2A ProjDesc BEQ FC66-HP476-BB137 Chiller Repairs.pdf
PDF 545 KB Posted
- Attached to
- BEQ Chiller Repairs FC66, HP476, BB137, etc
- Solicitation number
- N4008526R9014
About this file
This is a Project Description document for a chiller replacement contract at BEQ (Bachelor Enlisted Quarters) buildings. The contractor is responsible for replacing chillers and associated equipment at three facilities: HP476 (125-ton chiller and 1 chilled water pump), FC66 (2 110-ton chillers and 6 chiller water pumps), and BB137 (110-ton chiller, 1 chilled water pump, and variable frequency drive). The contractor must verify chiller and disconnect sizes before proceeding with installation.
Operations at the facilities will continue throughout the construction period, requiring the contractor to minimize interference with normal activities. The contractor is responsible for moving furniture and other room contents as necessary. Supervision requirements allow a single qualified individual to serve as Superintendent, Quality Control Manager, and Safety & Health Officer, provided that person meets all three position qualifications as defined in the project specification.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT DESCRIPTION
The responsibility of the contractor is to replace chillers at the following BEQ buildings.
Replace chillers at the following buildings.
1.HP476 -125 ton Chiller &1 Chilled Water Pump
2.FC66-2-110 Ton Chillers &6 Chiller Water Pumps*Chiller and disconnect sizes should be verified by the contractor.
3.BB137-110-ton Chiller& 1 Chilled water Pump &VFD.
SPECIAL SCHEDULING
The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/ activity. The furniture and other objects in the room are to be moved by the contractor.
SUPERVISION
One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.