260423 - Continuation Sheet - CLHP.pdf
PDF 205 KB Posted
- Attached to
- Design-Build (DB) Barracks Initiative (Package #2), Marine Corps Base (MCB) Camp Lejeune, North Carolina
- Solicitation number
- N4008526R0058
About this file
This is a Continuation Sheet – Modification "A" for a Marine Corps construction project at MCB Camp Lejeune – Hadnot Point, Jacksonville, NC, dated 23 April 2026. The modification revises requirements for the FY 26 Marine Corps Barracks – Repair by Replacement project (eProjects Work Order Number 1894554).
The modification updates environmental controls and design standards across three primary areas. In Section 01 57 19 (Temporary Environmental Controls), language addressing surplus soils disposal is revised to require contractors to anticipate all surplus soil media as contaminant-impacted—including PFAS/PFOA, petroleum, metals, VOCs, and PAHs—and dispose of it at licensed, permitted facilities accepting such materials with proper characterization. Similarly, construction dewatering effluent requirements are revised to mandate contractors anticipate all dewatering effluent as contaminant-impacted and treat it to non-detect levels prior to discharge into an existing vegetated swale at a location approved by the Contracting Officer. In Part 3B (Project Program), all references to UFC 3-600-10N are replaced with UFC 3-600-01 (Fire Protection Engineering for Facilities). Under Section 2.6 (Special Design Challenges), the Government will provide a revised Total Building Commissioning section with no additional coordination effort anticipated from the contractor. Finally, under G201090 (Other Roadways), references to ESR Section D4090 are replaced with UFC 3-600-01, and the requirement for roadways to accommodate two fire truck trips monthly is removed.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Continuation Sheet – Modification “A” eProjects Work Order Number: 1894554
Construction Contract Number: --
Building: --
Project Title: FY 26 Marine Corps Barracks – Repair by Replacement MCB Camp Lejeune – Hadnot Point, Jacksonville, NC
Date: 23 April 2026
PART 2 – GENERAL REQUIREMENTS:
REVISE the following sections:
Section 01 57 19 TEMPORTARY ENVIRONMENTAL CONTROLS
1.5.1.1.1.2 Surplus Soils Disposal for Camp Lejeune and MCAS New River
REPLACE the following language:
Remove: “Soil should be reused on its originating construction footprint. As there are currently no regulations regarding management and disposal of PFAS-impacted soil, all PFAS-impacted media should be managed so as to minimize the future impacts to the environment, should they become regulated. If PFAS-impacted soil needs to leave the originating site…”
Replace with: “Anticipate that all surplus soil media is contaminant impacted (including but not limited to PFAS/PFOA, petroleum, metals, VOC’s, and PAH’s) and must be disposed of at a licensed, permitted facility that accepts PFAS impacted soil media. It must be properly characterized…”
3.3.1 Cofferdams, Diversions, and Dewatering
REPLACE the following language:
Remove: “All construction dewatering effluent must be anticipated to be PFAS impacted and sampled, tested, and treated to no-detect levels.”
Replace with: “Anticipate that all construction dewatering effluent is contaminant impacted (including but not limited to PFAS/PFOA, petroleum, metals, VOC’s and PAH’s) and must be treated to non-detect levels prior to discharge into an existing vegetated swale at a location approved by the Contracting Officer.”
PART 3B – PROJECT PROGRAM:
REVISE the following:
REPLACE all occurrences of ‘UFC 3-600-10N’ with UFC 3-600-01, Fire Protection Engineering for Facilities.
2.6 Special Design Challenges
Replace the first sentence of ‘Additional Building Commissioning Requirements’ with: “The Government will provide a revised Section 01 91 00.15 22 Total Building Commissioning (currently in Part 2 of this RFP) as design progresses; no additional coordination effort by the contractor is anticipated.”
G201090 OTHER ROADWAYS
Replace “…in accordance with the requirements of ESR Section D4090…” with “in accordance with the requirements of UFC 3-600-01…”
Remove “…must accommodate two fire truck trips every month and…”