This document is a mechanical systems schedule detailing equipment specifications for HVAC, chilling, boiler, pump, and related building infrastructure components.

The Air Handler Schedule specifies three TRANE units (Models 7485, 6650, and 8170) with capacities ranging from 1400 to 1850 CFM, featuring 3-inch casings and various airflow configurations. Each unit includes a 10 HP electrical supply fan and MERV 13 filters, with remarks noting provisions for UV light and VFD installations. The Energy Recovery Unit section documents a dedicated OSA AHU with 4690 CFM supply capacity, 3/4-inch piping, and specialized components including preheat coil, exhaust air/livecoil connections, and 4026 CFM exhaust capability. The Chiller Schedule lists a single unit serving an exterior location with 65.4-ton capacity, 300-3 designation, and 534.5-gallon capacity operating at 50°F. The Boiler Schedule identifies three hydrotherm units (Mesh RM model with 399 MBH input/349 MBH output) fueled by natural gas with 180°F operating temperatures, 1360 LBS capacity, and associated electrical and burner specifications. The Pumps section documents four Bell & Gossett units rated between 75 to 187 GPM at 80 feet total head and 1750 RPM, with 208-3 electrical configurations and various installation notes including standby and VFD provisions. Supply diffuser and return/exhaust register schedules provide manufacturer designations and installation specifications. All equipment includes detailed remarks regarding factory panels, buffer tanks, circulation pumps, and operational requirements.

View the file

Other files

File Type Posted
Amen03 HP 121 Pump Info.pdf PDF
Amen03 HP476 Pump Schedule -1.pdf PDF
Amendment 03.pdf PDF
Amendment 02.pdf PDF
Amen02 HP121.pdf PDF
Amendment 01.pdf PDF
Amen01 HP476 Chiller Detail- existing.pdf PDF
Amen01 25-0441 Site Visit.pdf PDF
Amen01 BB274 Chiller and Pumps.pdf PDF
Amen01 HP476 Chiller and Pumps.pdf PDF
Amendment 01.pdf PDF
Amen01 FC66-1Chiller and Pumps.pdf PDF
Amen01 BB270 Chiller and Pumps.pdf PDF
Amen01 Inertion Tank BB-274 BB275.pdf PDF
Amen01 BB275 Chller and Pumps.pdf PDF
Amen01 BB137-BB138(SBB333).pdf PDF
Amen01 FC66-2Chiller and Pumps.pdf PDF
Combined DIV 01 specs small projects.pdf PDF
2A ProjDesc BEQ FC66-HP476-BB137 Chiller Repairs.pdf PDF
2D BEQ FC66-HP476-BB137 Chiller Repairs Detail.pdf PDF
1B Proj BEQ Chiller Repairs-Courthouse Bay-HP121 SOW.pdf PDF
2C BEQ FC66-HP476-BB137 Chiller Repairs DWG.pdf PDF
2E BEQ FC66-HP476-BB137 Chiller Repairs SR.pdf PDF
1C BEQ Chiller Repairs-Courthouse Bay-HP121 SR.pdf PDF
RFP 250441.pdf PDF
2B BEQ FC66-HP476 Chiller Repairs SOW.pdf PDF
SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
1A ProjDesc BEQ Chiller Repairs-Courthouse Bay-HP121.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .