This amendment modifies solicitation N62742-21-R-1334 for the construction of a multi-story Bachelor Officers Quarters and utility building at Marine Corps Base Guam. The amendment revises technical specifications, drawings, and construction requirements. It deletes paragraphs on plastic bathtub liners and surrounds from plumbing specifications. For accessible units, it requires two shower heads mounted at different heights. It modifies earthwork requirements and adds probe holes and grout backfilling for continuous footings. The amendment also reissues several drawings with revisions to notes, materials, fire ratings, access panels, generator details, and schedules.

View the file

Other files

File Type Posted
Class JA for ECC Elevator Control Systems 20210419 REDACTED.pdf PDF
AMD 0009 21R1334.pdf PDF
21R1334 Note 7 Final.pdf PDF
AMD 0008 21R1334.pdf PDF
21R1334 Note 6 Final.pdf PDF
Amd 07 Rev Dwgs.pdf PDF
21R1334 Note 5 Final.pdf PDF
Amd 06 rev Dwgs-a.pdf PDF
AMD 0006 21R1334.pdf PDF
Amd 05 Rev DWGS.pdf PDF
AMD 0005 21R1334.pdf PDF
21R1334-Note 4 Final.pdf PDF
Amd 04 revised DWGS.pdf PDF
Amd 03 Civil DWGS reissued.pdf PDF
AMD 0004 21R1334.pdf PDF
Amd 02 Civil DWGS reissued.pdf PDF
21R1334-Note3 Final.pdf PDF
AMD 03 21R1334.pdf PDF
Amd 03 Rev Spec Sections.pdf PDF
Amd 03 Rev DWGS.pdf PDF
Class JA for Dormakaba RFID Locking System_REDACTED.pdf PDF
21R1334-Note2-Final.pdf PDF
Amd 02 BOQ A AMD 02 DWGS_R1 signed.pdf PDF
AMD 02 21R1334.pdf PDF
Amd 02 BOQ A Civil Dwgs - Reissued.pdf PDF
21R1334-Note1-Final.pdf PDF
Amd 01 IMAGE 26 NOV 2020.pdf PDF
Amd 01 1A-5B-1.pdf PDF
Amd 01 6A-8C-1.pdf PDF
AMD 01 21R1334.pdf PDF
Amd 01 J023 site photo key.pdf PDF
J-023 BOQ A Specifications_Signed Off_Volume 2 of 2_.pdf PDF
Class JA - Fed Signal-redacted.pdf PDF
J-023 BOQ A Specifications_Signed Off_Volume 1 of 2_.pdf PDF
Class JA King F Transmitters-Redacted.pdf PDF
J-023 BOQ A Drawings_Signed Off_4 of 4_Electrical Telecommunications.pdf PDF
J-023 BOQ A Drawings_Signed Off_1 of 4_Civil Structural.pdf PDF
MCBG Knox Box Class JA_Redacted.pdf PDF
JA BEQs-BOQs RFID Vingcard-Redacted.pdf PDF
Class JA No 20-016 for AMI Meter (Redacted) w Att A.pdf PDF
N62742-21-R-1334 Front End.pdf PDF
J-023 BOQ A Drawings_Signed Off_3 of 4_Fire Protection Mechanical Plumbing.pdf PDF
J-023 BOQ A Drawings_Signed Off_2 of 4_Architectural Interiors.pdf PDF
Class JA for JCI METASYS (20200626)_Redacted.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

972483

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N62742-21-R-1334, Amendment 0007

See Next Page

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Mar-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274221R1334

X 9B. DATED (SEE ITEM 11)

17-Dec-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Mar-2021

CODE

HAND DELIVER

NAVFAC PACIFIC

CONSTRUCTION CONTRACTS BR (ACQ33)

4256 RADFORD DR, BLDG 62

HONOLULU HI 96818-3296

N62742 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6274221R1334

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

This amendment is issued to revise the following:

1. Section 09 30 10, paragraph 2.5, 1st subparagraph is deleted in its entirety and replaced with the following:

Provide clear anodized aluminum transitions between tile and carpet or resilient flooring. Provide types as recommended by flooring manufacturer for both edges and transitions of flooring materials specified. Provide transition strips that comply with 36 CFR 1191 requirements.

2. Section 12 24 13, paragraph 1.5.1.1 is deleted in its entirety and replaced with the following:

Obtain manual roller shades through one source from a single manufacturer with a minimum of twenty years experience and minimum of three projects of similar scope and size in manufacturing products comparable to those specified in this section.

3. Section 22 00 00, delete the following subparagraphs in their entirety and designate those subparagraphs as “Reserved:”

a. 2.4.11 Plastic Bathtub Liners

b. 2.4.12 Plastic Bathtub Wall Surrounds

c. 2.4.13 Precast Terrazzo Shower Floors

4. Section 22 00 00, paragraph 2.6.2, is revised to add the following sentence at the 8th line after “….each supply to faucet.”

For accessible units, provide a second mounting bracket and shower head at an accessible reach height in compliance with ABA requirements.

5. Section 31 23 00.00 20, paragraph 3.3.1 is deleted in its entirety and replaced with the following:

Over excavate below spread footings 600mm and backfill with select material in 150mm lifts compacted to 95 percent of ASTM D1557 maximum density. Ensure that footing subgrades have been inspected and approved by the Contracting Officer prior to concrete placement.

6. Section 31 32 23 is revised as follows:

a. Paragraph 3.2.1c is deleted in its entirety and replaced with the following:

Provide one probe hole for each 4.6 square meters of footing area and one probe hole for remaining balance of each footing, and one probe hole for each footing smaller 4.6 sq. meters. Drill each probe hole to 3 meters below the bottom of footing. For continuous footings, drill probe holes at 3 meters on center along the centerline of the continuous footings each to 3 meters below the bottom of the continuous footing.

b. Add paragraph 3.2.1d as the follows:

Backfill all probe holes completely with grout having at least 1,030 kPa 28-day compressive strength. Pump the grout through a tremie pipe starting at the bottom of the probe hole.

7. Revised Drawings: The following previously issued drawings are revised and reissued. These revised drawings supersede any previously issued drawings:

N6274221R1334

NO. SHEET NO. NAVFAC NO. DESCRIPTION

1 CS403 17255261 Revised Note

2 CS501 17255262 Revised Note

3 A-131 17255366 1-HR Corridor Ceiling Added

4 A-132 17255367 1-HR Corridor Ceiling Added

5 A-143 17255373 Access Panel Added

6 A-144 17255374 Access Panel Added

7 A-313 17255386 Lid Added

8 A-314 17255387 Ceiling Change

9 A-315 17255388 Ceiling Change

10 A-316 17255389 Roof Louvers Section

11 A-532 17255412 1-HR Corridor Ceiling Added

12 A-601 17255418 Material, Finish Edit

13 M-001 17255483 Revised Mech. Notes

14 M-114 17255489 Revised Generator and AS

15 M-403 17255498 Revised Generator and AS

16 M-601 17255503 Revised Mech. Schedule

17 M-704 17255510 Revised Seq. of Ops.

18 M-901 17255515 Air Separator

19 P-602 17255540 Revised ASHP Schedule

20 P-727 17255554 Revised Schematic

8. All other terms and conditions remain unchanged.