About this file

This document is a comprehensive set of Final Design architectural and engineering drawings for the P-1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base New London in Groton, Connecticut, prepared by NAVFAC (Naval Facilities Engineering Systems Command) Mid-Atlantic and dated 6/23/2025. The project encompasses a single-story, approximately 11,205 square-foot facility designed to serve multiple functions including weapons storage, ordnance operations, administrative offices, and residential bunking for military personnel. The facility is classified as Type II-B construction with mixed occupancies including Assembly A-3, Business, Residential R-2, and Storage S-2. The design incorporates fire protection systems, sprinkler coverage, fire alarm systems, and comprehensive life safety features complying with IBC 2021, NFPA 101 Life Safety Code, and UFC standards. The structural design utilizes cast-in-place concrete walls and foundations, structural steel framing with open web steel joists, and steel roof decking with a fully adhered TPO roofing membrane system.

The facility design includes detailed specifications for mechanical systems with R-35 minimum roof insulation, electrical distribution systems with emergency lighting and power systems, plumbing systems with accessible fixtures, telecommunications infrastructure, fire suppression and alarm systems, and comprehensive audio-visual equipment integration. Interior finishes specify sealed concrete flooring in storage and mechanical areas, resilient luxury vinyl tile and porcelain tile in occupied spaces, and acoustic ceiling panels throughout. Architectural finishes feature ground-face and rock-face architectural concrete masonry units in varying colors (Alabaster, Buff, and Limestone), prefinished metal coping and canopies, and interior millwork with solid surface countertops. The drawings include 140 sheets covering general notes, structural details, architectural floor plans and elevations, mechanical and electrical systems, fire protection, plumbing, telecommunications, interior design with furniture/fixture/equipment schedules, and signage specifications. Design approval was provided by LCDR Elizabeth Olokode, NAVFAC Operations Director, with final design issued 6/23/2025.

View the file

Other files

File Type Posted
N4008526R00040014 SF 30.pdf PDF
Amend 0014 Spec 1667770.pdf PDF
N4008526R00040013 SF 30.pdf PDF
N4008526R00040011 SF 30.pdf PDF
N4008526R00040012 SF 30.pdf PDF
APPENDIX_D_Air Leakage Rate by Fan Pressurization.xlsx XLSX spreadsheet
ATTACHMENT H - Price Proposal Form REV4.docx DOCX document
N4008526R00040010 SF 30.pdf PDF
1667770spc07.28.26_rev.pdf PDF
ATTACHMENT T - P1102_PROD.xlsx XLSX spreadsheet
P1102_Amend 0007_Drawings3of3.pdf PDF
P-1102_Amend 0007_Drawings2of3.pdf PDF
ATTACHMENT R - Geo Inv Analytical Rep.pdf PDF
ATTACHMENT Q - NRZ_Checklist-POAM_Items.pdf PDF
Revised Attachment H Price Proposal Form REV2.docx DOCX document
JA ML-26-16 P1102 Interior Finishes_Redacted.pdf PDF
JA ML-26-15 P1102 Stormwater_Redacted.pdf PDF
JA ML-26-13 P1102 Fire Alarm_Redacted.pdf PDF
JA ML-26-12 P1102 ESS_Redacted.pdf PDF
ATTACHMENT N - NDDB Determination Renewal 16JAN2026.pdf PDF
ATTACHMENT L - Explosive Safety-HERO training.pptx PPTX presentation
P-1102_Amend 0006_Drawings_rev.pdf PDF
ATTACHMENT O - MK48 STORAGE FACILITY.pdf PDF
ATTACHMENT M - Permits Record of Decision (PROD).pdf PDF
N4008526R00040005 SF 30.pdf PDF
Amendment 0004 PPIs.pdf PDF
Attachment G- Small Business Subcontracting Plan (SBSP) Rev.pdf PDF
Attachment K - P1102 Site Visit Log.pdf PDF
Amendment 0002 PPIs.pdf PDF
N4008526R00040002 SF 30.pdf PDF
Attachment I - Site Visit Map.pdf PDF
N4008526R00040001 SF 30.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
FINAL DESIGN_1667770dwg2of3Operations.pdf PDF
FINAL DESIGN_1667770dwg2of2Sentry.pdf PDF
FINAL DESIGN_1667770dwg2of4Site.pdf PDF
FINAL DESIGN_1667770dwg3of4Site.pdf PDF
P-1102_1667770spc1of3.pdf.pdf PDF
P-1102_1667770spc3of3.pdf.pdf PDF
Solicitation - N4008526R0004.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
Attachment F - Small Business Participation Commitment.pdf PDF
FINAL DESIGN_1667770dwg1of2Sentry.pdf PDF
FINAL DESIGN_1667770dwg1of1TypeG.pdf PDF
FINAL DESIGN_1667770dwg1of1TypeH.pdf PDF
Attachment C - Construction Experience Project Data.pdf PDF
Attachment G - Individual Small Business Subcontracting Plan.pdf PDF
FINAL DESIGN_1667770dwg1of4Site.pdf PDF
FINAL DESIGN_1667770dwg4of4Site.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VISITOR'S

ENTRANCE

NAVAL SUBMARINE

BASE

NEW LONDON

PROJECT SITE

SITE OF OPERATIONS BUILDING

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S

YS

TE

M

S C

O M

M A

N D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS NOTED

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

6/

/2

:3 1:

A

M \\d c1 vs

\fe dp rj\

FD

ZE

\A R

C H

\B

LD

G -1

-A

-B

IM

.rv t

G-001

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

F

AC

ILI

TY

G

EN

ER

AL

C O

VE

R

SH

EE

T

WS

12893951

PS PS

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLON FEAD

DIRECTOR NEW LONDON, GROTEN, CT

O

PE

RA

TI

O

NS

SMS/ CWJ

1667770

GR

OT

ON

, C

ON

NE

CT

IC

UT

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

JWJ

DJD

HPN

M

ID

-A

TL

A N

TI

C

G -0

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

-M

ID

-A

TL

AN

TI

C N

A

VA

L S

TA

TI

O N

N

O R

FO

LK

, V A

VICINITY / BASE MAP

P-1102 WEAPONS MAGAZINE & ORDNANCE OPERATIONS FACILITY

NAVAL SUBMARINE BASE NEW LONDON, GROTON, CONNECTICUT

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND - MID-ATLANTIC

NAVFAC FACILITIES ENGINEERING AND ACQUISITION DIVISION (FEAD)

OPERATIONS

LOCATION MAP

FINAL DESIGN

6/23/2025

NEK

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S

YS

TE

M

S C

O M

M A

N D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS NOTED

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

6/

/2

:3 1:

A

M \\d c1 vs

\fe dp rj\

FD

ZE

\A R

C H

\B

LD

G -1

-A

-B

IM

.rv t

G-002

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

F

AC

ILI

TY

G

EN

ER

AL

L

IS

T O

F

SH

EE

TS

WS

12893952

PS PS

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLON FEAD

DIRECTOR NEW LONDON, GROTEN, CT

O

PE

RA

TI

O

NS

SMS/ CWJ

1667770

GR

OT

ON

, C

ON

NE

CT

IC

UT

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

JWJ

DJD

HPN

M

ID

-A

TL

A N

TI

C

G -0

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

-M

ID

-A

TL

AN

TI

C N

A

VA

L S

TA

TI

O N

N

O R

FO

LK

, V A

SHEET NO. NAVFAC DWG.

