This document is a Statement of Work or Performance Work Statement detailing HVAC chiller system requirements and modifications.

The contractor must provide chiller compound enlargement and equipment pad construction. The primary deliverable is procurement and installation of a new chiller system with modifications to existing piping infrastructure. The chiller specifications include: minimum capacity of 112 tons at 54°F entering water temperature and 40°F leaving water temperature, with 192 gallons per minute flow rate at 95°F entering air temperature, maximum 7-foot water pressure drop, and 460-volt, 3-phase, 60-hertz electrical service. The chiller must achieve a minimum adjusted efficiency of 0.98 kilowatts per ton, calculated through a weighted formula across multiple operating capacities (100%, 85%, 65%, and 35%), with efficiency inclusive of condenser fan energy consumption.

The contractor must also reuse the existing chilled water pump, performing testing, adjustment, and balancing to achieve 575 gallons per minute flow at 107 feet of discharge head. Following system balance completion, the impeller must be trimmed to match actual operating conditions plus 10 percent discharge pressure margin. The existing pump is an Armstrong Model 3/4/10, 4600-series unit operating at 3485 revolutions per minute.

View the file

Other files

File Type Posted
Amendment 03.pdf PDF
Amen03 HP 121 Pump Info.pdf PDF
Amen02 HP121.pdf PDF
Amendment 02.pdf PDF
Amendment 01.pdf PDF
Amen01 25-0441 Site Visit.pdf PDF
Amen01 HP476 Chiller Detail- existing.pdf PDF
Amen01 BB270 Chiller and Pumps.pdf PDF
Amen01 BB274 Chiller and Pumps.pdf PDF
Amen01 HP121 Chiller and Pumps.pdf PDF
Amendment 01.pdf PDF
Amen01 Inertion Tank BB-274 BB275.pdf PDF
Amen01 BB275 Chller and Pumps.pdf PDF
Amen01 HP476 Chiller and Pumps.pdf PDF
Amen01 FC66-1Chiller and Pumps.pdf PDF
Amen01 BB137-BB138(SBB333).pdf PDF
Amen01 FC66-2Chiller and Pumps.pdf PDF
1B Proj BEQ Chiller Repairs-Courthouse Bay-HP121 SOW.pdf PDF
1C BEQ Chiller Repairs-Courthouse Bay-HP121 SR.pdf PDF
2A ProjDesc BEQ FC66-HP476-BB137 Chiller Repairs.pdf PDF
2B BEQ FC66-HP476 Chiller Repairs SOW.pdf PDF
Combined DIV 01 specs small projects.pdf PDF
SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
RFP 250441.pdf PDF
2C BEQ FC66-HP476-BB137 Chiller Repairs DWG.pdf PDF
2E BEQ FC66-HP476-BB137 Chiller Repairs SR.pdf PDF
2D BEQ FC66-HP476-BB137 Chiller Repairs Detail.pdf PDF
1A ProjDesc BEQ Chiller Repairs-Courthouse Bay-HP121.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .