This is a Continuation Sheet for a construction contract modification for the FY 26 Marine Corps Barracks Repair by Replacement project at MCB Camp Lejeune, Hadnot Point, Jacksonville, NC (eProjects Work Order Number 1894554, dated 20 July 2026).

Part 3A – Project Program (HVAC) Revisions: The D30 HVAC General System Requirements section is revised to require outside design conditions follow the most stringent values between the RFP and the MCBCL Mechanical Design Guide. Ventilation and exhaust requirements must follow ASHRAE standard 62.1 version 2025, and energy requirements must follow ASHRAE 90.1 version 2019. Section D305006 Packaged Units is revised to add requirements for factory-installed/provided control covers for all PTAC/PTHP units to minimize access and prevent damage, including ligature-proof covers.

Part 3B – Project Program (Civil/Landscape) Revisions: Multiple sections of Chapter 3 and Chapter 6 are revised, including: (1) Section 3.2.1.6 – Dumpster pads must ensure accessibility for front-loading trash trucks per MCB Camp Lejeune Civil Design Guide and BEAP requirements; (2) G202001 – Crushed concrete is allowed under sidewalks but not under paved roadways; (3) G202005 – Wheel stops and bollards must comply with UFC 3-201-01 and MCB Camp Lejeune Civil Design Guide; (4) G202003 – Recycled asphalt pavement is not permitted; (5) G205005 – Rock mulch replaces hardwood mulch in planting beds, landscape edging required around non-bioretention planting beds, and mow strips required around facilities per MCB Camp Lejeune Civil Design Guide; and (6) G3070 – Open cuts in existing roadways or parking lots for utility installation are prohibited; utilities must be installed by boring under surfaces with no open cuts for existing utility removal (abandoned sections filled with flowable fill).

Part 6 – Attachments: Attachment D14 Specification 23 05 93, Section 3.1.1 is revised to require 100% of duct required for DALT.

View the file

Other files

File Type Posted
260724 - Continuation Sheet - CLHP.pdf PDF
260724 - Continuation Sheet - CLFC.pdf PDF
N4008526R0058 0011.pdf PDF
N4008526R00580010.pdf PDF
260720 - Continuation Sheet - CLFC.pdf PDF
260423 - Continuation Sheet - CLFC.pdf PDF
260423 - Continuation Sheet - CLHP.pdf PDF
N4008526R0058 0009.pdf PDF
MCBI P2 Fire Protection JA Redacted.pdf PDF
260722 - Continuation Sheet - CLHP.pdf PDF
260722 - Continuation Sheet - CLFC.pdf PDF
N4008526R0058 0008.pdf PDF
N4008525R0058 0007.pdf PDF
Attachment P -D20 - ITG A2L Refrigerants For Navy and Marine Corps Facilities.pdf PDF
Attachment O - D21 - Ladder 251 - Pierce Turning Performance Analysis.pdf PDF
N4008526R0058 0006.pdf PDF
Attachment K - B2 Hazardous Materials Report Bldgs HP51HP53HP55HP57_1340.pdf PDF
Attachment L - D19 - French Creek SW8211111 Permit.pdf PDF
Attachment N - MCBI Package 2 Site Visit Log.pdf PDF
Attachment M - D19 - Hadnot Point SW8891107 Permit.pdf PDF
N4008526R0058 0005.pdf PDF
Attachment H - MCB LEJ FC DBRFP VOL2of2.pdf PDF
Attachment H - MCB Camp Lejeune FC Subsurface Soil and Geotechnical Report.pdf PDF
Attachment H - 260423 - MOD A Continuation Sheet - CLHP.pdf PDF
Attachment H - 260423 - MOD A Continuation Sheet - CLFC.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).pdf PDF
Attachment I - Price Schedule.xlsx XLSX spreadsheet
Attachment H - MCB LEJ HP DBRFPVOL1of2.pdf PDF
Attachment H - MCB LEJ FC DBRFP VOL1of2.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
Attachment H - MCB LEJ HP DBRFP VOL2of2.pdf PDF
Attachment H - MCB Camp Lejeune HP Sites Subsurface Soil and Geotechnical Report.pdf PDF
N4008526R00580003.pdf PDF
Attachment J - Site Visit Map.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
N4008526R00580004.pdf PDF
N4008526R0058 0002.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.pdf PDF
N4008526R0058 0001.pdf PDF
Solicitation - N4008526R0058.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Continuation Sheet eProjects Work Order Number: 1894554

Construction Contract Number: --

Building: --

Project Title: FY 26 Marine Corps Barracks – Repair by Replacement MCB Camp Lejeune – Hadnot Point, Jacksonville, NC

Date: 20 July 2026

PART 3A – PROJECT PROGRAM:

REVISE the following:

D30 HVAC – General System Requirements

Add the following: Outside design conditions must follow the most stringent between the values stated in the RFP and the values stated in MCBCL Mechanical Design Guide document in Part 6.

For Ventilation and Exhaust requirement follow ASHRAE standard 62.1 version 2025

For Energy related requirements follow ASHRAE 90.1 version 2019.

D305006 Packaged Units

Add the following sentences to the end of the section: “Provide factory installed/provided controls covers for all PTAC/PTHP unit controls/thermostats to minimize/eliminate access to the controls of the unit and to help prevent damage to the unit. Provide Ligature- proof covers for all PTAC/PTHP units to help prevent damage to the unit.”

PART 3B – PROJECT PROGRAM:

Chapter 3

3.2.1.6 Dumpster Pad and Enclosure

Revise The second sentence “Conceal dumpsters with a decorative, gated structure in accordance with Camp Lejeune BEAP provided in Part 6,” to the following: “Ensure dumpster accessibility for front loading trash trucks, in accordance with the MCB Camp Lejeune Civil Design Guide and the Camp Lejeune BEAP requirements provided in Part 6.”

Chapter 6

G202001 Bases & Subbases

Revise The sentence “Crushed concrete meeting specified gradation for aggregate base or subbase courses may be used upon Engineer of Record (EOR) and Contracting Officer approval” to read “The use of crushed concrete is allowed under sidewalks but not under paved roadways.”

G202005 Guardrails & Barriers Revise The sentence “Provide wheel stops and bollards in accordance with UFC 3-201- 01, Civil Engineering.”, to the following: “Provide wheel stops and bollards in accordance with UFC 3-201-01, Civil Engineering and MCB Camp Lejeune Civil Design Guide in Part 6.”

G202003 Paved Surfaces

Revise The paragraph “Recycled asphalt pavement material may be used for bituminous concrete pavement (as permitted by the SHS).” to read “The use of recycled asphalt pavement is not permitted.”

G205005 Plantings Revise The sentence “Provide 3 inches of double shredded hardwood mulch over weed control fabric at planting beds.”, to the following: “Provide rock mulch over weed control fabric in all landscape planting beds in lieu of hardwood mulch, in accordance with the MCB Camp Lejeune Civil Design Guide in Part 6.”

Revise The sentence “Encompass planting beds not used for bioretention filters with steel edging except where beds abut walls or sidewalks.”, to the following: “Provide landscape edging around all planting beds not utilized as bioretention filters, except where planting beds are adjacent to walls or sidewalks, in accordance with the MCB Camp Lejeune Civil Design Guide in Part 6.”

Add “Provide a mow strip around facilities to minimize maintenance and damage, in accordance with the MCB Camp Lejeune Civil Design Guide in Part 6.”

G3070 Bedding Material

Revise The sentences “Bedding material backfill must be placed to the spring line of the pipe for all concrete and PVC pipe trench excavations. Utility line and utility structure excavations in existing pavement areas must be completely backfilled with excavatable flowable fill meeting DOT specifications to the aggregate base/subbase course subgrade elevation” with the following “Open cuts of existing roadways or parking lots for installation of new utilities is not allowed. Utilities will be installed by boring under these surfaces. No existing roadway or parking lot open cuts for removal of existing utilities; cut, cap & fill abandoned section with flowable fill”.

PART 6 – ATTACHMENTS:

Attachment D14 Specification 23 05 93

Revise Section 3.1.1 to “100% of duct required for DALT”