260724 - Continuation Sheet - CLHP.pdf
PDF 171 KB Posted
- Attached to
- Design-Build (DB) Barracks Initiative (Package #2), Marine Corps Base (MCB) Camp Lejeune, North Carolina
- Solicitation number
- N4008526R0058
About this file
This is a Continuation Sheet for a federal construction work order issued by Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic. The document provides a project program revision for the FY 26 Marine Corps Barracks Repair by Replacement project located at MCB Camp Lejeune, Hadnot Point, Jacksonville, NC.
The revision modifies specification D306001 1.1 for Direct Digital Controls (DDC) systems. The contractor is required to provide controls integrated door switches and all applicable wiring, conduit, and infrastructure to support PTAC (Packaged Terminal Air Conditioner) unoccupied operation after a 2+0 room or accessible room door is left open for an adjustable amount of time. This addition specifies the technical requirements for automated climate control functionality in the barracks renovation project. The work order number is 1894554, and the revision was dated 24 July 2026.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Continuation Sheet eProjects Work Order Number: 1894554
Construction Contract Number: --
Building: --
Project Title: FY 26 Marine Corps Barracks – Repair by Replacement MCB Camp Lejeune – Hadnot Point, Jacksonville, NC
Date: 24 July 2026
PART 3A – PROJECT PROGRAM:
REVISE the following:
D306001 1.1 Direct Digital Controls (DDC)
Add. “Provide controls integrated door switch and all applicable wiring, conduit and infrastructure to support PTAC Unoccupied operation after a 2+0 Room or Accessible
Room door is left open for an (adj) amount of time.”
File details come from the government source that posted it. Updated .