This solicitation requests proposals for the construction of a multi-story Bachelor Officers Quarters building and associated facilities at Marine Corps Base Guam. The project includes a housing tower with single-occupancy units, common areas, and support spaces. Detached buildings will provide utilities and multipurpose rooms. Proposals are due on December 17, 2021. The construction work will be awarded on a design-bid-build basis. The Navy Facilities Engineering Command is the contracting agency.

View the file

Other files

File Type Posted
Class JA for ECC Elevator Control Systems 20210419 REDACTED.pdf PDF
AMD 0009 21R1334.pdf PDF
21R1334 Note 7 Final.pdf PDF
AMD 0008 21R1334.pdf PDF
21R1334 Note 6 Final.pdf PDF
Amd 07 Rev Dwgs.pdf PDF
AMD 0007 21R1334.pdf PDF
21R1334 Note 5 Final.pdf PDF
Amd 06 rev Dwgs-a.pdf PDF
AMD 0006 21R1334.pdf PDF
Amd 05 Rev DWGS.pdf PDF
AMD 0005 21R1334.pdf PDF
21R1334-Note 4 Final.pdf PDF
Amd 04 revised DWGS.pdf PDF
Amd 03 Civil DWGS reissued.pdf PDF
AMD 0004 21R1334.pdf PDF
Amd 02 Civil DWGS reissued.pdf PDF
21R1334-Note3 Final.pdf PDF
AMD 03 21R1334.pdf PDF
Amd 03 Rev DWGS.pdf PDF
Class JA for Dormakaba RFID Locking System_REDACTED.pdf PDF
21R1334-Note2-Final.pdf PDF
Amd 02 BOQ A AMD 02 DWGS_R1 signed.pdf PDF
AMD 02 21R1334.pdf PDF
Amd 02 BOQ A Civil Dwgs - Reissued.pdf PDF
21R1334-Note1-Final.pdf PDF
Amd 01 IMAGE 26 NOV 2020.pdf PDF
Amd 01 1A-5B-1.pdf PDF
Amd 01 6A-8C-1.pdf PDF
AMD 01 21R1334.pdf PDF
Amd 01 J023 site photo key.pdf PDF
J-023 BOQ A Specifications_Signed Off_Volume 2 of 2_.pdf PDF
Class JA - Fed Signal-redacted.pdf PDF
J-023 BOQ A Specifications_Signed Off_Volume 1 of 2_.pdf PDF
Class JA King F Transmitters-Redacted.pdf PDF
J-023 BOQ A Drawings_Signed Off_4 of 4_Electrical Telecommunications.pdf PDF
J-023 BOQ A Drawings_Signed Off_1 of 4_Civil Structural.pdf PDF
MCBG Knox Box Class JA_Redacted.pdf PDF
JA BEQs-BOQs RFID Vingcard-Redacted.pdf PDF
Class JA No 20-016 for AMI Meter (Redacted) w Att A.pdf PDF
N62742-21-R-1334 Front End.pdf PDF
J-023 BOQ A Drawings_Signed Off_3 of 4_Fire Protection Mechanical Plumbing.pdf PDF
J-023 BOQ A Drawings_Signed Off_2 of 4_Architectural Interiors.pdf PDF
Class JA for JCI METASYS (20200626)_Redacted.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-023 BACHELOR OFFICER QUARTERS-A 972483

US NAVSUPPACT MCB GUAM

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 30 02.00 20 DESIGN, PROCUREMENT AND INSTALLATION OF FURNITURE,

FIXTURES AND EQUIPMENT

01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT

MANAGEMENT SYSTEM

01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 13 SPECIAL PROJECT PROCEDURES

01 35 26 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 20 QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.03 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (JRM ESS)

01 57 19.04 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (DPRI)

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

PROJECT TABLE OF CONTENTS Page 1

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 21 16 MINERAL FIBER BLANKET INSULATION

07 24 00 EXTERIOR FINISH SYSTEMS

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 36 SPRAY FOAM AIR BARRIERS

07 56 00 FLUID-APPLIED ROOFING SYSTEM

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS, FRAMES, WINDOW WALL AND SUNSHADE

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 26 00 VENEER PLASTER

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 14 00.20 PLAQUE SIGNAGE

10 14 53 TRAFFIC SIGNAGE

10 26 00 WALL PROTECTION

10 28 13 TOILET ACCESSORIES

10 71 13.13 STORM SHUTTERS

DI VI SI ON 12 - FURNI SHI NGS

12 24 13 ROLLER WINDOW SHADES

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 93 00 SITE FURNISHINGS

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 12 00 STANDPIPE SYSTEMS

21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBING, GENERAL PURPOSE

22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

PROJECT TABLE OF CONTENTS Page 2

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

25 08 11.00 20 RISK MANAGEMENT FRAMEWORK FOR FACILITY-RELATED CONTROL

SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 27 14.00 20 ELECTRICITY METERING

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 32 13.00 20 SINGLE OPERATION GENERATOR SETS

26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DI VI SI ON 31 - EARTHWORK

31 21 13 RADON MITIGATION

31 23 00.00 20 EXCAVATION AND FILL

31 31 16.13 CHEMICAL TERMITE CONTROL

31 31 16.19 TERMITE CONTROL BARRIERS

31 32 23 FOUNDATION DRILLING AND GROUTING

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

PROJECT TABLE OF CONTENTS Page 3

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.19 SEISMIC BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 21 23 HYDRONIC PUMPS

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 65 00 COOLING TOWERS AND REMOTE EVAPORATIVELY-COOLED CONDENSERS

32 11 20 SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 14 13.13 INTERLOCKING PRECAST CONCRETE UNIT PAVING

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 84 24 TEMPORARY IRRIGATION SPRINKLER SYSTEMS

32 92 19 SEEDING

32 93 00 EXTERIOR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING

33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

33 40 00 STORM DRAINAGE UTILITIES

33 52 10 FUEL SYSTEMS PIPING (SERVICE STATION)

33 52 23.15 POL SERVICE PIPING WELDING

33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS

33 58 00 LEAK DETECTION FOR FUELING SYSTEMS

33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION

33 61 13.19 VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES

33 61 14 EXTERIOR BURIED PREINSULATED WATER PIPING

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

32 16 15 CONCRETE BLOCK PAVEMENTS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 91 PAGES

972483

J-023 BACHELOR OFFICER QUARTERS-A

01 33 29 SD-01 Preconstruction Submittals

1.6.3.1 G SPreliminary High Performance

and Sustainable Building Checklist

1.5.1 G SSustainability Action Plan

1.6.3.1 G SPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

1.6.3.1 G SFinal High Performance and

Sustainable Building Checklist

1.6.3.1 G SFinal Sustainability eNotebook

1.6.3.1 G SAmended Final Sustainability

eNotebook

1.6.3.1 G SAmended Final High

Performance and Sustainable

Building Checklist

3.2 G SThird Party Certification

Certificate, Assessment, or

Validation

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

3.1.1 GProject Manual

SD-06 Test Reports

3.1.1Daily Reports

3.1.3Daily Reports

3.1.1Biweekly Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

01 45 35 SD-07 Certificates

2.1Fabrication Plant

2.1Certificate of Compliance

1.5.9 GSpecial Inspector of Record

1.5 GSpecial Inspector

SD-11 Closeout Submittals

3.1.1 GComprehensive Final Report

01 57 19 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

1.9Solid Waste Management Permit

1.5.2Regulatory Notifications

1.6Environmental Protection Plan

3.2.1.1Stormwater Pollution Prevention

Plan

3.2.1.2Stormwater Notice of Intent

1.6.9.1Dirt and Dust Control Plan

1.5.5Employee Training Records

1.5.4Environmental Manager

Qualifications

SD-06 Test Reports

3.2.1.3Inspection Reports

1.9.1Monthly Solid Waste Disposal

Report

SD-07 Certificates

1.5.5Employee Training Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

01 57 19 1.4.1.2ECATTS Certificate Of

Completion

1.5.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

3.2.1.4Stormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5Stormwater Notice of Termination

3.7.1Waste Determination

Documentation

3.7.3.6Disposal Documentation for

Hazardous and Regulated Waste

1.5.5Assembled Employee Training

Records

1.9Solid Waste Management Permit

3.7.2.1Project Solid Waste Disposal

Documentation Report

3.8.1Contractor Hazardous Material

Inventory Log

3.7.3.1Hazardous Waste/Debris

Management

1.5.2Regulatory Notifications

3.7.2.1Sales Documentation

3.2.1.5As-Built Topographic Survey

01 57 19.03 SD-01 Preconstruction Submittals

1.4 GESS Work Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

01 57 19.03 3.1 GComprehensive Community

Relations Plan

1.5 GInstallation Commanding Officer

(ICO) Notification

1.5.1 GGeographic Information System

(GIS) Work Area Grid

1.3 GPersonnel Qualifications and

Duties

1.3.1 GSite Health and Safety Plan

3.2 GOccupancy, Population and

Vehicle Survey

3.3 GExclusion Zone Work Schedule

SD-06 Test Reports

1.7 GQC Report

3.8 GBedrock Determinations

SD-11 Closeout Submittals

1.9 GGIS Data

1.10 GAfter Action Report (AAR)

01 91 00.15 SD-01 Preconstruction Submittals

1.4.1 GContractor's Commissioning

Quality Control Representative

(QCR)

1.7 G DOCommissioning Firm

1.7.1 G DOTechnical Commissioning

Specialists

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

01 91 00.15 3.2 GDesign Review Report

3.1.3.1 G DOInterim Construction Phase

Commissioning Plan

3.1.3.2 G DOFinal Construction Phase

Commissioning Plan

3.1.3.1.3 G DOTemplate Building Envelope

Inspection Checklists

3.1.6.2 G DOBuilding Envelope Inspection

Checklists

3.1.6.3 G DOPre-Functional Checklists

1.9Issues Log

3.2 G DOCommissioning Report

SD-07 Certificates

1.10 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.7 G ROTraining Plan

3.1.7 G ROTraining Attendance Rosters

3.1.8 G DOSystems Manual

SD-11 Closeout Submittals

3.2 S DOFinal Commissioning Report

02 41 00 SD-01 Preconstruction Submittals

1.9Existing Conditions

SD-07 Certificates

1.6 GNotification

03 30 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

03 30 00 1.6.3.1Concrete Curing Plan

1.6.6 GQuality Control Plan

1.6.7 GQuality Control Personnel

Certifications

1.6.7Quality Control Organizational

Chart

1.6.9 GLaboratory Accreditation

1.6.2.1 GForm Removal Schedule

3.3.9Maturity Method Data

SD-02 Shop Drawings

1.6.2.1Formwork

1.6.2.2 GReinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.1Formwork Materials

2.3.3.2Recycled Aggregate Materials

2.3.1Cementitious Materials

2.4.6Vapor Barrier

2.4.1Concrete Curing Materials

2.6Reinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

03 30 00 2.2.2Waterstops

2.2.3Biodegradable Form Release

Agent

1.6.3.2Pumping Concrete

1.6.3.3Finishing Plan

2.4.2Nonshrink Grout

SD-04 Samples

1.6.5.1Slab Finish Sample

1.6.5.2Surface Finish Samples

SD-05 Design Data

1.6.1.2 GConcrete Mix Design

1.6.1.1Formwork Calculations

SD-06 Test Reports

1.6.1.2 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.10.2.1Tolerance Report

3.13.2.3 GCompressive Strength Tests

3.13.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.8Welder Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

03 30 00 1.6.3.4VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.5Safety Data Sheets

1.6.7.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5Joint Sealants

2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.3.2.1 GCut CMU

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

2.4.1.2 GCement

2.4.1.1 GCementitious Materials

SD-04 Samples

2.2.2.2 GConcrete Masonry Units (CMU)

2.4.1.4 GAdmixtures for Masonry Mortar

2.6.2 GAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

04 20 00 2.2.2.4Fire-Rated Concrete Masonry

Units

3.2.4 GBracing Calculations

SD-06 Test Reports

2.2.2.4Fire-Rated Concrete Masonry

Units

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

SD-07 Certificates

1.3.1Special Masonry Inspector

Qualifications

2.2.2.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.2.1 SRecycled Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

05 50 13 SD-02 Shop Drawings

2.4 GFloor Gratings

2.5 GBollards/Pipe Guards

2.7 GAngles and Plates and Masonry

Wall Bracing

2.7 GElevator Beams and Connections

SD-03 Product Data

2.4 GFloor Gratings

2.1 SRecycled Content

SD-07 Certificates

2.1 GCertificates of Compliance

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

SD-03 Product Data

2.2.1 GConcrete Inserts

2.2.2 GMasonry Anchorage Devices

2.2.4 GAluminum Railings and Handrails

1.2.1 GAnchorage and Fastening

Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

05 52 00 SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 20 00 SD-02 Shop Drawings

1.3 GDetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.1 GWood Products

1.4 GTreated Wood Products

2.5 GHardware and Accessories

SD-07 Certificates

1.6.1.1 GCertificates of Grade

2.1.3 SCertified Sustainably Harvested

Wood for Trim

2.1.4 SCertified Sustainably Harvested

Softwood Plywood

06 41 16.00 10 SD-02 Shop Drawings

1.5.2Shop Drawings

2.9Shop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

1.5.3Certification

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

06 41 16.00 10 2.3 GPlastic Laminates

2.6Cabinet Hardware

SD-07 Certificates

1.5Quality Assurance

06 61 16 SD-02 Shop Drawings

1.5.2Detail Drawings

3.1Installation

SD-03 Product Data

2.1Solid Polymer Material

1.5.1Qualifications

2.3Fabrications

2.2.4 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

2.3.5 GCounter and Vanity Tops

SD-06 Test Reports

2.1Solid Polymer Material

SD-07 Certificates

2.3Fabrications

1.5.1Qualifications

2.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

3.2Clean-up

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

1.6.4 GAir Leakage Test Report

3.5.8 GAir Leakage Test Report

1.6.4 GDiagnostic Test Report

3.6.4 GDiagnostic Test Report

07 13 53 SD-03 Product Data

1.3Manufacturer's Standard Details

2.2Elastomeric Waterproofing Sheet

Material

2.4Protection Board

1.4Primers, Adhesives, and Mastics

2.2Primers, Adhesives, and Mastics

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

07 13 53 2.2Elastomeric Waterproofing Sheet

Material

Field Quality Control

3.5Protective Covering

SD-07 Certificates

2.2Elastomeric Waterproofing Sheet

Material

1.4Primers, Adhesives, and Mastics

2.2Primers, Adhesives, and Mastics

1.4Protective Coverings

1.7Special Warranties

1.7Special Warranties

2.1.1Certificates Of Compliance

2.1.2Certificates Of Compliance

SD-08 Manufacturer’s Instructions

1.4Primers, Adhesives, and Mastics

2.2Primers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1.1Certificates Of Compliance

2.1.2Certificates Of Compliance

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.1.2 SRecycled Content for Insulation

Materials

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

07 21 16 2.1.4 SIndoor Air Quality for Insulation

Materials

SD-08 Manufacturer’s Instructions

3.2.1Insulation

07 24 00 SD-03 Product Data

2.2Leveler Coat

2.3Base Coat

2.4Reinforcing Fabric

2.5Finish Coat

2.7Joint Sealant

2.6Sealant Primer

2.8Bond Breaker

2.9Backer Rod

1.7Warranty

SD-04 Samples

1.2.3.6 GSample Boards

1.2.3.6Color and Texture

SD-05 Design Data

1.2.1.2Wind Load

1.2.4Moisture Analysis

SD-06 Test Reports

1.2.3.1Abrasion Resistance

1.2.3.2Accelerated Weathering

1.2.2.2Impact Resistance

1.2.3.3Mildew Resistance

1.2.3.4Salt Spray Resistance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

07 24 00 1.2.4Vapor Transmission

1.2.1.3Wall Fire Test

1.2.1.1Water Penetration

1.2.3.5Water Resistance

1.2.1.3Full Scale or Intermediate Scale

Fire Test

1.2.2.1Surface Burning Characteristics

3.1Substrate

1.2.1.2Wind Load

SD-07 Certificates

1.4.1Qualifications of EFS

Manufacturer

1.4.2Qualification of EFS Installer

1.4.3Qualification of Sealant Applicator

3.5.1Inspection Check List

SD-08 Manufacturer’s Instructions

3.3Installation

SD-10 Operation and Maintenance

Data

1.2Exterior Finish System (EFS)

07 27 10.00 10 SD-02 Shop Drawings

2.1 GAir Barrier System Shop

Drawings

SD-03 Product Data

2.1 GAir Barrier System Product Data

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

07 27 10.00 10 3.1.2 GMock-Up

2.1 GMaterial Samples For Air Barrier

System

SD-05 Design Data

1.8 GDesign Data And Calculations

For The Air Barrier System

SD-06 Test Reports

1.8 GDesign Review Report

3.1.3 GTesting and Inspection

SD-07 Certificates

1.7 GAir Barrier Inspector

07 27 36 SD-01 Preconstruction Submittals

1.10.1 GQualification of Manufacturer

1.10.2 GQualification of Installer

1.11 GQuality Control Plan

1.11 GSafety Plan

1.9.1 GFire Prevention Plan

1.9.2 GRespirator Plan

SD-02 Shop Drawings

1.5Spray Foam Air Barrier

1.11 GFoam Air Barrier System

1.5.1 GFire-Rated Assemblies

SD-03 Product Data

2.1.2 GClosed Cell

2.2 GTransition Membrane

2.3 GPrimers, Adhesives, and Mastics

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

07 27 36 2.5 GSealants

1.5.2 GSafety Data Sheets

2.1.1 GThermal Barrier Materials

2.1.1 GIgnition Barrier Coatings

2.1.6 GAccessories

2.1.2 SRecycled Content for Closed Cell

Spray Foam Air Barrier

SD-04 Samples

1.5 GSpray Foam Air Barrier

SD-06 Test Reports

1.5.4 GField Peel Adhesion Test

3.4.5.1 GThermographic Test

1.8 GAir Barrier Test

1.5.3 GPrimers

1.5.4 GFire-Ratings Of Thermal Barrier

Materials

1.5.4 GFlame Spread And Smoke

Developed Index Ratings Of SPF

Products

1.5.4 GFlame Propagation Of Wall

Assemblies

3.4.1 GSite Inspections

SD-07 Certificates

2.1.2 GClosed cell

1.10.1 GQualification of Manufacturer

1.10.2 GQualification of Installer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

07 27 36 2.2 GTransition Membrane

2.1.5 SIndoor Air Quality for Spray Foam

Air Barrier

SD-08 Manufacturer’s Instructions

1.6.1 GSPF Handling, Storage, and

Spray Procedures

3.2.1 GSubstrate Preparation

1.5.1 GThermal Barrier

2.2 GTransition Membrane

2.3 GPrimers, Adhesives, and Mastics

SD-09 Manufacturer’s Field

Reports

3.3.3Daily Work Record

3.4.5Visual Inspection and Thermal

Scanning

07 56 00 SD-01 Preconstruction Submittals

1.4.3Applicator's Qualifications

1.5.3Material Compatibility

SD-03 Product Data

1.6 GFluid-Applied Roofing System

3.1.1 GFluid-Applied Roofing System

3.3.1 GFluid-Applied Roofing System

3.6Moisture Meter

SD-04 Samples

1.4.1 GFluid-Applied Roofing

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

07 56 00 1.6Fluid-Applied Roofing System

3.1.1Fluid-Applied Roofing System

3.3.1Fluid-Applied Roofing System

SD-08 Manufacturer’s Instructions

1.5.1Application Instructions

SD-11 Closeout Submittals

1.9.1Roof Membrane Manufacturer

Warranty

1.9.2Roofing System Installer

Warranty

07 84 00 SD-02 Shop Drawings

2.1Firestopping System

SD-03 Product Data

2.2Firestopping Materials

SD-06 Test Reports

3.3Inspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1Installer Qualifications

07 92 00 SD-03 Product Data

2.1Sealants

2.2Primers

2.3Bond Breakers

2.4Backstops

3.1Field Adhesion

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

07 92 00 SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.1.4 SIndoor Air Quality For Interior

Acoustical Sealants

08 11 13 SD-02 Shop Drawings

2.1Doors

2.1Doors

2.1 SRecycled Content for Steel Door

Product

2.6Frames

2.6Frames

2.6 SRecycled Content for Steel Frame

Product

2.4Accessories

SD-03 Product Data

2.1Doors

2.6Frames

2.4Accessories

08 11 16 SD-02 Shop Drawings

1.5.1Door, Frame, Window Wall and

Sunshade Assembly

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

08 11 16 3.4 GDoor, Frame, Window Wall and

Sunshade

2.3.3 SRecycled Content of Aluminum

Material

SD-04 Samples

1.5.2 GFinish Samples

SD-05 Design Data

1.2.1Calculations

SD-06 Test Reports

1.2.3Air Infiltration

1.2.4Water Penetration

SD-08 Manufacturer’s Instructions

3.4 GDoor, Frame, Window Wall and

Sunshade

SD-10 Operation and Maintenance

Data

1.5.4Adjustments, Cleaning, and

Maintenance

08 14 00 SD-02 Shop Drawings

2.1Doors

SD-03 Product Data

2.1Doors

2.1.2.1 SRecycled Content for Door Cores

2.2Accessories

2.3.7Water-resistant Sealer

1.5Warranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

08 14 00 2.1.4Sound Transmission Class

Rating

2.1.5Fire Resistance Rating

SD-04 Samples

2.1Doors

SD-06 Test Reports

2.4Cycle-Slam

2.4Hinge Loading Resistance

SD-07 Certificates

1.3.1Certificates of Grade

2.1.1 SCertified Sustainably Harvested

Stile and Rail Wood Doors

2.1.2 SCertified Sustainably Harvested

Flush Wood Doors

SD-11 Closeout Submittals

1.5Warranty

08 31 00 SD-02 Shop Drawings

1.3Access Doors And Panels

SD-03 Product Data

1.3Access Doors And Panels

1.3.2Hardware

2.2.6Accessories

2.1 SRecycled Content

SD-04 Samples

2.5 GFinishes

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

08 31 00 1.3.1Fire-rating(s) of Assemblies

08 71 00 SD-02 Shop Drawings

1.3Manufacturer's Detail Drawings

1.3Verification of Existing Conditions

1.5Hardware Schedule

2.3.9Keying System

SD-03 Product Data

2.3Hardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5Hardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

2.2Insulating Glass

1.3Glazing Accessories

2.3.1.1Sealants

2.3.2Joint Backer

SD-04 Samples

2.2Insulating Glass

2.3.4Tape

2.3.4Sealing Tapes

SD-07 Certificates

2.2Insulating Glass

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

08 81 00 1.3.1Exterior Glazing

2.2Exterior Glazing

SD-08 Manufacturer’s Instructions

2.3Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.7.1Insulated Glass Units

08 91 00 SD-02 Shop Drawings

1.4Wall louvers

1.5Wall louvers

SD-03 Product Data

2.2Metal Wall Louvers

SD-04 Samples

1.4 GWall louvers

1.5 GWall louvers

09 22 00 SD-02 Shop Drawings

2.1Metal Support Systems

SD-03 Product Data

2.1Metal Support Systems

2.1 SRecycled Content for Metal

Support Systems

09 26 00 SD-03 Product Data

2.1.1Gypsum Veneer Plaster

09 29 00 SD-03 Product Data

2.1.3Cementitious Backer Units

2.1.2Abuse Resistant Gypsum Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

09 29 00 2.1.7Accessories

2.1.1Gypsum Board

2.1.1 SRecycled Content for Gypsum

Board

2.1.4 SVOC Content of Joint Compound

SD-07 Certificates

2.1Asbestos Free Materials

2.1.1 SIndoor Air Quality for Gypsum

Board

SD-08 Manufacturer’s Instructions

2.1Safety Data Sheets

09 30 10 SD-03 Product Data

2.1.1Porcelain Tile

2.1.1 SRecycled Content for Porcelain

Tile

2.1.2Glass Tile

2.1.2 SRecycled Content for Glass Tile

2.1.3Glazed Wall Tile

2.1.3 SRecycled Content for Glazed Wall

Tile

2.2Setting-Bed

2.4Mortar and Grout

2.2.5Reinforcing Wire Fabric

SD-04 Samples

2.1 GTile

2.1 GTransition Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

09 30 10 2.5 GTransition Strips

GGrout

SD-07 Certificates

SIndoor Air Quality for Sealants

SD-10 Operation and Maintenance

Data

3.2Installation

09 51 00 SD-02 Shop Drawings

2.1Detail Drawings

SD-03 Product Data

Acoustical Ceiling Systems

2.2.1.1 SRecycled Content for Ceiling

Tiles

2.3.1 SRecycled Content for Suspension

Systems

SD-04 Samples

2.2 GAcoustical Units

SD-07 Certificates

2.2.1.1 SIndoor Air Quality for Ceiling Tiles

2.7 SIndoor Air Quality for Sealants

09 65 00 SD-03 Product Data

2.7Resilient Flooring and

Accessories

2.4Adhesives

2.1Luxury Vinyl Tile

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

09 65 00 2.1 SRecycled content for Luxury Vinyl

Tile

2.2Wall Base

SD-04 Samples

2.7 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3Moisture, Alkalinity and Bond

Tests

SD-07 Certificates

2.1 SIndoor Air Quality for Luxury Vinyl

Tile

2.4 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2Surface Preparation

3.1Installation

SD-10 Operation and Maintenance

Data

2.7Resilient Flooring and

Accessories

09 90 00 SD-02 Shop Drawings

3.10Piping Identification

SD-03 Product Data

2.1Coating

SD-04 Samples

1.11 GColor

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

09 90 00 SD-07 Certificates

1.4Applicator's Qualifications

2.1Indoor Air Quality for Paints and

Primers

2.1Indoor Air Quality for

Consolidated Latex Paints

SD-08 Manufacturer’s Instructions

3.6.2Mixing

1.8.2Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1Coatings

10 14 00.20 SD-02 Shop Drawings

1.3.2Detail Drawings

SD-03 Product Data

3.1Installation

1.5Warranty

SD-04 Samples

1.3.1Plaque Signage

SD-10 Operation and Maintenance

Data

3.1.2 GProtection and Cleaning

10 14 53 SD-03 Product Data

2.1Traffic Sign Posts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

10 14 53 2.3Traffic Sign Retroreflective

Sheeting

SD-04 Samples

2.5.2Flexible Posts

10 26 00 SD-02 Shop Drawings

2.2Corner Guards

SD-03 Product Data

2.2Corner Guards

SD-04 Samples

2.3 GFinish

SD-06 Test Reports

2.2Corner Guards

SD-07 Certificates

2.2Corner Guards

2.4 SIndoor air quality for adhesives

10 28 13 SD-03 Product Data

2.1.2Finishes

2.1Accessory Item

2.1 SRecycled content for stainless

steel toilet accessories

SD-04 Samples

2.1.2 GFinishes

2.2Accessory Items

SD-07 Certificates

2.2Accessory Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

10 28 13 SD-10 Operation and Maintenance

Data

2.1Accessory Units

10 71 13.13 SD-02 Shop Drawings

2.2.1Roll shutters

2.2shutters

SD-03 Product Data

2.2.1Roll shutters

SD-04 Samples

2.2 GShutters

SD-10 Operation and Maintenance

Data

2.2 GShutters

SD-11 Closeout Submittals

1.6.1Removable shutter location drawings

12 24 13 SD-02 Shop Drawings

3.2Installation

SD-03 Product Data

2.1Window Shades

2.1 SRecycled Content for various

fiber components

SD-04 Samples

2.1 GWindow Shades

SD-06 Test Reports

2.1Window Shades

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

12 24 13 SD-07 Certificates

2.1 SIndoor Air Quality for roller

window shades

SD-08 Manufacturer’s Instructions

2.1Window Shades

SD-10 Operation and Maintenance

Data

2.1Window Shades

SD-11 Closeout Submittals

1.7Warranty

12 48 13 SD-02 Shop Drawings

3.2Installation Drawings

3.2Detail Drawings

SD-03 Product Data

2.1.1Entrance Floor Mats and Frames

2.1.2 GAdhesives and Concrete Primers

SD-04 Samples

2.1.1 GEntrance Floor Mats and Frames

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Instructions

SD-10 Operation and Maintenance

Data

3.2Protection, Maintenance, and

Repair Information

12 93 00 SD-02 Shop Drawings

2.5 GBenches

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

12 93 00 2.6 GBicycle Racks

1.3.3Assembly Instruction Drawings

SD-03 Product Data

2.5Benches

2.6Bicycle Racks

2.7Waste Receptacles

SD-04 Samples

2.3.4 GFinish

SD-06 Test Reports

3.3Testing

SD-07 Certificates

1.3.4Primer Certificate

1.3.5Powder Coatings Certificate

14 21 23 SD-02 Shop Drawings

2.1 GElevator

1.2.1 GElevator Components

1.2.2 GElevator Components

1.2.1 GElevator Machine

1.2.1 GElevator Controller

1.3.4 GWiring Diagrams

SD-03 Product Data

2.1 GElevator

1.2.1 GElevator Components

1.2.2 GElevator Components

1.2.2 GData Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

14 21 23 2.5.2 GElevator Microprocessor

Controller

SD-05 Design Data

1.2.3.3Emergency Power Systems

1.2.3.2Heat Loads

1.2.3.1Reaction Loads

SD-07 Certificates

1.3.2 GPrice Lists

1.4Warranty

1.3.1.1Endorsement Letter

1.2.4Welders' Qualifications

2.5.2.3 GElevator Controller Certification

SD-10 Operation and Maintenance

Data

2.1 GElevator

1.2.5 GMaintenance Control Program

(MCP)

2.5.2.2 GSoftware and Documentation

21 12 00 SD-02 Shop Drawings

1.4.4Standpipe system

SD-03 Product Data

2.1.1Pipe and fittings

2.1.1Mechanical couplings

2.1.2Pipe hangers and supports

2.1.3Valves

2.1.8Fire department connections

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

21 12 00 2.1.9Valve tamper switch

2.2.1Buried Pipe and fittings

SD-06 Test Reports

3.8.1Preliminary tests

3.8.2Acceptance tests

SD-07 Certificates

1.6.1Qualifications of installer

SD-11 Closeout Submittals

1.6.2 GSystem as-built drawings

21 13 13.00 20 SD-02 Shop Drawings

1.5.2Shop Drawings

SD-03 Product Data

2.2.1Pipe

2.2.1Fittings

2.2.5Valves

2.2.4Sprinklers

2.2.6Pipe hangers and supports

2.3.1Sprinkler Alarm Switches

2.2.7Fire department connections

2.2.1Mechanical couplings

2.2.8Backflow Prevention Assembly

2.2.6Seismic Bracing

SD-05 Design Data

1.3Hydraulic Calculations

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

21 13 13.00 20 3.6request to schedule Preliminary

Tests

3.6Preliminary Test Report

3.7request to schedule Final

Acceptance Test

SD-07 Certificates

3.1Inspection by Fire Protection

Engineer

1.5.1Fire Protection Engineer

1.5.2Sprinkler System Installer

SD-10 Operation and Maintenance

Data

3.8Operating and Maintenance

Instructions

SD-11 Closeout Submittals

1.5.2As-built drawings

3.8On-site training

22 00 00 SD-02 Shop Drawings

3.9.1 GPlumbing System

SD-03 Product Data

2.1 SRecycled Content for Steel Pipe

2.4Fixtures

2.4.2Flush Valve Water Closets

2.4.2 SWaterSense Label for Flush

Valve Water Closet

2.4.3Flush Valve Urinals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 91 PAGES

J-023 BACHELOR OFFICER QUARTERS-A

22 00 00 2.4.3 SWaterSense Label for Urinal

2.4.4Flush Tank Water Closets

2.4.4 SWaterSense Label for Flush Tank

Water Closet

2.4.5Wall Hung Lavatories

2.4.6Countertop Lavatories

2.4.7Kitchen Sinks

2.4.8Service Sinks

2.4.9 GDrinking-Water Coolers

2.4.9 SEnergy Star Label for Electric

Water Cooler

2.6.2 SWaterSense Label for

Showerhead

2.4.11Plastic Bathtub Liners

2.4.12Plastic Bathtub Wall Surrounds

2.9 GWater Heaters

2.11 GPumps

3.9.1.1 GBackflow Prevention Assemblies

2.6.2 GShower Faucets

1.5.1Welding

3.4 GVibration-Absorbing Features

3.9.1Plumbing System

SD-06 Test Reports

3.9Tests, Flushing and Disinfection

3.9.1.1 GTest of Backflow Prevention

Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .