Amendment 0010 modifies the Request for Proposal (RFP) for a Battery Energy Storage Systems (BESS) project at Marine Corps Air Ground Combat Center in Twentynine Palms, California. The amendment makes multiple changes, including extending the Phase Two proposal due date from June 3, 2025 to June 9, 2025 at 2:00 PM PDT, and providing responses to 20 separate Requests for Information (RFIs) that adjust various sections of the original solicitation. Key modifications include revising technical specifications for HVAC, plumbing, foundations, security systems, and project objectives, as well as adding several technical enclosures such as geotechnical reports, historical small business utilization documents, and control system diagrams. The amendment also introduces a new maintenance bid option for two years of system maintenance and expands the BESS capacity description from 10.6 MWh to 10MW/40MWh, with the system designed to provide approximately 48% of base-wide electrical load during summer and 60% during winter months.

View the file

Other files

File Type Posted
Solicitation Amendment N6247324R52270024 SF 30.pdf PDF
ENCL 2 - WD_CA20250026_AMEND 23.pdf PDF
ENCL 1 - P1238_RFP_AMEND 0023_Revised 21AUG25.pdf PDF
Amendment 0023_P1238.pdf PDF
Amendment 0022_P1238_14AUG25.pdf PDF
Amendment 0021_P1238_13AUG25.pdf PDF
ENCL 1 - P1238_RFP_AMEND 0020_Revised 06AUG25.pdf PDF
Amendment 0020_P1238_06AUG25.pdf PDF
ENCL 2 - WD_CA20250026_MOD 08_01AUG25.pdf PDF
Amendment 0019_P1238_31JUL25.pdf PDF
Phase Two Enc 1 - P1238_RFP_AMEND 0019_Revised31JUL25.pdf PDF
Amendment 0018_P1238_21JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0018_Revised 21JUL25.pdf PDF
Amendment 0017_P1238_15JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0017_Revised 15JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0016_Revised 02JUL25.pdf PDF
Amendment 0016_P1238_02JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0015_Revised 01JUL25.pdf PDF
Amendment 0015_P1238_01JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0014_Revised 30JUN25.pdf PDF
Amendment 0014_P1238_30JUN25.pdf PDF
Section 00 45 00 Reps and Certs_24R5227_AMEND 0014.docx DOCX document
Amendment 0013_P1238_24JUN25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0013_Revised 24JUN25.pdf PDF
Wage Determination CA 20250026 dated 06062025.pdf PDF
Phase Two Enclosure 3 - P1238_Blank_OfferSchedule_Revised 04JUN25.xlsx XLSX spreadsheet
Amendment 0012_P1238_05JUN25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0012_Revised 05JUN25.pdf PDF
PLA Request for Information N6247324R5227.docx DOCX document
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0011_Revised 29MAY25.pdf PDF
Wage Determination_CA20250017_Modification 8_29MAY25.pdf PDF
Amendment 0011_P1238_29MAY25.pdf PDF
ENCL C_ESR_D30_P1238.pdf PDF
ENCL B_ESR_D20_P1238.pdf PDF
ENCL H_EXHIBIT F_P1238_Small Business Participation Commitment.docx DOCX document
ENCL E_2a- P-495 Geotech Report 1999-01-19.pdf PDF
ENCL F_Geotech Report.pdf PDF
ENCL A_ESR_A10_P1238.pdf PDF
ENCL J_UFGS 01 91 00.15-DBContract_P1238.pdf PDF
ENCL G_EXHIBIT E_P1238_Historical Small Business Utilization.docx DOCX document
ENCL K_P1238_N6247324R5227_RFI_Responses_Amendment 0010.xlsx XLSX spreadsheet
ENCL D_Utilities_P1238.pdf PDF
P1238_N6247322R5227_RFI_Submission - Non-Amendment Responses_08MAY25.xlsx XLSX spreadsheet
Phase Two Enclosure 3_P1238_Blank_OfferSchedule_Revised.xlsx XLSX spreadsheet
N6247324R5227_Amendment 0009_SF30.pdf PDF
EXHIBIT E_P1238_Historical Small Business Utilization.pdf PDF
Revised Standard Form (SF) 1442_P1238_N6247324R5227.pdf PDF
Phase Two Enclosure 1_P1238_RFP Part 1_Revised.pdf PDF
P1238_RFI Submission Form_Responses_17APR2025.xlsx XLSX spreadsheet
N6247324R5227_Amendment 0008.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0010

Date: May 19, 2025

Solicitation No.: N62473-24-R-5227

P-1238 CONSTRUCTION OF GRID STABILITY & RESILIENCY 10MW BATTERY ENERGY

STORAGE MARINE CORPS AIR GROUND COMBAT CENTER

TWENTYNINE PALMS, CALIFORNIA

The purpose of this amendment is to provide Request for Information (RFI) responses, adjust the proposal due date, and correct the below identified sections of the Request for Proposal (RFP):

1. Provide RFI responses for Phase Two of the solicitation via Enclosure K, P1238_N6247324R5227_RFI_Responses_Amendment 0010.

2. Revise the Phase Two proposal due date and time in response to RFI #205:

FROM:

Tuesday, June 3, 2025 at 2:00 PM, Pacific Daylight Time (PDT)

TO:

Monday, June 9, 2025 at 2:00 PM, Pacific Daylight Time (PDT)

3. RFP Part 3, Section D30 in response to Request for Information (RFI) no. 8, 9, 10, 11,12, 13, 14, 15, 26, and 143 as follows:

FROM:

D30 HVAC entirely

Revised D30 HVAC as attached (Enclosure C).

4. RFP Part 3, Chapter 1, Project Description, in response to Request for Information (RFI) no. 17 as follows:

.. then the Contractor will be responsible for building a concrete masonry unit (CMU) wall around the BESS and seek the necessary exemption from the authority having jurisdiction (AHJ) and the UFC committee.

(Blank)

5. RFP Part 3, Chapter 1.1, Background, in response to Request for Information (RFI) no. 19 as follows:

FROM:

... Approximately 2.75 MW of PV at MCAGCC is under PPA or ESPC contracts and will require additional coordination with those contractors.

Approximately 2.75 MW of PV at MCAGCC is under PPA or ESPC contracts.

6. RFP Part 3, Section D503005 in response to Request for Information (RFI) no. 31 as follows:

FROM:

An Electronic Security System (ESS) is the integrated electronic system that encompasses one or more of the following subsystems; access control system (ACS), intrusion detection system (IDS), and closed circuit television (CCTV) systems for assessment of alarm conditions.

TO:

An Electronic Security System (ESS) is the integrated electronic system that encompasses one of the following subsystems: closed circuit television (CCTV) systems for assessment of alarm conditions

7. RFP Part 3, Chapter 1 Project Description, Section 1.3, scope of work include of the following contract options, in response to Request for Information (RFI) no. 32 and 141 as follows:

(Blank)

TO:

4) BID OPTION 003: Provide a cost for two years of maintenance to consist of the following:

• Monitor system remotely to ensure battery modules are healthy, focusing on thermal anomalies

• Provide software and firmware upgrades to communication and control systems

• HVAC system maintenance

• Fire suppression system maintenance

• Acknowledge the following within 12 hours and remedy within 72 hours:

o Fix bugs o Items that are not covered in warranty, i.e., setpoint in HVAC is incorrect, rodents chew through cables, any other corrective maintenance identified

• Other maintenance per manufacturer’s recommendations

8. RFP Part 3, Chapter 3, D503005 in response to Request for Information (RFI) no. 34 as follows:

FROM:

An Electronic Security System (ESS) is the integrated electronic system that encompasses one or more of the following subsystems; access control system (ACS), intrusion detection system (IDS), and closed circuit television (CCTV) systems for assessment of alarm conditions.

TO:

An Electronic Security System (ESS) is the integrated electronic system that encompasses one of the following subsystems; closed circuit television (CCTV) systems for assessment of alarm conditions.

9. RFP Part 3, Chapter 3, D503005, Security Systems, in response to Request for Information (RFI)

no. 36 as follows:

An Electronic Security System (ESS) is the integrated electronic system that encompasses one or more of the following subsystems; access control system (ACS), intrusion detection system (IDS), and closed circuit television (CCTV) systems for assessment of alarm conditions.

TO:

An Electronic Security System (ESS) is the integrated electronic system that encompasses one of the following subsystems; closed circuit television (CCTV) systems for assessment of alarm conditions.

10. RFP Part 6, Attachments D, Existing PV locations, in response to Request for Information (RFI)

no. 46 as follows, FROM:

Spec Section 01 91 00.15 BUILDING COMMISSIONING, entirely.

TO:

Spec Section 01 91 00.15 BUILDING COMMISSIONING as attached (Enclosure J)

11. RFP Part 3, Chapter 1, Project Description, in response to Request for Information (RFI) no. 54 as follows:

FROM:

Then the Contractor will be responsible for building a concrete masonry unit (CMU) wall around the BESS and seek the necessary exemption from the authority having jurisdiction (AHJ) and the UFC committee.

TO:

(Blank)

12. RFP Part 3, Chapter 6, ESR D20 Plumbing, in response to Request for Information (RFI) no. 56

57, 59, and 143 as follows:

FROM:

ESR D20 PLUMBING, entirely.

ESR D20 PLUMBING as attached (Enclosure B).

13. RFP Part in response to Request for Information (RFI) no. 60 as follows:

Utility plan is provided as PDF files, see Enclosure D_Utility_P1238.

14. RFP Part 3, Chapter 2, Project Objectives, Subsection 2.1 Mission Statement, in response to

Request for Information (RFI) no. 63 and 114 as follows:

FROM:

In support of MCAGCC mission critical activities, the primary purpose for the 10.6 MWh BESS is to improve energy resiliency and improve “Islanding” capability to offset a Loss of Offsite Power (LOP) event by providing a minimum of four-hour runtime for rapid summer/winter load recovery and micro grid stabilization functions while ensuring security and mission assurance. During a LOP event, the 10.6 MWh BESS is designed to provide approximately 48% of the base wide electrical load during summer months and 60% electrical load during winter months.

TO:

In support of MCAGCC mission critical activities, the primary purpose for the 10MW/40MWh BESS is to improve energy resiliency and improve “Islanding” capability to offset a Loss of Offsite Power (LOP) event by providing a minimum of four-hour runtime for rapid summer/winter load recovery and micro grid stabilization functions while ensuring security and mission assurance. During a LOP event, the 10MW/40MWh BESS is designed to provide approximately 48% of the base wide electrical load during summer months and 60% electrical load during winter months.

15. In response to Request for Information (RFI) no. 74 as follows:

The Building 1580 (PV field) is controlled via the main breaker located at Building 1579. Some systems are currently tied to control functions on the PV inverters through EMON DMON 5000 meters. Currently through EMCS building control systems. PPA will be controlled and monitored through SCADAMATE switch external to PPA. No control within PPA boundaries. Central Control System (CCS) will provide control and metering functions through Rockwell Cogen 1 CCS programming, see Enclosure I - Control Diagram System.

Note: Enclosure I - Control Diagram Systems is Controlled Unclassified Information (CUI) and is only available to Phase Two qualifiers after signing an NDA.

FROM:

(BLANK)

TO:

Add Enclosure I - Control Diagram System.

16. RFP Part 2 Spec Section 01 45 35, Section 1.2 General Requirements, in response to Request for

Information (RFI) no. 97 as follows:

FROM:

Structural observations will be performed separately by the Government by the Structural Engineer of Record on the Contractor's Design-Build team. The Contractor must provide notification to the Contracting Officer Structural Engineer of Record and Contracting Officer 14 days prior to the following points of construction to allow for structural observation.

TO:

Structural observations will be performed by the Structural Engineer of Record on the Contractor's Design-Build team. The Contractor must provide notification to the Structural Engineer of Record and Contracting Officer 14 days prior to the following points of construction to allow for structural observation.

17. In response to Request for Information (RFI) no. 128 as follows:

(BLANK)

Add: Attachment #2a – P-495 Geotech Report (1999-01-19) and Attachment #2b – P-126, 130, 131, 143, 171 Geotech Report

18. SF1442 Factor 5: Technical Solution, Proposal Submission Requirements’ in response to Request for Information (RFI) no. 131 as follows:

Provide a narrative not to exceed two (2) double-sided pages (or four (4) single-sided pages), minimum size 10 font, describing the technical solution to the project that meets or exceeds the requirements of the RFP. Address the following within the narrative.

TO:

Provide a narrative not to exceed four (4) double-sided pages (or eight (8) single-sided pages), minimum size 10 font, describing the technical solution to the project that meets or exceeds the requirements of the RFP. Address the following within the narrative.

19. RFP Part in response to Request for Information (RFI) no. 143 as follows:

(BLANK)

Add ESR D20 (Enclosure B) and ESR D30 (Enclosure C)

20. In response to Request for Information (RFI) no. 146 as follows:

(BLANK)

TO:

Exhibit E (Enclosure G) and Exhibit F (Enclosure H) as attached.

21. RFP Part 3, Chapter 6, ESR A10 Foundation, in response to Request for Information (RFI) no.

186 and 187 as follows:

FROM:

(BLANK)

Add ESR A10 (Enclosure A) as attached.

22. ALL OTHER PARAGRAPHS, PROVISIONS, AND CONDITIONS OF SOLICITATION

N62473-24-R-5227 PLANNED REMAIN UNCHANGED. THE OFFEROR MUST

ACKNOWLEDGE RECEIPT OF ALL AMENDEMENTS ON THE OFFER SCHEDULE.

Enclosures:

a. ESR_A10_P1238

b. ESR_D20_P1238

c. ESR_D30_P1238

d. Utilities_P1238

e. #2a - P495 Geotech Report (1999-01-19)

f. #2b – P-126, 130, 131, 143, 171 Geotech Report

g. Exhibit E_P1238_Historial Small Business Utilization

h. Exhibit F_P1238_Small Business Participation Commitment

i. Control Systems Diagram (CUI) – Available with signed NDA for Phase Two participants only.

j. UGFS 01 91 00.15 – DB Contract_P1238

k. P1238_N6247324R5227_RFI_Responses_Amendment 0010

File details come from the government source that posted it. Updated .