This is Amendment 0006 to a federal solicitation issued by NAVFACSYSCOM MID-ATLANTIC for a Navy construction project (WO# 1894554). The amendment, effective 08 July 2026, addresses responses to pre-proposal inquiries and provides continuation sheets with technical modifications for two separate facilities: French Creek and Hadnot Point. The Phase II proposal due date remains 27 July 2026 at 2:00 P.M. EDT.

The amendment incorporates government responses to 31 pre-proposal inquiries clarifying contractor responsibilities for asbestos testing, hazardous materials abatement, temporary utilities, backfill materials, demolition permits, site security, damage liability, project scope boundaries, and closeout documentation. Key technical revisions include updating ASHRAE standards from 2022 to 2024, modifying exterior enclosure specifications, adding security window requirements per UFC 4-026-01, requiring ligature-proof covers for PTAC/PTHP units, and revising telecommunications outlet configurations. The amendment specifies demolition of structures within ten feet of buildings, removal of pavement and utilities, and demolition of mechanical/power brick enclosures housing HVAC and electrical equipment. Additional modifications address foundation systems, emergency lighting and power reliability for specific sites, equipment drying areas with specifications for covered hardstands, thermostat covers, and two new technical attachments regarding A2L refrigerants and piercing turning performance analysis. The contractor is responsible for all associated costs related to environmental compliance, testing, and remediation activities.

View the file

Other files

File Type Posted
N4008526R0058 0011.pdf PDF
260724 - Continuation Sheet - CLHP.pdf PDF
260724 - Continuation Sheet - CLFC.pdf PDF
N4008526R00580010.pdf PDF
MCBI P2 Fire Protection JA Redacted.pdf PDF
260720 - Continuation Sheet - CLFC.pdf PDF
260423 - Continuation Sheet - CLFC.pdf PDF
260722 - Continuation Sheet - CLHP.pdf PDF
260722 - Continuation Sheet - CLFC.pdf PDF
260720 - Continuation Sheet - CLHP.pdf PDF
260423 - Continuation Sheet - CLHP.pdf PDF
N4008526R0058 0009.pdf PDF
N4008526R0058 0008.pdf PDF
N4008525R0058 0007.pdf PDF
Attachment P -D20 - ITG A2L Refrigerants For Navy and Marine Corps Facilities.pdf PDF
Attachment O - D21 - Ladder 251 - Pierce Turning Performance Analysis.pdf PDF
Attachment L - D19 - French Creek SW8211111 Permit.pdf PDF
Attachment K - B2 Hazardous Materials Report Bldgs HP51HP53HP55HP57_1340.pdf PDF
Attachment N - MCBI Package 2 Site Visit Log.pdf PDF
Attachment M - D19 - Hadnot Point SW8891107 Permit.pdf PDF
N4008526R0058 0005.pdf PDF
Attachment H - MCB LEJ HP DBRFP VOL2of2.pdf PDF
Attachment H - MCB Camp Lejeune HP Sites Subsurface Soil and Geotechnical Report.pdf PDF
Attachment H - MCB LEJ FC DBRFP VOL2of2.pdf PDF
Attachment H - MCB Camp Lejeune FC Subsurface Soil and Geotechnical Report.pdf PDF
Attachment H - 260423 - MOD A Continuation Sheet - CLHP.pdf PDF
Attachment H - 260423 - MOD A Continuation Sheet - CLFC.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).pdf PDF
N4008526R00580003.pdf PDF
Attachment J - Site Visit Map.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
N4008526R00580004.pdf PDF
Attachment I - Price Schedule.xlsx XLSX spreadsheet
Attachment H - MCB LEJ HP DBRFPVOL1of2.pdf PDF
Attachment H - MCB LEJ FC DBRFP VOL1of2.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
N4008526R0058 0002.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.pdf PDF
N4008526R0058 0001.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Solicitation - N4008526R0058.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Responses to Pre-Proposal Inquiries (PPIs):

2. CONTINUATION SHEET FRENCH CREEK

Replace

B201001 Exterior Enclosure combination of brick masonry, concrete unit masonry, or non-structural / architectural precast concrete to match installation standards referenced in Part 3

B201011 Sun Control Devices (Exterior) that requirements of UFC 3-101-

B202001 Windows evaluating the project program security requirements using UFC 4-026-01. There are no forced entry

D305006 Packaged Units

Add for all PTAC/PTHP unit controls/thermostats to minimize/eliminate access to the controls of the unit and to help prevent damage to the unit. Provide Ligature- proof covers for all PTAC/PTHP units to help

D503001 Telecommunications Systems

Revise during design and must support the standard room module configuration provided in Part 3A, Section 4.2

D509002 Emergency Lighting and Power

2.6 Special Design Challenges

A10 Foundations

Revise - CHAPTER 6 / ESR A10 -three pages.

A101002 Deep Foundations the Geotechnical Engineer of Record and meeting specified performance criteria are technically

F2010 1.1 GENERAL DEMOLITION

Add:

Demolition of the structure and all improvements within ten feet of the building, Removal of pavement, sidewalks, utilities, and other site improvements is required to construct the new facilities. Any/all demo required for new improvements must be included; all abandoned utilities must be removed from site.

G204090 Other Site Improvements feet, in accordance with FC-4-721-10N. Each drying area will be located adjacent to the corresponding equipment wash-down area on a concrete hardstand and will be covered with a standing-seam metal roof to provide weather protection. The area will be semi-enclosed or open and is not required to be fully enclosed. Division into separate sections and lockable gates are not required. Horizontal support members will be designed to accommodate a minimum hanging load of 490 pounds per linear foot. The concrete

Add the following to specification 23 81 00 section 2.3.1.10 end of 1st paragraph:

Provide wall mounted thermostat with cover.

Add INTERIM TECHNICAL GUIDANCE - ALIGNING TO INDUSTRY

Add Ladder 251

3. CONTINUATION SHEET HADNOT POINT

B201001 Exterior Enclosure combination of brick masonry, concrete unit masonry, or non-structural / architectural precast concrete to match installation standards referenced in Part 3

B201011 Sun Control Devices (Exterior) that requirements of UFC 3-101-

B202001 Windows

Replace evaluating the project program security requirements using UFC 4-026-01. There are no forced entry

Packaged Units

Add for all PTAC/PTHP unit controls/thermostats to minimize/eliminate access to the controls of the unit and to help prevent damage to the unit. Provide Ligature- proof covers for all PTAC/PTHP units to help

D503001 Telecommunications Systems during design and must support the standard room module configuration provided in Part 3A, Section 4.2

D509002 Emergency Lighting and Power

2.6 Special Design Challenges

A10 Foundations

Revise - CHAPTER 6 / ESR A10 -three pages.

A101002 Deep Foundations the Geotechnical Engineer of Record and meeting specified performance criteria are technically

F2010 1.1 GENERAL DEMOLITION

Add:

Demolition of the structure and all improvements within ten feet of the building, Removal of pavement, sidewalks, utilities, and other site improvements is required to construct the new facilities. Any/all demo required for new improvements must be included; all abandoned utilities must be removed from site.

G204090 Other Site Improvements feet, in accordance with FC-4-721-10N. Each drying area will be located adjacent to the corresponding equipment wash-down area on a concrete hardstand and will be covered with a standing-seam metal roof to provide weather protection. The area will be semi-enclosed or open and is not required to be fully enclosed. Division into separate sections and lockable gates are not required. Horizontal support members will be designed to accommodate a minimum hanging load of 490 pounds per linear foot. The concrete

Add the following to specification 23 81 00 section 2.3.1.10 end of 1st paragraph:

Provide wall mounted thermostat with cover.

Add INTERIM TECHNICAL GUIDANCE - ALIGNING TO INDUSTRY

Add Ladder 251

4. ATTACHMENTMENT O D21 - Ladder 251 - Pierce Turning Performance Analysis

5. ATTACHMENTMENT P D20 - ITG A2L Refrigerants for Navy and Marine Corps Facilities