260720 - Continuation Sheet - CLFC.pdf

PDF 208 KB Posted

Attached to
Design-Build (DB) Barracks Initiative (Package #2), Marine Corps Base (MCB) Camp Lejeune, North Carolina
Solicitation number
N4008526R0058
Issued by

About this file

This is a Continuation Sheet for a federal construction contract for the FY 26 Marine Corps Barracks Repair by Replacement project at MCB Camp Lejeune in French Creek, Jacksonville, NC (eProjects Work Order Number 1894552, dated 20 July 2026).

The document revises technical specifications across multiple sections of the project program. In Part 3A, HVAC requirements are updated to mandate outside design conditions follow the most stringent values between the RFP and MCBCL Mechanical Design Guide, ventilation and exhaust must comply with ASHRAE standard 62.1 version 2025, and energy requirements must follow ASHRAE 90.1 version 2019. Additionally, PTAC/PTHP packaged units must include factory-installed control covers and ligature-proof covers to prevent damage and unauthorized access. Part 3B contains multiple civil and site work revisions: dumpster pad enclosures must ensure accessibility for front-loading trash trucks per Camp Lejeune Civil Design Guide and BEAP requirements; erosion control areas must be captured within NCDEQ-approved limits; roadways must be constructed per Camp Lejeune PWD Civil Design Guidance rather than at designer discretion; subsurface drainage system requirements for roadways are removed; recycled asphalt pavement use is prohibited in bituminous concrete mixtures; crushed concrete is restricted to sidewalks only; rock mulch is required over weed control fabric instead of hardwood mulch; landscape edging must be provided around planting beds per Civil Design Guide; a mow strip is required around facilities; utility installations in existing pavement areas must utilize boring methods rather than open cuts, with abandoned utilities cut, capped, and filled with flowable fill. Part 6 revises Attachment D14 Specification 23 05 93, Section 3.1.1 to require 100% of duct required for DALT.

View the file

Other files

File Type Posted
N4008526R0058 0011.pdf PDF
260724 - Continuation Sheet - CLHP.pdf PDF
260724 - Continuation Sheet - CLFC.pdf PDF
N4008526R00580010.pdf PDF
MCBI P2 Fire Protection JA Redacted.pdf PDF
260722 - Continuation Sheet - CLHP.pdf PDF
260722 - Continuation Sheet - CLFC.pdf PDF
260720 - Continuation Sheet - CLHP.pdf PDF
260423 - Continuation Sheet - CLFC.pdf PDF
260423 - Continuation Sheet - CLHP.pdf PDF
N4008526R0058 0009.pdf PDF
N4008526R0058 0008.pdf PDF
N4008525R0058 0007.pdf PDF
N4008526R0058 0006.pdf PDF
Attachment P -D20 - ITG A2L Refrigerants For Navy and Marine Corps Facilities.pdf PDF
Attachment O - D21 - Ladder 251 - Pierce Turning Performance Analysis.pdf PDF
Attachment L - D19 - French Creek SW8211111 Permit.pdf PDF
Attachment N - MCBI Package 2 Site Visit Log.pdf PDF
Attachment M - D19 - Hadnot Point SW8891107 Permit.pdf PDF
N4008526R0058 0005.pdf PDF
Attachment K - B2 Hazardous Materials Report Bldgs HP51HP53HP55HP57_1340.pdf PDF
Attachment H - MCB LEJ HP DBRFP VOL2of2.pdf PDF
Attachment H - MCB Camp Lejeune HP Sites Subsurface Soil and Geotechnical Report.pdf PDF
N4008526R00580003.pdf PDF
Attachment J - Site Visit Map.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
N4008526R00580004.pdf PDF
Attachment H - MCB LEJ FC DBRFP VOL2of2.pdf PDF
Attachment H - MCB Camp Lejeune FC Subsurface Soil and Geotechnical Report.pdf PDF
Attachment H - 260423 - MOD A Continuation Sheet - CLHP.pdf PDF
Attachment H - 260423 - MOD A Continuation Sheet - CLFC.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).pdf PDF
Attachment I - Price Schedule.xlsx XLSX spreadsheet
Attachment H - MCB LEJ HP DBRFPVOL1of2.pdf PDF
Attachment H - MCB LEJ FC DBRFP VOL1of2.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.pdf PDF
N4008526R0058 0002.pdf PDF
N4008526R0058 0001.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
Solicitation - N4008526R0058.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Continuation Sheet eProjects Work Order Number: 1894552

Construction Contract Number: --

Building: --

Project Title: FY 26 Marine Corps Barracks – Repair by Replacement MCB Camp Lejeune – French Creek, Jacksonville, NC

Date: 20 July 2026

PART 3A – PROJECT PROGRAM:

REVISE the following:

D30 HVAC – General System Requirements

Add the following: Outside design conditions must follow the most stringent between the values stated in the RFP and the values stated in MCBCL Mechanical Design Guide document in Part 6.

For Ventilation and Exhaust requirement follow ASHRAE standard 62.1 version 2025

For Energy related requirements follow ASHRAE 90.1 version 2019.

D305006 Packaged Units

Add the following sentences to the end of the section: “Provide factory installed/provided controls covers for all PTAC/PTHP unit controls/thermostats to minimize/eliminate access to the controls of the unit and to help prevent damage to the unit. Provide Ligature- proof covers for all PTAC/PTHP units to help prevent damage to the unit.”

PART 3B – PROJECT PROGRAM:

3.2.1.6 Dumpster Pad and Enclosure

Revise The second sentence “Conceal dumpsters with a decorative, gated structure in accordance with Camp Lejeune BEAP provided in Part 6,” to the following: “Ensure dumpster accessibility for front loading trash trucks, in accordance with the MCB Camp Lejeune Civil Design Guide and the Camp Lejeune BEAP requirements provided in Part 6.”

3.2.1.15 Permits

Revise Add the following sentence to the end of paragraph: “Ensure areas are captured within the NCDEQ approved erosion control limits of disturbance.”

G2010 Roadways

Revise The sentence “Provide bituminous concrete or Portland cement concrete (PCC) roadways at the discretion of the Designer of Record.” with the following “Provide bituminous concrete or Portland cement concrete (PCC) roadways in accordance with

Camp Lejeune PWD Civil Design Guidance”.

Remove The paragraph “A subsurface drainage system must be provided in all roadway areas. The subsurface drainage system must consist of as a minimum weep holes in all drainage structures and perimeter underdrain or strip drains designed such that the aggregate base and sand subbase layers remain in a drained (i.e. unsaturated) condition during service.”

G201003 Paved Surfaces

Revise The paragraph “Recycled asphalt pavement material may be used in bituminous concrete mixtures in accordance with guidelines outlined by in the latest edition of North

Carolina Department of Transportation (NCDOT) Standards Specifications for Roads and Structures.” to read “The use of recycled asphalt pavement is not permitted.”

G202001 Bases & Subbases

Revise The sentence “Crushed concrete meeting specified gradation for aggregate base or subbase courses may be used upon Engineer of Record (EOR) and

Contracting Officer approval” to read “The use of crushed concrete is allowed under sidewalks but not under paved roadways.”

G202003 Paved Surfaces

Revise The paragraph “Recycled asphalt pavement material may be used for bituminous concrete pavement (as permitted by the SHS).” to read “The use of recycled asphalt pavement is not permitted.”

G205005 Plantings

Revise The sentence “Provide 3 inches of double shredded hardwood mulch over weed control fabric at planting beds.”, to the following: “Provide rock mulch over weed control fabric in all landscape planting beds in lieu of hardwood mulch, in accordance with the MCB Camp Lejeune Civil Design Guide in Part 6.”

Revise The sentence “Encompass planting beds not used for bioretention filters with steel edging except where beds abut walls or sidewalks.”, to the following: “Provide landscape edging around all planting beds not utilized as bioretention filters, except where planting beds are adjacent to walls or sidewalks, in accordance with the MCB Camp Lejeune Civil Design Guide in Part 6.”

Add “Provide a mow strip around facilities to minimize maintenance and damage, in accordance with the MCB Camp Lejeune Civil Design Guide in Part 6.”

G30 Site Civil/Mechanical Utilities

General System Requirements

Revise The sentences “Utility line and utility structure excavations made in existing pavement areas must be completely backfilled to the aggregate base/subbase course elevation using excavatable flowable fill meeting NCDOT specifications” with the following “Open cuts of existing roadways or parking lots for installation of new utilities is not allowed. Utilities will be installed by boring under these surfaces. No existing roadway or parking lot open cuts for removal of existing utilities; cut, cap & fill abandoned section with flowable fill”.

PART 6 – ATTACHMENTS:

Attachment D14 Specification 23 05 93

Revise Section 3.1.1 to “100% of duct required for DALT”