1A ProjDesc BEQ Chiller Repairs-Courthouse Bay-HP121.pdf

PDF 518 KB Posted

Attached to
BEQ Chiller Repairs FC66, HP476, BB137, etc
Solicitation number
N4008526R9014
Issued by

About this file

This document is a Project Description for a federal contract involving the replacement of chiller systems at four BEQ (Bachelor Enlisted Quarters) buildings. The contractor is responsible for replacing chillers and associated chilled water pumps at the following locations: BB-270 (75 Ton Chiller with 2 pumps), BB-274 (70 Ton Chiller with 2 pumps), BB-275 (75 Ton Chiller with 2 pumps), and HP-121 (90 Ton Chiller with 1 pump).

The contractor must conduct all operations with minimal interference to normal facility operations, as the facility will remain in operation throughout the construction period. The contractor is responsible for relocating furniture and other objects in the rooms as needed. For project supervision, a single qualified individual may serve as Superintendent, Quality Control Manager, and Safety & Health Officer, provided that person meets all three position qualifications as defined in the project specification.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT DESCRIPTION

The responsibility of the contractor is to replace chillers at the following BEQ buildings.

1.BB-270 75 Ton Chiller and 2- Chilled Water Pumps 2.BB-274 70 Ton Chiller and 2- Chilled Water Pumps 3.BB275 75 Ton Chiller and 2- Chilled Water Pumps 4.HP-121 90 Chiller and 1- Chilled Water Pump

SPECIAL SCHEDULING

The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/ activity. The furniture and other objects in the room are to be moved by the contractor.

SUPERVISION

One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.