This is a technical schematic diagram depicting a mechanical/HVAC system layout for what appears to be a geothermal heating and cooling installation. The diagram shows a comprehensive floor plan integration of multiple building systems and components designed to work in conjunction with geothermal technology.

The schematic illustrates several key system components including a 90-ton York chiller unit, hot water and chilled water buffer tanks, a geothermal heat exchanger header system with multiple connection points, and piping arrangements for both supply and return lines. The layout includes provisions for a future ambient temperature sensor with sunshield, future work to accommodate a 6-inch Schedule 40 steel buffer tank bypass, and detailed clearance specifications for pipe installation and maintenance. Additional elements shown are an expansion tank, support poles for the geothermal field connections, future FCI (likely ground loop field connections), wall penetrations between the top pipe and geothermal header at four specified locations, a new transformer, and an existing transformer. The diagram maintains specific dimensional callouts (6'0", 4', 8'9", 19'0") and notes requirements to preserve existing horizontal and vertical clearances. This appears to be a design or construction document intended to guide installation and coordination of multiple building mechanical systems.

View the file

Other files

File Type Posted
Amendment 03.pdf PDF
Amen03 HP476 Pump Schedule -1.pdf PDF
Amen03 HP 121 Pump Info.pdf PDF
Amendment 02.pdf PDF
Amendment 01.pdf PDF
Amen01 BB270 Chiller and Pumps.pdf PDF
Amen01 BB274 Chiller and Pumps.pdf PDF
Amen01 HP121 Chiller and Pumps.pdf PDF
Amen01 25-0441 Site Visit.pdf PDF
Amen01 HP476 Chiller Detail- existing.pdf PDF
Amen01 BB137-BB138(SBB333).pdf PDF
Amen01 FC66-2Chiller and Pumps.pdf PDF
Amendment 01.pdf PDF
Amen01 Inertion Tank BB-274 BB275.pdf PDF
Amen01 BB275 Chller and Pumps.pdf PDF
Amen01 HP476 Chiller and Pumps.pdf PDF
Amen01 FC66-1Chiller and Pumps.pdf PDF
RFP 250441.pdf PDF
2C BEQ FC66-HP476-BB137 Chiller Repairs DWG.pdf PDF
2E BEQ FC66-HP476-BB137 Chiller Repairs SR.pdf PDF
1B Proj BEQ Chiller Repairs-Courthouse Bay-HP121 SOW.pdf PDF
1C BEQ Chiller Repairs-Courthouse Bay-HP121 SR.pdf PDF
2A ProjDesc BEQ FC66-HP476-BB137 Chiller Repairs.pdf PDF
2B BEQ FC66-HP476 Chiller Repairs SOW.pdf PDF
Combined DIV 01 specs small projects.pdf PDF
SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
1A ProjDesc BEQ Chiller Repairs-Courthouse Bay-HP121.pdf PDF
2D BEQ FC66-HP476-BB137 Chiller Repairs Detail.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .