Amen01 BB270 Chiller and Pumps.pdf
PDF 1 MB Posted
- Attached to
- BEQ Chiller Repairs FC66, HP476, BB137, etc
- Solicitation number
- N4008526R9014
About this file
This is a final submittal document (M-602) for mechanical, electrical, and plumbing (MEP) systems at Marine Corps Base Camp Lejeune, dated 02.29.2016. The document presents comprehensive schedules for HVAC and related equipment specifications across multiple buildings and functional areas at the facility.
The submittal includes detailed equipment schedules covering air-cooled chillers, natural gas-fired boilers, expansion tanks, chilled water buffer tanks, combination air/oil separator tanks, packaged terminal air-conditioning units, unit heaters, louvers, dehumidifiers, and outside air calculation data. Each schedule specifies equipment marks, locations, service types, capacities, voltages, and technical notes for proper installation and operation. The document establishes performance requirements for cooling and heating systems, including specifications for water-cooled equipment connection, boiler placement with factory-sealed connections, and fan coil unit configurations with electrical provisions. Additional notes require coordination between mechanical contractors and electrical contractors for voltage requirements and proper installation of hardware connections. The schedules indicate equipment is distributed across multiple buildings with varying capacity requirements, and installation guidance includes provisions for internal battles, high-capacity air vents, and coordinated pump placement to avoid conflicts with other building systems.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .