Amen01 HP476 Chiller Detail- existing.pdf

PDF 128 KB Posted

Attached to
BEQ Chiller Repairs FC66, HP476, BB137, etc
Solicitation number
N4008526R9014
Issued by

About this file

This is a technical construction drawing for a chiller compound enlargement project that includes mechanical systems and site layout modifications. The document presents two comparative floor plans (Data Terminal Cabinet configurations) showing existing and proposed layouts with domestic hot water storage, chiller equipment, and associated infrastructure.

The construction notes specify the following key requirements: (1) provision of a chiller compound enlargement with new equipment and piping infrastructure, including a minimum 1.2-ton capacity unit with specified flow rates and pressure specifications; (2) reuse of existing hot water pump and modification of the 1,750 RPM motor with conversion equipment; (3) efficiency requirements including condenser fan energy integration and testing protocols to validate actual conditions against specified parameters; (4) relocation of the existing fence to accommodate the compound enlargement with new posts and drainage provisions; (5) area regrading around the chiller compound with modifications to existing catch basin drainage; (6) modifications to existing energy monitoring and control systems with requirements for new cabling, conductors, and final connections between existing and new mechanical units; and (7) concrete retaining wall construction with 8-foot chain-link fencing at specified elevations. The drawing includes contour lines, ditch basin locations, pavement elevations marked as T.P. (Top of Pavement), and a legend indicating proposed new work locations and fence configurations.

View the file

Other files

File Type Posted
Amen03 HP 121 Pump Info.pdf PDF
Amen03 HP476 Pump Schedule -1.pdf PDF
Amendment 03.pdf PDF
Amendment 02.pdf PDF
Amen02 HP121.pdf PDF
Amendment 01.pdf PDF
Amen01 25-0441 Site Visit.pdf PDF
Amen01 BB274 Chiller and Pumps.pdf PDF
Amen01 HP476 Chiller and Pumps.pdf PDF
Amen01 HP121 Chiller and Pumps.pdf PDF
Amendment 01.pdf PDF
Amen01 FC66-1Chiller and Pumps.pdf PDF
Amen01 BB270 Chiller and Pumps.pdf PDF
Amen01 Inertion Tank BB-274 BB275.pdf PDF
Amen01 BB275 Chller and Pumps.pdf PDF
Amen01 BB137-BB138(SBB333).pdf PDF
Amen01 FC66-2Chiller and Pumps.pdf PDF
Combined DIV 01 specs small projects.pdf PDF
2A ProjDesc BEQ FC66-HP476-BB137 Chiller Repairs.pdf PDF
2D BEQ FC66-HP476-BB137 Chiller Repairs Detail.pdf PDF
1B Proj BEQ Chiller Repairs-Courthouse Bay-HP121 SOW.pdf PDF
2C BEQ FC66-HP476-BB137 Chiller Repairs DWG.pdf PDF
2E BEQ FC66-HP476-BB137 Chiller Repairs SR.pdf PDF
1C BEQ Chiller Repairs-Courthouse Bay-HP121 SR.pdf PDF
RFP 250441.pdf PDF
2B BEQ FC66-HP476 Chiller Repairs SOW.pdf PDF
SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
1A ProjDesc BEQ Chiller Repairs-Courthouse Bay-HP121.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .