Amen01 FC66-2Chiller and Pumps.pdf

PDF 163 KB Posted

Attached to
BEQ Chiller Repairs FC66, HP476, BB137, etc
Solicitation number
N4008526R9014
Issued by

About this file

This document is a technical specification schedule for mechanical systems equipment and services. It contains three integrated schedules detailing pump systems, hot water boiler systems, and a chilled water buffer tank for what appears to be a federal facility infrastructure project.

The pump schedule specifies five units across various applications: a primary hot water boiler circulation pump (BP-110 S), secondary hot water pump (P-1.2), primary chilled water pump (P-3.4.5), secondary chilled water pump (P-6.7), and a condenser heat recovery pump (P-8.9). These units are located at MECH 1403 and CHILLER YARD locations and feature water-based fluid systems with operating temperatures ranging from 42°F to 347°F. Specifications include impeller diameters ranging from 6.2 to 8.0 inches, GPM outputs from 30 to 70, and minimum efficiencies between 71% and 86.4%. Key requirements mandate premium efficiency motors with variable speed drives, parallel pump configuration with shared redundant capacity, full-size impellers balanced to design conditions using VFD, and TEFC motors rated for outdoor conditions. The hot water boiler schedule details six firetube/condensing boiler units (B-1 through B-6) with maximum outputs of 379 IMBH, minimum gas inputs of 80 IMBH, and operating pressures of 4.0 IN WG. These units require multiple boiler controller integration with BACnet compatibility, direct spark ignition with modulating gas valve and 5:1 turndown capability, thermal efficiency of 95% or higher, and ASME CSD-1 compliance. The chilled water buffer tank (CWBT-1) is a vertical unit with 680-gallon capacity, 2-inch flange connections, and requires R-20 insulation with factory-installed heat tape and jacketing for outdoor installation.

View the file

Other files

File Type Posted
Amen03 HP 121 Pump Info.pdf PDF
Amen03 HP476 Pump Schedule -1.pdf PDF
Amendment 03.pdf PDF
Amendment 02.pdf PDF
Amen02 HP121.pdf PDF
Amendment 01.pdf PDF
Amen01 HP476 Chiller Detail- existing.pdf PDF
Amen01 25-0441 Site Visit.pdf PDF
Amen01 BB274 Chiller and Pumps.pdf PDF
Amen01 HP476 Chiller and Pumps.pdf PDF
Amen01 HP121 Chiller and Pumps.pdf PDF
Amendment 01.pdf PDF
Amen01 FC66-1Chiller and Pumps.pdf PDF
Amen01 BB270 Chiller and Pumps.pdf PDF
Amen01 Inertion Tank BB-274 BB275.pdf PDF
Amen01 BB275 Chller and Pumps.pdf PDF
Amen01 BB137-BB138(SBB333).pdf PDF
Combined DIV 01 specs small projects.pdf PDF
2A ProjDesc BEQ FC66-HP476-BB137 Chiller Repairs.pdf PDF
2D BEQ FC66-HP476-BB137 Chiller Repairs Detail.pdf PDF
1B Proj BEQ Chiller Repairs-Courthouse Bay-HP121 SOW.pdf PDF
2C BEQ FC66-HP476-BB137 Chiller Repairs DWG.pdf PDF
2E BEQ FC66-HP476-BB137 Chiller Repairs SR.pdf PDF
1C BEQ Chiller Repairs-Courthouse Bay-HP121 SR.pdf PDF
RFP 250441.pdf PDF
2B BEQ FC66-HP476 Chiller Repairs SOW.pdf PDF
SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
1A ProjDesc BEQ Chiller Repairs-Courthouse Bay-HP121.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .