2E BEQ FC66-HP476-BB137 Chiller Repairs SR.pdf
PDF 61 KB Posted
- Attached to
- BEQ Chiller Repairs FC66, HP476, BB137, etc
- Solicitation number
- N4008526R9014
About this file
This is a Submittal Register form used to track and manage contractor submittals throughout a construction contract. The document serves as a control mechanism for monitoring required documentation submissions, approval timelines, and material delivery schedules associated with construction activities.
The register lists numerous preconstruction submittals (SD-01), closeout submittals (SD-11), product data (SD-03), test reports (SD-06), and certificates (SD-07) that contractors must submit at specified times. Preconstruction requirements include the Schedule of Prices, List of Contact Personnel, Construction Schedule, Accident Prevention Plan (APP), Activity Hazard Analysis (AHA), Equipment Delivery Schedule, Crane Work Plans and Critical Lift Plans (if applicable), Traffic Control Plan (if applicable), Environmental Protection Plan, Preconstruction Survey, and Permit for Storm Water Discharge (if applicable). Test reports and certificates required include Crane Reports, Confined Space Entry Permits, Accident Reports, Monthly Exposure Reports, Regulatory Citations and Violations, Backflow Preventer Tests and Certifications (if applicable), and Third Party Certification of Barge-Mounted Mobile Cranes (if applicable). The register provides columns for tracking action codes, submission dates, approval authority review dates, dates materials are needed, and other administrative tracking information. The form indicates this is the January 1996 edition and notes that the previous edition is obsolete.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NO.
CONTRACTOR
SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 20 00
1.3
01 30 00
1.4.1
01 31 50
1.2
01 32 16
1.2
1.3
01 33 00
1.4.1
1.6.1
01 35 29
1.9
1.10
1.9.1
1.9.1
1.7.1.4
1.14
1.14.1
1.14.3
1.14.4
1.14.5
1.11
Crane Reports
SD-07 CERTIFICATES
Confined Space Entry Permit
Approving AuthorityContractor Schedule Dates
SD-11 CLOSEOUT SUBMITTALS
Interim DD1354, Transfer & Acceptance
SD-11 CLOSEOUT SUBMITTALS
Submittal Register
Complete Submittal Package
TITLE AND LOCATION
(Enter Contract Title and Locaiton Here)
Schedule of Prices
List of Contact Personnel
Construction Schedule of Military Real Property (If Applicable)
A C T I V I T Y
N O
T R A N S M I T T A L
N O
(d)
Contractor Action
DESCRIPTION
ITEM SUBMITTED
(Enter Contractor Name Here)
Crane Work Plan (If Applicable)
Activity Hazard Analysis (AHA)
SD-06 TEST REPORTS
SD-01 PRECONSTRUCTION SUBMITTALS
(Enter Contract No. Here)
SD-01 PRECONSTRUCTION SUBMITTALS
Accident Prevention Plan (APP)
SD-01 PRECONSTRUCTION SUBMITTALS
Equipment Delivery Schedule
SD-01 PRECONSTRUCTION SUBMITTALS
SUBMITTAL REGISTER
P A R A G R A P H
N O
S P E C
S E C T
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
Crane Critical Lift Plan (If Applicable)
Crane Operators (If Applicable)
Reports
Accident Reports
Monthly Exposure Reports
Regulatory Citations and Violations
1.14.6
1.14.7
01 45 10
1.6
01 50 00
1.6.2.1
2.1
3.1
1.3
01 57 19
1.6.1
1.6.4
1.7.2
1.7
1.7
PAGE 1 OF _
Third Party Certification of Barge-
Mounted Movile Cranes
SD-11 CLOSEOUT SUBMITTALS
Qaulity Control Plan (QC Plan)
Certificate of Compliance
Backflow Tester Certification (If Applicable)
Backflow Preventer Tests (If Applicable)
SD-01 PRECONSTRUCTION SUBMITTALS
Traffic Control Plan (If Applicable)
SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE
MSDS for Class I ODS Waivered Product
SD-01 PRECONSTRUCTION SUBMITTALS
Permit for Storm Water Discharge (If applicab
Environmental Protection Plan
Preconstruction Survey
Notice of Intent (If applicable)
SD-03 PRODUCT DATA
Backflow Preventers (If Applicable)
Backflow Preventers Certificate (If Applicable)
SD-06 TEST REPORTS
SD-07 CERTIFICATES
File details come from the government source that posted it. Updated .