This is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by NAVFACSYSCOM MID-ATLANTIC on 08 July 2026. The amendment number 0007 applies to solicitation N4008526R0058 (dated 04 Mar 2026) and is effective immediately. The contracting office is located in Norfolk, VA 23511-0395, with contracting officer Mary Pool as the primary contact.

The amendment updates clause 52.11-12 Liquidated Damages-Construction, modifying the liquidated damages amount to $10,455.19 per calendar day of delay until work completion or acceptance. The clause specifies that if the Contractor fails to complete work within the contract timeframe, liquidated damages accrue daily; if the Government terminates the Contractor's right to proceed, damages continue until work completion and are in addition to excess costs of repurchase under the Termination clause. The Phase II proposal due date of 27 July 2026 at 2:00 P.M. EDT remains unchanged. All other terms and conditions of the referenced solicitation remain in full force and effect. Contractors must acknowledge receipt of this amendment prior to the specified deadline using one of three methods: completing and returning items 8 and 15, acknowledging receipt on each offer copy, or submitting separate written or electronic communication with solicitation and amendment number references.

View the file

Other files

File Type Posted
N4008526R0058 0011.pdf PDF
260724 - Continuation Sheet - CLHP.pdf PDF
260724 - Continuation Sheet - CLFC.pdf PDF
N4008526R00580010.pdf PDF
MCBI P2 Fire Protection JA Redacted.pdf PDF
260720 - Continuation Sheet - CLFC.pdf PDF
260423 - Continuation Sheet - CLFC.pdf PDF
260722 - Continuation Sheet - CLHP.pdf PDF
260722 - Continuation Sheet - CLFC.pdf PDF
260720 - Continuation Sheet - CLHP.pdf PDF
260423 - Continuation Sheet - CLHP.pdf PDF
N4008526R0058 0009.pdf PDF
N4008526R0058 0008.pdf PDF
Attachment P -D20 - ITG A2L Refrigerants For Navy and Marine Corps Facilities.pdf PDF
Attachment O - D21 - Ladder 251 - Pierce Turning Performance Analysis.pdf PDF
N4008526R0058 0006.pdf PDF
Attachment L - D19 - French Creek SW8211111 Permit.pdf PDF
Attachment K - B2 Hazardous Materials Report Bldgs HP51HP53HP55HP57_1340.pdf PDF
Attachment N - MCBI Package 2 Site Visit Log.pdf PDF
Attachment M - D19 - Hadnot Point SW8891107 Permit.pdf PDF
N4008526R0058 0005.pdf PDF
Attachment H - MCB LEJ HP DBRFP VOL2of2.pdf PDF
Attachment H - MCB Camp Lejeune HP Sites Subsurface Soil and Geotechnical Report.pdf PDF
Attachment H - MCB LEJ FC DBRFP VOL2of2.pdf PDF
Attachment H - MCB Camp Lejeune FC Subsurface Soil and Geotechnical Report.pdf PDF
Attachment H - 260423 - MOD A Continuation Sheet - CLHP.pdf PDF
Attachment H - 260423 - MOD A Continuation Sheet - CLFC.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).pdf PDF
N4008526R00580003.pdf PDF
Attachment J - Site Visit Map.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
N4008526R00580004.pdf PDF
Attachment I - Price Schedule.xlsx XLSX spreadsheet
Attachment H - MCB LEJ HP DBRFPVOL1of2.pdf PDF
Attachment H - MCB LEJ FC DBRFP VOL1of2.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
N4008526R0058 0002.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.pdf PDF
N4008526R0058 0001.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Solicitation - N4008526R0058.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

File details come from the government source that posted it. Updated .