N4008526R0058 0011.pdf
PDF 614 KB Posted
- Attached to
- Design-Build (DB) Barracks Initiative (Package #2), Marine Corps Base (MCB) Camp Lejeune, North Carolina
- Solicitation number
- N4008526R0058
About this file
This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by NAVFACSYSCOM MID-ATLANTIC for Work Order 1894544. The amendment is numbered 0011 with an effective date of 27 July 2026 and was issued to modify solicitation N4008526R0058, which was originally dated 04 Mar 2026.
The amendment confirms that the Phase II proposal due date remains unchanged at 31 July 2026 no later than 1400 EDT. The amendment provides continuation sheets for two locations: French Creek 260724 and Hadnot Point 260724, both provided as attachments. Additionally, the amendment includes Pre-Proposal Inquiry (PPI) responses, with a critical notice that no additional PPIs will be accepted going forward. One substantive PPI response addresses Specification Paragraph 2.3.1.8 regarding louver requirements for hurricane-prone areas. The government's response to PPI #94 directs bidders to "Bid per RFP" regarding whether AMCA 540 and AMCA 550 standards apply to PTAC/PTHP unit louvers, leaving this specification requirement as stated in the original solicitation.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): The purpose of this Amendment is as follows:
1. Phase II proposal due date of 31 July 2026 NLT 1400 EDT remains unchanged.
2. Continuation Sheet(s) – French Creek 260724
3. Continuation Sheet(s) – Hadnot Point 260724
4. Provide Pre-Proposal Inquiry Responses
***PLEASE NOTE: NO ADDITIONAL PPI’S WILL BE ACCETPTED***
2. Continuation Sheet(s) – French Creek 260724 – PROVIDED VIA ATTACHMENT
3. Continuation Sheet(s) – Hadnot Point 260724 – PROVIDED VIA ATTACHEMNT
4. PRE-PROPOSAL INQUIRY RESPONSES:
PPI #
Reference
Question Government Response Page Section Paragraph
Part 5 Section 23
81 00
Specification Paragraph
2.3.1.8 Louver states "for
locations located in hurricane prone areas provide field installed louvers that are hurricane rated per AMCA
540 and AMCA 550". The standard PTAC Louver does not meet AMCA 540 nor
AMCA 550. Typically at
Lejeune these louvers are not required to be hurricane rated.
Please note that the windows are not hurricane rated. if hurricane louvers are required, the PTAC/PTHP unit would not function properly as the unit would need to be moved inward of the exterior wall thus projecting more into the room. Please confirm AMCA
540 and AMCA 550 do not apply.
Bid per RFP.
| 0011 AMD pg 1 |
| PPIs 0011 |