Phase Two Enclosure 3_P1238_Blank_OfferSchedule_Revised.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA
Solicitation number
N6247324R5227
Issued by

About this file

This file is a Price/Offer Schedule for Solicitation N6247324R5227, detailing a Design-Build contract for Battery Energy Storage Systems (BESS) at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The base bid item is a firm-fixed price for constructing a 10 MW/40 MWh BESS across two cogeneration sites, including 4.0 MW/16 MWh at site 1 and 2 MW/8 MWh at site 2, with additional supporting infrastructure such as fiber optic cable replacement, meter additions to 54 existing PV systems, and microgrid integration.

The solicitation includes two optional bid items: Option 0001 provides an additional 2 MW/8 MWh BESS at cogeneration site #1, increasing total capacity to 6 MW/24 MWh, and Option 0002 adds another 2 MW/8 MWh BESS at the same site, bringing site #1's capacity to 4 MW/16 MWh. The contract requires comprehensive design, procurement, construction, testing, and commissioning of the BESS, with all associated management, supervision, quality control, labor, equipment, and materials. The proposal is valid for 90 days from receipt, and all amendments must be acknowledged to avoid potential rejection.

View the file

Other files

File Type Posted
Solicitation Amendment N6247324R52270024 SF 30.pdf PDF
ENCL 2 - WD_CA20250026_AMEND 23.pdf PDF
ENCL 1 - P1238_RFP_AMEND 0023_Revised 21AUG25.pdf PDF
Amendment 0023_P1238.pdf PDF
Amendment 0022_P1238_14AUG25.pdf PDF
Amendment 0021_P1238_13AUG25.pdf PDF
ENCL 1 - P1238_RFP_AMEND 0020_Revised 06AUG25.pdf PDF
Amendment 0020_P1238_06AUG25.pdf PDF
ENCL 2 - WD_CA20250026_MOD 08_01AUG25.pdf PDF
Amendment 0019_P1238_31JUL25.pdf PDF
Phase Two Enc 1 - P1238_RFP_AMEND 0019_Revised31JUL25.pdf PDF
Amendment 0018_P1238_21JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0018_Revised 21JUL25.pdf PDF
Amendment 0017_P1238_15JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0017_Revised 15JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0016_Revised 02JUL25.pdf PDF
Amendment 0016_P1238_02JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0015_Revised 01JUL25.pdf PDF
Amendment 0015_P1238_01JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0014_Revised 30JUN25.pdf PDF
Amendment 0014_P1238_30JUN25.pdf PDF
Section 00 45 00 Reps and Certs_24R5227_AMEND 0014.docx DOCX document
Amendment 0013_P1238_24JUN25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0013_Revised 24JUN25.pdf PDF
Wage Determination CA 20250026 dated 06062025.pdf PDF
Phase Two Enclosure 3 - P1238_Blank_OfferSchedule_Revised 04JUN25.xlsx XLSX spreadsheet
Amendment 0012_P1238_05JUN25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0012_Revised 05JUN25.pdf PDF
PLA Request for Information N6247324R5227.docx DOCX document
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0011_Revised 29MAY25.pdf PDF
Wage Determination_CA20250017_Modification 8_29MAY25.pdf PDF
Amendment 0011_P1238_29MAY25.pdf PDF
ENCL C_ESR_D30_P1238.pdf PDF
ENCL B_ESR_D20_P1238.pdf PDF
ENCL H_EXHIBIT F_P1238_Small Business Participation Commitment.docx DOCX document
ENCL E_2a- P-495 Geotech Report 1999-01-19.pdf PDF
ENCL F_Geotech Report.pdf PDF
ENCL A_ESR_A10_P1238.pdf PDF
ENCL J_UFGS 01 91 00.15-DBContract_P1238.pdf PDF
ENCL G_EXHIBIT E_P1238_Historical Small Business Utilization.docx DOCX document
ENCL K_P1238_N6247324R5227_RFI_Responses_Amendment 0010.xlsx XLSX spreadsheet
Amendment 0010_P1238_RFI Responses_19MAY25.pdf PDF
ENCL D_Utilities_P1238.pdf PDF
P1238_N6247322R5227_RFI_Submission - Non-Amendment Responses_08MAY25.xlsx XLSX spreadsheet
N6247324R5227_Amendment 0009_SF30.pdf PDF
EXHIBIT E_P1238_Historical Small Business Utilization.pdf PDF
Revised Standard Form (SF) 1442_P1238_N6247324R5227.pdf PDF
Phase Two Enclosure 1_P1238_RFP Part 1_Revised.pdf PDF
P1238_RFI Submission Form_Responses_17APR2025.xlsx XLSX spreadsheet
N6247324R5227_Amendment 0008.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

P1238 Construction of Grid Stability & Resiliency 10 MW Battery Energy StorageEnclosure (1)
OFFEROR:Contractor's Name Here
DATE:Date Here

The offeror shall enter prices and rates in the yellow highlighted cells. Price entries shall be limited to 2 decimal places.

BASE BID ITEMS
Base Item 0001Firm Fixed Price for a DESIGN-BUILD PROJECT, P1238, Construction of Grid Stability & Resiliency 10MW/40MWh Battery Energy Storage, Various Buildings, Twenty Nine Palms MCAGCC, provides 4.0MW/16MWh at cogeneration site 1 and 2MW/8MWh at cogeneration site 2, include a replacement and modification of the existing fiber optic cable by installing a new fiber optic cable; adding meters, on-off control, and data acquisition to 54 existing PV systems; and modifying programming of the existing CCS to integrate BESS with existing microgrid operations. The resulting cable shall be a loop that connects all existing co-generator, microgrid, PV and BESS systems. This base item includes design and construction of design, procurement, construction testing and commissioning of a Battery Energy Storage System (BESS) and all related Management, supervision, quality control, labor, equipment, and materials to provide a complete and usable facility. Price includes all incidental related work to support the design and construction including permits, utility connection fees, taxes, bond cost, overhead and profit, complete in accordance with the RFP and all Amendments, but not including work indicated or specified to be provided under any other bid items.$ - 0
Design Consultant Service
General Conditions
PRIMARY FACILITIES
6MW/24MWh Battery Energy Storage (includes CONEX boxes, Foundation, Shade Structure, Electrical, Plumbing, Mechanical)
SUPPORTING FACILITIES
Replacement and modification of the existing fiber optic cable by installing a new fiber optic cable; adding meters, on-off control, and data acquisition to 54 existing PV systems; and modifying programming of the existing CCS to integrate BESS with existing microgrid operations. The resulting cable shall be a loop that connects all existing co-generator, microgrid, PV and BESS systems. (Includes Site Preparations & Improvements, Civil, Mechanical & Electrical Utilities)

TOTAL BASE ITEM (0001) $ - 0

OPTION ITEMS
Option Item 0001OPTION 0001: Provide an additional minimum of 2MW/8MWh (nominal) BESS with same design to that of the Base Bid item. This Bid Option increases the total BESS capacity to 6MW/24MWh (nominal) at cogeneration site #1. FFP (Lump Sum) Includes all labor, equipment, and materials to construct this option. Price includes all incidental related work to support the design and construction including permits, utility connection fees, taxes, bond cost, overhead and profit, complete in accordance with the RFP and all Amendments, but not including work indicated or specified to be provided under any other bid items.
General Conditions
Primary Facilities 2 MW/8 MWh BATTERY ENERGY STORAGE (BESS) (includes CONEX boxes, Foundation, Shade Structure, Electrical, Plumbing, Mechanical)
Supporting Facilities (includes Site Preparations & Improvements, Civil, Mechanical & Electrical Utilities)
Total Option Item (0001)$ - 0

Option Item 0002 OPTION 0002: Provide an additional minimum of 2MW/8MWh (nominal) BESS at cogeneration Site #1 with same design to that of the Base Bid item. This Bid Option increases the total BESS capacity to 4MW/16MWh (nominal) at cogeneration site #1. FFP (Lump Sum) Includes all labor, equipment, and materials to construct this option. Price includes all incidental related work to support the design and construction including permits, utility connection fees, taxes, bond cost, overhead and profit, complete in accordance with the RFP and all Amendments, but not including work indicated or specified to be provided under any other bid items.

General Conditions
Primary Facilities 2 MW/4 MWh BATTERY ENERGY STORAGE (BESS) (includes CONEX boxes, Foundation, Shade Structure, Electrical, Plumbing, Mechanical)
Supporting Facilities (includes Site Preparations & Improvements, Civil, Mechanical & Electrical Utilities)
Total Option Item (0002)$ - 0

TOTAL OPTION ITEMS (0001-0002) $ - 0

TOTAL EVALUATED PRICE (Total of Base Items [F18] + Total of Option Items [F59]$ - 0
EVALUATION OF PRICE
In accordance with the Price Factor, the Total Evaluated Price will be in accordance with FAR 52.217-5 Evaluation of Options, which includes the total of Base Item(s), and all Option Items.

The Government reserves the right to verify the calculations in this spreadsheet. In the event that an error in the Contractor's calculations are found, the Government will use the actual amounts entered in for the Base Item, and the Option Item(s) (if applicable) as the intended price. The Government will use these proposed amounts to determine the Total Evaluated Price.

All applicable cells must be completed. Failure to propose on all items shall result in proposal being rejected as nonresponsive. Failure to acknowledge all amendments may result in proposal being rejected as nonresponsive.

SUBMITTED PROPOSALS SHALL BE VALID FOR 90 DAYS FROM THE DATE OF RECEIPT.

THIS OFFEROR ACKNOWLEDGES RECEIPTS OF AMENDMENTS TO THE SOLICITATION:

AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________

OFFEROR NAME: DUNS:

STREET ADDRESS: EIN (TAX ID):

CITY, STATE, ZIP CODE:

EMAIL ADDRESS: PHONE:

SIGNATURE OF PERSON AUTHORIZED TO SIGN OFFER:

SIGNATURE:

PRINTED NAME:DATE:
**************************************************************************************************************
SURETY COMPANY:PHONE:
SURETY POC/BONDING AGENT:
EMAIL ADDRESS: