260423 - Continuation Sheet - CLHP.pdf

PDF 205 KB Posted

Attached to
Design-Build (DB) Barracks Initiative (Package #2), Marine Corps Base (MCB) Camp Lejeune, North Carolina
Solicitation number
N4008526R0058
Issued by

About this file

This is a Continuation Sheet – Modification "A" for a Marine Corps construction project at MCB Camp Lejeune – Hadnot Point, Jacksonville, NC, dated 23 April 2026. The modification revises requirements for the FY 26 Marine Corps Barracks – Repair by Replacement project (eProjects Work Order Number 1894554).

The modification updates environmental controls and design standards across three primary areas. In Section 01 57 19 (Temporary Environmental Controls), language addressing surplus soils disposal is revised to require contractors to anticipate all surplus soil media as contaminant-impacted—including PFAS/PFOA, petroleum, metals, VOCs, and PAHs—and dispose of it at licensed, permitted facilities accepting such materials with proper characterization. Similarly, construction dewatering effluent requirements are revised to mandate contractors anticipate all dewatering effluent as contaminant-impacted and treat it to non-detect levels prior to discharge into an existing vegetated swale at a location approved by the Contracting Officer. In Part 3B (Project Program), all references to UFC 3-600-10N are replaced with UFC 3-600-01 (Fire Protection Engineering for Facilities). Under Section 2.6 (Special Design Challenges), the Government will provide a revised Total Building Commissioning section with no additional coordination effort anticipated from the contractor. Finally, under G201090 (Other Roadways), references to ESR Section D4090 are replaced with UFC 3-600-01, and the requirement for roadways to accommodate two fire truck trips monthly is removed.

View the file

Other files

File Type Posted
260724 - Continuation Sheet - CLHP.pdf PDF
N4008526R0058 0011.pdf PDF
260724 - Continuation Sheet - CLFC.pdf PDF
N4008526R00580010.pdf PDF
260720 - Continuation Sheet - CLFC.pdf PDF
260423 - Continuation Sheet - CLFC.pdf PDF
MCBI P2 Fire Protection JA Redacted.pdf PDF
260722 - Continuation Sheet - CLHP.pdf PDF
260722 - Continuation Sheet - CLFC.pdf PDF
260720 - Continuation Sheet - CLHP.pdf PDF
N4008526R0058 0009.pdf PDF
N4008526R0058 0008.pdf PDF
N4008525R0058 0007.pdf PDF
Attachment P -D20 - ITG A2L Refrigerants For Navy and Marine Corps Facilities.pdf PDF
Attachment O - D21 - Ladder 251 - Pierce Turning Performance Analysis.pdf PDF
N4008526R0058 0006.pdf PDF
Attachment K - B2 Hazardous Materials Report Bldgs HP51HP53HP55HP57_1340.pdf PDF
Attachment L - D19 - French Creek SW8211111 Permit.pdf PDF
Attachment N - MCBI Package 2 Site Visit Log.pdf PDF
Attachment M - D19 - Hadnot Point SW8891107 Permit.pdf PDF
N4008526R0058 0005.pdf PDF
Attachment H - MCB LEJ FC DBRFP VOL2of2.pdf PDF
Attachment H - MCB Camp Lejeune FC Subsurface Soil and Geotechnical Report.pdf PDF
Attachment H - 260423 - MOD A Continuation Sheet - CLHP.pdf PDF
Attachment H - 260423 - MOD A Continuation Sheet - CLFC.pdf PDF
Attachment F - Small Business Participation Commitment Document (SBPCD).pdf PDF
Attachment H - MCB LEJ HP DBRFP VOL2of2.pdf PDF
Attachment H - MCB Camp Lejeune HP Sites Subsurface Soil and Geotechnical Report.pdf PDF
N4008526R00580003.pdf PDF
Attachment J - Site Visit Map.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
N4008526R00580004.pdf PDF
Attachment I - Price Schedule.xlsx XLSX spreadsheet
Attachment H - MCB LEJ HP DBRFPVOL1of2.pdf PDF
Attachment H - MCB LEJ FC DBRFP VOL1of2.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
N4008526R0058 0002.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.pdf PDF
N4008526R0058 0001.pdf PDF
Solicitation - N4008526R0058.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Continuation Sheet – Modification “A” eProjects Work Order Number: 1894554

Construction Contract Number: --

Building: --

Project Title: FY 26 Marine Corps Barracks – Repair by Replacement MCB Camp Lejeune – Hadnot Point, Jacksonville, NC

Date: 23 April 2026

PART 2 – GENERAL REQUIREMENTS:

REVISE the following sections:

Section 01 57 19 TEMPORTARY ENVIRONMENTAL CONTROLS

1.5.1.1.1.2 Surplus Soils Disposal for Camp Lejeune and MCAS New River

REPLACE the following language:

Remove: “Soil should be reused on its originating construction footprint. As there are currently no regulations regarding management and disposal of PFAS-impacted soil, all PFAS-impacted media should be managed so as to minimize the future impacts to the environment, should they become regulated. If PFAS-impacted soil needs to leave the originating site…”

Replace with: “Anticipate that all surplus soil media is contaminant impacted (including but not limited to PFAS/PFOA, petroleum, metals, VOC’s, and PAH’s) and must be disposed of at a licensed, permitted facility that accepts PFAS impacted soil media. It must be properly characterized…”

3.3.1 Cofferdams, Diversions, and Dewatering

REPLACE the following language:

Remove: “All construction dewatering effluent must be anticipated to be PFAS impacted and sampled, tested, and treated to no-detect levels.”

Replace with: “Anticipate that all construction dewatering effluent is contaminant impacted (including but not limited to PFAS/PFOA, petroleum, metals, VOC’s and PAH’s) and must be treated to non-detect levels prior to discharge into an existing vegetated swale at a location approved by the Contracting Officer.”

PART 3B – PROJECT PROGRAM:

REVISE the following:

REPLACE all occurrences of ‘UFC 3-600-10N’ with UFC 3-600-01, Fire Protection Engineering for Facilities.

2.6 Special Design Challenges

Replace the first sentence of ‘Additional Building Commissioning Requirements’ with: “The Government will provide a revised Section 01 91 00.15 22 Total Building Commissioning (currently in Part 2 of this RFP) as design progresses; no additional coordination effort by the contractor is anticipated.”

G201090 OTHER ROADWAYS

Replace “…in accordance with the requirements of ESR Section D4090…” with “in accordance with the requirements of UFC 3-600-01…”

Remove “…must accommodate two fire truck trips every month and…”

File details come from the government source that posted it. Updated .