Amendment 0013 for Solicitation No. N62473-24-R-5227 modifies the original Request for Proposal (RFP) for a Battery Energy Storage Systems (BESS) project at Marine Corps Air Ground Combat Center in Twentynine Palms, California. The amendment extends the Phase Two proposal due date from June 26, 2025, to July 03, 2025, at 2:00 PM Pacific Daylight Time, and updates the Department of Labor Construction Wage Determination from CA 20250017 modification 8 to CA 20250026 dated 06/06/2025. The offerors are required to acknowledge receipt of this amendment on the offer schedule, with all other provisions of the original solicitation remaining unchanged.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 0013
Date: June 24, 2025
Solicitation No.: N62473-24-R-5227
P-1238 CONSTRUCTION OF GRID STABILITY & RESILIENCY 10MW BATTERY ENERGY
STORAGE MARINE CORPS AIR GROUND COMBAT CENTER
TWENTYNINE PALMS, CALIFORNIA
The purpose of this amendment is to adjust the proposal due date and provide a revised offer schedule.
1. Revise the Phase Two proposal due date and time:
FROM:
Thursday, June 26, 2025 at 2:00 PM, Pacific Daylight Time (PDT)
TO:
Thursday, July 03, 2025 at 2:00 PM, Pacific Daylight Time (PDT)
2. Revise ‘Instructions to Offerors’ Section 2, under ‘Instructions for Electronic Submission of Proposals are
Provided Below:” of the SF1442 and Section 5, ‘Instruction for submission of Phase Two proposals using the DoD Safe “Drop-Off” feature...’ of the Request for Proposal (RFP) Part 1:
Note: The Offeror may request the DoD Safe drop-off request code at any time before the Phase Two proposal due date 2:00 PM (Pacific Daylight Time (PDT)) on June 26, 2025.
TO:
Note: The Offeror may request the DoD Safe drop-off request code at any time before the Phase Two proposal due date 2:00 PM (Pacific Daylight Time (PDT)) on July 03, 2025.
3. Incorporate the current Department of Labor Construction Wage Determination update in Section 11 of the
Request for Proposal (RFP) Part 1:
The minimum wages, required to be paid for work under this contract, are in accordance with U.S.
Department of Labor, General Decision No. CA 20250017 modification 8 dated 04/18/2025. The General Wage Decision can be found at the following website: www.sam.gov.
TO:
The minimum wages, required to be paid for work under this contract, are in accordance with U.S.
Department of Labor, General Decision No. CA 20250026 dated 06/06/2025. The General Wage Decision can be found at the following website: www.sam.gov.
4. ALL OTHER PARAGRAPHS, PROVISIONS, AND CONDITIONS OF SOLICITATION N62473-24-R-
5227 PLANNED REMAIN UNCHANGED. THE OFFEROR MUST ACKNOWLEDGE RECEIPT OF
ALL AMENDEMENTS ON THE OFFER SCHEDULE.
Enclosure:
1. P1238 Final RFP_Part 1_Phase Two_AMEND 0013_REVISED_25JUN2025 http://www.sam.gov/ http://www.sam.gov/
2. Wage Determination CA 20250026 dated 06/06/2025
File details come from the government source that posted it. Updated .