This solicitation requests proposals for the construction of a multi-story Bachelor Officers Quarters building and associated facilities at Marine Corps Base Guam. The project includes a housing tower with single-occupancy units, common areas, and support spaces. Detached buildings will provide utilities and multipurpose rooms. Proposals are due on December 17, 2021. The construction work will be awarded on a design-bid-build basis. The Navy Facilities Engineering Command is the contracting agency.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-023 BACHELOR OFFICER QUARTERS-A 972483
US NAVSUPPACT MCB GUAM
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 30 02.00 20 DESIGN, PROCUREMENT AND INSTALLATION OF FURNITURE,
FIXTURES AND EQUIPMENT
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 13 SPECIAL PROJECT PROCEDURES
01 35 26 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.03 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (JRM ESS)
01 57 19.04 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (DPRI)
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
PROJECT TABLE OF CONTENTS Page 1
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 16 MINERAL FIBER BLANKET INSULATION
07 24 00 EXTERIOR FINISH SYSTEMS
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 36 SPRAY FOAM AIR BARRIERS
07 56 00 FLUID-APPLIED ROOFING SYSTEM
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS, FRAMES, WINDOW WALL AND SUNSHADE
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 26 00 VENEER PLASTER
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.20 PLAQUE SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 26 00 WALL PROTECTION
10 28 13 TOILET ACCESSORIES
10 71 13.13 STORM SHUTTERS
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 SITE FURNISHINGS
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 12 00 STANDPIPE SYSTEMS
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
PROJECT TABLE OF CONTENTS Page 2
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 08 11.00 20 RISK MANAGEMENT FRAMEWORK FOR FACILITY-RELATED CONTROL
SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 13.00 20 SINGLE OPERATION GENERATOR SETS
26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DI VI SI ON 31 - EARTHWORK
31 21 13 RADON MITIGATION
31 23 00.00 20 EXCAVATION AND FILL
31 31 16.13 CHEMICAL TERMITE CONTROL
31 31 16.19 TERMITE CONTROL BARRIERS
31 32 23 FOUNDATION DRILLING AND GROUTING
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
PROJECT TABLE OF CONTENTS Page 3
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 21 23 HYDRONIC PUMPS
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 65 00 COOLING TOWERS AND REMOTE EVAPORATIVELY-COOLED CONDENSERS
32 11 20 SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 14 13.13 INTERLOCKING PRECAST CONCRETE UNIT PAVING
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 84 24 TEMPORARY IRRIGATION SPRINKLER SYSTEMS
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 52 10 FUEL SYSTEMS PIPING (SERVICE STATION)
33 52 23.15 POL SERVICE PIPING WELDING
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 58 00 LEAK DETECTION FOR FUELING SYSTEMS
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
33 61 13.19 VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES
33 61 14 EXTERIOR BURIED PREINSULATED WATER PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
32 16 15 CONCRETE BLOCK PAVEMENTS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 91 PAGES
972483
J-023 BACHELOR OFFICER QUARTERS-A
01 33 29 SD-01 Preconstruction Submittals
1.6.3.1 G SPreliminary High Performance
and Sustainable Building Checklist
1.5.1 G SSustainability Action Plan
1.6.3.1 G SPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.6.3.1 G SFinal High Performance and
Sustainable Building Checklist
1.6.3.1 G SFinal Sustainability eNotebook
1.6.3.1 G SAmended Final Sustainability
eNotebook
1.6.3.1 G SAmended Final High
Performance and Sustainable
Building Checklist
3.2 G SThird Party Certification
Certificate, Assessment, or
Validation
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
3.1.1 GProject Manual
SD-06 Test Reports
3.1.1Daily Reports
3.1.3Daily Reports
3.1.1Biweekly Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
01 45 35 SD-07 Certificates
2.1Fabrication Plant
2.1Certificate of Compliance
1.5.9 GSpecial Inspector of Record
1.5 GSpecial Inspector
SD-11 Closeout Submittals
3.1.1 GComprehensive Final Report
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.9Solid Waste Management Permit
1.5.2Regulatory Notifications
1.6Environmental Protection Plan
3.2.1.1Stormwater Pollution Prevention
Plan
3.2.1.2Stormwater Notice of Intent
1.6.9.1Dirt and Dust Control Plan
1.5.5Employee Training Records
1.5.4Environmental Manager
Qualifications
SD-06 Test Reports
3.2.1.3Inspection Reports
1.9.1Monthly Solid Waste Disposal
Report
SD-07 Certificates
1.5.5Employee Training Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
01 57 19 1.4.1.2ECATTS Certificate Of
Completion
1.5.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.1.4Stormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5Stormwater Notice of Termination
3.7.1Waste Determination
Documentation
3.7.3.6Disposal Documentation for
Hazardous and Regulated Waste
1.5.5Assembled Employee Training
Records
1.9Solid Waste Management Permit
3.7.2.1Project Solid Waste Disposal
Documentation Report
3.8.1Contractor Hazardous Material
Inventory Log
3.7.3.1Hazardous Waste/Debris
Management
1.5.2Regulatory Notifications
3.7.2.1Sales Documentation
3.2.1.5As-Built Topographic Survey
01 57 19.03 SD-01 Preconstruction Submittals
1.4 GESS Work Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
01 57 19.03 3.1 GComprehensive Community
Relations Plan
1.5 GInstallation Commanding Officer
(ICO) Notification
1.5.1 GGeographic Information System
(GIS) Work Area Grid
1.3 GPersonnel Qualifications and
Duties
1.3.1 GSite Health and Safety Plan
3.2 GOccupancy, Population and
Vehicle Survey
3.3 GExclusion Zone Work Schedule
SD-06 Test Reports
1.7 GQC Report
3.8 GBedrock Determinations
SD-11 Closeout Submittals
1.9 GGIS Data
1.10 GAfter Action Report (AAR)
01 91 00.15 SD-01 Preconstruction Submittals
1.4.1 GContractor's Commissioning
Quality Control Representative
(QCR)
1.7 G DOCommissioning Firm
1.7.1 G DOTechnical Commissioning
Specialists
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
01 91 00.15 3.2 GDesign Review Report
3.1.3.1 G DOInterim Construction Phase
Commissioning Plan
3.1.3.2 G DOFinal Construction Phase
Commissioning Plan
3.1.3.1.3 G DOTemplate Building Envelope
Inspection Checklists
3.1.6.2 G DOBuilding Envelope Inspection
Checklists
3.1.6.3 G DOPre-Functional Checklists
1.9Issues Log
3.2 G DOCommissioning Report
SD-07 Certificates
1.10 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.7 G ROTraining Plan
3.1.7 G ROTraining Attendance Rosters
3.1.8 G DOSystems Manual
SD-11 Closeout Submittals
3.2 S DOFinal Commissioning Report
02 41 00 SD-01 Preconstruction Submittals
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
03 30 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
03 30 00 1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Plan
1.6.7 GQuality Control Personnel
Certifications
1.6.7Quality Control Organizational
Chart
1.6.9 GLaboratory Accreditation
1.6.2.1 GForm Removal Schedule
3.3.9Maturity Method Data
SD-02 Shop Drawings
1.6.2.1Formwork
1.6.2.2 GReinforcing Steel
SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
2.3.3.2Recycled Aggregate Materials
2.3.1Cementitious Materials
2.4.6Vapor Barrier
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
03 30 00 2.2.2Waterstops
2.2.3Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
1.6.3.3Finishing Plan
2.4.2Nonshrink Grout
SD-04 Samples
1.6.5.1Slab Finish Sample
1.6.5.2Surface Finish Samples
SD-05 Design Data
1.6.1.2 GConcrete Mix Design
1.6.1.1Formwork Calculations
SD-06 Test Reports
1.6.1.2 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.10.2.1Tolerance Report
3.13.2.3 GCompressive Strength Tests
3.13.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.8Welder Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
03 30 00 1.6.3.4VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.5Safety Data Sheets
1.6.7.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants
2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.3.2.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
2.4.1.2 GCement
2.4.1.1 GCementitious Materials
SD-04 Samples
2.2.2.2 GConcrete Masonry Units (CMU)
2.4.1.4 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
04 20 00 2.2.2.4Fire-Rated Concrete Masonry
Units
3.2.4 GBracing Calculations
SD-06 Test Reports
2.2.2.4Fire-Rated Concrete Masonry
Units
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
SD-07 Certificates
1.3.1Special Masonry Inspector
Qualifications
2.2.2.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.2.1 SRecycled Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
05 50 13 SD-02 Shop Drawings
2.4 GFloor Gratings
2.5 GBollards/Pipe Guards
2.7 GAngles and Plates and Masonry
Wall Bracing
2.7 GElevator Beams and Connections
SD-03 Product Data
2.4 GFloor Gratings
2.1 SRecycled Content
SD-07 Certificates
2.1 GCertificates of Compliance
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
SD-03 Product Data
2.2.1 GConcrete Inserts
2.2.2 GMasonry Anchorage Devices
2.2.4 GAluminum Railings and Handrails
1.2.1 GAnchorage and Fastening
Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
05 52 00 SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 20 00 SD-02 Shop Drawings
1.3 GDetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.1 GWood Products
1.4 GTreated Wood Products
2.5 GHardware and Accessories
SD-07 Certificates
1.6.1.1 GCertificates of Grade
2.1.3 SCertified Sustainably Harvested
Wood for Trim
2.1.4 SCertified Sustainably Harvested
Softwood Plywood
06 41 16.00 10 SD-02 Shop Drawings
1.5.2Shop Drawings
2.9Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
1.5.3Certification
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
06 41 16.00 10 2.3 GPlastic Laminates
2.6Cabinet Hardware
SD-07 Certificates
1.5Quality Assurance
06 61 16 SD-02 Shop Drawings
1.5.2Detail Drawings
3.1Installation
SD-03 Product Data
2.1Solid Polymer Material
1.5.1Qualifications
2.3Fabrications
2.2.4 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 GMaterial
2.3.5 GCounter and Vanity Tops
SD-06 Test Reports
2.1Solid Polymer Material
SD-07 Certificates
2.3Fabrications
1.5.1Qualifications
2.1 SIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
3.2Clean-up
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-05 Design Data
3.2 GEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 GPressure Test Procedures
1.6.4 GAir Leakage Test Report
3.5.8 GAir Leakage Test Report
1.6.4 GDiagnostic Test Report
3.6.4 GDiagnostic Test Report
07 13 53 SD-03 Product Data
1.3Manufacturer's Standard Details
2.2Elastomeric Waterproofing Sheet
Material
2.4Protection Board
1.4Primers, Adhesives, and Mastics
2.2Primers, Adhesives, and Mastics
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
07 13 53 2.2Elastomeric Waterproofing Sheet
Material
Field Quality Control
3.5Protective Covering
SD-07 Certificates
2.2Elastomeric Waterproofing Sheet
Material
1.4Primers, Adhesives, and Mastics
2.2Primers, Adhesives, and Mastics
1.4Protective Coverings
1.7Special Warranties
1.7Special Warranties
2.1.1Certificates Of Compliance
2.1.2Certificates Of Compliance
SD-08 Manufacturer’s Instructions
1.4Primers, Adhesives, and Mastics
2.2Primers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1.1Certificates Of Compliance
2.1.2Certificates Of Compliance
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.1.2 SRecycled Content for Insulation
Materials
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
07 21 16 2.1.4 SIndoor Air Quality for Insulation
Materials
SD-08 Manufacturer’s Instructions
3.2.1Insulation
07 24 00 SD-03 Product Data
2.2Leveler Coat
2.3Base Coat
2.4Reinforcing Fabric
2.5Finish Coat
2.7Joint Sealant
2.6Sealant Primer
2.8Bond Breaker
2.9Backer Rod
1.7Warranty
SD-04 Samples
1.2.3.6 GSample Boards
1.2.3.6Color and Texture
SD-05 Design Data
1.2.1.2Wind Load
1.2.4Moisture Analysis
SD-06 Test Reports
1.2.3.1Abrasion Resistance
1.2.3.2Accelerated Weathering
1.2.2.2Impact Resistance
1.2.3.3Mildew Resistance
1.2.3.4Salt Spray Resistance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
07 24 00 1.2.4Vapor Transmission
1.2.1.3Wall Fire Test
1.2.1.1Water Penetration
1.2.3.5Water Resistance
1.2.1.3Full Scale or Intermediate Scale
Fire Test
1.2.2.1Surface Burning Characteristics
3.1Substrate
1.2.1.2Wind Load
SD-07 Certificates
1.4.1Qualifications of EFS
Manufacturer
1.4.2Qualification of EFS Installer
1.4.3Qualification of Sealant Applicator
3.5.1Inspection Check List
SD-08 Manufacturer’s Instructions
3.3Installation
SD-10 Operation and Maintenance
Data
1.2Exterior Finish System (EFS)
07 27 10.00 10 SD-02 Shop Drawings
2.1 GAir Barrier System Shop
Drawings
SD-03 Product Data
2.1 GAir Barrier System Product Data
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
07 27 10.00 10 3.1.2 GMock-Up
2.1 GMaterial Samples For Air Barrier
System
SD-05 Design Data
1.8 GDesign Data And Calculations
For The Air Barrier System
SD-06 Test Reports
1.8 GDesign Review Report
3.1.3 GTesting and Inspection
SD-07 Certificates
1.7 GAir Barrier Inspector
07 27 36 SD-01 Preconstruction Submittals
1.10.1 GQualification of Manufacturer
1.10.2 GQualification of Installer
1.11 GQuality Control Plan
1.11 GSafety Plan
1.9.1 GFire Prevention Plan
1.9.2 GRespirator Plan
SD-02 Shop Drawings
1.5Spray Foam Air Barrier
1.11 GFoam Air Barrier System
1.5.1 GFire-Rated Assemblies
SD-03 Product Data
2.1.2 GClosed Cell
2.2 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
07 27 36 2.5 GSealants
1.5.2 GSafety Data Sheets
2.1.1 GThermal Barrier Materials
2.1.1 GIgnition Barrier Coatings
2.1.6 GAccessories
2.1.2 SRecycled Content for Closed Cell
Spray Foam Air Barrier
SD-04 Samples
1.5 GSpray Foam Air Barrier
SD-06 Test Reports
1.5.4 GField Peel Adhesion Test
3.4.5.1 GThermographic Test
1.8 GAir Barrier Test
1.5.3 GPrimers
1.5.4 GFire-Ratings Of Thermal Barrier
Materials
1.5.4 GFlame Spread And Smoke
Developed Index Ratings Of SPF
Products
1.5.4 GFlame Propagation Of Wall
Assemblies
3.4.1 GSite Inspections
SD-07 Certificates
2.1.2 GClosed cell
1.10.1 GQualification of Manufacturer
1.10.2 GQualification of Installer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
07 27 36 2.2 GTransition Membrane
2.1.5 SIndoor Air Quality for Spray Foam
Air Barrier
SD-08 Manufacturer’s Instructions
1.6.1 GSPF Handling, Storage, and
Spray Procedures
3.2.1 GSubstrate Preparation
1.5.1 GThermal Barrier
2.2 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
SD-09 Manufacturer’s Field
Reports
3.3.3Daily Work Record
3.4.5Visual Inspection and Thermal
Scanning
07 56 00 SD-01 Preconstruction Submittals
1.4.3Applicator's Qualifications
1.5.3Material Compatibility
SD-03 Product Data
1.6 GFluid-Applied Roofing System
3.1.1 GFluid-Applied Roofing System
3.3.1 GFluid-Applied Roofing System
3.6Moisture Meter
SD-04 Samples
1.4.1 GFluid-Applied Roofing
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
07 56 00 1.6Fluid-Applied Roofing System
3.1.1Fluid-Applied Roofing System
3.3.1Fluid-Applied Roofing System
SD-08 Manufacturer’s Instructions
1.5.1Application Instructions
SD-11 Closeout Submittals
1.9.1Roof Membrane Manufacturer
Warranty
1.9.2Roofing System Installer
Warranty
07 84 00 SD-02 Shop Drawings
2.1Firestopping System
SD-03 Product Data
2.2Firestopping Materials
SD-06 Test Reports
3.3Inspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1Installer Qualifications
07 92 00 SD-03 Product Data
2.1Sealants
2.2Primers
2.3Bond Breakers
2.4Backstops
3.1Field Adhesion
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
07 92 00 SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
08 11 13 SD-02 Shop Drawings
2.1Doors
2.1Doors
2.1 SRecycled Content for Steel Door
Product
2.6Frames
2.6Frames
2.6 SRecycled Content for Steel Frame
Product
2.4Accessories
SD-03 Product Data
2.1Doors
2.6Frames
2.4Accessories
08 11 16 SD-02 Shop Drawings
1.5.1Door, Frame, Window Wall and
Sunshade Assembly
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
08 11 16 3.4 GDoor, Frame, Window Wall and
Sunshade
2.3.3 SRecycled Content of Aluminum
Material
SD-04 Samples
1.5.2 GFinish Samples
SD-05 Design Data
1.2.1Calculations
SD-06 Test Reports
1.2.3Air Infiltration
1.2.4Water Penetration
SD-08 Manufacturer’s Instructions
3.4 GDoor, Frame, Window Wall and
Sunshade
SD-10 Operation and Maintenance
Data
1.5.4Adjustments, Cleaning, and
Maintenance
08 14 00 SD-02 Shop Drawings
2.1Doors
SD-03 Product Data
2.1Doors
2.1.2.1 SRecycled Content for Door Cores
2.2Accessories
2.3.7Water-resistant Sealer
1.5Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
08 14 00 2.1.4Sound Transmission Class
Rating
2.1.5Fire Resistance Rating
SD-04 Samples
2.1Doors
SD-06 Test Reports
2.4Cycle-Slam
2.4Hinge Loading Resistance
SD-07 Certificates
1.3.1Certificates of Grade
2.1.1 SCertified Sustainably Harvested
Stile and Rail Wood Doors
2.1.2 SCertified Sustainably Harvested
Flush Wood Doors
SD-11 Closeout Submittals
1.5Warranty
08 31 00 SD-02 Shop Drawings
1.3Access Doors And Panels
SD-03 Product Data
1.3Access Doors And Panels
1.3.2Hardware
2.2.6Accessories
2.1 SRecycled Content
SD-04 Samples
2.5 GFinishes
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
08 31 00 1.3.1Fire-rating(s) of Assemblies
08 71 00 SD-02 Shop Drawings
1.3Manufacturer's Detail Drawings
1.3Verification of Existing Conditions
1.5Hardware Schedule
2.3.9Keying System
SD-03 Product Data
2.3Hardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5Hardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
2.2Insulating Glass
1.3Glazing Accessories
2.3.1.1Sealants
2.3.2Joint Backer
SD-04 Samples
2.2Insulating Glass
2.3.4Tape
2.3.4Sealing Tapes
SD-07 Certificates
2.2Insulating Glass
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
08 81 00 1.3.1Exterior Glazing
2.2Exterior Glazing
SD-08 Manufacturer’s Instructions
2.3Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
08 91 00 SD-02 Shop Drawings
1.4Wall louvers
1.5Wall louvers
SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.4 GWall louvers
1.5 GWall louvers
09 22 00 SD-02 Shop Drawings
2.1Metal Support Systems
SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 26 00 SD-03 Product Data
2.1.1Gypsum Veneer Plaster
09 29 00 SD-03 Product Data
2.1.3Cementitious Backer Units
2.1.2Abuse Resistant Gypsum Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
09 29 00 2.1.7Accessories
2.1.1Gypsum Board
2.1.1 SRecycled Content for Gypsum
Board
2.1.4 SVOC Content of Joint Compound
SD-07 Certificates
2.1Asbestos Free Materials
2.1.1 SIndoor Air Quality for Gypsum
Board
SD-08 Manufacturer’s Instructions
2.1Safety Data Sheets
09 30 10 SD-03 Product Data
2.1.1Porcelain Tile
2.1.1 SRecycled Content for Porcelain
Tile
2.1.2Glass Tile
2.1.2 SRecycled Content for Glass Tile
2.1.3Glazed Wall Tile
2.1.3 SRecycled Content for Glazed Wall
Tile
2.2Setting-Bed
2.4Mortar and Grout
2.2.5Reinforcing Wire Fabric
SD-04 Samples
2.1 GTile
2.1 GTransition Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
09 30 10 2.5 GTransition Strips
GGrout
SD-07 Certificates
SIndoor Air Quality for Sealants
SD-10 Operation and Maintenance
Data
3.2Installation
09 51 00 SD-02 Shop Drawings
2.1Detail Drawings
SD-03 Product Data
Acoustical Ceiling Systems
2.2.1.1 SRecycled Content for Ceiling
Tiles
2.3.1 SRecycled Content for Suspension
Systems
SD-04 Samples
2.2 GAcoustical Units
SD-07 Certificates
2.2.1.1 SIndoor Air Quality for Ceiling Tiles
2.7 SIndoor Air Quality for Sealants
09 65 00 SD-03 Product Data
2.7Resilient Flooring and
Accessories
2.4Adhesives
2.1Luxury Vinyl Tile
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
09 65 00 2.1 SRecycled content for Luxury Vinyl
Tile
2.2Wall Base
SD-04 Samples
2.7 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3Moisture, Alkalinity and Bond
Tests
SD-07 Certificates
2.1 SIndoor Air Quality for Luxury Vinyl
Tile
2.4 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2Surface Preparation
3.1Installation
SD-10 Operation and Maintenance
Data
2.7Resilient Flooring and
Accessories
09 90 00 SD-02 Shop Drawings
3.10Piping Identification
SD-03 Product Data
2.1Coating
SD-04 Samples
1.11 GColor
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
09 90 00 SD-07 Certificates
1.4Applicator's Qualifications
2.1Indoor Air Quality for Paints and
Primers
2.1Indoor Air Quality for
Consolidated Latex Paints
SD-08 Manufacturer’s Instructions
3.6.2Mixing
1.8.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1Coatings
10 14 00.20 SD-02 Shop Drawings
1.3.2Detail Drawings
SD-03 Product Data
3.1Installation
1.5Warranty
SD-04 Samples
1.3.1Plaque Signage
SD-10 Operation and Maintenance
Data
3.1.2 GProtection and Cleaning
10 14 53 SD-03 Product Data
2.1Traffic Sign Posts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
10 14 53 2.3Traffic Sign Retroreflective
Sheeting
SD-04 Samples
2.5.2Flexible Posts
10 26 00 SD-02 Shop Drawings
2.2Corner Guards
SD-03 Product Data
2.2Corner Guards
SD-04 Samples
2.3 GFinish
SD-06 Test Reports
2.2Corner Guards
SD-07 Certificates
2.2Corner Guards
2.4 SIndoor air quality for adhesives
10 28 13 SD-03 Product Data
2.1.2Finishes
2.1Accessory Item
2.1 SRecycled content for stainless
steel toilet accessories
SD-04 Samples
2.1.2 GFinishes
2.2Accessory Items
SD-07 Certificates
2.2Accessory Items
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
10 28 13 SD-10 Operation and Maintenance
Data
2.1Accessory Units
10 71 13.13 SD-02 Shop Drawings
2.2.1Roll shutters
2.2shutters
SD-03 Product Data
2.2.1Roll shutters
SD-04 Samples
2.2 GShutters
SD-10 Operation and Maintenance
Data
2.2 GShutters
SD-11 Closeout Submittals
1.6.1Removable shutter location drawings
12 24 13 SD-02 Shop Drawings
3.2Installation
SD-03 Product Data
2.1Window Shades
2.1 SRecycled Content for various
fiber components
SD-04 Samples
2.1 GWindow Shades
SD-06 Test Reports
2.1Window Shades
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
12 24 13 SD-07 Certificates
2.1 SIndoor Air Quality for roller
window shades
SD-08 Manufacturer’s Instructions
2.1Window Shades
SD-10 Operation and Maintenance
Data
2.1Window Shades
SD-11 Closeout Submittals
1.7Warranty
12 48 13 SD-02 Shop Drawings
3.2Installation Drawings
3.2Detail Drawings
SD-03 Product Data
2.1.1Entrance Floor Mats and Frames
2.1.2 GAdhesives and Concrete Primers
SD-04 Samples
2.1.1 GEntrance Floor Mats and Frames
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Instructions
SD-10 Operation and Maintenance
Data
3.2Protection, Maintenance, and
Repair Information
12 93 00 SD-02 Shop Drawings
2.5 GBenches
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
12 93 00 2.6 GBicycle Racks
1.3.3Assembly Instruction Drawings
SD-03 Product Data
2.5Benches
2.6Bicycle Racks
2.7Waste Receptacles
SD-04 Samples
2.3.4 GFinish
SD-06 Test Reports
3.3Testing
SD-07 Certificates
1.3.4Primer Certificate
1.3.5Powder Coatings Certificate
14 21 23 SD-02 Shop Drawings
2.1 GElevator
1.2.1 GElevator Components
1.2.2 GElevator Components
1.2.1 GElevator Machine
1.2.1 GElevator Controller
1.3.4 GWiring Diagrams
SD-03 Product Data
2.1 GElevator
1.2.1 GElevator Components
1.2.2 GElevator Components
1.2.2 GData Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
14 21 23 2.5.2 GElevator Microprocessor
Controller
SD-05 Design Data
1.2.3.3Emergency Power Systems
1.2.3.2Heat Loads
1.2.3.1Reaction Loads
SD-07 Certificates
1.3.2 GPrice Lists
1.4Warranty
1.3.1.1Endorsement Letter
1.2.4Welders' Qualifications
2.5.2.3 GElevator Controller Certification
SD-10 Operation and Maintenance
Data
2.1 GElevator
1.2.5 GMaintenance Control Program
(MCP)
2.5.2.2 GSoftware and Documentation
21 12 00 SD-02 Shop Drawings
1.4.4Standpipe system
SD-03 Product Data
2.1.1Pipe and fittings
2.1.1Mechanical couplings
2.1.2Pipe hangers and supports
2.1.3Valves
2.1.8Fire department connections
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
21 12 00 2.1.9Valve tamper switch
2.2.1Buried Pipe and fittings
SD-06 Test Reports
3.8.1Preliminary tests
3.8.2Acceptance tests
SD-07 Certificates
1.6.1Qualifications of installer
SD-11 Closeout Submittals
1.6.2 GSystem as-built drawings
21 13 13.00 20 SD-02 Shop Drawings
1.5.2Shop Drawings
SD-03 Product Data
2.2.1Pipe
2.2.1Fittings
2.2.5Valves
2.2.4Sprinklers
2.2.6Pipe hangers and supports
2.3.1Sprinkler Alarm Switches
2.2.7Fire department connections
2.2.1Mechanical couplings
2.2.8Backflow Prevention Assembly
2.2.6Seismic Bracing
SD-05 Design Data
1.3Hydraulic Calculations
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
21 13 13.00 20 3.6request to schedule Preliminary
Tests
3.6Preliminary Test Report
3.7request to schedule Final
Acceptance Test
SD-07 Certificates
3.1Inspection by Fire Protection
Engineer
1.5.1Fire Protection Engineer
1.5.2Sprinkler System Installer
SD-10 Operation and Maintenance
Data
3.8Operating and Maintenance
Instructions
SD-11 Closeout Submittals
1.5.2As-built drawings
3.8On-site training
22 00 00 SD-02 Shop Drawings
3.9.1 GPlumbing System
SD-03 Product Data
2.1 SRecycled Content for Steel Pipe
2.4Fixtures
2.4.2Flush Valve Water Closets
2.4.2 SWaterSense Label for Flush
Valve Water Closet
2.4.3Flush Valve Urinals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 91 PAGES
J-023 BACHELOR OFFICER QUARTERS-A
22 00 00 2.4.3 SWaterSense Label for Urinal
2.4.4Flush Tank Water Closets
2.4.4 SWaterSense Label for Flush Tank
Water Closet
2.4.5Wall Hung Lavatories
2.4.6Countertop Lavatories
2.4.7Kitchen Sinks
2.4.8Service Sinks
2.4.9 GDrinking-Water Coolers
2.4.9 SEnergy Star Label for Electric
Water Cooler
2.6.2 SWaterSense Label for
Showerhead
2.4.11Plastic Bathtub Liners
2.4.12Plastic Bathtub Wall Surrounds
2.9 GWater Heaters
2.11 GPumps
3.9.1.1 GBackflow Prevention Assemblies
2.6.2 GShower Faucets
1.5.1Welding
3.4 GVibration-Absorbing Features
3.9.1Plumbing System
SD-06 Test Reports
3.9Tests, Flushing and Disinfection
3.9.1.1 GTest of Backflow Prevention
Assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS…