
EE
RI
NG
\E
NG
IN
EE
RI
NG
\29
7 P
OR
TS
MO
UT
H
NA
VA
L S
HI
PY
AR
D\
7.2
.00 1 -
N
UW
C P0
D
ES
IG
N\ P0
_F
DA
_S
HA
RE
D_
FO
LD
ER
S\
DR
AW
IN
GS
\S
HE
ET
S\ C-
3A
ND
C-
4.D
W G
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM
CHIEF ENG/ARCH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
NU
W
C R
H O
D E
IS
LA
N D
PL
AN
N
IN
G , D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
N O
R
FO
LK
, V
A
DRAWFORM REVISION: 14 SEP 2023
1812043
P-
N
EX
T
G
EN
ER
AT
IO
N
T O
R
PE
D O
IN
TE
G R
AT
IO
N L
AB
13MAY2026
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
BRANCH MANAGER
FIRE PROTECTION
XXXXXX-XX-X-XXXX
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
MS
C
OM
MA
ND
MI
D-
AT
LA
NT
IC PPB/RDC
JWJ
HPN
SCALE:
D
Approved by Michael Geremina, Infrastructure Division Head, Code 102, via email
KEYNOTES:
PROVIDE 4" SANITARY SEWER SERVICE WITH WYE CONNECTION, SEE DETAILS A2
& A4 ON C-506
TIE INTO 4" BUILDING SANITARY SEWER SERVICE, PIPE INV AT FOUNDATION 15.05
PROVIDE 8" WATER SERVICE, SEE DETAILS ON C-506
PROVIDE 2" DOMESTIC WATER SERVICE WITH VALVE AND 6" FIRE WATER SERVICE
TO THE BUILDING, SEE DETAILS ON C-506
PROVIDE FIRE DEPARTMENT CONNECTION AND WALL MOUNTED POST INDICATOR
VALVE, SEE SHEETS FP001 AND FP101.
PROVIDE HYDRANT LATERAL. SEE DETAIL C2/C-506
SUBGRADE STORMWATER INFILTRATION SYSTEM
PROVIDE 4" FOUNDATION DRAIN TO CB12, SEE B1 & C1/C-507
PROVIDE CONNECTION OF ROOF DRAIN PIPE INTO 4" STORM DRAIN PIPE, SEE
C-105
12" HDPE CULVERT, SEE SHEET C-105
PROVIDE LIGHT POLES (TYPx7), SEE LIGHT SCHEDULE ON E-601
PROVIDE PAD MOUNTED TRANSFORMER, SEE ES101
PROVIDE 5" 2-WAY ELECTRICAL SERVICE FROM ELECTRICAL MANHOLE TO
TRANSFORMER. SEE DUCT BANK DETAIL C1/C-505
PROVIDE 5" 4-WAY ELECTRICAL SERVICE FROM TRANSFORMER TO BUILDING. SEE
DUCT BANK DETAIL B1/C-505
PROVIDE 3-WAY 5" ELECTRICAL SERVICE DUCT BANK FROM EXISTING ELECTRICAL
MANHOLE TO EMH-1. SEE DETAIL C4/C-505.
PROVIDE NEW CONDUCTORS ROUTED THROUGH EXISTING SPARE CONDUITS
FROM NEW MEDIUM VOLTAGE SWITCH TO EXISTING ELECTRICAL MANHOLE
REPLACE MEDIUM VOLTAGE SWITCH, SEE DETAIL B4/C-505
PROVIDE 1" CONDUIT FOR LIGHTING, SEE DETAIL A2/C-505
PROVIDE MANHOLE FOR ELECTRIC OR COMMUNICATIONS, SEE DETAIL A4/C-505
PROVIDE 6-WAY 4" COMMUNICATIONS DUCT BANK FROM B1349. SEE C-104 FOR
B1349 LOCATION, SEE DETAL C4/C-505 & SHEET C-301 FOR PROFILE.
PROVIDE 3-WAY 4" COMMUNICATIONS TO BUILDING FROM CMH-1. SEE ELECTRICAL
FOR CABLING
PROVIDE MECHANICAL EQUIPMENT, SEE MP101
PROVIDE WALL MOUNTED MECHANICAL EQUIPMENT, SEE A4/M-503
PROVIDE CONCRETE PAD FOR TRAP STATION, SEE DETAIL C2/C-510
CONNECT STEAM PIPE TO EXISTING. SEE B1/M-403 FOR STEAM PIPING TIE-IN
INSIDE EXISTING MH 3-74. REFER TO NOTE 5 FOR TIMING OF WORK.
PROVIDE 3" STEAM PIPE FROM EXISTING STEAM MH 3-74 TO CONDENSATE PUMP
HOUSE U230 UTILIZING EXISTING CONCRETE BOX TRENCH. SUPPORT 3" STEAM
PIPING FROM SUPPLEMENTARY STEEL INSIDE TRENCH. USE INSULATION SHOES
AND ROLLER CLEVIS HANGERS WITH MINIMUM HANGER SPACING OF 15 FEET.
INSULATE AND CLAD PIPING PER SPEC 23 07 00 - THERMAL INSULATION FOR
MECHANICAL SYSTEMS. SEE MECHANICAL PLANS FOR DETAILS.
PROVIDE 5'x5' STEAM EXPANSION LOOP (TYPx2)
PROVIDE DIRECT BURIED 2" STEAM AND 2" COND SERVICE, SEE DETAIL B2/C-510
PROVIDE STEAM AND CONDENSATE ENTRANCE THROUGH FOUNDATION (PIPE INV
= 15.74) , SEE MP101. PROVIDE ANCHOR BEFORE PENETRATING FOUNDATION, SEE
DETAIL A4/C-510
SEE M-403 FOR STEAM AND CONDENSATE PIPING INSIDE CONDENSATE PUMP
STRUCTURE U230
EXISTING 4" GRAVITY CONDENSATE PIPING, SEE B3/M-403
EXISTING 2.5" FORCED CONDENSATE PIPING, SEE B3/M-403
NOTES:
1. REFER TO MECHANICAL SHEETS FOR DETAIL OF WORK WITHIN STEAM
MANHOLES AND CONDENSATE PUMP HOUSE
2. REPAIR DISTURBED AREAS THAT ARE NOT CONCRETE OR ASPHALT WITH 4" OF
LOAM AND SEED
3. STORM DRAIN SYSTEM SHOWN FOR REFERENCE ONLY, SEE SHEET C-105 FOR
DRAINAGE DESIGN AND GRADING PLAN
4. L-101 FOR LANDSCAPE PLAN
5. CONNECTIONS TO EXISTING STEAM AND CONDENSATE MAINS MUST BE DONE
DURING SUMMER SHUTDOWN (MAY-SEPT).
C-103
SI
TE
U
TI
LIT
Y
PL
AN
(1 O
F 2)
12946153
DAM LDADSE
DLB
AS NOTED
SCALE:A1 SITE UTILITY PLAN (1 OF 2)
1" = 30'-0"
60'0' 1"=30'
30'
AM
EN
D
M
EN
T
/1 9/
AM
EN
D
M
EN
T
/2 9/
DAVID A.
MANZO
NO. 18918
L
I C E N S E
D
P R
O F
E S S I O NA L E NG
I N E
E R
ST
AT E OF MA I NE
11-19-2026
James E. Donahue, R.A.
/19
/20
:51
:17 A
M C:
\C
CE
D
RO
PB
OX
\C
OL
BY
C
OM
PA
NY
E
NG
IN
EE
RI
NG
\E
NG
IN
EE
RI
NG
\29
7 P
OR
TS
MO
UT
H
NA
VA
L S
HI
PY
AR
D\
7.2
.00 1 -
N
UW
C P0
D
ES
IG
N\ P0
_F
DA
_S
HA
RE
D_
FO
LD
ER
S\
DR
AW
IN
GS
\S
HE
ET
S\ C-
2T
OC
-5
.D
W G
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM
CHIEF ENG/ARCH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
NU
W
C R
H O
D E
IS
LA
N D
PL
AN
N
IN
G , D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
N O
R
FO
LK
, V
A
DRAWFORM REVISION: 14 SEP 2023
1812043
P-
N
EX
T
G
EN
ER
AT
IO
N
T O
R
PE
D O
IN
TE
G R
AT
IO
N L
AB
13MAY2026
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
BRANCH MANAGER
FIRE PROTECTION
XXXXXX-XX-X-XXXX
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
MS
C
OM
MA
ND
MI
D-
AT
LA
NT
IC PPB/RDC
JWJ
HPN
SCALE:
D
Approved by Michael Geremina, Infrastructure Division Head, Code 102, via email
C-504
CI
VI
L C
ON
ST
RU
CT
IO
N
DE
TA
ILS
(3 O
F 3)
12946166
DAM LDADSE
DLB
AS NOTED
SCALE:
ENTRANCE SLIDE GATE DETAIL
NOT TO SCALE B1C-101
STANDARD U-BOLT
OPPOSING BARREL
HINGE PIN AND PLATE
RETAINER BOLT
HINGE COLLAR
HINGE BOLT
LATCH
3/16" *
(*)NOTE: WELD HINGES TO POST IF INSTALLING CABLE REINFORCEMENT ON GATES.
ENSURE CORRECT HEIGHT FOR FULL OPERATION PRIOR TO WELDING (TYP.)
OPPOSING BARREL
HINGE PIN AND PLATE
GATE POST
GATE LEAF POST
FENCE POST HINGE
ASSEMBLY
STANDARD U-BOLT
SECURING HOLE FOR LOCK
SWING GATE HINGE DETAIL
SWING GATE LATCH DETAIL
TYPICAL ELELVATION
TW
IS
T
SELVAGE
T & B
CONSTRUCT IN ACCORDANCE WITH RIDOT SECTION 903
NOTES:
1. FENCING AND GATES MUST BE PROVIDED IN ACCORDANCE WITH UFC 4-022-03.
2. ALL FENCING AND GATES MUST BE PROVIDED WITH 3 LAYERS OF BARBED WIRE 1' HIGH, SEE DETAIL ABOVE
3. POSTS, FABRIC, AND ACCESSORIES MUST BE GALVANIZED STEEL.
4. POST SIZE AND ASSOCIATED FOOTING DIAMETER TO BE DETERMINED BY MANUFACTURER, BASED ON LEAF WEIGHT AND
DIMENSION. FOOTING CONCRETE MUST BE A MINIMUM OF 4,000 PSI.
5. ALL GATE FRAMES MUST BE MINIMUM 1.90: NOMINAL (ROUND). GATE FRAMES MUST BE OF WELDED CONSTRUCTION. BRACE
WELDED GATE FRAMES. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE PROPER RIGID CONSTRUCTION OF ALL GATES
SUPPLIED.
6. ALL FENCE POSTS CAST IN CONCRETE MUST BE SET WITHIN 3" OF CONCRETE PIER CENTER.
7. ALL FENCE HARDWARE TO BE PEENED OVER OR TACK WELDED.
6" 3'-
0"
6" 3'-
0"
X X X X X X X X X
3"
ELELVATION
PLAN - SINGLE SWING GATE
2'-0"
MOUNT SIGN TO FENCE
MUTCD OM1-2 (18"x18")
GATE HINGE WITH OPPOSING BARREL PINS
POST CAP
STANDARD GATE
LATCH. SEE
DETAIL B1/C-504
GATE HINGE WITH OPPOSING BARREL PINS SEE DETAIL
B1/C-504 (TYP. U.N.O.)
GATE POST (TYP. U.N.O.)
4" O.D. (TYP)
3/8" DIA TRUSS ROD
(TYP. U.N.O.)
BOTTOM RAIL OR
TENSION WIRE
GATE UPRIGHT FOR
FRAME (TYP. U.N.O.)
VARIES, SEE C-101
NOTES:
1. FENCING AND GATE MUST BE PROVIDED IN ACCORDANCE WITH UFC 4-022-03.
2. POSTS, FABRIC, AND ACCESSORIES MUST BE GALVANIZED STEEL.
3. POST SIZE AND ASSOCIATED FOOTING DIAMETER TO BE DETERMINED BY MANUFACTURER, BASED ON LEAF WEIGHT AND DIMENSION.
MINIMUM FOOTING DIAMETER IS 4X THE POST WIDTH. FOOTING CONCRETE MUST BE A MINIMUM OF 4,000 PSI.
4. SWING GATES MUST BE CONSTRUCTED WITH LATCH ASSEMBLY, AND GATE KEEPERS EXCEPT AS NOTED.
5. ALL GATE FRAMES MUST BE MINIMUM 1.90: NOMINAL (ROUND). GATE FRAMES MUST BE OF WELDED CONSTRUCTION. BRACE WELDED GATE
FRAMES. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE PROPER RIGID CONSTRUCTION OF ALL GATES SUPPLIED.
6. ALL FENCE POSTS CAST IN CONCRETE MUST BE SET WITHIN 3" OF CONCRETE PIER CENTER.
7. ALL FENCE HARDWARE TO BE PEENED OVER OR TACK WELDED.
SEE DETAIL
B1/C-504 FOR
FENCE
DETAILS AND
SPECIFICATIONS
CHAIN LINK FABRIC 2" MESH
NO 9 GAUGE BARBED FINISH(TYP.)
SCALE:
SINGLE SWING GATE DETAIL
NOT TO SCALE A4C-101
CONSTRUCT IN ACCORDANCE WITH RIDOT SECTION 903
FINISH GRADE
EXCAVATE EXISTING UNCONTROLLED FILL.
REPLACE WITH COMPACTED STRUCTURAL
FILL (**).
5'- 0"
5'- 0"
VARIES, SEE CD103
5'-0"
NOTES:
** - EXISTING UNCONTROLLED FILL ABOVE NATURALLY DEPOSITED INORGANIC SOIL AND/OR WEATHERED ROCK SHOULD BE REMOVED AND REPLACED WITH COMPACTED STRUCTURAL FILL. AS A MINIMUM, REMOVAL LIMITS BELOW THE BUILDINGS SHOULD EXTEND TO THE LATERAL LIMITS DEFINED BY A 1H:1V LINE PITCHED DOWN AND OUTWARD FROM THE BOTTOM OUTIDE EDGE OF BUILDING PERIMETER FOOTINGS. OBSTRUCTIONS ENCOUNTERED WITHIN THE EXVAVATIONS SHOULD BE REMOVED TO THEIR FULL EXTENT AND REPLACED WITH COMPACTED STRUCTURAL FILL.
EXCAVATE EXISTING
UNCONTROLLED FILL, SEE CD103.
REPLACE WITH COMPACTED
STRUCTURAL FILL (**).
EXCAVATE EXISTING UNCONTROLLED FILL,
SEE CD103. REPLACE WITH COMPACTED
STRUCTURAL FILL (**).
TIE IN WITH APPROPRIATE
GROUND COVER SECTION
VA
RI
ES
, S
EE
C
D1
SCALE:
SITE EXCAVATION DETAIL
NOT TO SCALE A1C-101
1 1
40'-0" 10'-0"
8.625" O.D. POSTS
2" O.D. VERTICAL
SUPPORTS (TYP)
2-1/2" HORIZONTAL RAIL (TYP) GALV. STEEL CHAIN LINK
FABRIC #9 GA., 2" MESH TOP
TENSION
WIRE
MOUNT SIGN TO FENCE
MUTCD OM1-2 (18"x18")
1-5/8" DIAGONAL SUPPORTS (TYP)
CONCRETE 4,000 PSI
(TYP)
2-1/2" BOTTOM
HORIZONTAL RAIL
(TYP)
4'-0" DIA. (MIN.)
6" 3'-
6" 8'-
0" 2"
6'- 0"
4' BAYS
(TYP.)
8.625" O.D. POSTS
CANTILEVER ROLLER ASSEMBLY (TYP)
2 1/2" O.D. TOP RAIL
2 1/2" O.D. TOP RAIL
FENCE
FABRIC
CANTILEVER ROLLER
ASSEMBLY (TYP) 3 ROWS BARBED WIRE
SECTION
CANTILEVER ROLLER
ASSEMBLY (TYP)
6" 3'-
0"
10'-0" MAX SPACING
2" M
AX
X X X X X X X X X X X X
BARBED WIRE
'-0
1'-
0"
ALL POSTS MUST BE
ENCASED IN CONCRETE
BOTTOM RAIL OR
TENSION WIRE
BUILDING
CHAIN LINK FABRIC 2" MESH
NO 9 GAUGE BARBED FINISH(TYP.)
2"
MAX.
LINE POST
2.5" O.D. (TYP)
END POST
LINE POST
3/8" DIA TRUSS RODBRACE RAILS
TOP RAIL OR TENSION WIREPOST CAP
'-0
1'-
0"
SCALE:
TYPICAL FENCING DETAIL
NOT TO SCALE C4C-101
NOTES:
1. FENCING AND GATE MUST BE PROVIDED IN ACCORDANCE WITH UFC 4-022-03.
2. POSTS, FABRIC, AND ACCESSORIES MUST BE GALVANIZED STEEL.
3. POST SIZE AND ASSOCIATED FOOTING DIAMETER TO BE DETERMINED BY MANUFACTURER, BASED ON LEAF WEIGHT AND
DIMENSION. MINIMUM FOOTING DIAMETER IS 4X THE POST WIDTH. FOOTING CONCRETE MUST BE A MINIMUM OF 4,000 PSI.
4. ALL FENCE POSTS CAST IN CONCRETE MUST BE SET WITHIN 3" OF CONCRETE PIER CENTER.
5. ALL FENCE HARDWARE TO BE PEENED OVER OR TACK WELDED.
5'-0"
5'- 0"
5'-0"
AM
EN
D
M
EN
T
/2 9/
AM
EN
D
M
EN
T
/1 9/
DAVID A.
MANZO
NO. 18918
L
I C E N S E
D
P R
O F
E S S I O NA L E NG
I N E
E R
STAT E OF MA I NE
/19
/20
:51
:32 A
M C:
\C
CE
D
RO
PB
OX
\C
OL
BY
C
OM
PA
NY
E
NG
IN
EE
RI
NG
\E
NG
IN
EE
RI
NG
\29
7 P
OR
TS
MO
UT
H
NA
VA
L S
HI
PY
AR
D\
7.2
.00 1 -
N
UW
C P0
D
ES
IG
N\ P0
_F
DA
_S
HA
RE
D_
FO
LD
ER
S\
DR
AW
IN
GS
\S
HE
ET
S\ C-
2T
OC
-5
.D
W G
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM
CHIEF ENG/ARCH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
NU
W
C R
H O
D E
IS
LA
N D
PL
AN
N
IN
G , D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
N O
R
FO
LK
, V
A
DRAWFORM REVISION: 14 SEP 2023
1812043
P-
N
EX
T
G
EN
ER
AT
IO
N
T O
R
PE
D O
IN
TE
G R
AT
IO
N L
AB
13MAY2026
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
BRANCH MANAGER
FIRE PROTECTION
XXXXXX-XX-X-XXXX
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
MS
C
OM
MA
ND
MI
D-
AT
LA
NT
IC PPB/RDC
JWJ
HPN
SCALE:
D
Approved by Michael Geremina, Infrastructure Division Head, Code 102, via email
C-505
EL
EC
TR
IC
AL
C
OM
MU
NI
CA
TI
ON
S
DE
TA
ILS
12946167
DAM LDADSE
DLB
AS NOTED
SCALE:
4-WAY ELECTRICAL SERVICE TRENCH DETAIL
NOT TO SCALE B1C-102
5'- 0"
MI
N
4'- 0"
MI
N
2'-0"
NOTES:
1. SEE SITE LAYOUT PLANS FOR POLE LOCATIONS
2. BASE, BACKFILL AND FINISH SURFACE BY EARTHWORK CONTRACTOR
3. CONDUIT, CABLE, POLE AND FIXTURE BY ELECTRICAL CONTRACTOR.
4. REFER TO ELECTRICAL SITE PLAN FOR CONDUIT AND BRANCH CIRCUIT SIZING AND QUANTITY.
POLE BASE BOLT COVER
GROUND WIRE CONNECTED
TO LIGHT POLE
LIGHT POLE: SEE LIGHT FIXTURE
SCHEDULE ON E-101 FOR LIGHT
POLE HEIGHTS AND FIXTURE
INFORMATION.
HOT DIPPED GALVANIZED
NUTS, TOP & BOTTOM (TYP)
ANCHOR BOLT AS PER LIGHT POST
MANUFACTURES STANDARDS (TYP)
3/4" CHAMFER (TYP)
(2) 3/4" PVC CONDUITS
CAST IN THE BASE
8' LONG GROUND ROD
CONCRETE BASE:
WRAP SONOTUBE FORM W/4,500
PSI. CONCRETE, REINFORCED
W/6-#4 VERTICAL DOWELS AND
#3 TIES @ 12" O.C.
CONSTRUCT IN ACCORDANCE WITH RIDOT SECTION T08
SCALE:
LIGHT POLE BASE DETAIL
NOT TO SCALE A1C-101
TURF AREAS PAVED/GRAVEL AREAS
IDENTIFICATION AND
WARNING TAPE,
INSTALL 12" BELOW
FINISH GRADE
6" PLANTING TOPSOIL,
SEED AND MULCH
MI
N
CO
VE
R:
SE
E
NO
TE
#1
6" CRUSHED
GRAVEL. RIDOT
SECTION M01.09
TABLE I COLUMN II.
PVC SCH 80
1" CONDUIT
COMMON BORROW TO
BE COMPACTED IN 12"
LIFTS AND CONFORM TO
RIDOT SECTION 302
NOTES:
1. CONTRACTOR MUST PROVIDE DETAILED AS-BUILT LOCATION
INFORMATION FOR ALL CONDUIT AND SLEEVES TO THE OWNER.
PAVED OR GRAVEL
AREA BUILDUP
3" 3"3"
MIN. TRENCH WIDTH: 18"
6" 6"
CONSTRUCT IN ACCORDANCE WITH RIDOT SECTION T06 AND NATIONAL GRID STANDARDS
SCALE:
LIGHTING CONDUIT TRENCH DETAIL
NOT TO SCALE A2C-102
SCALE:
2-WAY ELECTRICAL SERVICE TRENCH
NOT TO SCALE C1C-102
.6"3" C
LE
AR
MI
N.
, T
YP
6.3
6.26"
20.62"
DETECTABLE
TAPE
5" CONDUIT (TYP)
2'- 0"
M
IN
4,000 PSI CONCRETE
AFTER 28 DAYS
8.1"6.26"
#4 STIRRUPS
AT 8" O.C.
6" CRUSHED GRAVEL.
RIDOT SECTION M01.09
TABLE I, COLUMN II
#5 @ 8" O.C., CONT.
MAX. PROVIDE
MINIMUM ONE IN EACH
CORNER (QTY.
VARIES)
RE
FE
R
TO
A
PP
LIC
AB
LE
SU
RF
AC
E
BU
ILD
-U
P
DE
TA
IL
ADD HDPE
SPACERSMIN., TYP.
3" CLEAR
CONSTRUCT IN ACCORDANCE WITH RIDOT SECTION T06 & NATIONAL GRID
#5 @ 8" O.C., CONT. MAX.
PROVIDE MINIMUM ONE IN EACH
CORNER (QTY. VARIES)
MI
N.
, T
YP
MIN., TYP.
3" C
LE
AR
8.1"
20.62"
DETECTABLE
TAPE
5" CONDUIT (TYP)
2'- 0"
M
IN
4,000 PSI CONCRETE AFTER 28 DAYS
.7"
6.3
6.3
8.1
6" CRUSHED GRAVEL.
RIDOT SECTION M01.09
TABLE I, COLUMN II
3" CLEAR
#4 STIRRUPS
AT 8" O.C.ADD 2.5" HDPE
SPACERS
RE
FE
R
TO
A
PP
LIC
AB
LE
SU
RF
AC
E
BU
ILD
-U
P
DE
TA
IL
6.26"
CONSTRUCT IN ACCORDANCE WITH RIDOT SECTION T06 & NATIONAL GRID
#4 STIRRUPS
AT 8" O.C.
#5 @ 8" O.C., CONT. MAX.
PROVIDE MINIMUM ONE IN EACH
CORNER (QTY. VARIES)
MIN., TYP.
REFER TO APPLICABLE SURFACE
BUILD-UP DETAIL
7"
3" CLEAR
6"7"
2'-2"
DETECTABLE
TAPE
4" CONDUIT (TYP)
2'- 0"
M
IN
6"
4,000 PSI CONCRETE
AFTER 28 DAYS
6" CRUSHED GRAVEL.
RIDOT SECTION M01.09
TABLE I, COLUMN II
"6 "
6"ADD HDPE SPACERS
NOTES:
1. PROVIDE MULE TAPE IN EACH CONDUIT WITH AN EXTRA 5' EXTRA SECURES AT EACH END
2. INSTALL DUCT BANK FOR CONDUIT RUN UNDER ASPHALT PAVEMENT AND CONCRETE
PAVEMENT
CONSTRUCT IN ACCORDANCE WITH RIDOT SECTION T06 & NATIONAL GRID
SCALE:
3-WAY COMMUNICATION DUCTBANK TRENCH
NOT TO SCALE C2C-102
PLAN
A A
SECTION A-A
MANHOLE DIMENSIONS
TYPE A B C (AT HIGHT PT.)
3 6'-0" 6'-0" 6'-6" 4 6'-0" 8'-0" 6'-6"
NOTES:
1. MANHOLE AND COVERS ARE DESIGNED FOR MAXIMUM WHEEL LOAD IN ACCORDANCE WITH AASHTO HS20-44.
2. FOR DETAILS OF CABLE RACKS, DUCT ENTRANCE AND PULLING-IN IRONS, SEE DETAILS ON THIS DWG.
3. MINIMUM CONCRETE COMPRESSIVE STRENGTH MUST BE 4,000 PSI.
4. PROVIDE SHOP DRAWINGS AND ANTI-FLOTATION DESIGN AND CALCULATIONS, INCLUDING EXTENDED BASE SLABS AS
NEEDED. FOR ALL PROPOSED MANHOLES AND CATCH BASINS ASSUME GROUNDWATER LEVELS EQUAL TO TOP OF
GROUND ELEVATIONS AND PROVIDE FOR A 1.2 FACTOR OF SAFETY AGAINST FLOTATION.
5. PROVIDE IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE (NEC) 2023
6. CONSTRUCT IN ACCORDANCE WITH RIDOT SECTION T01, T05, & NATIONAL GRID
8"B8"
6"
MIN
C
7/8" DIA PULLING IRON
#5 @ 6" EW, T&B
#4 @ 6" EW EF
CONCRETE OR BLACK
TOP ROADWAY
7/8" DIA PULLING IRON
SLOPE 1:40 TO SUMP
DUCT ENTRANCE. LOCATION TO BE
AS INDICATED
12" x 12" x 10" DEEP SUMP
FOR MANHOLE FRAME & COVER, SEE FED. SPEC. A-A-60005,
FIG. 1, SIZE 30A AND SPEC. 8, SIZE 30A, RESPECTIVELY
CONCRETE COLLAR LINED UP WITH
CEMENT MORTAR
DUCT ENTRANCE
LAP REINF. 24" (TYP.)
GROUND ROD & CLAMP
#4 @ 6" T&B
WATERSTOP AT
CONSTRUCTION JOINTS (TYP) 10"
B 8"8"
A
8"
PROVIDE 12" MIN. COMPACT CRUSHED
GRAVEL. RIDOT M01.09 TABLE I, COLUMN II
#5 @ 8" O.C., CONT. MAX.
PROVIDE MINIMUM ONE IN EACH
CORNER (QTY. VARIES)
MI
N.
, T
YP
MIN., TYP.
3" C
LE
AR
7" 7"
2'-1"
DETECTABLE
TAPE
4" CONDUIT (TYP)
2'- 0"
M
IN
4,000 PSI CONCRETE
AFTER 28 DAYS
1'- 6"
5.5
5.5
7"
6" CRUSHED GRAVEL
RIDOT SECTION M01.09
TABLE I, COLUMN II
3" CLEAR
#4 STIRRUPS
AT 8" O.C.ADD 2.5" HDPE
SPACERS
NOTES:
1. INSTALL DUCT BANK FOR CONDUIT RUN UNDER ASPHALT PAVEMENT AND CONCRETE PAVEMENT.
RE
FE
R
TO
A
PP
LIC
AB
LE
SU
RF
AC
E
BU
ILD
-U
P
DE
TA
IL
5.5"
PROVIDE INNER DUCTS
CONSTRUCT IN ACCORDANCE WITH RIDOT SECTION T06 & NATIONAL GRID
SCALE:
6-WAY COMMUNICATION DUCTBANK TRENCH
NOT TO SCALE B2C-102
SCALE:
COMMUNICATION/ELECTRICAL MANHOLE DETAIL
NOT TO SCALE A4C-102
SCALE:
ELECTRICAL EQUIPMENT CONCRETE SLAB
NOT TO SCALE C3C-102
BEDDING SAND
MUST CONFORM
WITH AASHTO M6
NOTES:
NOTES:
1. MIN. CONCRETE STRENGTH fc' = 4,000psi
2. EXACT PAD DIMENSIONS, LOCATION AND QUANTITY OF CONDUIT
PENETRATIONS TO BE COORDINATED WITH EQUIPMENT SUPPLIER.
3. PAD MUST BE A MINIMUM OF 12" LARGER THAN THE EQUIPMENT ON ALL SIDES.
4. MUST BE CONSTRUCTED IN ACCORDANCE WITH RIDOT SECTION 808.
4000 PSI (AIR ENTRAINED 6% +/- 1%) CONCRETE PAD
w/ #4 BARS @ 12" O.C. EACH WAY, RIDOT SECTION M02
3/4" CHAMFER
6"
6"2" M
IN
. C
LR
6"
6"6"
6"
(ALL SIDES)
3"
CLEAR
PLAN VIEW (6 CONDUIT STUB)
SECTION VIEW
3" M
IN
(T
YP
2'-4"
1'-9"
MIN
#4 WITH STANDARD HOOK
WHEN <2' FROM EDGE
6" THICK
CONCRETE
SLAB
3'-0" DIAGONALS
AT CORNERS
VA
RI
ES
VARIES
COMPACT SUBGRADE TO
95% (3000 PSF) PER ASTM
D698 - STD. PROCTOR
EXISTING 6-WAY DUCT
BANK FROM
ELECTRICAL MANHOLE
COORDINATE EXACT CONDUIT LOCATION
WITH ELECTRICAL CONTRACTOR.
FRONT OF SWITCH
2'-4" X 1'-8"
OPENING
SEAL WITH
NON-SHRINK GROUT
AROUND CONDUIT
PROVIDE BROOM FINISH
AND SLOPE AT 1/4":12" TO
PREVENT PONDING ON
THE PAD
EXACT CONDUIT
CONFIGURATION
MUST BE
COORDINATED WITH
THE SELECTED
SWITCH GEAR
BANK RUN GRAVEL BASE
COURSE. RIDOT SECTION
M01.09 TABLE I COLUMN IA
#4 STIRRUPS
AT 8" O.C.
#5 @ 8" O.C., CONT. MAX.
PROVIDE MINIMUM ONE IN EACH
CORNER (QTY. VARIES)
MIN., TYP.
REFER TO APPLICABLE SURFACE
BUILD-UP DETAIL
7"
3" CLEAR
6"7"
28.69"
DETECTABLE
TAPE
5" CONDUIT (TYP)
2'- 0"
M
IN
6"
4,000 PSI CONCRETE
AFTER 28 DAYS
6" CRUSHED GRAVEL.
RIDOT SECTION M01.09
TABLE I, COLUMN II
.56
"6.28"
6"ADD HDPE SPACERS
NOTES:
1. PROVIDE MULE TAPE IN EACH CONDUIT WITH AN EXTRA 5' EXTRA SECURES AT EACH END
2. INSTALL DUCT BANK FOR CONDUIT RUN UNDER ASPHALT PAVEMENT AND CONCRETE
PAVEMENT
CONSTRUCT IN ACCORDANCE WITH RIDOT SECTION T06 & NATIONAL GRID
SCALE:
3-WAY ELECTRICAL DUCTBANK TRENCH
NOT TO SCALE C4C-102
AM
EN
D
M
EN
T
/1 9/
DAVID A.
MANZO
NO. 18918
L
I C E N S E
D
P R
O F
ES S I ONA L E NG
I N E
E R
STAT E OF MA I NE
COORD. W/ ARCH AND ELEVATOR MANUFACTURER 1' - 5"
1'
3" 1'
3"
1' - 3"
3'
3/
SUMP PIT (COORD. LOCATION
W/ ARCH AND PLUMBING)
CL JACK BLOCKOUT
14" THICK CONCRETE MAT
(SEE PLAN AND SECTION)
DESIGN BUFFER FORCE
(INCLUDING IMPACT) = 12 KIPS
C L
JA
K
B
LO
C
K O
U T
2'-6" SQ. OPENING (BLOCKOUT) FOR ELEVATOR JACK
ASSEMBLY - TO BE COORDINATED WITH ELEVATOR SUPPLIER.
FILL IN WITH NON-SHRINK GROUT AFTER JACK IS INSTALLED.
5,000 PSI MINIMUM 28-DAY COMPRESSIVE STRENGTH. FOLLOW
MANUFACTURERS RECOMMENDATIONS FOR POUR DEPTH
LIMITATIONS. MAINTAIN PIT WATERPROOFING UNDER
BLOCKOUT. PROVIDE WATERSTOP AT BLOCKOUT BOUNDARY.
PIT CHANNEL(S) BY ELEVATOR SUPPLIER, 1'-6" MIN.
BEARING LENGTH OF PIT CHANNEL BEYOND BLOCK
OUT. BUFFER LOAD TO BE EVENLY DISTRIBUTED
OVER THIS LENGTH. ORIENT CHANNEL(S) STRONG
AXIS VERTICAL
PROVIDE MINIMUM (4)
#5 TOP AND BOTTOM
IN N-S DIRECTION
LADDER TO PIT
G1
1/
4' - 4 3/4" 3' - 5 1/8"
1' - 6" 1' - 6"
C3
S-401
A1
S-401
2'
6" S
Q
1'
6"
2' - 2"
T.O. CONC.
(SEE PLAN)
T.O. SLAB
(SEE PLAN)
ELEVATOR PIT MAT BEYOND,
CONTINUE MAT THICKNESS
AND REINFORCING TO
BOTTOM MAT AT SUMP PIT
#5@12" O.C. HORIZ., E.F.
FLUID APPLIED WATERPROOFING
SEE SPECIFICATIONS. APPLY TO
VERTICAL AND HORIZONTAL
SURFACES OF PIT WALLS.
SUMP PIT
2' - 6" SQUARE
PROVIDE #5 @ 12" O.C. EW
#5@10" O.C.
S C
H E
D . L
A P
3"
3 SIDES
8"1' - 3" 10"
10"
COORDINATE LOCATION WITH ARCH DRAWINGS
COORDINATE PIT DIMENSIONS WITH ELEVATOR MANUFACTURER
ROUGHEN SURFACE TYP.
CONTINUOUS WATERSTOP
(TYP.) SEE SPECIFICATION
#5@12" O.C. E.W., T&B
1 1/4" METAL GRATING (SEE PLAN)
2'
0"
2 LAYERS OF VAPOR BARRIER BELOW THE PIT
SLAB, EACH LAYER SEALED TO WATER PROOFING
AT THE PIT WALLS. EXTEND UP SIDES TO TOP OF
SLAB. SEE SPECIFICATIONS.
#5@12" O.C. VERT., E.F.
COMPACTED
STRUCTURAL FILL
MIN.
1' - 0"
12" MIN. COMPACTED STRUCTURAL FILL
C
LR
3"
1' - 3"
10" CMU WALL BEYOND,
SEE PLAN
PROVIDE WATERPROOF COATING SYSTEM ON
ELEVATOR PIT WALLS AND FLOOR (INCLUDING
SUMP). SEE SPECIFICATION 09 96 59
MIN
.1'
- 0
1'
2"
S U
M P
P
IT
D E
P T
H
3'
6"
2" 3"
1' - 3"
CONTINUOUS WATERSTOP
(TYP.) SEE SPECIFICATION
GALV. L4x4x3/8 GRATING SUPPORT, SEE DOOR
LEDGE THIS SECTION, FOR ANCHORAGE
#5@12" O.C. E.W., T&B
2'
0"
T.O. WALL
(SEE PLAN)
FLOOR SLAB (SEE PLAN)
HAUNCH ON TOP OF WALL
AT ELEVATOR DOOR -
CONT. L4x4x3/8 W/ 1/2"⌀ EXPANSION
BOLTS @ 24" O.C. VERIFY SIZE
WITH ELEVATOR SELECTED.
(TYP ALL DOORS) 4 3/4" EMBED.
A1
S-401
1 1/2" NOTCH IN CONC.
AT SUMP (3) SIDES
E
LE
V A
T O
R M
A N
U F
A C
T U
R E
R
6' -0
M
A X
V
E R
IF
Y
W
IT
H ROUGHEN SURFACE, TYP.
DOWELS WITH HOOK -
MATCH SPACING AND
SIZE OF WALL BARS
#5@12" O.C.
2' - 0"
2' -0
2'
0"
LAP AND SEAL SLAB VAPOR
BARRIER 2 FEET DOWN
ELEVATOR PIT WALLS, TYP.
T.O. CONC.
(SEE PLAN)
10" CONCRETE SHAFT WALL
1'
2" 2'
4"
1'
2"
1' - 2"
SUMP PIT
2' - 6" 1' - 2"
C
LR3"
TYP
2" CLR
C
LR3"
#5@12" O.C. E.W., T&B
#5@12" O.C. E.W., EACH FACE
MIN.
1' - 0"
MIN
.1'
- 0
12" MIN. COMPACTED
STRUCTURAL FILL
S U
M P
P
IT
D E
P T
H
3'
6"
2' - 0"
2'
0"
2' - 0"
CONTINUOUS WATERSTOP
(TYP.) SEE SPECIFICATION
2' - 0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N O
R F
O L K
V
A
AS NOTED
/1 /2
:2
:2
P
M
A u to d e s k D o c s /2
.2
.0
N
U W
C P
D e s ig n /2
.2
.0
-P
S tr u c tu ra l.
rv t
S-401
P -0
N
E X
T G
E N
E R
A T
IO
N
T O
R P
E D
O I N
T E
G R
A T
IO
N
L A
B
E L E
V A
T O
R P
IT
P
A R
T P
L A
N
HAS
12946190
DS CRD
13MAY2026
PPB/RDC
1812043
R H
O D
E I
S L A
N D
N U
W C
JWJ
NEK
HPN
P L A
N N
IN
G
D
E S
IG
N
A N
D C
O N
S T
R U
C T
IO
N
S -4
Approved by Michael Geremina, Infrastructure Division Head, Code 102, via Email.
A1
S-101 SCALE: 1/2" = 1'-0"
C1
ELEVATOR PIT PART PLAN
SCALE: NOT TO SCALE
C3
ELEVATOR PIT SECTION
SCALE: NOT TO SCALE
A1
SECTION THROUGH ELEVATOR STEPPED PIT MAT
1' 2' 4'0' 1/2" =1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A A
M M
E N
D M
E N
T
/1 9/
CALEN B. COLBY
STATE OF
RHODE
ISL A ND
OH P E
No. 8961
REGISTERED
PROFESSIONAL ENGINEER
(CIVIL)
05/29/26
A
T P
R
DN
UP
UP
DN
F A
C U
W A
M N
S A
C U
V F
D
DN
DNDN
UP
A3
A-202
A1
A-201
A1
A-202
A3
A-201
A1
A-301
A
B
C
D
2 3 41.8 2.8 3.2
A.9
A.1
BREAK ROOM
WOMEN'S
MEN'S
JANITOR
ELECTRICAL
STAIR 'A'
OPEN OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
SERVER ROOM
SECURE
TELCOM
TELCOM
STAIR 'B'
A3
A-302
9' -0
9'
-0
11'-5 1/4" 11'-5 1/4" 11'-5 1/4" 11'-4 1/4"
'-0
7'
-2
/8
80'-6"
13'-9" 2'-3" 28'-3" 2'-3"2'-3" 31'-9"
12'-11"
2' -1
1/
2"
'-2
/2
1' -9
'-1 0"
'-4
'-1
8'-0"
14'-8 3/4"
B.4
MECHANICAL
SHAFT
A3
A-301
213 215 216 217 218
DN
A-401
A1
A-402
C2
'-6
18'-1 5/8" 11'-3 5/8"
A-404
C5
6' -2
/8
206 205
B
B
B
9' -1
/4
VEST
B
B B B B B B
B
A
A
A
ELEVATOR
B1
A2 A2 A2 A2
B1
B1B1
B1B1
B1
B1
C
D
2 3 41.8 2.8 3.2
PENTHOUSE
A3
A-302
STAIR 'A'
6'-11"
'-0
/8
2'-3"2'-3" 31'-9"
'-8
/8
8'-6 1/4"
53'-10 5/8"
'-4
B.4
2.4
'-2
/4
16'-9"
13'-2"
A-402
B1
13'-9" 2'-3" 11'-6"
S
LO
P E
/ 1 2"
S
LO
P E
/4
/ 1
2"
10'-9 5/8"
B3
A-504
A-402
A1
MECHANICAL
SHAFT
A-505
B4
53'-0"
7'-5"
NOTES:
1. SEE SHEET A-001 FOR LEGEND, ABBREVIATIONS, GENERAL NOTES AND
MATERIALS LEGEND.
2. VERIFY DIMENSIONS IN FIELD PRIOR TO CONSTRUCTION.
3. SEE DRAWINGS A-002 AND A-003 FOR TYPICAL MOUNTING HEIGHTS AND
CLEARANCES.
4. SEE MECHANICAL, ELECTRICAL, FIRE PROTECTION, AND FIRE ALARM
FOR ADDITIONAL INFORMATION.
5. SEE IF101 AND IF102 FOR FURNITURE LAYOUT AND INFORMATION.
6. SEE EXTERIOR ELEVATIONS FOR WINDOW LOCATIONS.
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N O
R F
O L K
V
A
AS NOTED
/1 /2
:2
:0
P
M
A u to d e s k D o c s /2
.2
.0
N
U W
C P
D e s ig n /2
.2
.0
P
-0
A rc h it e c tu ra l.
rv t
A-102
P -0
N
E X
T G
E N
E R
A T
IO
N
T O
R P
E D
O I N
T E
G R
A T
IO
N
L A
B
L E
V E
L
A N
D P
E N
T H
O U
S E
F L O
O R
P L A
N
EAC
12946214
DRE ECL
13MAY2026
PPB/RDC
1812043
R H
O D
E I
S L A
N D
N U
W C
JWJ
DJD
HPN
P L A
N N
IN
G
D
E S
IG
N
A N
D C
O N
S T
R U
C T
IO
N
A -1
Approved by Michael Geremina, Infrastructure Division Head, Code 102, via Email.
SCALE: 1/8" = 1'-0"
A1
LEVEL 2 FLOOR PLAN
SCALE: 1/8" = 1'-0"
A3
PENTHOUSE FLOOR PLAN
1/8" = 1'-0" 4' 8' 16'0'
PLAN
NORTH
KEYNOTES:
1 AIR HANDLER UNIT, SEE MECHANICAL DRAWINGS
2 EPDM ROOF ASSEMBLY PLATFORM WITH 24" X 24" WALK PADS FULLY
ADHERED IN GRID PATTERN
3 42" HIGH PAINTED METAL BALLASTED GUARDRAIL
4 GUTTER ASSEMBLY
5 DOWNSPOUT LOCATION
6 STANDING SEAM METAL ROOF W/SELF-ADHERED ROOFING MEMBRANE
7 ROOF ACCESS LADDER, SEE STRUCTURAL
8 EQUIPMENT PAD, SEE STRUCTURAL
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
M E
N D
M E
N T
/1
9/
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N O
R F
O L K
V
A
AS NOTED
/1 /2
:0
:3
P
M
A u to d e s k D o c s /2
.2
.0
N U
W C
P
D e s ig n /2
.2
.0
P -0
I n te ri o rs .r v t
I 601
P -0
N
E X
T G
E N
E R
A T
IO
N
T O
R P
E D
O I N
T E
G R
A T
IO
N
L A
B
IN
T
E R
IO
R
F
IN
IS
H
S C
H E
D U
L E
LL
12946257
LP LP
13MAY2026
PPB/RDC
1812043
CONTRACT_NO
R H
O D
E I
S L A
N D
N U
W C
JWJ
DJD
HPN
P L A
N N
IN
G
D
E S
IG
N
A N
D C
O N
S T
R U
C T
IO
N
I
Approved by Michael Geremina, Infrastructure Divison Head, Code 102, via Email.
INTERIOR FINISH SCHEDULE
ROOM NO. ROOM NAME
FLOORS WALL FINISHES (ABOVE/BELOW) MILLWORK
DOORS,
FRAMES
CEILING FINISH
WINDOW
TREATMENTS
NOTES
FLOOR FINISH
FLOOR
BASE NORTH EAST SOUTH WEST HORIZONTAL VERTICAL
Not Placed
100 VESTIBULE EM1/STR1 WB1 P1 P1 P1 P1 NA NA P4 ACT1 NA
101 CORRIDOR SC WB1 P1 P1 P1 P1 NA SS1 P4 ACT1 NA SS1 BEHIND BOTTLE FILLER AND TRASH RECEPTACLES
102 STAIR A STR1/STR2 WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA P4-RAILING, PAINTED
103 ELEV MACHINE ROOM SC WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA
104 JANITOR PT1/GF1 WB1 P1/RWP1 P1/RWP1 P1/RWP1 P1/RWP1 NA NA P4 ACT1 NA REFER TO INTERIOR ELEVATION FOR P1/RWP1 LIMITS
105 STEAM ENTRANCE SC WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA
106 RESTROOM PT1/GF1 PT1/GF1 P1/PT2/GW1 PT2/PT3/GW1 P1/PT2/GW1 P1/PT2/GW1 NA NA P4 ACT2 NA REFER TO INTERIOR ELEVATION FOR PT2 AND PT3 LIMITS
107 RESTROOM PT1/GF1 PT1/GF1 P1/PT1/GW1 PT2/PT3/GW1 P1/PT1/GW1 P1/PT1/GW1 NA NA P4 ACT2 NA REFER TO INTERIOR ELEVATION FOR PT2 AND PT3 LIMITS
108 FIRE PROTECTION SC WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA
109 ELECTRICAL SC WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA
110 STAIR B EM1/STR1 WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA P4-RAILING, PAINTED
111 TELCOM SC WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA
112 HARDWARE & SOFTWARE INTEGRATION
FACILITY - A
SC WB1 P1/RWP1 P1/RWP1 P1/RWP1 P1/RWP1 AWP2 AWP2 P4 EXPOSED, P3 NA REFER TO INTERIOR ELEVATION FOR P1/RWP1 LIMITS
112 HARDWARE & SOFTWARE INTEGRATION
FACILITY - B
SC WB1 P1/RWP1 P1/RWP1 P1/RWP1 P1/RWP1 AWP2 AWP2 P4 EXPOSED, P3 NA REFER TO INTERIOR ELEVATION FOR P1/RWP1 LIMITS
113 ELECTRONIC FABRICATION SC WB1 P1/AWP1 P1/AWP1 P1/AWP1 P1/AWP1 NA AWP1 P4 ACT1 NA REFER TO INTERIOR ELEVATION FOR P1/AWP1 LIMITS
114 STORAGE SC MTL MTL MTL MTL MTL MTL MTL MTL ACT1 NA STAINLESS STEEL PANELS, DOOR AND RAILINGS
115 SECURE TELCOM SC WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA
116 SERVER ROOM SC WB1 P1 P1/AWP1 P1/AWP1 P1 NA NA P4 ACT2 NA
117 STORAGE SC WB1 P1/RWP1 P1/RWP1 P1/RWP1 P1/RWP1 NA NA P4 ACT2 NA REFER TO INTERIOR ELEVATION FOR P1/RWP1 LIMITS, SIM.
TO 104 JANITOR
118 WORKSTATION ROOM SC WB1 P1/AWP1 P1/AWP1 P1/AWP1 P1/AWP1 NA AWP1 P4 ACT2 NA REFER TO INTERIOR ELEVATION FOR P1/AWP1 LIMITS
119 WORKSTATION ROOM SC WB1 P1/AWP1 P1/AWP1 P1/AWP1 P1/AWP1 NA AWP1 P4 ACT2 NA REFER TO INTERIOR ELEVATION FOR P1/AWP1 LIMITS
120 MEZZANINE SC WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA P4-RAILING, PAINTED
201 STAIR A STR1/STR2 WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 WS2 P4-RAILING, PAINTED
202 OPEN OFFICE CPT1 WB1 P5 P1/DWS1 P1/DWS1 P1 SS2 PL2, SS1 P4 ACT1 NA SS1 BEHIND BOTTLE FILLER, SS2/PL2 AT COPY AREA
203 ELECTRICAL SC WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA
204 JANITOR PT1/GF1 PT1/GF1 P1/RWP1 P1/RWP1 P1/RWP1 P1/RWP1 NA NA P4 EXPOSED, P3 NA REFER TO INTERIOR ELEVATION FOR P1/RWP1 LIMITS
205 MEN'S PT1/GF1 PT1/GF1 P1/PT2/GW1 P1/PT2/GW1 P1/PT2/GW1 PT2/PT3/GW
NA TLT1 P4 ACT2 NA REFER TO INTERIOR ELEVATION FOR PT2 AND PT3 LIMITS
206 WOMEN'S PT1/GF1 PT1/GF1 P1/PT2/GW1 PT2/PT3/GW1 P1/PT2/GW1 P1/PT2/GW1 NA TLT1 P4 ACT2 WS2 REFER TO INTERIOR ELEVATION FOR PT2 AND PT3 LIMITS
207 BREAK ROOM LVT1 WB1 P1 P1/PT2/GW1 P1 P6 SS2 PL2 P4 ACT1 NA REFER TO INTERIOR ELEVATION FOR PT2 LIMITS
208 STAIR B STR1/STR2 WB1 P1 P1 P1 P1 NA NA P4 GWB, P3 WS2 P4-RAILING, PAINTED
209 TELCOM SC WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA
210 SECURE TELCOM SC WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA
211 SERVER ROOM SC WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA
212 CONFERENCE CPT3 WB1 P1 P1 P1 P6 SS2 PL2 P4 ACT1 WS1/WS2 WS1/WS2 DUAL ROLL SHADE
213 NOT USED NA NA NA NA NA NA NA NA NA NA NA
214 OFFICE CPT3 WB1 DWS1 P1 P6 P1 NA NA DWS1 ACT1 WS2
215 OFFICE CPT3 WB1 DWS1 P1 P6 P1 NA NA P4 ACT1 WS2
216 OFFICE CPT3 WB1 DWS1 P1 P6 P1 NA NA P4 ACT1 WS2
217 OFFICE CPT3 WB1 DWS1 P1 P6 P1 NA NA P4 ACT1 WS2
218 OFFICE CPT3 WB1 DWS1 P1 P6 P1 NA NA P4 ACT1 WS2
219 OFFICE CPT3 WB1 P1 P6 P1 DWS1 NA NA P4 ACT1 WS2
220 OFFICE CPT3 WB1 P1 P6 P1 DWS1 NA NA P4 ACT1 WS2
221 OFFICE CPT3 WB1 P1 P6 P1 DWS1 NA NA P4 ACT1 WS2
222 VEST STR1 WB1 P1 P1 P1 P1 NA NA P4 ACT1 NA P4-RAILING, PAINTED
301 STAIR A STR1/STR2 WB1 P1 P1 P1 P1 NA NA P4 GWB, P3 NA P4-RAILING, PAINTED
302 PENTHOUSE SC WB1 P1 P1 P1 P1 NA NA P4 EXPOSED, P3 NA P4-RAILING, PAINTED AT DOOR TO PENTHOUSE ROOF
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
M E
N D
M E
N T
/2
9/
A
M E
N D
M E
N T
/1
7/
D
B
A.9
A.1
A
1 2 3 3.2 4
HARDWARE &
SOFTWARE
INTEGRATION
FACILITY - A
ELECTRONIC
FABRICATION
SECURE
TELCOM
STORAGE
SERVER ROOM
116 WORKSTATION
ROOM
WORKSTATION
ROOM
VESTIBULE
JANITOR
ELEV MACHINE
ROOM
STAIR 'A'
STEAM
ENTRANCE
ELECTRICAL
FIRE
PROTECTION
ELEVATOR
STAIR B
RF
VAV
1-113
HWC-1-113
VAV
1-118
HWC-1-118
VAV
1-119
HWC-1-119
HWC-1-101
TELCOM
1.8 2.8
22x22 RA
22x24 SA
B.8
B.2
2.2
B.7
3.8
B.6
B.9 B.10
RESTROOM
RESTROOM
STORAGE
CORRIDOR
VAV
1-109
HWC-1-109
E-1
E-1
6"⌀ RADON
6"⌀ RADON
HARDWARE &
SOFTWARE
INTEGRATION
FACILITY - B
1 2
RF
RF
6"⌀ RADON
AD
FD
S-6
FD
AD
8"⌀ SA RISE
6"⌀ SA RISE
22x22 SA RISE
S-1
S-2
S-2
S-2
S-1
S-1
L-113
EF
VAV
1-101
3.9
B.12
M
L-105
M
ATFP
ATFP
24x22 SA UP
22x22 RA UP
DPT
22x22 RA RISE
10x6 SA
10x6 SA RISE
10x6 SA RISE
R
10x10 EA UP
30x16
RA UP
26x20
SA UP
20x10 SA
20x10 SA
14x14 RISE
CRAC
CRAC
AD
FC
FC
1 2 12x8 SA
S-5
S-5
R-5
R-
10"ø SA
6"ø SA
6x4 SA
6x4 SA
D
C
B
A.9
A.1
A
1 2 3 3.2 4
MEZZANINE
1.8 2.8
B.8
B.2
2.2
B.7
3.8
B.6
B.9 B.10
10x10 EA UP TO EF-106
22x22 RA UP & DN
24x22 SA UP & DN
8x8 EA
DROP
8x8 EA DROP
22x22 SA DROP
VAV
1-112
HWC-1-112
6" ⌀ SA DROP
8" ⌀ SA
DROP
S-4
TYP OF 4
16x16 SA
16x16 SA
6"ø SA
6"ø EA
8"ø EA
8"ø EA
10x10 EA
26x18 SA
3.9
B.12
20x24 TO 22x22
RA DROP
A4
M-301
10x6 SA DROP
10x6 SA DROP
10x10 EA UP TO
EF-105 & DN
FD
AD
16x30 RA
DROP
26x20 SA DROP
SERVER RM 116
WALL BELOW
8"ø SA
20x26 SA
20x26 SACRAC
116B
CRAC
116A 30x16 RA
30x16 RA
14x14
DROP
14x14
8" ⌀ SA RISE
20x18 SA
32x24 SA
16"ø SA
R-6
R-7
PT
20x24 RA
M
M
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N O
R F
O L K
V
A
AS NOTED
/1 /2
:5
:0
P M
A u to d e s k D o c s
/2
.2
.0
N
U W
C P
D e s ig n /2
.2
.0
N
U W
C P
D e s ig n
M
P
.r v t
MH101
P -0
N E
X T
G E
N E
R A
T
IO
N T
O R
P E
D O
I N
T E
G R
A T
IO
N
L A
B
L E
V E
L
A N
D M
E Z
Z A
N
IN
E D
U C
T W
O R
K P
L A
N S
DHB
12946284
RLM RML
13MAY2026
PPB/RDC
1812043
R H
O D
E I
S L A
N D
N U
W C
JWJ
ALG
P L A
N N
IN
G
D
E S
IG
N
A N
D C
O N
S T
R U
C T
IO
N
M H
Approved by Michael Geremina, Infrastructure Divison Head, Code 102, via Email.
PLAN
NORTH
KEYNOTES:
1 EXTRACTION ARM, 400 CFM. SERVED BY EF-113.
HMI PANEL FOR EXTRACTION ARM CONTROL. DISPLAY INCLUDES RED/GREEN
INDICATOR LIGHTS, FAN SPEED, HEPA FILTER DP.
HEPA FILTER.
RADON PIT, SEE STRUCTURAL DRAWINGS FOR RADON PIT DETAILS.
OPEN ENDED DUCT WITH 1/2" x 1/2" WIRE MESH SCREEN IN REMOVABLE FRAME.
PROVIDE WITH 2-1/4" HIGH PROFILE TIGHT TO THE FLOOR TO PREVENT SPILLS
FROM DRAINING TO ROOM 116. DESIGN BASIS PRODUCT IS ULINE MODEL
H-8679, H-12447 & H-2448 OR EQUAL.
NOTES:
1. SEE SHEET M-001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
SCALE: 1/8" = 1'-0"
A1
LEVEL 1 DUCTWORK PLAN
SCALE: 1/8" = 1'-0"
A3
MEZZANINE DUCTWORK PLAN
1/8" = 1'-0" 4' 8' 16'0'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
M E
N D
M E
N T
/1
9/
RICHARD L. MCCAULEY
STATEOF
RHODE
I S LAND
OH P E
No. 13720
REGISTERED
PROFESSIONAL ENGINEER
(MECHANICAL)
11/19/26
AHU
22x22 RA
22x24 SA
22x22 EA x2
O
A x5
E A
28x59 EA
H
PENTHOUSE
22x22 EA GOOSENECK 22x22 OA
GOOSENECK
TO DUCT
SHAFT
SA-1S
SA-1R
FCU
UH
16x52 EA x5
E A
22x22 EA x2
O
A
AHU
22x22 RA
22x22 SA
PENTHOUSE
H
(BEYOND)
22x22 EA GOOSENECK 22x22 OA
GOOSENECK
TO SECOND
FLOOR
SA-2S
SA-2R
STEAM
ENTRANCE
3" LPS UP TO
PENTHOUSE 302
2 1/2" LPS FROM
STEAM ENTRANCE
SEE A2/M-505 FOR
STEAM TRAP DETAIL
2" LPS
3" LPS
3" LPS
3" LPS
2 1/2" LPS
3" LPS
2 1/2" LPS STEAM
ENTRANCE
FLOOR
F M
STEAM FLOW METER
TCV-1102
TCV-1101
SERVER ROOM
TELCOM
MEZZANINE
CRAC
116A x2
S A
26x20 SA
8"ø SA
20x10 SA
S-5
30x16 RA
CABLE TRAY
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N O
R F
O L K
V
A
AS NOTED
/1 /2
:5
:0
P M
A u to d e s k D o c s
/2
.2
.0
N
U W
C P
D e s ig n /2
.2
.0
N
U W
C P
D e s ig
P
.r v t
M-301
P -0
N E
X T
G E
N E
R A
T
IO
N T
O R
P E
D O
I N
T E
G R
A T
IO
N
L A
B
M E
C H
A N
IC
A
L S
E C
T
IO
N S
DHB
12946288
RLM RML
13MAY2026
PPB/RDC
1812043
R H
O D
E I
S L A
N D
N U
W C
JWJ
ALG
HPN
P L A
N N
IN
G
D
E S
IG
N
A N
D C
O N
S T
R U
C T
IO
N
M -3
Approved by Michael Geremina, Infrastructure Divison Head, Code 102, via Email.
SCALE: 1/4" = 1'-0"
C1
SECTION AT AHU-1
SCALE: 1/4" = 1'-0"
C3
SECTION AT AHU-2
NOTES:
1. SEE SHEET M-001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
1/2" = 1'-0" 1' 2' 4'0'
SCALE: 1/2" = 1'-0"
A1
STEAM ASSEMBLY ELEVATION 1/4" = 1'-0"
2' 4' 8'0'
SCALE: 1/4" = 1'-0"
A4
SECTION AT CRAC 116A
KEYNOTES:
1 MOUNT WITH TRAPEZE HANGER PER MANUFACTURERS INSTRUCTIONS.
PROVIDE DRIP PAN.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
M E
N D
M E
N T
/1
9/
RICHARD L. MCCAULEY
STATEOF
RHODE
I S LAND
OH P E
No. 13720
REGISTERED
PROFESSIONAL ENGINEER
CEILING
CUH
COIL
UNIT FAN
HWS
HWR
NOTE:
1. LOCATE VALVES WITHIN UNIT CABINET WHERE POSSIBLE. PROVIDE ACCESS PANELS FOR
VALVES OUTSIDE OF CABINET.
2. LOCATE AND WIRE SPEED CONTROLLER WITHIN UNIT CABINET UNLESS OTHERWISE INDICATED.
CONTROL NOTES:
1. SEE CONTROL VALVE SCHEDULE.
1/2"
TO BAS
AIRFLOW
3/8" DIA THREADED
SUSPENSION ROD AT EACH
FACTORY SUPPORT POINT,
W/ ISOLATOR AT TOP OF
ROD: SECURE TO BUILDING
STRUCTURE. PROVIDE MISC
STEEL SUPPORT MEMBERS
AS REQUIRED
UNIT
HEATER
ADJUST DISCHARGE
LOUVER BLADES
NOTE:
1. ORIENT DRAIN VALVE FOR GREATEST CLEAR HEADROOM.
CONTROL NOTES:
1. SEE CONTROL VALVE SCHEDULE.
3/4" UNLESS
OTHERWISE
NOTED
TO BAS &
AQUASTAT
HWR
HWS
1/2" MIN
AQUASTAT
DPS 1/2" TYPICAL
SHUTOFF VALVE, OPEN DURING
NORMAL OPERATION, TYP OF 2
CHW/HW SUPPLY MAIN
CHW/HW RETURN MAIN
SHUNT VALVE, CLOSED DURING NORMAL OPERATION, OPEN
DURING AIR BLEEDING AT STARTUP AND FOR EQUALIZING
PRESSURE BEFORE REMOVING THE DPS FOR SERVICE
SEE PLAN DRAWINGS
FOR MAIN SIZES
WET-TO-WET PRESSURE TRANSDUCER. SELECT RANGE
BASED ON ANTICIPATED OR MEASURED DIFFERENTIAL
PRESSURE. SMALLER RANGE INCREASES ACCURACY
NOTE:
SENSOR MAY BE FURNISHED WITH
A PRE-ASSEMBLED BYPASS KIT.
HANG FAN FROM STRUCTURE
ABOVE WITH THREADED
RODS, & VIBRATION ISOLATION
AT TOPS OF RODS
FC
INTAKE
FAN
FC
AIRFLOW
DIRECTION
CONDENSING UNIT
1'-0" MIN
8" 8"
4' -0
M
IN
A
B O
V
G
R A
D E
REFRIGERANT PIPING, ROUTE
THROUGH EXTERIOR WALL
INSULATE OUTDOOR REFRIGERANT RG & RL PIPING,
W/ ELASTOMERIC FOAM INSULATION AND 30-MIL
PVC JACKET & FITTING SYSTEM
CONDENSING UNIT WALL BRACKET
MOUNTING BOLTS - (6) 1/4" ASTM F1554 RODS W/
INJECTABLE TWO-COMPONENT HYBRID ADHESIVE
MORTAR CONFORMING TO ICC-ES AC58. INJECT
ADHESIVE TO 2-IN MIN EMBEDMENT IN CMU.
LOCATE ANCHORS TO AVOID MORTAR JOINTS
PROVIDE PVC SLEEVE BETWEEN BACK OF
BRACKET AND FACE OF CMU AT BOTTOM ANCHORS
EXTERIOR SIDE OF WALL
CMU WALL WITH METAL PANEL FACADE
PUMP
S
NOTES:
1. VALVES MUST BE SAME SIZE AS PIPE.
2. SUPPORT PUMP & PIPING WITHIN MECHANICAL ROOM
WITH SPRING VIBRATION ISOLATORS.
STRAIGHT INLET LENGTH AS RECOMMENDED
BY PUMP MANUFACTURER. PROVIDE
SUCTION DIFFUSER WHERE NECESSARY
BALANCING VALVE
FOR FLOW
MEASURING, NOT
FOR THROTTLING
SPRING VIBRATION
ISOLATORS AT TOPS
OF RODS, SUPPORT
TO PUMP FLANGES
1/4" GAUGE
PIPING
VERTICAL INLINE PUMP
1/4" TUBING, 1/4 BALL VALVES,
SINGLE GAUGE TO SERVE PUMP AND
SUCTION DIFFUSER PORTS S
SPRING LOADED CHECK VALVE
SUCTION DIFFUSER AT INLET,
SUPPORT TO FLOOR WITH
ADJUSTABLE FOOT. REMOVE
STARTUP STRAINER SCREEN
AFTER STARTUP, HANG ON WALL
FOR INSPECTION
FLOOR
SEE STRUCTURAL FOR HOUSEKEEPING PAD
FLOOR STAND FURNISHED WITH PUMP, OR
FLANGE STANDS. FASTEN TO PUMP BUT
NOT TO FLOOR OR HOUSEKEEPING PAD
TWIN-SPHERE FLEXIBLE
CONNECTOR, LINE SIZE, TYP
SIZE PER PLANS & DETAILS, TYP
FLANGES, TYP
BRANCHES TO PAIRED PUMP.
PIPE IN FIRST-IN FIRST-OUT
ARRANGEMENT FOR
SYMMETRICAL PRESSURE
DROP TO BOTH PUMPS
FC
FC
NOTES:
1. REDUCERS MUST BE ECCENTRIC TYPE.
2. VALVES MUST BE SAME SIZE AS PIPE.
3. GAUGES MUST BE 0-50 PSIG.
BALANCING VALVE FOR
FLOW MEASURING, NOT FOR
THROTTLING
OFFSET PIPING TO ALLOW FOR COIL
REMOVAL WITHOUT DISTURBING PIPING
HEATING
COIL
CA QUICK-CONNECT
FITTING FOR BLOW-OUT
1/2" MIN
P/T
HWR
HWS
P/T
CONTROL NOTES:
1. SEE CONTROL VALVE SCHEDULE.
HWP
SEE B1/M-503
S
CHILLED
WATER COIL
CHWR
CHWS
TO BAS
NOTE:
1. LOCATE FLANGES OR UNIONS FOR COIL AND CONTROL VALVE REMOVAL.
2. SEE CONTROL VALVE SCHEDULE.
P/T
P/T
OFFSET PIPING TO ALLOW FOR COIL
REMOVAL WITHOUT DISTURBING PIPING
1/2" MIN
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N O
R F
O L K
V
A
AS NOTED
/1 /2
:5
:0
P M
A u to d e s k D o c s
/2
.2
.0
N
U W
C P
D e s ig n /2
.2
.0
N
U W
C P
D e s ig
P
.r v t
M-503
P -0
N E
X T
G E
N E
R A
T
IO
N T
O R
P E
D O
I N
T E
G R
A T
IO
N
L A
B
M E
C H
A N
IC
A
L D
E T
A
IL
S
DHB
12946294
RLM RML
13MAY2026
PPB/RDC
1812043
R H
O D
E I
S L A
N D
N U
W C
JWJ
ALG
HPN
P L A
N N
IN
G
D
E S
IG
N
A N
D C
O N
S T
R U
C T
IO
N
M -5
Approved by Michael Geremina, Infrastructure Divison Head, Code 102, via Email.
SCALE: NTS
C1
CEILING RECESSED CABINET UNIT HEATER DETAIL
SCALE: NTS
C4
HYDRONIC UNIT HEATER PIPING DETAIL
SCALE: NTS
B4
DIFFERENTIAL PRESSURE SENSOR DETAIL
SCALE: NTS
C3
INLINE FAN SUPPORT DETAIL
SCALE: NTS
A4
CONDENSING UNIT SUPPORT DETAIL
SCALE: NTS
B1
INLINE PUMP DETAIL
SCALE: NTS
B2
VERTICAL INLINE PUMP DETAIL
SCALE: NTS
A1
AHU HEATING COIL PIPING SCHEMATIC
SCALE: NTS
A3
AHU CHILLED WATER COIL PIPING DETAIL
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
M E
N D
M E
N T
/1
9/
RICHARD L. MCCAULEY
STATEOF
RHODE
I S LAND
OH P E
No. 13720
REGISTERED
PROFESSIONAL ENGINEER
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N O
R F
O L K
V
A
AS NOTED
/1 /2
:5
:0
P M
A u to d e s k D o c s
/2
.2
.0
N
U W
C P
D e s ig n /2
.2
.0
N
U W
C P
D e s ig
P
.r v t
M-601
P -0
N E
X T
G E
N E
R A
T
IO
N T
O R
P E
D O
I N
T E
G R
A T
IO
N
L A
B
M E
C H
A N
IC
A
L S
C H
E D
U L E
S
DHB
12946298
RLM RML
13MAY2026
PPB/RDC
1812043
R H
O D
E I
S L A
N D
N U
W C
JWJ
ALG
HPN
P L A
N N
IN
G
D
E S
IG
N
A N
D C
O N
S T
R U
C T
IO
N
M -6
Approved by Michael Geremina, Infrastructure Divison Head, Code 102, via Email.
AHU-2 302 PENTHOUSE SECOND FLR 950 4,200 2.50/5.57 3,590 2@ 4HP 4,200 2.5/3.79 3,157 2@ 4HP 218/89 82/69 52.0/51.9 42 57 31 10.5 30% PG 246.0 0.08 0.0 55.0 180 17.0 1.00
AHU-1 302 PENTHOUSE FIRST FLR & MEZ 1,460 4,940 2.5/5.35 3,787 2@ 4HP 4,940 2.5/3.77 3,387 2@ 4HP 235/105 81/68 52.0/51.9 42 57 34 10.5 30% PG 277.0 0.07 0.0 55.0 180 19.0 1.10
AIRFLOW
(CFM)
MIN
ESP/TSP
(IN WG)
SPEED
(RPM)
MOTOR
(HP)
AIRFLOW
(CFM)
ESP/TSP
(IN WG)
SPEED
(RPM)
MOTOR
(HP)
MIN
TOTAL/
SENSIBLE
(MBH)
EAT
DB/WB
(DEG F)
LAT
DB/WB
(DEG F)
EWT
(DEG F)
LWT
(DEG F)
FLOW
(GPM)
MAX
WPD
(FT WG)
FLUID
MIN
OUTPUT
(MBH)
MAX
APD
(IN WG)
EAT
(DEG F)
LAT
(DEG F)
EWT
(DEG F)
FLOW
(GPM)
MAX
WPD
(FT WG)
TAG LOCATION SERVES
OUTSIDE
AIRFLOW
(CFM)
SUPPLY FAN EXHAUST FAN COOLING HEATING
AIR HANDLING UNIT SCHEDULE - PART 1
NOTES:
1. DOUBLE WALL CONSTRUCTION WITH R-13 CONCEALED INSULATION, STAINLESS STEEL DRAIN PAN. MARINE LED LIGHT IN FAN SECTION, W/ EXTERNAL WIRED SWITCH. HINGED DOORS TO FAN, FILTER, MIXING BOX, & ACCESS SECTIONS.
2. DESCRIPTION: MIXING BOX WITH ULTRA-LOW-LEAK OPPOSED BLADE DAMPERS, FILTER SECTION WITH PRE- AND FINAL FILTERS, DX COOLING COIL, ACCESS SECTION WITH UVC LIGHTS, HEATING
COIL, AND CLASS 2 AIRFOIL 24.5-INCH DIAMETER PLENUM SUPPLY FAN.
3. SHIPPED ON FACTORY BASE FRAME. INDOOR UNIT BASE 8 INCHES HIGH. FIELD-VERIFY BASE HEIGHT FOR MANUFACTURER'S RECOMMENDED TRAP DEPTH PLUS SLOPE TO INDIRECT WASTE;
FIELD-FURNISH ADDITIONAL GALVANIZED STEEL BASE HEIGHT REQUIRED.
4. VARIABLE-FREQUENCY DRIVE FOR SOFT-STARTING AND REMOTE SPEED CONTROL. PROVIDE 2-CONTACTOR BYPASS, AND LINE REACTORS.
5. COOLING COIL: 30% PG WATER, 44 DEG. F. PROVIDE SEACOAST EPOXY COATING ON COILS.
6. HEATING COIL: WATER, 1 ROW, 7 FINS PER INCH, 5/8-INCH MINIMUM TUBE DIAMETER, 0.020-INCH MINIMUM TUBE THICKNESS. PROVIDE SEACOAST EPOXY COATING ON COILS.
7. FILTERS: WITH END FILLERS AND GASKETING TO REDUCE AIR BYPASS. 2-INCH MERV-A-8 PREFILTERS, 12-INCH MERV-A-13 FINAL FILTERS. RATE FANS WITH FILTERS AT MID LIFE. HINGED ACCESS.
PROVIDE FILTER PRESSURE GAUGE.
8. APPROXIMATE SOUND BY OCTAVE BAND: RETURN INLET 75, 70, 74, 66, 65, 58, 46, 51. SUPPLY FAN OUTLET: 85, 80, 85, 83, 87, 83, 78, 74.
9. UVC ULTRAVIOLET EMITTER LIGHT ASSEMBLY IN ACCESS SECTION BETWEEN THE COILS, WITH VIEWING WINDOW IN ACCESS DOOR AND POWER INTERLOCK TO DISABLE UV LIGHT WHEN DOOR IS
OPENED. DEDICATED CIRCUIT: 115V/1PH/60HZ, 15A.
10. LIGHTS REQUIRE DEDICATED CIRCUIT: 115V/1PH/60HZ, 15A.
11. CONVENIENCE RECEPTACLE REQUIRES DEDICATED CIRCUIT: 115V/1PH/60HZ, 15A.
12. PROVIDE OA AND EA MODULATIONG DAMPERS INTEGRAL TO THE AHU.
AHU-2 ENTHALPY WHEEL 0.0 44/37 95/72 82/69 460/3/60 18.72 25 25 273x62x82 3470 1-12
AHU-1 ENTHALPY WHEEL 0.0 48/39 95/72 81/68 460/3/60 18.72 25 25 284x67x89 3950 1-12
VOLTAGE
(V/PH/HZ)
FLA
(AMP)
MOPD
(AMP)
SCCR
TYPE
WINTER
EAT
DB
(DEG F)
WINTER LAT
DB/WB
(DEG F)
SUMMER
EAT
DB/WB
(DEG F)
SUMMER LAT
DB/WB
(DEG F)
SUPPLY FAN
TAG
ENERGY RECOVERY UNIT POWER
APPROX
DIMENSIONS
L x W x H
(IN)
APPROX
WEIGHT
(LB)
NOTES
AIR HANDLING UNIT SCHEDULE - PART 2
NOTES:
1. HUMIDIFIER TO MAINTAIN 45% RELATIVE HUMIDITY AT THE FOLLOWING RETURN AIR CONDITIONS: 68°F, 45% RH
2. ENCLOSURE MATERIAL TO BE GALVANIZED STEEL, HEADER AND TUBE MATERIAL TO BE 304 STAINLESS STEEL.
3. INSTALL DISPERSION TUBES IN AIR HANDLING UNIT SECTION. MAINTAIN MANUFACTURER'S RECOMMENDED UPSTREAM AND DOWNSTREAM LENGTHS.
H-2 PENTHOUSE 302 AHU-2 46 4000 25x31x5 1.5 2 26.9x30x30.3 212 480/3/60 14.4 1, 2, 3
H-1 PENTHOUSE 302 AHU-1 46 4500 25x31x5 1.5 2 26.9x30x30.3 212 480/3/60 14.4 1, 2, 3
SIZE
WxHxL
(IN)
TUBE
DIAMETER
(IN)
TUBE
QUANTITY
DIMENSIONS
LxWxH
(IN)
OPERATING
WEIGHT
(LB)
VOLTAGE
(V/PH/HZ)
FLA
(AMP)
UNIT NO LOCATION SERVES
MOISTURE
OUTPUT
(LB/HR)
AIRFLOW
(CFM)
DISPERSION PIPING STEAM GENERATOR ELECTRICAL
NOTES
HUMIDIFIER SCHEDULE
NOTES:
1. FACTORY DISCONNECT SWITCH.
2. ECM (ELECTRONICALLY-COMMUTATED MOTOR) WITH SPEED ADJUSTMENT FOR BALANCING MOUNTED IN FAN. CAPABLE OF RECEIVING 0-10VDC REMOTE SPEED REFERENCE
SIGNAL FROM BUILDING MANAGEMENT SYSTEM.
3. EF-113, WILL BE PROGRAMMED THROUGH THE BAS TO SOFT SART LINEARLY OF A 1 MINUTE PER TO ALLOW AHU-1 OUTSIDE AND EXHAUST AIR DAMPERS TO ADJUST TO DPT-113.
RF-3 RADON PIT INLINE DIRECT 200 1.00 72W 120/1/60 1.13 7.8 1,2
RF-2 RADON PIT INLINE DIRECT 200 1.00 72W 120/1/60 1.13 7.8 1,2
RF-1 RADON PIT INLINE DIRECT 200 1.00 72W 120/1/60 1.13 7.8 1,2
EF-205 MENS 205, WOMENS 206 ROOFTOP DIRECT 350 1.00 1574 9.1 1/4 115/1/60 2.85 57 1,2
EF-202 COPY/PRINT INLINE DIRECT 50 0.50 673 0.5 1/8 115/1/60 .46 24 1,2
EF-113 ELEC FAB 113 INLINE DIRECT 800 1.70 1946 12.5 3/4 208/1/60 6.5 71 1,2, 3
EF-106 RESTROOM 106, 107, JAN 104 ROOFTOP DIRECT 210 0.98 1725 9.6 1/4 115/1/60 2.85 57 1,2
EF-105 STEAM ENTRANCE 105 ROOFTOP DIRECT 450 1.00 1657 9.9 1/4 115/1/60 2.85 57 1,2
VOLTAGE
(V/PH/HZ)
FLA
(AMP)
TAG SERVES TYPE DRIVE
AIRFLOW
(CFM)
ESP
(IN WG)
FAN
SPEED
(RPM)
INLET
SOUND
(SONES)
MOTOR
(HP)
UNIT ELECTRICAL
WEIGHT
(LB)
NOTES
EXHAUST FAN SCHEDULE
NOTES:
1. GALVANIZED STEEL, 22-GAUGE OUTER CASING, 22-GAUGE PERFORATED METAL LINING W/ INNER DIMENSIONS TO MATCH DUCT. VERIFY DIMENSIONS BASED ON MANUFACTURER'S AVAILABLE MODULES.
2. FIBERGLASS ACOUSTIC MATERIAL W/ POLYMER FILM LINING. HIGH-VELOCITY RATED, SUITABLE FOR THE DESIGN VELOCITY. INLET & OUTLET 1-1/2" FLANGES SHIPPED LOOSE.
3. PRESSURE DROP RATED W/ ELBOWS UPSTREAM & DOWNSTREAM.
SA-2R PENTHOUSE AHU-2 RETURN 4,132 893 0.23 - 29 29 ELBOW 22 22 6 13 20 27 34 30 24 21 50 44 38 27 39 38 38 29 1-3
SA-2S PENTHOUSE AHU-2 SUPPLY 4,132 893 0.23 - 29 29 ELBOW 22 22 6 11 17 25 32 30 24 21 47 45 39 40 39 34 36 28 1-3
SA-1R PENTHOUSE AHU-1 RETURN 4,650 1190 0.28 - 29 29 ELBOW 22 22 6 11 20 24 30 26 23 19 54 46 42 31 41 41 42 34 1-3
SA-1S PENTHOUSE AHU-1 SUPPLY 4,650 1091 0.25 - 31 31 ELBOW 24 22 6 9 16 21 25 24 22 19 49 47 40 41 41 35 38 30 1-3
WIDTH HEIGHT 63 125 250 500 1K 2K 4K 8K 63 125 250 500 1K 2K 4K 8K
TAG LOCATION SERVES
AIRFLOW
(CFM)
FACE
VELOCITY
(FPM)
APD
(IN WG)
BAFFLE
LENGTH
(IN)
LEG 1
LENGTH (IN)
LEG 2
LENGTH (IN)
STYLE
DUCT DIMENSIONS
(IN)
DYNAMIC INSERTION LOSS (dB)
BY OCTAVE BAND FREQUENCY
SELF-NOISE (dB)
BY OCTAVE BAND FREQUENCY NOTES
DUCT SILENCER SCHEDULE
NOTES:
1. TRAP ISOLATION BALL VALVES, BOD SVF N8 ESV- EXTREME STEAM VALVE FULL PORT FNPT X FNPT, 150 MAP AND 60°F WITH SUPALON SEALS.
2. CHECK VALVE BOD INLINE BONNEY FORGE BOLTED BONNET FULL PORT , ANSI CLASS 800 FNPT X FNPT
3. PROVIDE CONDENSATE FLASH ARRESTOR BOD WATSON MCDANIEL FA-17-F300-20-14-CS SCHEDULE 80.
4. PROVIDE BOD SPIRAX SARCO FT-125 STEAM TRAP.
5 .PROVIDE BOD SPIRAX SARCO FT-15 STEAM TRAP.
6. PROVIDE CONDENSATE FLASH ARRESTOR BOD WATSON MCDANIEL FA-19-F300-20-14-CS SCHEDULE 80, IN COMMON LINE FROM ST-6 AND - 7.
ST-7 VAULT U230 1 CAST IRON FOAT & THERMOSTATIC 125 3/4 800 1,2, 4, & 6
ST-6 VAULT U230 1 CAST IRON FOAT & THERMOSTATIC 125 3/4 800 1,2, 4, & 6
ST-5 302 PENTHOUSE 1 CAST IRON FOAT & THERMOSTATIC 15 3/4 800 1,2,5
ST-4 302 PENTHOUSE 1 CAST IRON FOAT & THERMOSTATIC 15 3/4 800 1,2,5
ST-3 302 PENTHOUSE 1 CAST IRON FOAT & THERMOSTATIC 15 3/4 800 1,2,5
ST-2 302 PENTHOUSE 1 CAST IRON FOAT & THERMOSTATIC 125 3/4 800 1-4
ST-1 105 STEAM ENTRANCE 1 CAST IRON FOAT & THERMOSTATIC 125 3/4 800 1-4
TAG LOCATION
VALVE
INLET MIN
(IN)
TYPE MAWP DESIGN TEMP
TRAP CAPACITY MIN,
PPH
NOTES
STEAM TRAP SCHEDULE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
M E
N D
M E
N T
/1
9/
RICHARD L. MCCAULEY
STATEOF
RHODE
I S LAND
OH P E
No. 13720
REGISTERED
PROFESSIONAL ENGINEER
(MECHANICAL)
11/19/26
RICHARD L. MCCAULEY
STATEOF
RHODE
I S LAND
OH P E
No. 13720
REGISTERED
PROFESSIONAL ENGINEER
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N O
R F
O L K
V
A
AS NOTED
/1 /2
:5
:0
P M
A u to d e s k D o c s
/2
.2
.0
N
U W
C P
D e s ig n /2
.2
.0
N
U W
C P
D e s ig
P
.r v t
M-604
P -0
N E
X T
G E
N E
R A
T
IO
N T
O R
P E
D O
I N
T E
G R
A T
IO
N
L A
B
M E
C H
A N
IC
A
L S
C H
E D
U L E
S
DHB
12946301
RLM RML
13MAY2026
PPB/RDC
1812043
R H
O D
E I
S L A
N D
N U
W C
JWJ
ALG
HPN
P L A
N N
IN
G
D
E S
IG
N
A N
D C
O N
S T
R U
C T
IO
N
M -6
Approved by Michael Geremina, Infrastructure Divison Head, Code 102, via Email.
NOTES:
1. SELF-CONTAINED WITH METAL CONSTRUCTION, REPLACEABLE FILTER.
2. POWER CORD WITH NEMA L7-15P PLUG.
3. INTERNAL CONDENSATE PUMP, 17 FEET OF LIFT, 30-FOOT PUMPING DISTANCE.
4. FURNISH A SPARE FILTER TO THE OWNER.
DH-3 PENTHOUSE 302 PORTABLE SELF-CONTAINED 900 345 1.7 277/1/60 15 215 1-4
DH-2 PROJECT 1 112B PORTABLE SELF-CONTAINED 900 345 1.7 277/1/60 15 215 1-4
DH-1 PROJECT 1 112A PORTABLE SELF-CONTAINED 900 345 1.7 277/1/60 15 215 1-4
VOLTAGE
(V/PH/HZ)
MCA
(AMP)
TAG LOCATION TYPE
AIRFLOW
(CFM)
MOISTURE
REMOVAL
(LB/DAY)
POWER
CONSUMPTION
(kW)
UNIT ELECTRICAL
WEIGHT
(LB)
NOTES
DEHUMIDIFIER SCHEDULE
NOTES:
1. RATED CONDITION TEMPERATURES (DEG. F): COOLING INDOOR 80 DB/67 WB, OUTDOOR 95 DB/75 WB.
2. OPERATING OUTDOOR TEMPERATURE RANGES (DEG. F): COOLING RANGE - PROVIDE WIND BAFFLES FOR -4 TO +115 F.
3. REFRIGERANT R-454A INVERTER VARIABLE-SPEED COMPRESSOR. MULTI-SPEED SUPPLY FAN MOTOR (HIGH SPEED CFM INDICATED).
4. POWER SUPPLY TO OUTDOOR UNIT. PROVIDE INTERCONNECTING POWER & CONTROL CONDUIT TO INDOOR UNIT.
5. HARD-WIRED WALL-MOUNT CONTROLLER. MOUNT ON RECESSED WALL BOX.
6. PROVIDE FIELD-INSULATED REFRIGERANT AND CONDENSATE DRAIN LINES IN SIZES SCHEDULED AND AS INDICATED ON PLAN DRAWINGS. FIELD-APPLY OUTDOOR 30-MIL PVC JACKET AND FITTING SYSTEM TO INSULATION EXPOSED OUTDOORS.
HP-109 CU-109 ELEVATOR MACHINE ROOM 1 R-454B 385 WALL MOUNT 12,200 8,900 21.1 9,400 21.1 1/2 1/4 3/4 208/1/60 16.0 27 36x10x12 35x12x25 28 99 1-6
TOTAL
(BTUH)
SENSIBLE
(BTUH)
SEER2
(BTUH/W)
TOTAL
(BTUH)
SEER2
(BTUH/W)
GAS LIQUID COND
VOLTAGE
(V/PH/HZ)
MCA
(AMP)
MOPD
(AMP)
INDOOR OUTDOOR INDOOR OUTDOOR
TAG
(INDOOR)
TAG
(OUTDOOR)
SERVES
NOMINAL
TONS
(OUTDOOR)
REFRIGERANT
INDOOR
AIRFLOW
COOLING
(CFM)
INDOOR
UNIT
TY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .