Amen01 BB270 Chiller and Pumps.pdf

PDF 1 MB Posted

Attached to
BEQ Chiller Repairs FC66, HP476, BB137, etc
Solicitation number
N4008526R9014
Issued by

About this file

This is a final submittal document (M-602) for mechanical, electrical, and plumbing (MEP) systems at Marine Corps Base Camp Lejeune, dated 02.29.2016. The document presents comprehensive schedules for HVAC and related equipment specifications across multiple buildings and functional areas at the facility.

The submittal includes detailed equipment schedules covering air-cooled chillers, natural gas-fired boilers, expansion tanks, chilled water buffer tanks, combination air/oil separator tanks, packaged terminal air-conditioning units, unit heaters, louvers, dehumidifiers, and outside air calculation data. Each schedule specifies equipment marks, locations, service types, capacities, voltages, and technical notes for proper installation and operation. The document establishes performance requirements for cooling and heating systems, including specifications for water-cooled equipment connection, boiler placement with factory-sealed connections, and fan coil unit configurations with electrical provisions. Additional notes require coordination between mechanical contractors and electrical contractors for voltage requirements and proper installation of hardware connections. The schedules indicate equipment is distributed across multiple buildings with varying capacity requirements, and installation guidance includes provisions for internal battles, high-capacity air vents, and coordinated pump placement to avoid conflicts with other building systems.

View the file

Other files

File Type Posted
Amen03 HP 121 Pump Info.pdf PDF
Amen03 HP476 Pump Schedule -1.pdf PDF
Amendment 03.pdf PDF
Amendment 02.pdf PDF
Amen02 HP121.pdf PDF
Amendment 01.pdf PDF
Amen01 HP476 Chiller Detail- existing.pdf PDF
Amen01 25-0441 Site Visit.pdf PDF
Amen01 BB274 Chiller and Pumps.pdf PDF
Amen01 HP476 Chiller and Pumps.pdf PDF
Amen01 HP121 Chiller and Pumps.pdf PDF
Amendment 01.pdf PDF
Amen01 FC66-1Chiller and Pumps.pdf PDF
Amen01 Inertion Tank BB-274 BB275.pdf PDF
Amen01 BB275 Chller and Pumps.pdf PDF
Amen01 BB137-BB138(SBB333).pdf PDF
Amen01 FC66-2Chiller and Pumps.pdf PDF
Combined DIV 01 specs small projects.pdf PDF
2A ProjDesc BEQ FC66-HP476-BB137 Chiller Repairs.pdf PDF
2D BEQ FC66-HP476-BB137 Chiller Repairs Detail.pdf PDF
1B Proj BEQ Chiller Repairs-Courthouse Bay-HP121 SOW.pdf PDF
2C BEQ FC66-HP476-BB137 Chiller Repairs DWG.pdf PDF
2E BEQ FC66-HP476-BB137 Chiller Repairs SR.pdf PDF
1C BEQ Chiller Repairs-Courthouse Bay-HP121 SR.pdf PDF
RFP 250441.pdf PDF
2B BEQ FC66-HP476 Chiller Repairs SOW.pdf PDF
SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
1A ProjDesc BEQ Chiller Repairs-Courthouse Bay-HP121.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .