This request for proposal solicits bids for the construction of a multi-story housing tower and attached common area wing at the US Naval Supply Systems Command in Guam. The project includes single-occupancy housing units, common areas, and support spaces in the BOQ structure, as well as a detached utility building. Interested parties must submit pricing terms by the response date of December 17, 2021 to be considered for the award, which is expected to be between $100-150 million. The Navy will evaluate proposals and intends to award the construction contract, designated N62742-21-R-1334, for work to be completed by a single prime contractor.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
972483
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N62742-21-R-1334, Amendment 0005
See Next Page
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Mar-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274221R1334
X 9B. DATED (SEE ITEM 11)
17-Dec-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Mar-2021
CODE
HAND DELIVER
NAVFAC PACIFIC
CONSTRUCTION CONTRACTS BR (ACQ33)
4256 RADFORD DR, BLDG 62
HONOLULU HI 96818-3296
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
J-023 BACHELOR OFFICER QUARTERS-A WON 972483
US NAVSUPPACT MCB, GUAM
AMENDMENT No. 0005
SF 30 BLOCK 14 CONTINUATION PAGE
This amendment is issued to revise the following:
1. Amendment 0004 is amended as follows:
a. Item 15.a is deleted in its entirety and replaced with “Not Used.” Paragraph 1.5, References, Institute of Electrical and Electronic Engineers (IEEE), International Code Council (ICC), ICC IBC (2015) International Building Code remains in effect.
b. Item 16 is deleted in its entirety and replaced with “Not Used.” Item 16 is a duplicate of Item 15.b.
2. SF1442 is deleted in its entirety and replaced with the attached SF1442-Rev 1 dated 04 MAR 2021.
3. Document 00600, paragraph 1.13, DFARS 252.236-7010, Overseas Military Construction –Preference for United States Firms (JAN 1997) is deleted in its entirety from the Table of Contents and within Document 00600 and replaced with 1.13, NOT USED.
4. Document 00700, paragraph 1.28, FAR 52.211-10, Commencement, Prosecution, and Completion of Work (APR 1984), subparagraph (c), is deleted in its entirety and replaced with the following. All other term of paragraph 1.28 remain unchanged.
(c) Complete the entire work ready for use not later than 970 calendar days after notice to proceed.
5. Section 01 45 00.00 20 is deleted in its entirety and replaced with the attached Section 01 45 00.00 20, Amendment 0005. Forms at the end of the original Section 01 45 00.00 20 remain unchanged.
6. Section 03 30 00, paragraph 2.3.1, is amended to add the following:
The use of supplementary cementitious material and admixtures such as fly ash, slag cement, and other supplementary cementitious materials are at the Contractor’s discretion. Material used shall meet all performance requirements as stated in the drawings and specifications.
7. Section 07 24 00, paragraph 1.2, 1st sentence is deleted in its entirety and replaced with the following:
Exterior Finish System (EFS) must be a job-fabricated, exterior wall covering consisting of leveler coat, reinforcing fabric, base coat, finish coat, as applicable.
8. Section 08 14 00, paragraph 2.1.3, 1st sentence is deleted in its entirety and replaced with the following:
Provide hardboard grade flush doors conforming to ANSI/WDMA I.S.1A, louvered doors standard grade, conforming to ANSI/WDMA I.S.6A with 38mm thickness.
9. Section 08 71 00 Door Hardware, Hardware Sets are revised with the following:
Set: 1.0
2 Continuous Hinge (Grade 1) PE
2 Shim Kit 541 SA
1 Concealed Vert Rod Exit, Exit Only 55 AD8410 EO US32D SA
1 Concealed Vert Rod Exit, Nightlatch 55 56 64 AD8410 106 x 862 US32D SA
1 Core (LFIC 6Pin) 6300 US15 SA
2 Surface Closer (CO2021) UNI7500 600 689 NO
1 Threshold (A156.21) BY DOOR SUPPLIER OT
1 Rain Guard (A156.22) 346C WIDTH PE
1 Gasketing (A156.22) BY DOOR SUPPLIER OT
2 Sweep (with rain guard) (A156.22) 345AV WIDTH PE
2 Astragal (split) BY DOOR SUPPLIER OT
2 ElectroLynx Harness (in door) QC-CXXX LENGTH MK
2 ElectroLynx Harness (in frame) QC-C1500P MK
1 Card Reader BY ACCESS CONTROL SUPPLIER OT
2 Position Switch MSS-1C SU
1 Power Supply AQD4 SU
Notes: Description of operation:
- Opening always closed and secure.
- Entry by presenting authorized card at card reader, or mechanical key override.
- Free exit at all times.
- REX in device monitors exit.
- Upon power failure, entry by key and free exit.
Set: 2.0
2 Continuous Hinge (Grade 1) CFMHD1 HEIGHT PE
1 Concealed Vert Rod Exit, Nightlatch (Type 6-03)
64 AD8410 106 x 862 US32D SA
2 Shim Kit 541 SA
1 Concealed Vert Rod Exit, Exit Only AD8410 EO US32D SA
1 Core (LFIC 6Pin) 6300 US15 SA
2 Surface Closer (CO2021) UNI7500 600 689 NO
1 Gasketing (A156.22) BY DOOR SUPPLIER OT
2 Sweep (A156.22) 18061CNB WIDTH PE
2 Astragal (split) BY DOOR SUPPLIER OT
Notes: - Hex key dogging.
10. Section 10 26 00 is deleted in its entirety and replaced with the attached Section 10 26 00, Amendment 0005.
11. Section 10 71 13.13 is amended as follows:
a. Paragraph 1.5 is deleted in its entirety and replaced with the following:
Storm Shutters shall have been tested, rated, and factory marked for the positive and negative wind pressures as indicated or as calculated in accordance with ASCE 7 for the windspeed, exposure, and importance factor for this project and ICC IBC. Storm Shutters must be tested per ASTM E1886 & E1996. Design storm shutter components, including frame, hardware, and anchors to withstand an allowable wind-loading design pressure of
a. Risk Category II (standard occupancy)
b. Wind Speed (3-second gust) = 314 km/h
c. Exposure Category C
d. Topographic Factor, Kzt = 1.0
b. Paragraph 2.2.1.4 is deleted in its entirety and replaced with the following:
Provide storm bar assembly of purlins, header frames and mullion of aluminum tube extrusion, 6063-T5, as calculated in accordance with ASCE 7 for the windspeed, exposure, and importance factor for this project and ICC IBC. Refer to paragraph 1.5 for storm shutter design requirement. Finish shall be the same as the frame and tracks.
12. Section 33 11 00 is deleted in its entirety and replaced with the attached Section 33 11 00, Amendment 0005.
13. Section 33 52 10, paragraph 3.3.1 is deleted in its entirety and replaced with the following:
System commissioning must conform to Section 33 08 55 Commissioning of Fuel Facility Systems.
14. Revised Drawings: The following previously issued drawings. These revised drawings supersede the previously issued drawings:
NO.
SHEET
NO.
NAVFAC
NO.
DESCRIPTION
1 S-128 17255317 Revised Conc. Details
2 S-403 17255343 Revised Conc. Details
3 S-406 17255346 Revised Conc. Details
4 A-114 17255356 Entry Awning Extended 457mm
5 Not Used
6 A-204 17255379 SST Downspout Changed to PVC
7 A-222 17255381 Added Side Rail Note
8 A-312 17255385 Entry Awning Extended 457mm
9 A-401 17255391 Linen Dim Added
10 A-402 17255392 Linen Dim Added
11 A-403 17255393 Door Removed from Linen Cab
12 A-501 17255399 Door Updated to Generic
13 A-503 17255401 Tube Steel, Conc Sill, Note Add
14 A-511 17255404 SST Downspout Changed to PVC
15 A-513 17255406 BOQ-B Ref Marked Thru
16 A-532 17255412 Vinyl Corner Bead Detail
17 A-533 17255413 Door Removed from Linen Cab
18 A-542 17255416 Layer of GYP Removed
19 A-601 17255418 Sill Detail Edit and Finish Edit
20 A-605 17255420 Acoustical Note Edit
21 A-611 17255421 Storm Shutter Notes/Graphics
22 A-631 17255423 Note Added/Edit
23 P-501 17255537 Revised Radon Details
24 ES101 17255556
Added Receptacle for AMI Water and Electric, Added Enlarged Plan, and Removed One Bollard Light Fixture
25 E-606 17255593 Revised AMI Meter Detail
26 E-608 17255595 Revised Water Meter Branch Circuit
27 T-100 17255605 ICS Redesign
28 T-114 17255605 ICS Redesign
29 T-116 17255607 ICS Redesign
30 T-125 17255611 ICS Redesign
31 T-301 17255616 ICS Redesign
32 T-401 17255619 ICS Redesign
33 T-503 17255626 ICS Redesign
34 T-602 17255630 ICS Redesign
35 TY114 17255639 ICS Redesign
36 TY125 17255645 ICS Redesign
15. All other terms and conditions remain unchanged.
End of Amendment
972483
RFP N62742-21-R-1334, WORK ORDER NUMBER 972483, J-023 BACHELOR OFFICER QUARTERS-A, US NAVSUPPACT MCB, GUAM
GENERAL DESCRIPTION: SEE SECTION 01 11 00, SUMMARY OF WORK, PARAGRAPH 1.1.1, Project Description.
THIS PROCUREMENT IS UNRESTRICTED. North American Industry Classification System (NAICS) Code 236116, New Multifamily Housing
Construction (except For-Sale Builders) - Average Annual Receipts for the Past 3 Years - $39.5M
ESTIMATED COST: BETWEEN $100,000,000 AND $150,000,000.
DPAS RATING: DO-C2
ENFORCEABILITY OF PROPOSAL: The proposal must set forth full, accurate and complete information as required by this solicitation. The Government will rely on such information in the award of a contract. The awardee’s proposal will be incorporated into the contract and all items proposed will become binding requirements of the contract. By submission of the offer, the offeror agrees that all items proposed (e.g., affiliates/subcontractors with teaming agreements, etc.) will be utilized for the duration of the contract and any substitutions must be equal or better and will require prior approval by the Contracting Officer.
NORINE E. HORIKAWA (808) 471-2235
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFOMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
17-DEC-2020
04-MAR-2021-REV 1
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
HAND DELIVER
NAVFAC PACIFIC
CONSTRUCTION CONTRACTS BR (ACQ33)
4256 RADFORD DR, BLDG 62
HONOLULU HI 96818-3296
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______ 15 calendar days and complete it within ________ 970 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Document 00700
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the work required are due at the place specified in Item 8 by 2:00 p.m. HST local time See Doc 00100 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 150 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC PACIFIC
CONSTR CONTRACTS BRANCH (CODE ACQ33)
258 MAKALAPA DR STE 100
JBPHH HI 96860-3134
N62742
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX: TEL: TEL: FAX:
N6274221R1334 9
See Doc 00100
N62742
20B. SIGNATURE
(REV. 4-85) STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE PRICE PROPOSAL SCHEDULE
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE 27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO.
Office: Fax:
(Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror) OFFER
DUNS NO.:
TIN NO.: CAGE CODE:
SOLICITATION, OFFER AND AWARD (SF 1442), CONTINUED
PRICE PROPOSAL SCHEDULE-REV 1
FOR
RFP NO. N62742-21-R-1334
J-023 BACHELOR OFFICER QUARTERS-A
US NAVSUPPACT MCB, GUAM
N62742-21-R-1334 SF1442 (continued)
ITEM
NO. DESCRIPTION QTY
UNIT OF
ISSUE
UNIT
PRICE AMOUNT
0001AA BASE ITEM: The basis for CLIN 0001AA is the price for all labor, material, and equipment for the entire work for WON 972483 complete and in accordance with the drawings and specifications, but not including any other CLIN/SLIN.
1 Lump Sum $__________________
0001AB MEC CLEARANCE
The basis for CLIN 0001AB is the price to perform full clearance ahead of construction for Munitions and Explosives of Concern (MEC)/Material Potentially Presenting an Explosive Hazard (MPPEH) for areas as shown on the attached maps, but not including any other CLIN/SLIN
420 CY $__________/CY $_________________
TOTAL CLIN 0001 $__________________
0002 PLANNED MODIFICATION:
FURNITURE, FIXTURES AND
EQUIPMENT (FF&E)
000201 Planned Modification: FF&E Govt Est Amt
$7,038,500.00
000202 Handling and Administrative Rate (HAR)
NTE 5% ___% $________
TOTAL CLIN 0002 $___________________
TOTAL EVALUATED PRICE (CLINS
0001 – 0002)
NOTES:
1. The Offeror SHALL include a price for all CLINs/SLINs. ALL OR NONE OFFERS - Offers are solicited on an “all or none” basis and FAR 52.215-1, INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISITION in Document 00100, is hereby modified. Failure to submit offers for all line items listed shall be cause for rejection of the offer.
2. Multiple awards will not be made.
3. The total of CLINs 0001 and 0002, total evaluated price, will form the basis for the price evaluation.
4. The Government intends to award CLIN 0001 only. CLIN 0002 will be awarded as noted in paragraph 7 below.
5. For SLIN 0001AB: In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended offer and the total will be recomputed accordingly. In an offer provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
SOLICITATION, OFFER AND AWARD (SF 1442), CONTINUED
PRICE PROPOSAL SCHEDULE-REV 1
FOR
RFP NO. N62742-21-R-1334
J-023 BACHELOR OFFICER QUARTERS-A
US NAVSUPPACT MCB, GUAM
N62742-21-R-1334 SF1442 (continued)
6. For SLIN 000202: For evaluation purposes only, in the event of a discrepancy between the extended price for the HAR and the actual calculation of the HAR percentage proposed multiplied by the Government Estimated Amount, the Government will use the percentage proposed and will adjust your proposal accordingly.
7. The following notes apply to CLIN 0002 for Furniture, Fixtures and Equipment (FF&E):
a. Government Estimated Amount for FF&E. The Government Estimated Amount for FF&E, as shown above (CLIN 000201), includes the material cost, freight and installation charges. The Government Estimated Amount has been identified to provide Offerors with the projected magnitude of effort for FF&E. The total CLIN 0002 amount shall include all costs to procure, install and store the Furniture Fixtures and Equipment and includes the Prime Contractor’s proposed Handling and Administrative Rate (HAR).
b. Prime Contractor Handling and Administration Rate (HAR). Offerors may propose a HAR fee in CLIN 000202, up to but not to exceed 5%, for the handling and administration of the FF&E. This fee will account for all administrative costs;
overhead; bonding fees, if any; administration of subcontractors; profit; and any other costs associated with and related to the coordination and processing of the procurement and installation of the FF&E. The prime contractor’s proposed HAR mark-up will be applied to the Government Estimated Amount to derive a total proposed price for CLIN 0002.
c. The prime contractor’s HAR percentage rate will be incorporated into the contract as proposed and will not be adjusted regardless of fluctuations in the Government Estimated Amount. The HAR is a fixed percentage rate that will be utilized in calculating the final price for the planned modification. When the final FF&E package is priced, the contractor’s proposed HAR percentage rate, as incorporated into the contract, will be applied to the selected supplier/vendor’s quote to arrive at a total proposed price for final negotiation of the planned modification.
d. It is anticipated that a planned modification will be awarded at least six months prior to the completion of the work. The planned modification will be issued after receipt of appropriate funding. A minimum of six months is required for the contractor to purchase, deliver and install the FF&E without impacting the overall completion date of the project. No schedule extensions will be granted if the planned modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the planned modification less than six months prior to the contract completion date, the contractor may be entitled to a contract extension.
8. DFARS 252.247-7023, TRANSPORTATION OF SUPPLIES BY SEA. Within 30 days of each shipment, the Contractor is required to provide an electronic copy of the carrier’s bill of lading to the Contracting Officer and to MARAD via email. MARAD email: mark.e.williams@dot.gov. In addition, the Contractor shall notify the Contracting Officer when oceanic shipments have been initiated within 3 working days of shipment.
CU101
BOQ A BLDG
UTILITY BLDG
SCALE:
J-023 UTILITY SITE PLAN 11:500
PAVILION
TRASH ENCLOSURE
AND RECYCLING
NOTES:
1. EXISTING SITE FEATURES ARE CONCEPTUAL. THE EXISTING SITE
FEATURES ARE BASED UPON THE FINAL DESIGN FOR PROJECT
J-001B.
2. VERIFY LOCATION AND INVERT OF EXISTING UTILITIES PRIOR TO
CONSTRUCTION.
3. UNLESS FEATURES ARE IDENTIFIED FOR REMOVAL, THE
FEATURES MUST REMAIN. PROTECT EXISTING FEATURES TO
REMAIN.
4. REFER TO PLUMBING, MECHICAL, AND FIRE PROTECTION
DRAWINGS FOR CONTINUATION.
5. REFER TO CU201 - CU202 FOR WATER PROFILES. ALL WATER
MAINS MUST HAVE A MINIMUM OF 750mm DEPTH OF COVER.
6. REFER TO CU203 FOR SANITARY SEWER PROFILES.
7. FOR UTILITIES NOT PROFILED, REFER TO CROSSING UTILITY
PROFILES FOR FOR SEPARATION AT CROSSING.
8. PROVIDE THRUST BLOCK AT VERTICAL AND HORIZONTAL BENDS
OF WATER LINES. REFER TO DETAIL 1/CU502.
9. REFER TO CU504 FOR PIPE BEDDING SECTION.
10. REFER TO CU603 FOR WATER APPURTENANCE SCHEDULE.
11. REFER TO CU604 FOR SANITARY SEWER STRUCTURE SCHEDULE.
12. REFER TO ES101 FOR ELECTRICAL SITE PLANS.
13. REFER TO T-100 FOR TELECOMMUNICATIONS SITE PLAN.
14. ALL PIPE SLOPES 0.004mm EXCEPT SERVICE LATERAL IS 0.01mm.
ALL DIMENSIONS AND/OR DIMENSIONS SHOWN
IN CALLOUT/NOTES ARE IN METERS UNLESS
OTHERWISE NOTED.
SEE NOTE 12
SEE NOTE 13
PLAN
NORTH
PLAN
NORTH
SEE NOTE 4
SSWR
MH16
SSWR MH14
SSWR MH12
SSWR MH11
SSWR MH12
KEYNOTES:
1 PROVIDE 300mm FUSIBLE PVC C-900 DR 18 DOMESTIC WATER SERVICE LINE
2 PROVIDE 250mm FUSIBLE PVC C-900 DR 18 DOMESTIC WATER SERVICE LINE
3 PROVIDE 400mm FUSIBLE PVC C-900 DR 18 DOMESTIC WATER SERVICE LINE
4 PROVIDE 250mm X 200mm REDUCER
5 HOSE BIB
6 PROVIDE 40mm FUSIBLE PVC ASTM D-1785 SCH 40 DOMESTIC WATER
SERVICE LINE WITH WATER METER, SEE DETAIL C/CU502
7 PROVIDE 150mm FIRE WATER SERVICE LINE
8 PROVIDE FIRE HYDRANT ASSEMBLY, SEE DETAIL 4/CU504
9 PROVIDE POST INDICATOR VALVE, SEE DETAIL 5/CU503
10 FIRE DEPARTMENT CONNECTION, SEE DETAIL 1/CU504
11 PROVIDE 200mm PVC SDR 35 SANITARY SEWER SERVICE LINE
12 PROVIDE 150mm PVC SDR 35 SANITARY SEWER SERVICE LINE
13 PROVIDE SANITARY SEWER MANHOLE, SEE DETAIL 2/CU503
14 PROVIDE SANITARY SEWER CLEANOUT, SEE DETAIL 1/CU503
15 PROVIDE DOUBLE SANITARY SEWER CLEANOUT
16 PCC ENCASEMENT, SEE DETAIL 3/CU502
17 WATER LINE 3 (200mm PVC)
18 MH2B-3
19 WATER LINE 2 (300mm PVC)
20 WATER LINE 2 (300mm PVC)
21 UTILITY CORRIDOR, SEE DETAIL 6/CU503
22 UTILITY CORRIDOR, SEE DETAIL 4/CU502
23 PROVIDE 100mm PVC SDR 35 SANITARY SEWER SERVICE LINE
24 PROVIDE SANITARY SEWER MANHOLE DROP CONNECTION, SEE DETAIL
3/CU503
25 PROVIDE GATE VALVE SEE DETAIL 6/CU501
26 PROVIDE COMBINATION AIR VALVE SEE DETAIL 1/CU505
WTR LTRL (200mm PVC)
STA 1+290.500
INV =139.950
STA 1+108.250
RIM 139.619
200mm INV IN: 137.839
SLOPE IN 0.514%
250mm INV OUT: 137.789
SLOPE OUT 2.833%
WTR LTRL (200mm PVC)
STA 1+986.000
INV =137.900
WTR LTRL (200mm PVC)
STA 1+916.000
INV = 139.139
4 17
SSWR MH09 13
SSWR MH14
SSWR MH01
SSWR MH02
13SSWR
MH18
13SSWR MH17
SEE
NOTE 4
J-023 SSWR LINE C
5 68
SSWR MH03
BIKE PAVILLION
J-023 SSWR LINE A
J-023 WATR LINE B
J-023 MECH LINE TO VALVE PIT
13 SSWR MH04
SSWR MH05
13 SSWR MH08
BBQ PAVILION
5 6
PAVILION
J-023 SSWR LINE B
J-023 WATR LINE C
J-023 SSWR LINE A
J-023 MECH LINE
J-023 FIRE WATER LINE A
SEE NOTE 1216
J-023 WATR LINE A
J-023 WATR LINE A
13 SSWR MH13
J-023 WATR LINE A
J-023 VALVE PIT FOR
DISTRICT PLANT
J-023 FIRE WATER LINE B
SEE NOTE 13
SSWR MH06
5 6
13 SSWR MH13
Polygonal Line
Polygonal Line
Polygonal Line
Polygonal Line
Polygonal Line
Polygonal Line
EL
EV
AT
IO
N
EL
EV
AT
IO
N
STATION
STATION
2+990 3+000 3+020 3+040 3+060 3+080 3+100
EG FG
3+000
3.
3.
3+020
2.
3.
3+040
2.
3.
3+060
1.
3.
3+080
150mm FIRE PIPE 03 L=11m S=4.29%
WATR PIPE 25
CHWS PIPE 02
CHWR PIPE 02
HWS PIPE 02
HWR PIPE 02
PROPOSED GRADE
EXISTING GRADE
150mm FIRE PIPE 01 L=1m S=4.24%
150mm FIRE PIPE 02
L=22m S=4.29%
150mm FIRE PIPE 04 L=21m S=0.34%
150mm FIRE PIPE 05 L=19m S=0.34%
0.
0.
CW PIPE 02
HWR PIPE 05
HWS PIPE 05
CHWR PIPE 05
CHWS PIPE 05
0.
FA 2
FA 1
FA 3
PIV
FA 4 FA 5 FA 6 HHWR PIPE 02
HHWS PIPE 02
WATR PIPE 28
WATR PIPE 30
0.
EL
EV
AT
IO
N
EL
EV
AT
IO
N
STATION
STATION
2+490 2+500 2+520 2+540 2+560 2+580
EG FG
2+500
1.
3.
2+520
1.
2.
2+540
2.
2.
2+560
PROPOSED GRADE
EXISTING GRADE
250mm WATR PIPE 19
L=15m S=6.97%
250mm WATR PIPE 20
L=29m S=3.18%
WA 19
WA 20
WA 21
EL
EV
AT
IO
N
EL
EV
AT
IO
N
STATION
STATION
3+190 3+200 3+220 3+240 3+250
EG FG
3+200
3.
3.
3+220
3.
3.
3+240
PROPOSED GRADE
EXISTING GRADE
150mm FIRE PIPE 08 L=29m S=4.84%
150mm FIRE PIPE 07 L=2m S=22.78%
150mm FIRE PIPE 06 L=5m S=13.32%FA 7
FA 8
FA 9
FA 10
HWR PIPE 06
HWS PIPE 06
CHWR PIPE 06
CHWS PIPE 06
0.
EL
EV
AT
IO
N
EL
EV
AT
IO
N
STATION
STATION
1+990 2+000 2+020 2+040 2+060 2+080 2+100 2+120 2+130
EG FG
2+000
8.
0.
2+020
9.
1.
2+040
9.
1.
2+060
0.
1.
2+080
0.
2.
2+100
0.
2.
2+120
300mm WATR PIPE 02 L=22m S=0.65%
PROPOSED GRADE
EXISTING GRADE
1.
300mm WATR PIPE 43 L=18m S=0.22%
300mm WATR PIPE 47
L=69m S=4.42%
SSWR PIPE 01
WA 43
WA 45
WA 2
WA 6
WA 47 GATE VALVE
WA 44 GATE VALVE
300mm WATR PIPE 46 L=1m S=4.42%
300mm WATR PIPE 44 L=1m S=0.22%
SDP-02E
1.
300mm WATR PIPE 03 L=8m S=0.66%
WA 3
CU201
VERTICAL
ALL DIMENSIONS AND/OR DIMENSIONS SHOWN
IN CALLOUT/NOTES ARE IN METERS UNLESS
OTHERWISE NOTED.
HORIZONTAL
SCALE:
J-023 FIRE WATER LINE A PROFILE 1H 1:500, V 1:50
NOTES:
1. SEE SHEETS CU605 - CU606 FOR PIPE AND APPURTENANCE
SCHEDULES.
SCALE:
J-023 FIRE WATER LINE B PROFILE 2H 1:500, V 1:50
SCALE:
J-023 WATER LINE A PROFILE 3H 1:500, V 1:50 SCALE:
J-023 WATER LINE B PROFILE 3H 1:500, V 1:50
Distance Measurement
4.73 in
Distance Measurement
1.55 m
Distance Measurement
2.19 m
Distance Measurement
1.31 m
Distance Measurement
1.29 m
Distance Measurement
1.24 m
Distance Measurement
1.46 m
Distance Measurement
1.08 m
Distance Measurement
1.04 m
AT
IO
N
EL
EV
AT
IO
N
STATION
STATION
3+990 4+000 4+020 4+040 4+060 4+080 4+100
EG FG
4+000
1.
3.
4+020
1.
3.
4+040
1.
2.
4+060
2.
2.
4+080
PROPOSED GRADE
EXISTING GRADE
200mm CHWR PIPE 03 L=27m S=2.60%
WATR PIPE 22
0.
200mm CHWR PIPE 01 L=2m S=2.50%
200mm CHWR PIPE 02 L=13m S=2.59%
0.
200mm CHWR PIPE 04 L=26m S=3.67%
FIRE PIPE 05
UCA 04
UCA 11
UCA 18
UCA 25
UCA 32
EL
EV
AT
IO
N
EL
EV
AT
IO
N
STATION
STATION
PROFILE VIEW OF J-023 WATR LINE C
2+190 2+200 2+220 2+240 2+260 2+280 2+300 2+320 2+340 2+360 2+380 2+400 2+420 2+440 2+460 2+480 2+500 2+520 2+540
EG FG
0.
2+200
1.
2.
2+220
1.
2.
2+240
2.
2.
2+260
2.
2.
2+280
3.
2.
2+300
3.
3.
2+320
3.
3.
2+340
3.
3.
2+360
2.
2.
2+380
2.
2.
2+400
1.
3.
2+420
1.
3.
2+440
0.
2.
2+460
0.
2.
2+480
9.
2.
2+500
9.
1.
2+520
9.
0.
300mm WATR PIPE 42 L=20m S=0.34% 300mm WATR PIPE 37
L=27m S=0.58%
300mm WATR PIPE 36 L=9m S=0.58%
300mm WATR PIPE 31 L=36m S=1.38%
300mm WATR PIPE 26 L=10m S=0.15% 300mm WATR PIPE 24
L=6m S=3.53%
300mm WATR PIPE 25 L=10m S=2.80%
300mm WATR PIPE 12
L=22m S=4.60%
300mm WATR PIPE 09 L=4m S=2.64%
300mm WATR PIPE 07 L=8m S=2.64%
300mm WATR PIPE 06 L=40m S=2.48%
300mm WATR PIPE 22 L=7m S=2.48%
CHWS PIPE 03 CHWR PIPE 03
HWS PIPE 03
HWR PIPE 03
SSWR PIPE 09
PROPOSED GRADE
EXISTING GRADE
0.
CW PIPE 03
300mm WATR PIPE 32 L=3m S=0.01%
WA 43
WA 41
WA 36
WA 37
WA 30
WA 32
WA 19
WA 23
WA 25
WA 26
WA 7
WA 8
WA 10
WA 6
HHWR PIPE 03
HHWS PIPE 03
WA 22 GATE VALVE
WA 24
COMBINATION AIR RELEASE VALVE
WA 18 GATE VALVE
300mm WATR PIPE 23 L=1m S=2.48%
300mm WATR PIPE 21 L=1m S=2.47%
300mm WATR PIPE 18 L=1m S=4.75%
300mm WATR PIPE 17
L=31m S=4.80%
WA 13
WA 27
300mm WATR PIPE 29 L=9m S=0.19%
WA 33
300mm WATR PIPE 35 L=27m S=0.62%
300mm WATR PIPE 40 L=53m S=0.58%
WA 38
SDP-02E
1.
FIRE PIPE 06
0.
FIRE PIPE 05
0.
PROPOSED GRADE
EXISTING GRADE
SSWR PIPE 32WA 48
EL
EV
AT
IO
N
EL
EV
AT
IO
N
STATION
STATION
4+190 4+200 4+220 4+240 4+260 4+270
EG FG
4+200
2.
3.
4+220
3.
3.
4+240
3.
3.
4+260
200mm CHWR PIPE 07 L=39m S=2.78%
200mm CHWR PIPE 06 L=12m S=2.25%
200mm CHWR PIPE 05 L=2m S=2.15%
FIRE PIPE 06
FIRE PIPE 02
0.
0.
UCA 37
UCA 41
UCA 45
UCA 49
PROPOSED GRADE
EXISTING GRADE
WATR PIPE 33
0.
0.
WATR PIPE 48
CU202
VERTICAL
ALL DIMENSIONS AND/OR DIMENSIONS SHOWN
IN CALLOUT/NOTES ARE IN METERS UNLESS
OTHERWISE NOTED.
HORIZONTAL
SCALE:
J-023 WATER LINE C PROFILE 1H 1:500, V 1:50
NOTES:
1. SEE SHEETS CU603 - CU606 FOR PIPE, STRUCTURE, AND
APPURTENANCE SCHEDULES
SCALE:
J-023 MECH LINE PROFILE 2H 1:500, V 1:50 SCALE:
J-023 MECH LINE TO VALVE PIT PROFILE 3H 1:500, V 1:50
Distance Measurement
2.15 m
Distance Measurement
2.57 m
Distance Measurement
1.12 in
1.19 in�
AT
IO
N
EL
EV
AT
IO
N
STATION
STATION
1+680 1+700 1+720 1+740 1+760 1+780 1+800 1+820 1+840 1+860 1+880 1+900 1+920 1+940 1+960
EG FG
1+700
0.
2.
1+720
0.
2.
1+740
0.
2.
1+760
1.
2.
1+780
1.
2.
1+800
2.
2.
1+820
2.
2.
1+840
3.
3.
1+860
3.
3.
1+880
3.
3.
1+900
2.
2.
1+920
2.
2.
1+940
200mm SSWR PIPE 14
L=28m S=1.00%
SS
W
R M
H
ST
A:
1+
8.
R
IM
:1
.1
N
IN
V.
IN
:1
.2
E
IN
V.
IN
:1
.7
S
IN
V.
O
U T:
9.
D
R O
P C
O N
N
EC
TI
O
N
SS
W
R M
H
ST
A:
1+
5.
R
IM
:1
.3
E
IN
V.
IN
:1
.5
S
IN
V.
O
U T:
9.
SSWR MH12
STA: 1+809.359
RIM: 142.934
E INV. IN: 140.130
S INV. IN: 141.576
W INV. OUT: 140.104
1 DROP CONNECTION
SSWR MH13
STA: 1+849.933
RIM: 143.072
SE INV. IN: 140.562
W INV. OUT: 140.536
SSWR MH14
STA: 1+855.566
RIM: 143.421
S INV. IN: 140.644
NW INV. OUT: 140.618
SSWR MH15
STA: 1+864.926
RIM: 143.303
S INV. IN: 140.764
W INV. IN: 141.926
N INV. OUT: 140.738
1 DROP CONNECTION
SSWR MH16
STA: 1+878.931
RIM: 143.098
W INV. IN: 140.930
N INV. OUT: 140.904
200mm SSWR PIPE 26 L=45m S=1.00%
SS
W
R M
H
ST
A:
1+
3.
R
IM
:1
.9
N
IN
V.
IN
:1
.5
E
IN
V.
O
U T:
1.
SS
W
R M
H
ST
A:
1+
6.
R
IM
:1
.4
S
IN
V.
IN
:1
.1
N
IN
V.
IN
:1
.9
E
IN
V.
IN
:1
.2
W
IN
V.
O
U T:
8.
EXISTING GRADE
PROPOSED GRADE
200mm SSWR PIPE 16 L=14m S=1.00%
200mm SSWR PIPE 18 L=13m S=1.00%
200mm SSWR PIPE 19 L=54m S=1.00%
200mm SSWR PIPE 22 L=6m S=1.00%
200mm SSWR PIPE 21
L=41m S=1.00%
200mm SSWR PIPE 23 L=9m S=1.00%
200mm SSWR PIPE 25 L=14m S=1.00%
SSWR MH10
STA: 1+742.483
RIM: 142.889
N INV. IN: 139.410
E INV. IN: 141.602
S INV. OUT: 139.384
1 DROP CONNECTION
EXISTING GRADE
PROPOSED GRADE
EL
EV
AT
IO
N
EL
EV
AT
IO
N
STATION
STATION
1+780 1+800 1+820 1+840 1+860 1+880
EG FG
1+800
0.
2.
1+820
1.
2.
1+840
1.
2.
1+860
PROPOSED GRADE
EXISTING GRADE
SS
W
R M
H
ST
A:
1+
5.
R
IM
:1
.9
E
IN
V.
IN
:1
.3
W
IN
V.
IN
:1
.3
S
IN
V.
O
U T:
1.
100mm SSWR PIPE 09 L=52m S=1.00%
0.
SS
W
R C
O
ST
A:
1+
1.
R
IM
:1
.1
W
IN
V.
O
U T:
1.
WATR PIPE 17
EL
EV
AT
IO
N
EL
EV
AT
IO
N
STATION
STATION
0+980 1+000 1+020 1+040 1+060 1+080 1+100 1+120 1+140 1+160 1+180
EG FG
1+000
9.
9.
1+020
0.
2.
1+040
9.
2.
1+060
9.
2.
1+080
9.
2.
1+100
9.
2.
1+120
0.
2.
1+140
0.
3.
1+160
PROPOSED GRADE
EXISTING GRADE
200mm SSWR PIPE 01 L=17m S=0.80%
SSWR MH02
STA: 1+073.209
RIM: 141.218
E INV. IN: 138.592
N INV. OUT: 138.566
SSWR MH03
STA: 1+085.788
RIM: 142.543
E INV. IN: 140.521
N INV. IN: 141.609
W INV. OUT: 139.410
2 DROP CONNECTIONS
SS
W
R M
H
ST
A:
1+
7.
R
IM
:1
.2
N E
IN
V.
IN
:1
.6
W
IN
V.
O
U T:
0.
200mm SSWR PIPE 07 L=22m S=0.48%
SS
W
R M
H
ST
A:
1+
5.
R
IM
:1
.9
E
IN
V.
IN
:1
.3
W
IN
V.
IN
:1
.3
S
IN
V.
O
U T:
1.
200mm SSWR PIPE 03
L=57m S=0.80%
200mm SSWR PIPE 04 L=13m S=6.50%
200mm SSWR PIPE 06 L=12m S=1.00%
200mm SSWR PIPE 30 L=7m S=1.00%
SSWR MH05
STA: 1+104.217
RIM: 142.786
N INV. IN: 140.757
SW INV. OUT: 140.731
WATR PIPE 47
SS
W
R M
H
ST
A:
1+
6.
R
IM
:1
.4
S
IN
V.
IN
:1
.1
N
IN
V.
IN
:1
.9
E
IN
V.
IN
:1
.2
W
IN
V.
O
U T:
8.
D
R O
P C
O N
N
EC
TI
O
N S
1.
INV. 137.954
SSWR MH06
STA: 1+126.257
RIM: 142.978
N INV. IN: 140.888
S INV. OUT: 140.862
200mm SSWR PIPE 31 L=29m S=1.39%
CU203
VERTICAL
ALL DIMENSIONS AND/OR DIMENSIONS SHOWN
IN CALLOUT/NOTES ARE IN METERS UNLESS
OTHERWISE NOTED.
HORIZONTAL
SCALE:
J-023 SSWR LINE B PROFILE 3H 1:500, V 1:50
SCALE:
J-023 SSWR LINE C PROFILE 2H 1:500, V 1:50
NOTES:
1. SEE SHEET CU603 FOR PIPE AND APPURTENANCE SCHEDULES.
SCALE:
J-023 SSWR LINE A PROFILE 1H 1:500, V 1:50
Distance Measurement
2.15 m
Distance Measurement
3.35 m
Distance Measurement
1.20 in
Distance Measurement
1.13 in
1.22 m
SDSDSD
W
W
SAN
W
W W
W
WWWWWW
W
W
W W
W W
W W
W W
WWWWW
W W
W W
W W
W W
W W
W W
W
W W W W W W W W W W W
S A
N S
A N
S A
N
SAN
S A
N S
A N
S A
N S
A N
S A
N S
A N
S A
N
SAN SAN SAN SAN SAN SAN
S A
N
SANSAN
W W W W
W
W
W
W
SAN SAN SAN
W W
W W W W W
W W
W W W W W
W W
W W W W W
W
W W W W W W
W
W W W W W W
W
W W W W W W
W
W W W W W W
F
F F F
W W
W W
W
W W
W W
W
W W
W W
W
W W
W W
W
W
WW
SANSAN
W
R O
A D
R O
A D
MH-579-10B
BOQ A BUILDING
SHH-2
SHH-1
E
S
E
E
ES
E S
ES
E
S
E S
ES
UTILITY BUILDING
PAVILION
PAVILION
E
S
E S
E
S
E
S
E S
ES
ES
E
S
E S
ES ES
10 10
SHH-1
E
S
E
S
E
S
E S
ES
ES
ES
ES
E
S
E
S
E
S
E
S
E
S
ES
E
S
E S
E
S
E
S
E
S
E
S
E
S
E
S
E S
E
S
E
S
E
S
ES
E
S
E S
E
S
E
S
E
S
E
S
E
S
E
S
E S
E
S
E
S
E S
E
S
E
S
E S
SDSDSD
R O
AD
ROAD 3
(E) ST P574A-18
(E) ST P579-10
(E) MH P574A-18
(E) MH P579-10
MH P579-10A
(E) MH P574-17
(E) MH P579-10A
SWITCHBOARD "4MDS-BB"
PAD MOUNTED TRANSFORMER "UA"
PAD MOUNTED TRANSFORMER "BA"
E-404
FOR ENLARGED PLAN, SEE & .
E-404
E-404
FOR ENLARGED PLAN, SEE & .
E-404
TYPICAL
BOQ A - ELECTRICAL SITE PLAN
ALL DIMENSIONS AND/OR DIMENSIONS SHOWN IN
CALLOUT/ NOTES ARE IN MILLIMETERS UNLESS
OTHERWISE NOTED.
PLAN
NORTH
KEY PLAN
NOT TO SCALE
ES101
TO SWITCHBOARD "4MDS-UB"
L
TYPICAL
M
TO ECB-EMB AND ECB-GBB
TO GENERATOR WIRE GUTTER
BOQ A BUILDING AMI METER
CT CABINET
P P
SP SP
P P SP
E-404
FOR ENLARGED PLAN, SEE & .
E-404
4L1L-8
VIA LC "LC-EL"
4L1L-10
VIA LC "LC-EL"
4L1L-11
VIA LC "LC-EL"
BBQ PAVILION
E-104
FOR ENLARGED PLAN, SEE & .
E-124
P P SP
P
P P
SP SP
TO ATS-GUB
S
S
S S S
S
GENERAL NOTES:
SEE ONE LINE DIAGRAM E-601 AND E-602 FOR CONDUIT AND WIRE SIZES AND
QUANTITIES.
LIGHT LINES INDICATE INFRASTRUCTURE CONSTRUCTED UNDER J-001B
FINEGAYAN UTILITIES AND SITE IMPROVEMENTS PHASE 1 PROJECT. DARK
LINES INDICATE NEW.
B O
Q A
E
LE
C
TR
IC
A L
S
IT
E P
LA
N
ES101
4L1L-12
VIA LC "LC-EL"
4L1L-9
VIA LC "LC-EL"
S
S S S
S
SP SP
S
27mmC, FOR AMI METER POWER
SP SP
S S S
S S S
TO PANEL "2L1P"
S S S
S
SP SP
S S
S S
S S S
S S
S S S
S
SP
S
SP
S SS
S S
S S S
S
SP
S
SP
S SS
S S S
S S S
D E P A R
TM
E N T O F
TH
E
N A V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
NAVFAC DRAWING NO.
N A V F A C
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
P A C
IF
IC
DES DRW
S Y M
D E S C R I P T I O N
D A T E
A P P R
DRAWFORM REVISION: 30 APRIL 2015
REV
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
N A
VF
A
C P
A C
IF
IC
M A K A L A P A
H A W A I I
FIRE PROTECTION
AS SHOWN
UNCLASSIFIED - FOR OFFICIAL USE ONLY
UNCLASSIFIED - FOR OFFICIAL USE ONLY
R E V D A T E
P L O T T E D
U N C L A S S I F I E D
F O R
O F F I C I A L
U S E
O N L Y
P R
E L
IM
IN
A
R Y
N O
T
FO
R C
O N
ST
RU
C
TI
O N
N A V F A C
P A C I F I C
XX/XX/XXXX
SEAL
GU
AM
US
N
AV
SU
PP
AC
T M
CB
G
UA
M
JF
Y
J
-0
B A
C H
E
LO
R O
FF
IC
E R
Q U
A R
TE
R
S -A
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK
AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO
INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.
DATE
IF SHEET IS LESS THAN 559 X 864
REDUCED PRINT. USE GRAPHIC
SCALES
JC
P. NISHIZAKI
MN/KO
972483
XXX
RANDALL TORIGOE
MARFORPAC DPRI MILCON LEAD
JJ/JF RS/NP AM
JS
SP SP
S S
VIA CT CABINET, SEE ONE LINE DIAGRAM FOR INFORMATION.
NOTES:
TO PAVILION LIGHTING.2
TO PAVILION RECEPTACLE.3
4L1L-132L1P-27
AutoCAD SHX Text
SCALE: 1:500
AutoCAD SHX Text
AutoCAD SHX Text 1:500
AutoCAD SHX Text 10m
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
(ELECTRICAL)
AutoCAD SHX Text No. 1259
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text U
AutoCAD SHX Text G
AutoCAD SHX Text
EXP.
AutoCAD SHX Text V.
AutoCAD SHX Text April 30, 2021
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Rectangle
EMCE
Polygon
J-023 BACHELOR OFFICIER QUARTERS-A 972483
US NAVSUPPACT MCB GUAM
SECTION 01 45 00.00 20
QUALITY CONTROL
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 52.2 (2012) Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size
ASTM INTERNATIONAL (ASTM)
ASTM D6245 (2012) Using Indoor Carbon Dioxide Concentrations to Evaluate Indoor Air Quality and Ventilation
ASTM D6345 (2010) Standard Guide for Selection of Methods for Active, Integrative Sampling of Volatile Organic Compounds in Air
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
ANSI/SMACNA 008 (2007) IAQ Guidelines for Occupied Buildings Under Construction, 2nd Edition
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES
SD-01 Preconstruction Submittals
Construction Quality Control (QC) Plan; G
Submit a Construction QC Plan within 30 calendar days of Contract Award. The Accepted QC plan is required prior to start of construction.
SECTION 01 45 00.00 20 Page 1 Ammendment 005 February 24, 2021
Indoor Air Quality (IAQ) Management Plan
Basis of Design and Design Intent
SD-05 Design Data
Contract Document Review
SD-07 Certificates
CxA Resume
1.3 INFORMATION FOR THE CONTRACTING OFFICER
Prior to commencing work on construction, the Contractor can obtain a single copy set of the current report forms from the Contracting Officer.
The report forms will consist of the Contractor Production Report, Contractor Production Report (Continuation Sheet), Contractor Quality Control (CQC) Report, CQC Report (Continuation Sheet), Preparatory Phase Checklist, Initial Phase Checklist, Rework Items List, and Testing Plan and Log.
Deliver the following to the Contracting Officer during Construction:
a. CQC Report: Submit the report electronically by 10:00 AM the next working day after each day that work is performed and for every seven consecutive calendar days of no-work.
b. Contractor Production Report: Submit the report electronically by 10:00 AM the next working day after each day that work is performed and for every seven consecutive calendar days of no-work.
c. Preparatory Phase Checklist: Submit the report electronically in the same manner as the CQC Report for each Preparatory Phase held.
d. Initial Phase Checklist: Submit the report electronically in the same manner as the CQC Report for each Initial Phase held.
e. QC Specialist Reports: Submit the report electronically by 10:00 AM the next working day after each day that work is performed.
f. Field Test Reports: Within two working days after the test is performed, submit the report as an electronic attachment to the CQC Report.
g. Monthly Summary Report of Tests: Submit the report as an electronic attachment to the CQC Report at the end of each month.
h. Testing Plan and Log: Submit the report as an electronic attachment to the CQC Report, at the end of each month. Provide a copy of the final Testing Plan and Log to the preparer of the Operation & Maintenance (O&M) documentation.
i. Rework Items List: Submit lists containing new entries daily, in the same manner as the CQC Report.
j. CQC Meeting Minutes: Within two working days after the meeting is held, submit the report as an electronic attachment to the CQC Report.
SECTION 01 45 00.00 20 Page 2
k. QC Certifications: As required by the paragraph entitled "QC Certifications."
l. Special Inspection Report: Submit the Special Inspection reports, in the same manner as the CQC Report.
1.4 QC PROGRAM REQUIREMENTS
Establish and maintain a QC program as described in this section. This QC program is a key element in meeting the objectives of NAVFAC Commissioning.
The QC program consists of a QC Organization, QC Plan, QC Plan Meeting(s), a Coordination and Mutual Understanding Meeting, QC meetings, three phases of control, submittal review and approval, testing, completion inspections, QC certifications, independent Special Inspections in accordance with Section 01 45 35 SPECIAL INSPECTIONS, and documentation necessary to provide materials, equipment, workmanship, fabrication, construction and operations which comply with the requirements of this Contract. The QC program must cover on-site and off-site work and be keyed to the work sequence. No construction work or testing may be performed unless the QC Manager is on the work site. The QC Manager must report to an officer of the firm and not be subordinate to the Project Superintendent or the Project Manager. The QC Manager, Project Superintendent and Project Manager must work together effectively. Although the QC Manager is the primary individual responsible for quality control, all individuals will be held responsible for the quality of work on the job.
1.4.1 Commissioning
Commissioning is a systematic process of ensuring that all building systems meet the requirements and perform interactively according to the Contract.
The QC Program is a key to this process by coordinating, verifying and documenting measures to achieve the following objectives:
a. Verify and document that the applicable equipment and systems are installed in accordance with the design intent as expressed through the Contract and according to the manufacturer's recommendations and industry accepted minimum standards.
b. Verify and document that equipment and systems receive complete operational checkout by the installing contractors.
c. Verify and document proper performance of equipment and systems.
d. Verify that Operation and Maintenance (O&M) documentation is complete.
e. Verify the Training Plan and training materials are accurate and provide correct instruction and documentation on the critical elements of the products, materials, and systems in the constructed facility.
Verify that all identified Government operating personnel are trained.
f. Verify and document that all contract requirements for commissioning are met.
1.4.2 Acceptance of the Construction Quality Control (QC) Plan
Acceptance of the QC Plan is required prior to the start of construction.
The Contracting Officer reserves the right to require changes in the QC Plan and operations as necessary, including removal of personnel, to ensure the specified quality of work. The Contracting Officer reserves the right
SECTION 01 45 00.00 20 Page 3 to interview any member of the QC organization at any time in order to verify the submitted qualifications. All QC organization personnel are subject to acceptance by the Contracting Officer. The Contracting Officer may require the removal of any individual for non-compliance with quality requirements specified in the Contract.
1.4.3 Preliminary Construction Work Authorized Prior to Acceptance
The only construction work that is authorized to proceed prior to the acceptance of the QC Plan is mobilization of storage and office trailers, temporary utilities, and surveying.
1.4.4 Notification of Changes
Notify the Contracting Officer, in writing, of any proposed changes in the QC Plan or changes to the QC organization personnel, a minimum of 10 work days prior to a proposed change. Proposed changes are subject to acceptance by the Contracting Officer.
1.4.5 Special Inspections
Perform all required Special Inspections per Section 01 45 35 SPECIAL INSPECTIONS, the statement of Special Inspections and the Schedule of Special Inspections.
1.5 QC ORGANIZATION
1.5.1 QC Manager
1.5.1.1 Duties
Provide a QC Manager at the work site to implement and manage the QC program.
The only duties and responsibilities of the QC Manager are to manage and implement the QC program on this Contract. The QC Manager is required to attend the partnering meetings, QC Plan Meetings, Coordination and Mutual Understanding Meeting, conduct the QC meetings, perform the three phases of control except for those phases of control designated to be performed by QC Specialists, perform submittal review and approval, ensure testing is performed and provide QC certifications and documentation required in this Contract. The QC Manager is responsible for managing and coordinating the three phases of control and documentation performed by the QC Specialists, testing laboratory personnel and any other inspection and testing personnel required by this Contract. The QC Manager is the manager of all QC activities. The QC manager is responsible for notifying the Special Inspector of Record of activities which require their review. The QC manager is responsible for coordinating the Special Inspection activities, see paragraph QUALITY CONTROL MANAGER, in Section 01 45 35 SPECIAL
INSPECTIONS.
1.5.1.2 Qualifications
A graduate of a four year accredited college or university program in one of the following disciplines: Engineering, Architecture, Construction Management, Engineering Technology, Building Construction, or Building Science, with a minimum of 10 years experience as a Project Superintendent, QC Manager, Project Manager, Project Engineer or Construction Manager on similar size and type construction contracts which included the major
SECTION 01 45 00.00 20 Page 4 trades that are part of this Contract. The individual must have at least two years experience as a QC Manager. The individual must be familiar with the requirements of EM 385-1-1, and have experience in the areas of hazard identification, safety compliance, and sustainability.
1.5.2 Commissioning Authority
1.5.2.1 Duties
Provide a Commissioning Authority (CxA) as key person for the commissioning and documentation thereof. The CxA must be an independent third party hired directly by the Prime Contractor. The CxA must not be a company employee of the Contractor or any Sub-Contractor performing the work to be inspected. The CxA directs and coordinates comissioning activities and submits commissioning reports to the Contracting Officer to meet the submittal and reporting requirements of commissioning and develops the commissioning plan. The CxA coordinates the actions of the QC Specialists, Testing Laboratory personnel,[ eOMSI Preparer,] and other inspection and testing personnel required by this Contract for building commissioning.
1.5.2.2 Qualifications
The CxA must be certified as a commissioning professional by the Associated Air Balance Council (AABC) Commissioning Group (ACG), the Association of Energy Engineers (AEE), the American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE), the Commissioning Process Management Professional (CPMP), the Building Commissioning Association (BCA), the National Environmental Balancing Bureau (NEBB), or the University of Wisconsin - Madison (UWM). CxA resume is required, providing education, experience and management capabilities on at least two similar size and type contracts. The CA may not have been involved with the project design, construction management, or supervision, and must be with a third-party firm that was not on the design team.
1.5.3 Construction Quality Management Training
In addition to the above experience and education requirements, the QC Manager must have completed the course entitled "Construction Quality Management (CQM) for Contractors." If the QC Manager does not have a current certification, they must obtain the CQM for Contractors course certification within 90 calendar days of award. This course is periodically offered by the Naval Facilities Engineering Command and the Army Corps of Engineers. Contact the Contracting Officer for information on the next scheduled class.
1.5.4 Alternate QC Manager Duties and Qualifications
Designate an alternate for the QC Manager at the work site to serve in the event of the designated QC Manager's absence. The period of absence may not exceed two weeks at one time, and not more than 30 workdays during a calendar year. The qualification requirements for the Alternate QC Manager must be the same as for the QC Manager.
1.5.5 QC Specialists Duties and Qualifications
Provide a separate QC Specialist at the work site for each of the areas of responsibilities, specified in Part 3, Execution, of the technical sections, who must assist and report to the QC Manager and who may perform
SECTION 01 45 00.00 20 Page 5 production related duties but must be allowed sufficient time to perform their assigned quality control duties. QC Specialists are required to attend the Coordination and Mutual Understanding Meeting, QC meetings and be physically present at the construction site to perform the three phases of control and prepare documentation for each definable feature of work in their area of responsibility at the frequency specified below.
1.5.5.1 Mechanical QC Specialist
Qualification/Experience in Area of Responsibility
Area of Responsibility Frequency
Registered Mechanical Engineer (PE)/ QC Specialist.
Installation and testing of mechanical systems.
As required…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .