This is Amendment 0003 to a federal solicitation for construction services issued by NAVFAC Mid-Atlantic. The solicitation number is N40085-26-R-9014, dated February 20, 2026, with an effective amendment date of March 27, 2026. The project number is 25-0441, titled "BEQ Chiller Repairs FC66, HP476, BB137, etc."
The amendment addresses requests for information regarding chiller system design parameters. Question 1 requests confirmation that existing piping can accommodate a 40% flow increase for HP476 (from 192 GPM to approximately 269 GPM) when installing a chiller with 44°F leaving water temperature, and asks for revised pump requirements including flow rate and head specifications. The answer directs offerors to a provided attachment for HP476 specifications. Question 2 requests confirmation of design parameters for HP121 at 54°F entering water temperature and 44°F leaving water temperature with approximately 216 GPM flow, along with revised pump requirements. The answer similarly directs offerors to a provided attachment for HP121 specifications. The receipt deadline for proposals remains unchanged from the original solicitation. Offerors must acknowledge receipt of this amendment with their proposals, as failure to do so may result in rejection. All other terms and conditions of the original solicitation remain in full force and effect.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
AMENDMENT NO. 0003 03/27/26 25-0441
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-26-R-9014
2/20/26
25-0441, BEQ Chiller Repairs FC66, HP476, BB137, etc Amendment 0003, Answer Requests for information
The time and date for receipt of proposals remains the same.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
N40085-26-R-9014 Amendment 0003
CONTINUATION SHEET
1. QUESTION: In amendment 2 it was determined to provide a chiller for HP476 with a 44F LWT. This would bring the design flow from 192 GPM to roughly 269 GPM. Can the existing piping handle a 40% increase of flow? If so, can new pump requirements (flow and ft of head) be provided?
ANSWER: Please see the provided attachment for HP476.
2. QUESTION: For HP121, can we assume 54F EWT / 44F LWT, roughly 216 GPM? Can new pump requirements (flow and ft of head) be provided?
ANSWER: Please see the provided attachment for HP121.
3. All other terms and conditions remain unchanged.