AMD 0004 21R1334.pdf
PDF 663 KB Posted
- Solicitation number
- N62742-21-R-1334
About this file
This federal solicitation requests proposals for the construction of a Bachelor Officers Quarters facility on Marine Corps Base Guam. Key details include:
-
The project scope involves construction of a multi-story housing tower with single-occupancy units, common areas, a one-story common area wing, and a detached utility building to provide living quarters for unmarried military officers.
-
The solicitation was issued on December 17, 2021 by the Department of the Navy Naval Facilities Engineering Command. Proposals are due based on amended response dates.
-
The construction work will be awarded on a design-bid-build basis. Pricing terms and any set-asides were not specified in the document provided.
-
The facility is intended to house approximately 200 officers and include associated housing, common space, office, mechanical and support areas. Completion is required to support military base expansion and realignment plans.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
972483
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N62742-21-R-1334, Amendment 0004
See Next Page
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Feb-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274221R1334
X 9B. DATED (SEE ITEM 11)
17-Dec-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Feb-2021
CODE
HAND DELIVER
NAVFAC PACIFIC
CONSTRUCTION CONTRACTS BR (ACQ33)
4256 RADFORD DR, BLDG 62
HONOLULU HI 96818-3296
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
J-023 BACHELOR OFFICER QUARTERS-A WON 972483
US NAVSUPPACT MCB, GUAM
Amendment 0004
SF 30 BLOCK 14 CONTINUATION PAGE
This amendment is issued as follows:
1. Wherever shown throughout the RFP, revise the project title to read as follows:
J-023 BACHELOR OFFICER QUARTERS-A, US NAVSUPPACT MCB, GUAM
2. Wherever shown throughout the RFP, delete the following in its entirety:
Unclassified – For Official Use Only
3. Document 00100, paragraph 1.1.a., b., and c., are revised to read as follows. Subparagraphs under paragraphs a., b., and c. remain unchanged.
a. PRICE PROPOSAL (PAPER): An original paper and one (1) paper copy of the price proposal shall be submitted on 31 March 2021, 2:00 p.m., H.S.T. in a sealed envelope and marked in the bottom right corner
"PRICE PROPOSAL SUBMITTED UNDER RFP N62742-21-R-1334 - DO NOT OPEN IN MAILROOM."
The PRICE PROPOSAL shall include the following:
b. TECHNICAL: (FACTORS 1, 2, AND 3)(PAPER): An original paper and three (3) paper copies of the technical proposals shall be submitted on 31 March 2021, 2:00 p.m., H.S.T. in a sealed envelope/package/box and marked in the bottom right corner "TECHNICAL PROPOSAL SUBMITTED UNDER RFP N62742-21-R- 1334 - DO NOT OPEN IN MAILROOM." Identify the original proposal as "Original" on the cover of the proposal. The TECHNICAL PROPOSAL shall be submitted in a three-ring binder with table of contents and tabbed. The TECHNICAL PROPOSAL shall include the following:
c. SUBCONTRACTING PLAN (PAPER): An original paper and one (1) paper copy of the subcontracting plan shall be submitted by 01 April 2021, 2:00 p.m., H.S.T. in a sealed envelope/package/box and marked in the bottom right corner "SUBCONTRACTING PLAN SUBMITTED UNDER RFP N62742-21-R-1334 - DO NOT OPEN IN MAILROOM." Identify the original proposal as "Original" on the cover of the proposal.
4. Document 00700, Clause 1.92 FAR 52.2238-15 Performance and Payment Bonds-Construction (JUN 2020)(Deviation 2020-O0016) is deleted in its entirety and replaced with the following:
1.92 FAR 52.228-15, PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (JUN 2020)(DEVIATION 2020-O0016)
(a) Definitions. As used in this clause-
Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is $150,000 of less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25, except that no seal is required). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25A, except that no seal is required). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection.
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitments supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:
U.S. Department of the Treasury, Financial Management Service, Surety Bond Branch, 3700 East West Highway, Room 6 F01, Hyattsville, MD 20782.
Or via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
5. Document 00800, Special Contract Requirements is revised as follows:
a. Paragraph 1.5, Notice Concerning Labor Rates, first paragraph deleted in its entirety and replaced with the following:
The Construction Wage Requirements statute (formerly known as the Davis-Bacon Act) will apply. The attached Guam General Decision Number: GU20210002, Publication Date 01/01/2021 will remain in effect for the duration of the project, unless modified.
b. Delete General Decision Number GU20200002, Publication Date 12/25/2020 and replace it with the attached General Decision Number GU20210002, Publication Date 01/01/2021.
6. Illegible Civil drawings issued under Amendment 0002 are reissued under this Amendment 0004.
7. Illegible Civil drawings issued under Amendment 0003 are reissued under this Amendment 0004.
8. Section 06 20 00 is revised as follows:
a. Add paragraph 2.2.2, after paragraph 2.2.1 as follows:
Fixed shelves at closet must be birch wood and be painted per 09 90 00 Paints and Coatings.
b. Paragraph 2.5.3 is deleted in its entirety and replaced with the following:
Stainless steel rods, not less than 32mm diameter by 1.3mm thick. Provide intermediate support brackets for rods more than 1200mm long.
c. Paragraph 3.2, 1st sentence is deleted in its entirety and replaced with the following:
Provide fixed shelves as indicated.
9. Section 08 71 00 Door Hardware, Hardware Sets is revised to add the following after Set: 27.0:
Set: 28.0
3 Hinge (A5111 NRP) TA2314 NRP 114mm x 114mm US32D MK 1 Fail Secure Lock RX 64 8271-XXV LNL US32D SA 1 Core (LFIC 6Pin) 6300 US15 SA 1 Surface Closer (CO2021) CPS7500 600 689 NO 1 Threshold (A156.21) 2005AT WIDTH PE 1 Rain Guard (A156.22) 346C WIDTH PE 1 Gasketing (A156.22) S88BL 1WIDTH x 2HEIGHT PE 1 Sweep (with rain guard) (A156.22) 345AV WIDTH PE
10. Section 22 31 00 is revised as follows:
a. Paragraph 2.2.2. is deleted in its entirety and replaced with the following:
Softener tank shall be a minimum of 1000 mm in diameter by 1500 mm straight shell (tangent line to tangent line). Shell shall be designed for a working pressure of 860 kPa. Tank shall be constructed of corrosion resistant RFP construction conforming to NSF/ ANSI 61.
b. Paragraph 2.3.1, 1st sentence is deleted in its entirety and replaced with the following:
Each saturator, brine or combined-purpose tank shall be fabricated from corrosion-resistant, rigid polyethylene, conforming to NSF/ANSI Standard 44 and 61.
11. Section 23 64 10 is deleted in its entirety and replaced with the attached Section 23 64 10.
12. Section 26 12 19.10, paragraph 2.2.1.1.e., third line, revise “three arrestors” to “six arrestors”
13. Section 26 20 00, paragraph 2.4.1 b. is deleted in its entirety and replaced with the following:
Each outlet: consisting of cast-metal body with threaded openings, for conduits, adjustable, brass flange ring, and cover.
14. Section 26 27 14.00 20 is revised as follows:
a. Add paragraph 1.8, Related Requirements after 1.7.2 as follows:
Related Requirements
Section 25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS and Section
25 08 11.00 20 RISK MANAGEMENT FRAMEWORK FOR FACILITY-RELATED CONTROL
SYSTEMS apply to this section except as modified herein.
b. Paragraph 2.1, last sentence is deleted in its entirety and replaced with the following:
Provide the approved AMI Electrical Meter: Schneider Electric Powerlogic ION 8650B, 64MB memory.
Notwithstanding any other provision of this contract, no other product will be acceptable.
15. Section 26 32 13.00 20 is revised as follows:
a. Paragraph 1.1, References, Institute of Electrical and Electronic Engineers (IEEE), International Code Council (ICC), ICC IBC (2015) International Building Code is deleted in its entirety and replaced with the following:
International Code Council (ICC), ICC IBC (2018) International Building Code
b. Paragraph 1.2. is deleted in its entirety and replaced with the following:
Section 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS, and Section 26 08 00 APPARATUS INSPECTION AND TESTING, Section 25 05 11 CYBERSECURITY FOR FACILITY- RELATED CONTROL SYSTEM and Section 25 08 11.00 20 RISK MANAGEMENT FRAMEWORK FOR FACILITY-RELATED CONTROL SYSTEMS apply to this section except as modified herein.
16. Section 26 36 23.00 20, paragraph 1.2. is deleted in its entirety and replaced with the following:
Section 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS, and Section 26 08 00 APPARATUS INSPECTION AND TESTING, Section 25 05 11 CYBERSECURITY FOR FACILITY- RELATED CONTROL SYSTEM and Section 25 08 11.00 20 RISK MANAGEMENT FRAMEWORK FOR FACILITY-RELATED CONTROL SYSTEMS apply to this section, with the additions and modifications specified herein.
17. Section 26 51 00 is revised as follows:
a. Paragraph 1.4 is revised to add the following as the last sentence:
Data, drawings, and reports must employ the terminology, classification and methods prescribed by the IES HB-10 as applicable, for the lighting system specified.
b. Paragraph 2.6.1.1,1st and 2nd sentences are deleted in their entirety and replaced with the following:
Provide in painted, diecast aluminum housing with UL damp label, configured for universal mounting.
Provide edge-lit type with clear acrylic, edge-lit face and aluminum trim having clear aluminum finish as indicated.
c. Paragraph 2.6.2, 3rd sentence is deleted in its entirety and replaced with the following:
Integral nickel-cadmium battery is required to supply a minimum of 90 minutes of emergency power as indicated.
18. Section 31 31 16.19 is revised to delete the following paragraphs in their entirety: 2.1.2, 2.2.4 and 3.3.2.
19. Section 31 32 23, paragraph 3.2.3.2 is deleted in its entirety and replaced with the following:
Holes shall be backfilled with grout proportioned as directed by the Contracting Officer and generally having a water/cement ratio less than 1.0. The backfilling shall be accomplished by injection of grout through a tremie pipe or hose inserted to full depth of hole. Gravity pour method may be used provided a tremie pipe is used. When grout vents at the surface, the tremie shall be gradually withdrawn, maintaining grout in the pipe or hose until completely removed. Holes containing freshly injected grout shall not be backfilled until the injected grout has set.
20. Section 33 05 23.13 is deleted in its entirety.
21. Section 33 71 02 is revised as follows:
a. Part 1.4 SD-03, add the following after “Cable supports (racks, arms and insulators); G”:
Protective Devices and Coordination Study; G. The study must be submitted with protective device equipment submittals. No time extension or similar contract modifications will be granted for work arising out of the requirements for this study. Approval of protective devices proposed must not be held responsible for any changes to equipment, device ratings settings, or additional labor for installation of equipment or devices ordered or procured prior to approval of the study.
b. Part 1.4 SD-06 Test Reports is revised to add the following:
Provide six copies of test reports.
c. Part 2, add the following after paragraph 2.1.6.4:
2.17. PROTECTIVE DEVICES AND COORDINATION. Provide protective devices and coordination as specified in Section 26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION.
22. The following previously issued drawings dated 12/04/2020 are revised by narrative description:
NO.
SHEET
NO.
NAVFAC
NO.
REVISIONS
1 CS403 17255261
Added to general notes: 2. At the 230mm thick PCC odd shaped slabs, provide 152x152 MW18.7/18.7” wire fabric
2 CS501 17255262
Detail 5 PCC Sidewalk/Maintenance Strip - revised callout from 150 x 150-W1.4XW1.4 WWF, to 152x152 MW9.1/9.1
3 S-301 17255337 Revised its sheet title as follows: FOUNDATION DETAILS
23. Revised Drawings: The following previously issued drawings are deleted in their entirety and replaced with the following. These revised drawings supersede any previously issued drawings:
NO.
SHEET
NO.
NAVFAC
NO.
DESCRIPTION
1 CG201 17255247 Updated for utility bldg and maintenance yard moves
2 CG401 17255249 Updated for utility bldg and maintenance yard moves
3 CS101 17255256 Updated for utility bldg and maintenance yard moves
4 CS401 17255259 Updated for utility bldg and maintenance yard moves
5 CS601 17255271 Updated for utility bldg and maintenance yard moves
6 CU101 17255272 Updated for utility bldg and maintenance yard moves
7 CU201 17255274 Updated for utility bldg and maintenance yard moves
8 CU202 17255275 Updated for utility bldg and maintenance yard moves
9 CU203 17255276 Updated for utility bldg and maintenance yard moves
10 CU601 17255282 Updated for utility bldg and maintenance yard moves
11 CU602 17255283 Updated for utility bldg and maintenance yard moves
12 CU603 17255284 Updated for utility bldg and maintenance yard moves
13 CU604 17255285 Updated for utility bldg and maintenance yard moves
14 A-114 17255356 Modified Window Tags
15 A-123 17255363 Modified Window Tags
16 A-124 17255364 Modified Window Tags
17 A-125 17255365 Modified Window Tags
18 A-202 17255377 Added Reference/Sim Tag
19 A-221 17255380 Sunshade Note, WW Tag Edit
20 A-222 17255381 Added Sunshade Note
21 A-316 17255414 Sill HT Added to D/602 & 605
22 A-317 17255390 Soffit Depth Edit
23 A-401 17255391 Closet Shelf Height/Depth ADJ
24 A-402 17255392 Closet Shelf Height/Depth ADJ
25 A-403 17255393 Closet Shelf Height/Depth ADJ
26 A-501 17255399 Threshold Detail Added
27 A-514 17255407 Soffit Depth Edit
28 A-533 17255413 Removed Detail
29 A-534 17255414 Accessible Closet Detail Added
30 A-602 17255419 602/605 Door Edits
31 P-114 17255521 Revised Mech Plant
32 P-713 17255553 Revised Mech Plant
33 P-727 17255554 Revised Schematic
24. All other terms and conditions remain unchanged.
End of Amendment
1/5/2021 beta.SAM.gov | Search https://beta.sam.gov/wage-determination/GU20210002/0?keywords=guam&sort=-relevance&index=wd&is_active=true&page=1 1/4
"General Decision Number: GU20210002 01/01/2021
Superseded General Decision Number: GU20200002
State: Guam
Construction Type: Building Building Construction (Applies only to projects funded under the National Defense Authorization Act of 2010 - Guam Realignment Fund - Defense Policy Review Initiative) BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories)
County: Guam Statewide.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021
SUGU2019-001 03/20/2020
Rates Fringes
CARPENTER, Includes Form Work....$ 15.78 0.00
CEMENT MASON/CONCRETE FINISHER...$ 14.34 0.00
ELECTRICIAN......................$ 18.11 0.00
HVAC TECHNICIAN (HVAC Unit Installation)....................$ 14.74 4.69
IRONWORKER, REINFORCING..........$ 15.45 0.00
LABORER: Common or General......$ 10.72 0.00 https://beta.sam.gov/wage-determination/GU20210002/0?keywords=guam&sort=-relevance&index=wd&is_active=true&page=1 2/4
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 17.12 0.00
PAINTER (Brush and Roller).......$ 14.95 0.00
PLUMBER..........................$ 17.20 0.49
SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 16.06 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the https://beta.sam.gov/wage-determination/GU20210002/0?keywords=guam&sort=-relevance&index=wd&is_active=true&page=1 3/4 most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
https://beta.sam.gov/wage-determination/GU20210002/0?keywords=guam&sort=-relevance&index=wd&is_active=true&page=1 4/4 and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
MAMIZU IDIQ J-023 & J-034 BOQ, A & B, MCB GUAM 972483
MARINE CORPS BASE, GUAM
SECTION 23 64 10
WATER CHILLERS, VAPOR COMPRESSION TYPE
11/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI 550/590 I-P (2015; ERTA 2016) Performance Rating Of Water-Chilling and Heat Pump Water-Heating Packages Using the Vapor Compression Cycle
AMERICAN BEARING MANUFACTURERS ASSOCIATION (ABMA)
ABMA 9 (2015) Load Ratings and Fatigue Life for Ball Bearings
ABMA 11 (2014) Load Ratings and Fatigue Life for Roller Bearings
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ANSI/ASHRAE 15 & 34 (2016) ANSI/ASHRAE Standard 15-Safety Standard for Refrigeration Systems and ANSI/ASHRAE Standard 34-Designation and Safety Classification of Refrigerants
AMERICAN WELDING SOCIETY (AWS)
AWS Z49.1 (2012) Safety in Welding and Cutting and Allied Processes
ASME INTERNATIONAL (ASME)
ASME BPVC SEC VIII D1 ( 2019 ) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1
ASTM INTERNATIONAL (ASTM)
ASTM A307 (2014; E 2017) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
ASTM B117 ( 2019 ) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM D520 (2000; R 2011) Zinc Dust Pigment
ASTM E84 (2018a) Standard Test Method for Surface Burning Characteristics of Building
SECTION 23 64 10 Page 1
AMD 0004
J-023 BACHELOR OFFICER QUARTERS-A 972483
US NAVSUPPACT MCB GUAM
Materials
ASTM F104 (2011) Standard Classification System for Nonmetallic Gasket Materials
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2016; SUPP 20162018) Motors and Generators
NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Verification of Dimensions
Factory Tests
System Performance Tests
Demonstrations
Refrigerant
Water Chiller - Field Acceptance Test Plan
SD-06 Test Reports
Field Acceptance Testing
Water Chiller - Field Acceptance Test Report
Factory Tests
System Performance Tests
SD-07 Certificates
Refrigeration System ; G
SD-08 Manufacturer's Instructions
Water Chiller - Installation Instructions ; G
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals ; G
SD-11 Closeout Submittals
SECTION 23 64 10 Page 2
AMD 0004
Indoor Air Quality During Construction ; S
1.3 SAFETY REQUIREMENTS
Exposed moving parts, parts that produce high operating temperature, parts which may be electrically energized, and parts that may be a hazard to operating personnel must be insulated, fully enclosed, guarded, or fitted with other types of safety devices. Safety devices must be installed so that proper operation of equipment is not impaired. Welding and cutting safety requirements must be in accordance with AWS Z49.1 .
1.4 DELIVERY, STORAGE, AND HANDLING
Stored items must be protected from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Proper protection and care of all material both before and during installation will be the Contractor's responsibility. Any materials found to be damaged must be replaced at the Contractor's expense. During installation, piping and similar openings must be capped to keep out dirt and other foreign matter.
1.5 PROJECT REQUIREMENTS
1.5.1 Verification of Dimensions
The Contractor must become familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any work.
PART 2 PRODUCTS
2.1 STANDARD COMMERCIAL PRODUCTS
Materials and equipment will be standard Commercial cataloged products of a manufacturer regularly engaged in the manufacturing of such products, which are of a similar material, design and workmanship. These products must have a two year record of satisfactory field service prior to bid opening. The two year record of service must include applications of equipment and materials under similar circumstances and of similar size.
Products having less than a two year record of satisfactory field service will be acceptable if a certified record of satisfactory field service for not less than 6000 hours can be shown. The 6000 hour service record must not include any manufacturer's prototype or factory testing. Satisfactory field service must have been completed by a product that has been, and presently is being sold or offered for sale on the commercial market through the following copyrighted means: advertisements, manufacturer's catalogs, or brochures.
2.2 MANUFACTURER'S STANDARD NAMEPLATES
Nameplates are required on major components if the manufacturer needs to provide specific engineering and manufacturing information pertaining to the particular component. Should replacement of this component be required, nameplate information will insure correct operation of the unit after replacement of this component.
2.3 ELECTRICAL WORK
a. Provide motors, controllers, integral disconnects, contactors, and controls with their respective pieces of equipment, except controllers
SECTION 23 64 10 Page 3
AMD 0004
indicated as part of motor control centers. Provide electrical equipment, including motors and wiring, as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Manual or automatic control and protective or signal devices required for the operation specified and control wiring required for controls and devices specified, but not shown, must be provided. For packaged equipment, the manufacturer must provide controllers including the required monitors and timed restart.
b. For single-phase motors, provide high-efficiency type, fractional-horsepower alternating-current motors, including motors that are part of a system, in accordance with NEMA MG 11.
c. For polyphase motors, provide squirrel-cage medium induction motors, including motors that are part of a system, and that meet the efficiency ratings for premium efficiency motors in accordance with
NEMA MG 1.
d. Use adjustable frequency drives for all variable-speed motor applications. Provide variable frequency drives for motors as specified in Section 23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR
HVAC AND OTHER BUILDING CONTROL SYSTEMS.
e. Provide inverter duty premium efficiency motors for use with variable frequency drives.
2.4 SELF-CONTAINED WATER CHILLERS, VAPOR COMPRESSION TYPE
Unless necessary for delivery purposes, units must be assembled, leak-tested, charged (refrigerant and oil), and adjusted at the factory.
In lieu of delivery constraints, a chiller may be assembled, leak-tested, charged (refrigerant and oil), and adjusted at the job site by a factory representative. Unit components delivered separately must be sealed and charged with a nitrogen holding charge. Parts weighing 50 pounds or more which must be removed for inspection, cleaning, or repair, such as motors, gear boxes, cylinder heads, casing tops, condenser, and cooler heads, must have lifting eyes or lugs. Chiller must be provided with a single point wiring connection for incoming power supply.
2.4.1 Rotary Screw Type
Chiller must be certified for performance per AHRI 550/590 I-P . If specified performance is outside of the Application Rating Conditions of AHRI 550/590 I-P , Table 2 then the chiller's performance must be rated in accordance with AHRI 550/590 I-P . Chiller must conform to ANSI/ASHRAE 15 & 34 . As a minimum, chiller must include the following components as defined in paragraph CHILLER COMPONENTS.
a. Refrigerant and oil
b. Structural base
c. Chiller refrigerant circuit
d. Controls package
e. Rotary screw compressor
f. Compressor driver, electric motor
SECTION 23 64 10 Page 4
AMD 0004
g. Compressor driver connection
j. Heat recovery condenser coil
k. Receiver
l. Purge system for chillers which operate below atmospheric pressure
2.5 CHILLER COMPONENTS
2.5.1 Refrigerant and Oil
Refrigerants must be one of the fluorocarbon gases. Refrigerants must have number designations and safety classifications in accordance with ANSI/ASHRAE 15 & 34 . CFC-based refrigerants are prohibited. Refrigerants must have an Ozone Depletion Potential (ODP) no greater than 0.0, with the exception of R-123. Provide SDS sheets for all refrigerants.
2.5.2 Structural Base
Chiller and individual chiller components must be provided with a factory-mounted structural steel base (welded or bolted) or support legs. Chiller and individual chiller components must be isolated from the building structure by means of vibration isolators with published load ratings. Vibration isolators must have isolation characteristics as recommended by the manufacturer for the unit supplied and the service intended.
2.5.3 Chiller Refrigerant Circuit
Chiller refrigerant circuit must be completely piped and factory leak tested in accordance with ANSI/ASHRAE 15 & 34 . For multi-compressor units, not less than 2 independent refrigerant circuits must be provided. Circuit must include as a minimum a combination sight glass and moisture indicator, an electronic or thermostatic expansion valve with external equalizer or float valve, charging ports, compressor service valves for field-serviceable compressors, and superheat adjustment.
2.5.4 Controls Package
Provide chillers with a complete factory-mounted , microprocessor based operating and safety control system. Controls package must contain as a minimum a digital display, an on-auto-off switch, motor starters, variable frequency motor controller, disconnect switches, power wiring, and control wiring. Controls package must provide operating controls, monitoring capabilities, programmable setpoints, safety controls, and BAS interfaces as defined below.
2.5.4.1 Operating Controls
Chiller must be provided with the following adjustable operating controls as a minimum.
a. Leaving chilled water temperature control
b. Adjustable timer or automated controls to prevent a compressor from short cycling
SECTION 23 64 10 Page 5
AMD 0004
c. Automatic lead/lag controls (adjustable) for multi-compressor units
d. Load limiting
e. System capacity control to adjust the unit capacity in accordance with the system load and the programmable setpoints. Controls must automatically re-cycle the chiller on power interruption.
f. Startup and head pressure controls to allow system operation at all ambient temperatures down to 10 degrees F .
2.5.4.2 Monitoring Capabilities
During normal operations, the control system must be capable of monitoring and displaying the following operating parameters. Access and operation of display must not require opening or removing any panels or doors.
a. Entering and leaving chilled water temperatures
b. Entering and leaving chilled water pressure and Chilled water flow
d. Self diagnostic
e. Operation status
f. Operating hours
g. Number of starts
h. Compressor status (on or off)
i. Compressor load (percent)
j. Refrigerant discharge and suction pressures
k. Magnetic bearing levitation status (if applicable)
l. Magnetic bearing temperatures (if applicable)
m. Oil pressure
o. Number of purge cycles over the last 7 days
2.5.4.3 Configurable Setpoints
The control system must be capable of being configured directly at the unit's interface panel. No parameters may be capable of being changed without first entering a security access code. The programmable setpoints must include the following as a minimum:
a. Leaving Chilled Water Temperature
c. Time Clock/Calendar Date
2.5.4.4 Safety Controls with Manual Reset
Chiller must be provided with the following safety controls which automatically shutdown the chiller and which require manual reset.
SECTION 23 64 10 Page 6
AMD 0004
a. Low chilled water temperature protection
b. High condenser refrigerant discharge pressure protection
c. Low evaporator pressure protection
d. Chilled water flow detection
e. High motor winding temperature protection
f. Low oil flow protection if applicable
g. Magnetic bearing controller (MBC), Internal fault (if applicable)
h. MBC, High bearing temperature (if applicable)
i. MBC, Communication fault (if applicable)
j. MBC, Power supply fault (if applicable)
k. Motor current overload and phase loss protection
2.5.4.5 Safety Controls with Automatic Reset
Chiller must be provided with the following safety controls which automatically shutdown the chiller and which provide automatic reset.
a. Over/under voltage protection
b. Chilled water flow interlock
c. MBC, Vibration (if applicable)
d. MBC, No levitation (if applicable)
e. Phase reversal protection
2.5.4.6 Remote Alarm
During the initiation of a safety shutdown, a chiller's control system must be capable of activating a remote alarm bell. In coordination with the chiller, the Contractor must provide an alarm circuit (including transformer if applicable) and a minimum 4 inch diameter alarm bell.
Alarm circuit must activate bell in the event of machine shutdown due to the chiller's monitoring of safety controls. The alarm bell must not sound for a chiller that uses low-pressure cutout as an operating control.
2.5.4.7 Utility Monitoring and Control System Interface
Provide a Utility Monitoring and Control System (UMCS) interface meeting the requirements of Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC and the requirements of Section 23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS. The interface must provide all system operating conditions, capacity controls, and safety shutdown conditions as network points. In addition, the following points must be overridable via the network interface:
a. Unit Start/Stop
SECTION 23 64 10 Page 7
AMD 0004
b. Leaving Chilled Water Temperature Setpoint
2.5.5 Compressor(s)
2.5.5.1 Rotary Screw Compressor(s)
Compressors must operate stably for indefinite time periods to at least 25 percent capacity reduction without gas bypass external to the compressor.
Provision must be made to insure proper lubrication of bearings and shaft seals on shutdown with or without electric power supply. Rotary screw compressors must include:
a. An open or hermetic, positive displacement, oil-injected design directly driven by the compressor driver. Allow access to internal compressor components for repairs, inspection, and replacement of parts.
b. Rotors must be solid steel, possessing sufficient rigidity for proper operation.
c. A maximum rotor operating speed no greater than 3600 RPM. Provide cast iron rotor housing.
d. Casings of cast iron, precision machined for minimal clearance about periphery of rotors with minimal clearance at rotor tops and rotor ends.
e. A lubrication system of the forced-feed type that provides oil at the proper pressure to all parts requiring lubrication.
f. Bearing housing must be conservatively loaded and rated for an L(10) life of not less than 200,000 hours. Shaft main bearings of the sleeve type with heavy duty bushings or rolling element type in accordance with ABMA 9 or ABMA 11.
g. A differential oil pressure or flow cutout to allow the compressor to operate only when the required oil pressure or flow is provided to the bearings.
h. Use a Variable Frequency Drive (VFD) to modulate capacity modulation from 100 percent to 15 percent.
i. An oil separator and oil return system to remove oil entrained in the refrigerant gas and automatically return the oil to the compressor.
j. Crankcase oil heaters must be provided.
2.5.6 Compressor Driver, Electric Motor
Components such as motors, starters, variable speed drives and wiring must be in accordance with paragraph ELECTRICAL WORK. Variable frequency drive must be unit mounted as indicated with variable frequency drive type, wiring, and accessories coordinated with the chiller manufacturer.
2.5.7 Compressor Driver Connections
Each machine driven through speed-increasing gears must be so designed as to assure self-alignment, interchangeable parts, proper lubrication system, and minimum unbalanced forces. Bearings must be of the sleeve or
SECTION 23 64 10 Page 8
AMD 0004
roller type. Gear cases must be oil tight. Shaft extensions must be provided with seals to retain oil and exclude all dust.
2.5.8 Receivers
Receiver must bear a stamp certifying compliance with ASME BPVC SEC VIII D1 and must meet the requirements of ANSI/ASHRAE 15 & 34 . Inner surfaces must be thoroughly cleaned by sandblasting or other approved means. Each receiver must have a storage capacity not less than 20 percent in excess of that required for the fully-charged system. Each receiver must be equipped with inlet, outlet drop pipe, drain plug, purging valve, relief valves of capacity and setting required by ANSI/ASHRAE 15 & 34 , and two bull's eye liquid-level sight glasses. Sight glasses must be in the same vertical plane, 90 degrees apart, perpendicular to the axis of the receiver, and not over 3 inches horizontally from the drop pipe measured along the axis of the receiver. In lieu of bull's eye sight glass, external gauge glass with metal glass guard and automatic closing stop valves may be provided.
2.5.9 Chiller Purge System
Chillers which operate at pressures below atmospheric pressure must be provided with a purge system. Purge system must automatically remove air, water vapor, and non-condensible gases from the chiller's refrigerant while keeping refrigerant emissions below requirements of ASHRAE Std 147.
Purge units must be certified per AHRI 580. Purge system must condense, separate, and return all refrigerant back to the chiller. An oil separator must be provided with the purge system if required by the manufacturer. Purge system must not discharge to occupied areas, or create a potential hazard to personnel. Purge system must include a purge pressure gauge, number of starts counter, and an elapsed time meter.
Purge system must include lights or an alarm which indicate excessive purge or an abnormal air leakage into chiller.
2.6 ACCESSORIES
2.6.1 Refrigerant Leak Detector
Detector must be the continuously-operating, halogen-specific type.
Detector must be appropriate for the refrigerant in use. Detector must be specifically designed for area monitoring and must include 5 sampling points installed where indicated. Detector design and construction must be compatible with the temperature, humidity, barometric pressure and voltage fluctuations of the operating area. Detector must have an adjustable sensitivity such that it can detect refrigerant at or above 3 parts per million (ppm). Detector must be supplied factory-calibrated for the appropriate refrigerant(s). Detector must be provided with an alarm relay output which energizes when the detector detects a refrigerant level at or above the TLV-TWA (or toxicity measurement consistent therewith) for the refrigerant(s) in use. The detector's relay must be capable of initiating corresponding alarms and ventilation systems as indicated on the drawings. Detector must be provided with a failure relay output that energizes when the monitor detects a fault in its operation.
2.6.2 Refrigerant Relief Valve/Rupture Disc Assembly
The assembly must be a combination pressure relief valve and rupture disc designed for refrigerant usage. The assembly must be in accordance with ASME BPVC SEC VIII D1 and ANSI/ASHRAE 15 & 34 . The assembly must be
SECTION 23 64 10 Page 9
AMD 0004
provided with a pressure gauge assembly which will provide local indication if a rupture disc is broken. Rupture disc must be the non-fragmenting type.
2.6.3 Refrigerant Signs
Refrigerant signs must be a medium-weight aluminum type with a baked enamel finish. Signs must be suitable for indoor or outdoor service.
Signs must have a white background with red letters not less than 0.5 inches in height.
2.6.3.1 Installation Identification
Each new refrigerating system must be provided with a refrigerant sign which indicates the following as a minimum:
a. Contractor's name.
b. Refrigerant number and amount of refrigerant.
c. The lubricant identity and amount.
d. Field test pressure applied.
2.6.3.2 Controls and Piping Identification
Refrigerant systems containing more than 110 lb of refrigerant must be provided with refrigerant signs which designate the following as a minimum:
a. Valves or switches for controlling the refrigerant flow, the ventilation system, and the refrigerant compressor(s).
b. Pressure limiting device(s).
2.6.4 Gaskets
Gaskets must conform to ASTM F104 - classification for compressed sheet with nitrile binder and acrylic fibers for maximum 700 degrees F service.
2.6.5 Bolts and Nuts
Bolts and nuts, except as required for piping applications, must be in accordance with ASTM A307. The bolt head must be marked to identify the manufacturer and the standard with which the bolt complies in accordance with ASTM A307.
2.7 FABRICATION
2.7.1 Factory Coating
Unless otherwise specified, equipment and component items, when fabricated from ferrous metal, must be factory finished with the manufacturer's standard finish, except that items located outside of buildings must have weather resistant finishes that will withstand 10,000 hours exposure to the salt spray test specified in ASTM B117 using a 5 percent sodium chloride solution. Coating shall have UV top coat to prevent UV degradation. Spray-on application is acceptable by a certified applicator for the coating product inside a shop in a controlled environment. No field or job site coating application allowed. Immediately after
SECTION 23 64 10 Page 10
AMD 0004
completion of the test, the specimen must show no signs of blistering, wrinkling, cracking, or loss of adhesion and no sign of rust creepage beyond 1/8 inch on either side of the scratch mark. Cut edges of galvanized surfaces where hot-dip galvanized sheet steel is used must be coated with a zinc-rich coating conforming to ASTM D520, Type I. Provide with stainless steel fasteners only.
2.7.2 Factory Applied Insulation
Chiller must be provided with factory installed insulation on surfaces subject to sweating including the water cooler, suction line piping, economizer, and cooling lines. Insulation on heads of coolers may be field applied, however it must be installed to provide easy removal and replacement of heads without damage to the insulation. Where motors are the gas-cooled type, factory installed insulation must be provided on the cold-gas inlet connection to the motor per manufacturer's standard practice. Factory insulated items installed outdoors are not required to be fire-rated. As a minimum, factory insulated items installed indoors must have a flame spread index no higher than 75 and a smoke developed index no higher than 150.