21R1334-Note1-Final.pdf

PDF 24 KB Posted

Attached to
J-023 BACHELOR OFFICER QUARTERS-A, US NAVSUPPACT MCB, GUAM
Solicitation number
N62742-21-R-1334
Issued by

About this file

This notice provides responses to questions from offerors on solicitation number N62742-21-R-1334 from the Department of the Navy Naval Facilities Engineering Command. The solicitation is for the construction of a multi-story housing tower and detached utility building to serve as Bachelor Officer Quarters on Marine Corps Base Guam. The work includes single-occupancy housing units, common areas, multipurpose spaces, and associated site work. Questions covered scheduling and cancelling an in-person site visit, requesting drawings and specifications, and clarifying details of floor and wall finishes, signage, and landscaping elements. Responses deferred action on some questions and indicated information would be provided in future amendments to the solicitation.

View the file

Other files

File Type Posted
Class JA for ECC Elevator Control Systems 20210419 REDACTED.pdf PDF
AMD 0009 21R1334.pdf PDF
21R1334 Note 7 Final.pdf PDF
AMD 0008 21R1334.pdf PDF
21R1334 Note 6 Final.pdf PDF
Amd 07 Rev Dwgs.pdf PDF
AMD 0007 21R1334.pdf PDF
21R1334 Note 5 Final.pdf PDF
Amd 06 rev Dwgs-a.pdf PDF
AMD 0006 21R1334.pdf PDF
Amd 05 Rev DWGS.pdf PDF
AMD 0005 21R1334.pdf PDF
21R1334-Note 4 Final.pdf PDF
Amd 04 revised DWGS.pdf PDF
Amd 03 Civil DWGS reissued.pdf PDF
AMD 0004 21R1334.pdf PDF
Amd 02 Civil DWGS reissued.pdf PDF
21R1334-Note3 Final.pdf PDF
AMD 03 21R1334.pdf PDF
Amd 03 Rev Spec Sections.pdf PDF
Amd 03 Rev DWGS.pdf PDF
Class JA for Dormakaba RFID Locking System_REDACTED.pdf PDF
21R1334-Note2-Final.pdf PDF
Amd 02 BOQ A AMD 02 DWGS_R1 signed.pdf PDF
AMD 02 21R1334.pdf PDF
Amd 02 BOQ A Civil Dwgs - Reissued.pdf PDF
Amd 01 IMAGE 26 NOV 2020.pdf PDF
Amd 01 1A-5B-1.pdf PDF
Amd 01 6A-8C-1.pdf PDF
AMD 01 21R1334.pdf PDF
Amd 01 J023 site photo key.pdf PDF
J-023 BOQ A Specifications_Signed Off_Volume 2 of 2_.pdf PDF
Class JA - Fed Signal-redacted.pdf PDF
J-023 BOQ A Specifications_Signed Off_Volume 1 of 2_.pdf PDF
Class JA King F Transmitters-Redacted.pdf PDF
J-023 BOQ A Drawings_Signed Off_4 of 4_Electrical Telecommunications.pdf PDF
J-023 BOQ A Drawings_Signed Off_1 of 4_Civil Structural.pdf PDF
MCBG Knox Box Class JA_Redacted.pdf PDF
JA BEQs-BOQs RFID Vingcard-Redacted.pdf PDF
Class JA No 20-016 for AMI Meter (Redacted) w Att A.pdf PDF
N62742-21-R-1334 Front End.pdf PDF
J-023 BOQ A Drawings_Signed Off_3 of 4_Fire Protection Mechanical Plumbing.pdf PDF
J-023 BOQ A Drawings_Signed Off_2 of 4_Architectural Interiors.pdf PDF
Class JA for JCI METASYS (20200626)_Redacted.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING COMMAND, PACIFIC

258 MAKALAPA DR., STE. 100

PEARL HARBOR, HI 96860-3134

Notice No. 1 12 January 2021

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-21-R-1334

J-023 BACHELOR OFFICER QUARTERS-A,

US NAVSUPPACT MCB, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.

1. Referenced form beta.SAM.gov, in the Description it stated that “The in-person site visit is cancelled”. But the RFP document “N62742-21-R-1334+Front+End”, page 25-26, 1.21 FAR 52.236-27, SITE VISIT (CONSTRUCTION) (FEB 1995) states that “(b) a one-time site pre-proposal site visit has been scheduled for January 12, 2021 0900, ChST”. Please clarify if the site visit is cancelled?

RESP: Yes, see Amendment 0001.

2. Since the site visit won’t be in any of the three bases on island, I wonder what base credential is required. Currently, our two attendees for the site walk already have access to Andersen Air Force Base, Naval Base Guam and NCTC. Please clarify if they still need to complete all the site visit forms attached in the RFP besides providing their names.

RESP: The in-person site visit is cancelled. Instead, we will be issuing photos of the site. See Amendment 0001.

3. The camera pass issued with the pre-solicitation lists RFP N62742-20-R-1317 P-317 Combined EOD Compound as the project. Will you be issuing a corrected form to reflect J-023

BOQ-A?

RESP: The in-person site visit is cancelled. Instead, we will be issuing photos of the site. See Amendment 0001.

4. Many of the drawing sheets issued with the solicitation were marked “conceptual and not released for construction”; can we expect to receive scaled full size construction drawings?

RESP: Markings “Drawings are conceptual and not released for construction” will be removed after the Government receives the site specific geotechnical and topographic surveys. Base bids on the drawings as provided. The civil drawings are based on information obtained from the J- 001B project.

5. Spec section 01 14 00, Missing pages, In the RFP documents provided, it appears spec section 01 14 00 “Work Restrictions” is incomplete. If so, please provide page 5 and onward to complete the section

RESP: Section 01 14 00 is replaced in its entirety. See Amendment 0002.

6. Spec section 01 11 00, para 1.1.1, Project Description, Please change to reflect one BOQ.

RESP: See Amendment 0002.

7. RFP Drawings V-001 to V-003 (V-102), Topographic Survey Drawing Sheets, RFP Drawings V-001 to V-003 do not contain any information regarding the topographic survey. Please provide sheets with the pertinent information. Additionally, the sheet numbers in the index do not match the sheet number on the drawing sheets.

RESP: The design is based on J-001B’s grading design. Base bids on the design provided.

Drawing index will be revised. See Amendment 0002.

8. RFP Drawings B-101 to B-108, Boring Drawing Sheets, The RFP drawing sheets B-101 to B- 108 contain no information. Please provide approved for construction sheets for the boring drawing sheets

RESP: The design is based on J-001B geographical information in the vicinity of the project site. Base bids on the design provided.

9. RFP Drawings CD101 to CU605, Civil Drawing Sheets, The drawings contained in the RFP are noted as “Conceptual and not released for construction” and appear to be scanned with much of the sheets being illegible. Being that the quantity and scope of the civil components of this project are vast and more complex than the typical projects on the Camp Blaz site, we respectfully ask for approved for construction sheets with legible lines and wording as soon as possible.

RESP: Base bids on the drawings provided. The civil drawings are based on information obtained from the J-001B project. DWGS CD101 to CU605 will be re-issued. See Amendment 0002.

10. Amendment 0001, Photo Date and Missing Photo, Please provide date that photos were taken, and provide photo 4A.

RESP: Photographs were taken on December 29, 2020. The satellite image is from 26 November 2020. As noted in Amendment 0001, Photo 4A was not provided. The photo file was damaged and could not be recovered.

11. Amendment 0001, J-001B Bedrock Determination, Please provide Bedrock determination map from J-001B project for the BOQ project site, if any.

RESP: Bedrock determination for Area 70 will be provided. See Amendment 0002.

12. Amendment 0001, J-001B Grading and Utility Reference Plans, J-001B Grading and Utility Reference Plans. Please provide grading and utility reference plans form the J-001B project for the BOQ project site.

RESP: The civil design is based on the J-001B Final Design Submittal.

13. Ref. Drawings A-141 & A-631, Ceiling Finish for MGR Room 124. Ceiling Finish for MGR Room as indicated in Ref. Drawing A-141 is Gypsum Board on Metal Framing while Ref.

Drawing A-631 Room Finish Schedule is ACT-1 (Acoustical Ceiling Tile). Please confirm which will govern.

RESP: ACT-1 is correct. See Amendment 0002.

14. Ref, Drawings IN401, A-621 & A-631, Floor Finish for Typical Units, Accessible Units.

Floor Finish for Typical and Accessible Units as indicated in Ref. Drawing IN401 is LVT- 1/LVT-5 (Luxury Vinyl Tile). LVT-5 is not shown in Material Finish Schedule and Room Finish Schedule Ref. Drawings: A-621 & A-631 respectively. Please clarify.

RESP: Removed LVT-5 from IN401. See Amendment 0002.

15. Ref. Drawings A-114 & A-124, Corner Guards. Corner Guards are indicated in Elevator Lobby & Lobby Area at First Floor (Ref. Drawing A-114), Are Corner Guards required in Elevator Lobby Area at 2nd floor to 5th Floor?

RESP: Yes, corner guards will be required at 2nd floor to 5th floor. See Amendment 0002.

16. Specification 10 28 13 Paragraph 2.2.9, Toilet Accessories. Soap Holder (SH) is specified in the Specification 10 28 13 Paragraph 2.2.9, Please indicate its location in the drawings

RESP: See Amendment 0002.

17. RFP Drawing detail A3/LP502, Barbeque Grill. Please provide specification for Barbeque Grill and width of concrete embedment.

RESP: Response is deferred.

18. RFP Drawing Detail, A1/LP502, Hot Ash Receptacle. Please provide specification for Hot Ash Receptacle.

RESP: Response is deferred.

19. RFP Drawing Detail, A1/LP502, Building (Site) Identification Sign and Foundation. Is a building (Site) Identification Sign required? If so, please provide detail and specification.

RESP: Response is deferred.

20. RFP Drawing Detail, A1/LP502, Two-Way Directional Site Signage. Are any two-way directional site signs required? If so, please provide detail and specification.

RESP: Response is deferred.

21. RFP Drawings CS101, CS104 & LP101, LP102, LP103, LP601, Concrete Paving Locations

– Landscape vs Civil Plans. The Civil Plans show Concrete Paving Herringbone Pattern at the two small pavilion and two concrete bench pad locations, whereas the Landscaping plans show regular concrete. Please confirm if Concrete paving is required at these 4 locations, and confirm or change the landscape plan quantity on drawing LP601 to reflect the answer.

RESP: Response is deferred.

22. RFP Drawing A-102 & LP103, Elongated Rectangle at Western BBQ Pavilion on Dw. A-

102. On RFP Drawing Sheet A-102, there appears to be an elongated rectangle depicted at the west BBQ Pavilion that is not shown on civil or landscaping plans. Please confirm there is no structure and to follow the landscaping plan LP103.

RESP: Response is deferred.

23. RFP Drawings CS series, Detail 3 / CS506. Please provide a signage schedule for all site signage required on this project (entrance drives, parking, firelane, walkways, etc).

RESP: Response is deferred.

24. RFP Drawing CS508 & E-502, Transformer Enclosure Floor. RFP Drawing Sheet E-502, detail 2, calls out for “Concrete floor throughout interior of enclosure” and note 2 states to refer to civil drawings for detail of concrete enclosure and concrete pad. Sheet CS508 details 3 and 4 indicate 75 mm deep crushed rock surrounding the transformer equipment pad. Please confirm the floor surrounding the transformer pad and provide adjusted details, if needed.

RESP: Response is deferred.

25. RFP Drawing CS501, Valley Gutter Reinforcement. Detail 10/CS501 does not indicate reinforcement in the PCC pavement concrete at the valley gutters. Please confirm no reinforcement is needed.

RESP: Response is deferred.

26. RFP Drawing CS403, PCC Pavement Joint Dowels. Please confirm if dowels are to be placed in PCC Pavement driveways and PCC fire lanes. Please indicate which joints are to receive the dowels and provide detail with dowel size, length, and spacing.

27. RFP Drawing CS501 detail 2, Subbase at HMA Parking Lot Pavement Section. Detail 2 on RFP Drawing CS501 shows 300 mm thick Subbase Course. Please provide specification for subbase material.

RESP: Response is deferred.

28. Request for Extension to Proposal Due Date. The absence of a complete and legible set of civil drawings categorized as “approved for construction’ is impeding the preparations of quantity takeoffs and the resultant outreach for vendor and subcontract quotes. The preparation period is further impacted by the travel restrictions to/from Hawaii imposed by the COVID pandemic. Delivery of the tender package requires the Offeror to submit ahead of time via express mail as appose to hand deliver on the due closing date.

QUESTION:

Given these challenges we respectfully request that the Proposal Due Date be extended by four weeks.

RESP: Response is deferred.

29. SECTION 01 30 02.00 20 – FURNITURE, FIXTURES & EQUIPMENT. Prime Contractor’s Interior Designers. Section 01 30 02.00 20 para 1.2, calls for the Prime Contractor to submit the qualifications for the Prime Contractor’s Interior Designer. Little more is said thereafter to describe the contribution of the contractor’s interior designer in the procurement & installation of the FF&E package beyond attendance at the two punch list site visits. The following para 1.3, General Requirements, infers that NAVFAC’s interior Designer/Collateral Equipment Manager shall develop the final FF&E package.

QUESTION:

Is the Prime Contractor required to engage the services of an Interior Designer? If so, please provide a description of their role & responsibility in order to facilitate a realistic cost assessment.

End of Notice

File details come from the government source that posted it. Updated .