About this file

This document is an Engineering Systems Requirements (ESR) specification for plumbing systems in a Battery Energy Storage System (BESS) project at 29 Palms, California. The plumbing system requirements cover domestic water supply, sanitary waste, emergency fixtures, and specialized systems specific to the battery installation. Key technical specifications include:

Plumbing system components must use copper tubing for above and below ground piping, with mineral fiber and cellular glass insulation with vapor barriers for hot and cold water lines. An emergency portable eyewash station meeting ANSI Z358.1 requirements is mandated, along with floor drains in the battery area. The system also requires a battery electrolyte waste collection system, and provisions for condensate drainage from AC units. All installations must comply with International Plumbing Code (IPC) and UFC 3-420-01 standards, with concrete equipment pads and proper working space around all equipment.

View the file

Other files

File Type Posted
Solicitation Amendment N6247324R52270024 SF 30.pdf PDF
ENCL 2 - WD_CA20250026_AMEND 23.pdf PDF
ENCL 1 - P1238_RFP_AMEND 0023_Revised 21AUG25.pdf PDF
Amendment 0023_P1238.pdf PDF
Amendment 0022_P1238_14AUG25.pdf PDF
Amendment 0021_P1238_13AUG25.pdf PDF
ENCL 1 - P1238_RFP_AMEND 0020_Revised 06AUG25.pdf PDF
Amendment 0020_P1238_06AUG25.pdf PDF
ENCL 2 - WD_CA20250026_MOD 08_01AUG25.pdf PDF
Amendment 0019_P1238_31JUL25.pdf PDF
Phase Two Enc 1 - P1238_RFP_AMEND 0019_Revised31JUL25.pdf PDF
Amendment 0018_P1238_21JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0018_Revised 21JUL25.pdf PDF
Amendment 0017_P1238_15JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0017_Revised 15JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0016_Revised 02JUL25.pdf PDF
Amendment 0016_P1238_02JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0015_Revised 01JUL25.pdf PDF
Amendment 0015_P1238_01JUL25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0014_Revised 30JUN25.pdf PDF
Amendment 0014_P1238_30JUN25.pdf PDF
Section 00 45 00 Reps and Certs_24R5227_AMEND 0014.docx DOCX document
Amendment 0013_P1238_24JUN25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0013_Revised 24JUN25.pdf PDF
Wage Determination CA 20250026 dated 06062025.pdf PDF
Phase Two Enclosure 3 - P1238_Blank_OfferSchedule_Revised 04JUN25.xlsx XLSX spreadsheet
Amendment 0012_P1238_05JUN25.pdf PDF
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0012_Revised 05JUN25.pdf PDF
PLA Request for Information N6247324R5227.docx DOCX document
Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0011_Revised 29MAY25.pdf PDF
Wage Determination_CA20250017_Modification 8_29MAY25.pdf PDF
Amendment 0011_P1238_29MAY25.pdf PDF
ENCL C_ESR_D30_P1238.pdf PDF
ENCL H_EXHIBIT F_P1238_Small Business Participation Commitment.docx DOCX document
ENCL E_2a- P-495 Geotech Report 1999-01-19.pdf PDF
ENCL F_Geotech Report.pdf PDF
ENCL A_ESR_A10_P1238.pdf PDF
ENCL J_UFGS 01 91 00.15-DBContract_P1238.pdf PDF
ENCL G_EXHIBIT E_P1238_Historical Small Business Utilization.docx DOCX document
ENCL K_P1238_N6247324R5227_RFI_Responses_Amendment 0010.xlsx XLSX spreadsheet
Amendment 0010_P1238_RFI Responses_19MAY25.pdf PDF
ENCL D_Utilities_P1238.pdf PDF
P1238_N6247322R5227_RFI_Submission - Non-Amendment Responses_08MAY25.xlsx XLSX spreadsheet
Phase Two Enclosure 3_P1238_Blank_OfferSchedule_Revised.xlsx XLSX spreadsheet
N6247324R5227_Amendment 0009_SF30.pdf PDF
EXHIBIT E_P1238_Historical Small Business Utilization.pdf PDF
Revised Standard Form (SF) 1442_P1238_N6247324R5227.pdf PDF
Phase Two Enclosure 1_P1238_RFP Part 1_Revised.pdf PDF
P1238_RFI Submission Form_Responses_17APR2025.xlsx XLSX spreadsheet
N6247324R5227_Amendment 0008.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-1238 Construction of Grid Stability & Resiliency 10 MW Battery Energy Storage, Various Buildings.

Work Order Number 20190612 29 Palms/California

PART 3 - CHAPTER 6 / ESR D20 - Page 1

6. ENGINEERING SYSTEMS REQUIREMENTS

D20 PLUMBING

Refer to Part 4 Section D20 for performance requirements of the building elements included in the plumbing system.

SYSTEM DESCRIPTION

The plumbing system for Battery Energy Storage System (BESS) consists of all fixtures, potable cold and hot water piping and equipment, piping insulation, water heating equipment, sanitary waste and vent piping systems, and other specialty piping and equipment within 5 foot (1.5 meter) of the building.

Refer to Building Requirements, Space Tabulations Section of the Project Program for building occupancy levels.

GENERAL SYSTEM REQUIREMENTS

Provide working space around all equipment. Provide concrete pads under all equipment. Provide all required fittings, connections and accessories required for a complete and usable system. Install all equipment in accordance with the criteria of PTS section D20 and the manufacturer's recommendations. Design and install in accordance with International Plumbing Code (IPC) and UFC 3-420-01, Plumbing Systems. Where the word "should" is used in the manufacturer's recommendations, substitute the word "must".

D2010 PLUMBING FIXTURES

Not Used.

D201090 EMERGENCY FIXTURES

Provide emergency portable eyewash. A portable, standalone type emergency eyewash (EWS) is required and will meet ANSI Z 358.1 requirements. The system shall have tepid water tank with heater. An emergency alarm indicator light will be provided per UFC 3-420-01. Floor drains are not required for EWS per International Plumbing Code Section 411 and UFC 3-420-01.

D202001 PIPES AND FITTINGS

Provide Copper tubing and fittings for above ground and buried piping.

D202004 INSULATION & IDENTIFICATION

Provide mineral fiber insulation with vapor barrier on domestic hot water supply and recirculation piping. Provide cellular glass insulation with vapor barrier on domestic cold water supply. Provide identification for piping and equipment.

D202090 OTHER DOMESTIC WATER SUPPLY

Provide piping supports in accordance with the IPC. Provide inspections, disinfection, and testing in accordance with the IPC.

P-1238 Construction of Grid Stability & Resiliency 10 MW Battery Energy Storage, Various Buildings.

Work Order Number 20190612 29 Palms/California

PART 3 - CHAPTER 6 / ESR D20 - Page 2

D2030 SANITARY WASTE

D203001 WASTE PIPE & FITTINGS

Provide plastic PVC or ABS piping, fittings, and solvent cement for above and below ground installation.

D203002 VENT PIPE & FITTINGS

Not used.

D203003 FLOOR DRAINS

Provide floor drains in battery area, design them in accordance with UFC 3-420-01, Plumbing Systems.

Provide floor sinks to receive condensate from AC units.

D2040 RAIN WATER DRAINAGE

D204001 PIPE & FITTINGS

D204002 ROOF DRAINS

Provide roof drains that are compatible with the roofing system.

D204004 INSULATION & IDENTIFICATION

D2090 OTHER PLUMBING SYSTEMS

D209002 ACID WASTE SYSTEMS

Provide battery electrolyte waste collection system for the BESS.

--End of Section--