NO. SHEET TITLENO. SHEET

ELECTRICAL

87 E-001 12894037 ELECTRICAL GENERAL NOTES

88 E-002 12894038 ELECTRICAL ABBREVIATIONS

89 E-003 12894039 ELECTRICAL SYMBOLS

90 E-004 12894040 ELECTRICAL SYMBOLS

91 EG101 12894041 ELECTRICAL GROUNDING PLAN

92 EG102 12894042 ELECTRICAL LIGHTNING PROTECTION PLAN

93 EL101 12894043 ELECTRICAL LIGHTING PLAN

94 EP101 12894044 ELECTRICAL POWER PLAN

95 EP102 12894045 ELECTRICAL EQUIPMENT POWER PLAN

96 E-501 12894046 ELECTRICAL DETAILS

97 E-502 12894047 ELECTRICAL DETAILS

98 E-503 12894048 ELECTRICAL DETAILS

99 E-504 12894049 ELECTRICAL DETAILS

100 E-601 12894050 ELECTRICAL POWER SINGLE LINE DIAGRAM

101 E-701 12894051 LIGHTING FIXTURE AND CONTROLS SCHEDULES

102 E-702 12894052 ELECTRICAL PANEL SCHEDULES

103 E-703 12894053 ELECTRICAL PANEL SCHEDULES

104 E-704 12894054 ELECTRICAL FEEDER SCHEDULE

TELECOMMUNICATIONS

105 T-001 12894055 TELECOMMUNICATIONS SYMBOLS, LEGEND, ABBREVIATIONS, AND NOTES

106 T-101 12894056 TELECOMMUNICATIONS FLOOR PLAN

107 T-201 12894057 TELECOMMUNICATIONS RACK ELEVATIONS

108 T-202 12894058 TELECOMMUNICATIONS ELEVATIONS

109 T-401 12894059 TELECOMMUNICATIONS ENLARGED PLANS

110 T-501 12894060 TELECOMMUNICATIONS DETAILS

111 T-502 12894061 TELECOMMUNICATIONS DETAILS

112 T-503 12894062 TELECOMMUNICATIONS DETAILS

113 T-504 12894063 TELECOMMUNICATIONS DETAILS

114 T-505 12894064 TELECOMMUNICATIONS DETAILS

115 T-506 12894065 TELECOMMUNICATIONS DETAILS

116 T-507 12894066 TELECOMMUNICATIONS DETAILS

117 T-508 12894067 TELECOMMUNICATIONS DETAILS

118 T-509 12894068 TELECOMMUNICATIONS DETAILS

119 T-510 12894069 TELECOMMUNICATIONS DETAILS

120 T-601 12894070 TELECOMMUNICATIONS RISER DIAGRAMS

121 T-602 12894071 TELECOMMUNICATIONS SCHEDULES

122 T-603 12894072 ONE LINE OSP RISER DIAGRAM

AUDIO VISUAL

123 TA001 12894073 AUDIO VISUAL SYMBOLS, LEGEND, ABBREVIATIONS, AND NOTES

124 TA002 12894074 AUDIO VISUAL DISPLAY SCHEDULE

125 TA101 12894075 AUDIO VISUAL FLOOR PLAN

126 TA201 12894076 AUDIO VISUAL ELEVATIONS

127 TA202 12894077 AUDIO VISUAL ELEVATIONS

128 TA401 12894078 AUDIO VISUAL ENLARGED PLANS

129 TA402 12894079 AUDIO VISUAL ENLARGED PLANS

130 TA501 12894080 AUDIO VISUAL DETAILS

131 TA502 12894081 AUDIO VISUAL DETAILS

132 TA601 12894082 AUDIO VISUAL DIAGRAMS

133 TA602 12894083 AUDIO VISUAL DIAGRAMS

SECURITY

134 TY001 12894084 SECURITY SYMBOLS, LEGEND, ABBREVIATIONS, AND NOTES

135 TY101 12894085 SECURITY FLOOR PLAN

136 TY501 12894086 SECURITY DETAILS

137 TY502 12894087 SECURITY DETAILS

138 TY503 12894088 SECURITY DETAILS

139 TY504 12894324 SECURITY DETAILS

140 TY601 12894323 SECURITY SCHEMATIC DESIGN

SHEET NO. NAVFAC DWG.

NO. SHEET TITLENO. SHEET

FIRE PROTECTION

50 FX001 12894000 FIRE SUPPRESSION SYMBOLS, LEGEND, ABBREVIATIONS AND NOTES

51 FX101 12894001 FIRE SUPPRESSION FLOOR PLAN

52 FX501 12894002 FIRE SUPPRESSION RISER AND DETAILS

FIRE ALARM

53 FA001 12894003 FIRE ALARM AND MASS NOTIFICATION SYMBOLS, LEGEND, ABBREVIATIONS AND NOTES

54 FA101 12894004 FIRE ALARM AND MASS NOTIFICATION FLOOR PLAN

55 FA501 12894005 FIRE ALARM AND MASS NOTIFICATION RISER DIAGRAM, MATRIX, AND DETAILS

PLUMBING

56 P-001 12894006 PLUMBING LEGEND AND GENERAL NOTES

57 P-101 12894007 PLUMBING SANITARY & VENT FLOOR PLAN

58 P-102 12894008 PLUMBING DOMESTIC WATER FLOOR PLAN

59 P-103 12894009 PLUMBING ROOF PLAN

60 P-104 12894010 PLUMBING RADON MITIGATION FLOOR PLAN

61 P-301 12894011 PLUMBING SECTIONS

62 P-401 12894012 PLUMBING ENLARGED PLANS - SANITARY & VENT

63 P-402 12894013 PLUMBING ENLARGED PLANS - DOMESTIC WATER

64 P-501 12894014 PLUMBING DETAILS

65 P-502 12894015 PLUMBING DETAILS

66 P-601 12894016 PLUMBING SCHEDULES

67 P-901 12894017 PLUMBING RISER DIAGRAMS - SANITARY WASTE & VENT

68 P-902 12894018 PLUMBING RISER DIAGRAMS - DOMESTIC WATER

MECHANICAL

69 M-001 12894019 MECHANICAL LEGEND, ABBREVIATIONS AND NOTES

70 M-101 12894020 MECHANICAL FLOOR PLAN - DUCTWORK

71 MP101 12894021 MECHANICAL FLOOR PLAN - PIPING

72 M-301 12894022 MECHANICAL SECTIONS

73 M-401 12894023 MECHANICAL ENLARGED FLOOR PLAN

74 M-501 12894024 MECHANICAL DETAILS

75 M-502 12894025 MECHANICAL DETAILS

76 M-601 12894026 MECHANICAL SCHEDULES

77 M-800 12894027 MECHANICAL CONTROLS LEGEND AND ABBREVIATIONS

78 M-801 12894028 MECHANICAL CONTROL DIAGRAMS & SEQUENCES

79 M-802 12894029 MECHANICAL CONTROL DIAGRAMS & SEQUENCES

80 M-803 12894030 MECHANICAL CONTROL DIAGRAMS & SEQUENCES

81 M-804 12894031 MECHANICAL CONTROL DIAGRAMS & SEQUENCES

82 M-805 12894032 MECHANICAL CONTROL POINTS SCHEDULE

83 M-806 12894033 MECHANICAL CONTROL POINTS SCHEDULE

84 M-807 12894034 MECHANICAL CONTROL POINTS SCHEDULE

85 M-808 12894035 MECHANICAL CONTROL POINTS SCHEDULE

86 M-809 12894036 MECHANICAL CONTROL POINTS SCHEDULE

SHEET NO. NAVFAC DWG.

NO. SHEET TITLENO. SHEET

GENERAL

1 G-001 12893951 GENERAL COVER SHEET

2 G-002 12893952 GENERAL LIST OF SHEETS

3 G-101 12893953 GENERAL BUILDING CODE ANALYSIS

4 G-102 12893954 GENERAL FLOOR PLAN - LIFE SAFETY

5 G-103 12893955 CODE COMPLIANCE SITE PLAN - AREA A

STRUCTURAL

6 S-001 12893956 GENERAL NOTES, ABBREVIATIONS & LEGEND

7 S-002 12893957 DESIGN CRITERIA & LOADS

8 S-003 12893958 MATERIAL NOTES

9 S-101 12893959 FOUNDATION & GROUND FLOOR PLAN

10 S-102 12893960 ROOF FRAMING PLANS

11 S-201 12893961 BUILDING ELEVATIONS

12 S-202 12893962 BUILDING ELEVATIONS

13 S-401 12893963 DUMPSTER ENCLOSURE

14 S-501 12893964 TYPICAL FOUNDATION & CONCRETE DETAILS

15 S-502 12893965 TYPICAL SLAB-ON-GROUND DETAILS

16 S-503 12893966 TYPICAL CONCRETE WALL DETAILS

17 S-504 12893967 TYPICAL STEEL DETAILS

18 S-505 12893968 TYPICAL JOIST DETAILS

19 S-510 12893969 SECTIONS & DETAILS

20 S-601 12893970 SCHEDULES

21 S-901 12893971 3D ISOMETRIC VIEWS

ARCHITECTURAL

22 A-001 12893972 ARCHITECTURAL NOTES AND SYMBOLS

23 A-002 12893973 ARCHITECTURAL ACCESSIBILITY STANDARDS & MOUNTING HEIGHTS

24 A-003 12893974 ARCHITECTURAL AIR BARRIER INFORMATION

25 A-101 12893975 ARCHITECTURAL FLOOR PLAN

26 A-102 12893976 ARCHITECTURAL REFLECTED CEILING PLAN

27 A-103 12893977 ARCHITECTURAL ROOF PLAN

28 A-201 12893978 ARCHITECTURAL BUILDING ELEVATIONS

29 A-301 12893979 ARCHITECTURAL BUILDING SECTIONS

30 A-302 12893980 ARCHITECTURAL WALL SECTIONS

31 A-401 12893981 ARCHITECTURAL ENLARGED PLANS

32 A-501 12893982 ARCHITECTURAL EXTERIOR DETAILS

33 A-502 12893983 ARCHITECTURAL MISCELLANEOUS DETAILS

34 A-503 12893984 OPENING DETAILS

35 A-510 12893985 TYPICAL ROOF DETAILS

36 A-601 12893986 ARCHITECTURAL SCHEDULES

37 A-602 12893987 ARCHITECTURAL PARTITION TYPES

38 A-603 12893988 ARCHITECTURAL EXTERIOR MATERIAL SCHEDULE

INTERIORS

39 I-101 12893989 FF&E PLAN & SCHEDULE

40 I-102 12893990 INTERIOR FINISH PLAN & ROOM FINISH SCHEDULE

41 I-103 12893991 SIGNAGE PLAN & SCHEDULE

42 I-401 12893992 OFFICE PLANS & ISOMETRIC VIEWS

43 I-402 12893993 WORKSTATION PLANS & ISOMETRIC VIEWS

44 I-403 12893994 INTERIOR ENLARGED PLANS & ELEVATIONS

45 I-404 12893995 INTERIOR ENLARGED PLANS & ELEVATIONS

46 I-405 12893996 INTERIOR ENLARGED PLANS & ELEVATIONS

47 I-501 12893997 INTERIOR DETAILS

48 I-502 12893998 SIGNAGE DETAILS

49 I-601 12893999 INTERIOR MATERIALS FINISH SCHEDULE

LIST OF SHEETS

NEK

SY

M

DE

SC

RI

PT

IO

N

DA

TE

LIFE SAFETY GENERAL NOTES LIFE SAFETY ABBREVIATIONS

AFF

AHJ

ANN

AVG

CO

COR

CP

ELEV

IBC

FE

FMCP

FPDOR

FT

LSC

MIN

NFPA

NP

NC

NIC

NTS

OLF

SQFT

TD

TYP

UNO

ABOVE FINISHED FLOOR

AUTHORITY HAVING JURISDICTION

ANNUNCIATOR PANEL

AVERAGE

CONTRACTING OFFICER

CONTRACTING OFFICER'S REPRESENTATIVE

COMMON PATH

ELEVATION

INTERNATIONAL BUILDING CODE

FIRE EXTINGUISHER

FIRE ALARM/ MASS NOTIFICATION CONTROL PANEL

FIRE PROTECTION DESIGNER OF RECORD

FOOT

LIFE SAFETY CODE

MINIMUM

NATIONAL FIRE PROTECTION ASSOCIATION

NOT PERMITTED

NONCOMBUSTIBLE

NOT IN CONTRACT

NOT TO SCALE

OCCUPANT LOAD FACTOR

SQUARE FEET

TRAVEL DISTANCE

TYPICAL

UNLESS NOTED OTHERWISE

APPLICABLE CODES:

- INTERNATIONAL BUILDING CODE (2021 EDITION)

- NFPA 1 FIRE CODE (2021 EDITION)

- NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS (2022 EDITION)

- NFPA 70, NATIONAL ELECTRICAL CODE (2020 EDITION)

- NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE (2022 EDITION)

- NFPA 101, LIFE SAFETY CODE (2021 EDITION)

- UFC 1-200-01, DOD BUILDING CODE (CHANGE 1, 1 SEPT 2022)

- UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES (CHANGE 6, 6 MAY 2021)

- UFC 4-021-01, DESIGN AND O&M: MASS NOTIFICATION SYSTEMS (CHANGE 1, JANUARY 2010)

CONSTRUCTION TYPE: TYPE II-B

OCCUPANCY:

IBC REQUIREMENTS:

NON-SEPARATED MIXED-USE

ASSEMBLY A-3 (IBC 303.4)

BUSINESS B (IBC 304.1)

RESIDENTIAL R-2 (IBC 310.4)

STORAGE S-2 (IBC 311.3)

NFPA REQUIREMENTS:

MIXED OCCUPANCY (NFPA 101 6.1.14.2.2

ASSEMBLY (NFPA 101 6.1.2.1)

BUSINESS (NFPA 101 6.1.11.1)

RESIDENTIAL (NFPA 101 6.1.8.1)

STORAGE: (NFPA 101 6.1.13)

SPRINKLERED: YES

FIRE ALARM: YES

ALLOWABLE HEIGHT: 3 STORIES / 75 FT (IBC TABLE 504.3, TABLE 504.4)

ALLOWABLE AREA: 38,000 FT2 (IBC 508.3.2)

NOTE: ALLOWABLE AREA IS BASED ON THE MOST RESTRICTIVE OCCUPANCY PRESENT WHICH IS THE ASSEMBLY A-3

OCCUPANCY.

ACTUAL HEIGHT: 1 STORY / 22 FT

ACTUAL AREA: 11,205 FT2

REQUIRED FIRE RESISTANCE RATINGS:

BUILDING ELEMENT FIRE RESISTANCE RATING CODE REFERENCE

PRIMARY STRUCTURAL FRAME 0 HOUR IBC TABLE 601

BEARING WALLS

EXTERIOR 0 HOUR IBC TABLE 601

INTERIOR 0 HOUR

FLOOR CONSTRUCTION 0 HOUR IBC TABLE 601

ROOF CONSTRUCTION 0 HOUR IBC TABLE 601

NON BEARING WALLS AND

PARTITIONS

EXTERIOR 0 HOUR IBC TABLE 601

INTERIOR 0 HOUR IBC TABLE 601

MEANS OF EGRESS REQUIREMENTS: REQUIREMENTS ARE BASED ON NFPA 101 PER UFC 3-600-01 2-1.1.

MINIMUM NUMBER OF EXITS: 2 (NFPA 101, 7.4.1)

MAXIMUM ALLOWED PROVIDED

MAXIMUM TRAVEL DISTANCE: ASSEMBLY 250 FT (NFPA 101 12.2.6) 74 FT

BUSINESS 300 FT (NFPA 101 38.2.6.1) 119 FT

RESIDENTIAL 200 FT (NFPA 101 28.2.6.3.3.1) 29 FT

STORAGE 400 FT (NFPA 101 42.2.6) 106 FT

MAXIMUM DEAD-END: ASSEMBLY 20 FT (NFPA 101 12.2.5.1.3) 0 FT

BUSINESS 50 FT (NFPA 101 38.2.5.2.1) 24 FT

RESIDENTIAL 50 FT (NFPA 101 28.2.5.6) 0 FT

STORAGE 100 FT (NFPA 101 42.2.5) 0 FT

MAXIMUM COMMON PATH: ASSEMBLY 20 FT (NFPA 101 12.2.5.1.2) 0 FT

75 FT, WHEN SERVING NOT MORE

THAN 50 OCCUPANTS (NFPA 101

12.2.5.1.2)

BUSINESS 100 FT (NFPA 101 38.2.5.3.1) 58 FT

RESIDENTIAL 50 FT (NFPA 101 28.2.5.3) 0 FT

STORAGE 100 FT (NFPA 101 42.2.5) 0 FT

MINIMUM EGRESS WIDTH

DOORS: 32 INCHES (NFPA 101 7.2.1.2.3.2) 34 INCHES

DOOR EGRESS CAPACITY: 0.2 IN/OCC (NFPA 101 TABLE 7.3.3.1)

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S

YS

TE

M

S C

O M

M A

N D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS NOTED

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

6/

/2

:2 8:

A

M \\d c1 vs

\fe dp rj\

FD

ZE

\F

PR

O \B

LD

G

-1

-F -B

IM

_v

.rv t

G-101

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

F

AC

ILI

TY

G

EN

ER

AL

B

UI

LD

IN

G C

O

DE

A

NA

LY

SI

S

JB

12893953

JM CL

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLON FEAD

DIRECTOR NEW LONDON, GROTEN, CT

O

PE

RA

TI

O

NS

SMS/CWJ

1667770

GR

OT

ON

, C

ON

NE

CT

IC

UT

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

JWJ

HPN

HPN

M

ID

-A

TL

A N

TI

C

G -1

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

-M

ID

-A

TL

AN

TI

C N

A

VA

L S

TA

TI

O N

N

O R

FO

LK

, V A

SY

M

DE

SC

RI

PT

IO

N

DA

TE

FP1 FP1FP1 FP1 FP1 FP1

FP1 FP1FP1 FP1 FP1 FP1 FP1 FP1 FP1

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP1 FP1FP1

FP1 FP1FP1 FP1 FP1 FP1 FP1

FP

FP

FP

FP

FP

FP

FP1 FP1FP1

FP

FP

FP

FP1 FP1FP1 FP1 FP1 FP1 FP1

FP1 FP1FP1

FP

FP

FP

FP

FP

FP

FP

FP1FP1 FP1FP1FP1FP1

FP

FP

FP

FP

FP

FP

FP

FP1FP1 FP1FP1FP1FP1

FP

FP

FP

FP1 FP1FP1

TRAINING/

CONFERENCE

VESTIBULE

ELECTRICAL

CORRIDOR

IDS MONITORING

OFFICE

SEA OFFICE

AWEPS OFFICE

TELECOM

MECHANICAL

COFFEE / MESS

STORAGE

OIS OFF

SIPR OIS

WEAPONS

OFFICER

OPERATIONAL

SUPPORT

E6 BUNKS

LOCKER

123E7 BUNKS

ELEC

TOILETS /

SHOWER

TOILETS /

SHOWER

JAN

LACTATION

LOCKER

E7 BUNKS

E6 BUNKS

CP = 58'

TD = 119'

C

P = 34'DE = 24'

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

TD = 74'

FE

FE

FMCP

ANN

TD = 106'

WASHER/ DRYER

ARMS ROOM

A

B

C

2 3 4 6 7 85

SYMBOL DESCRIPTION

CP = XX

DE = XX

TD = XX TRAVEL DISTANCE (MEASURED IN FEET)

COMMON PATH (MEASURED IN FEET)

DEAD END CORRIDOR (MEASURED IN FEET)

xx xx xx xx xx

BUNK ROOMS (50 GROSS)

CONFERENCE ROOMS (15 NET)

ACCESSORY/STORAGE (500 GROSS)

MECHANICAL/ELECTRICAL SPACES (500 GROSS)

LOCKER ROOMS (50 GROSS)

X

Y

W

Z

W = EXIT CAPACITY FACTOR (IN./PERSON)

X = OCCUPANTS USING EXIT (PERSONS)

Y = EXIT CAPACITY (PERSONS)

Z = EXIT CLEAR WIDTH (IN.)

xx IT/TELECOM ROOMS (300 GROSS) xx BUSINESS (150 GROSS)

1 HOUR FIRE PARTITION

AREA DESCRIPTIONNAMEROOM NUMBER OLF OCCUPANT LOAD

LIFE SAFETY OCCUPANT DATA

OCCUPANT LOAD

TOTAL FLOOR AREA: 11, 205 SQFT

TOTAL NON-BUSINESS USE AREA: 4,833 SQFT

TOTAL BUSINESS USE AREA: 6,372 SQFT

BUSINESS OCCUPANT LOAD FACTOR: 150 GROSS SQFT PER OCCUPANT

BUSINESS OCCUPANT LOAD: 43 PERSONS

TOTAL OCCUPANT LOAD: 170 PERSONS

MEANS OF EGRESS CAPACITY AND EXITS

THREE EXTERIOR EXIT DOORS ARE PROVIDED WITH A CLEAR WIDTH OF 68 IN.

TOTAL EXIT CAPACITY: 340 PERSONS

SIX EXTERIOR EXIT DOORS ARE PROVIDED WITH A CLEAR WIDTH OF 34 IN.

TOTAL EXIT CAPACITY: 170 PERSONS

NON- BUSINESS LIFE SAFETY OCCUPANCY SCHEDULE

BUNK ROOMS

BUNK ROOMS

BUNK ROOMS

LOCKER ROOMS

STORAGE USE

BUNK ROOMS

STORAGE USE

STORAGE USE112

111/110

E6 BUNKS

E7 BUNKS

LOCKER

JAN

E7 BUNKS

E6 BUNKS

STORAGE

ARMORY WORK

BENCHES /

STORAGE

# OF BEDS

50 SF

500 SF

500 SF

500 SF

322 SF

142 SF

135 SF

50 SF

141 SF

324 SF

896 SF

509 SF

LOCKER ROOMS123 LOCKER 50 SF159 SF 4

MECHANICAL ELECTRICAL ROOMS124 ELECTRICAL 500 SF20 SF 1

CONFERENCE ROOMS

IT/ TELECOM ROOMS

MECHANICAL ELECTRICAL ROOMS

TRAINING /

CONFERENCE

TELECOM

ELECTRICAL

15 SF

300 SF

500 SF

1,182 SF

103 SF

203 SF

MECHANICAL ELECTRICAL ROOMS104 MECHANICAL 500 SF425 SF 1

# OF BEDS

# OF BEDS

# OF BEDS

PLAN

NORTH

1/8" = 1'-0"

24'4' 8' 16'

GENERAL SHEET NOTES

SHEET KEYNOTES

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S

YS

TE

M

S C

O M

M A

N D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS NOTED

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

6/

/2

:2 8:

A

M \\d c1 vs

\fe dp rj\

FD

ZE

\F

PR

O \B

LD

G

-1

-F -B

IM

_v

.rv t

G-102

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

F

AC

ILI

TY

G

EN

ER

AL

F

LO

O R

PL

AN

LI

FE

S

AF

ET

Y

JB

12893954

JM CL

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLON FEAD

DIRECTOR NEW LONDON, GROTEN, CT

O

PE

RA

TI

O

NS

SMS/CWJ

1667770

GR

OT

ON

, C

ON

NE

CT

IC

UT

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

JWJ

HPN

HPN

M

ID

-A

TL

A N

TI

C

G -1

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

-M

ID

-A

TL

AN

TI

C N

A

VA

L S

TA

TI

O N

N

O R

FO

LK

, V A

1/8" = 1'-0"B1 FIRST FLOOR PLAN - LIFE SAFETY

1. ARMORY CEILING MUST BE FIRE RESISTANCE RATED FOR A MINIMUM OF 1

HOUR.

2. OCCUPANT LOAD INDICATED IS THE ENTIRE BUSINESS USE OCCUPANT

LOAD.

SY

M

DE

SC

RI

PT

IO

N

DA

TE

X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X

X

X X

X X

X

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

F

F

F

W

W W

.00

.33

G-103

FAX: 571.218.1600

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

DRAWFORM REVISION: 25 AUGUST 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

CODES AND STANDARDS

GENERAL NOTES

1. ELEVATIONS NOTED ON THE STRUCTURAL DRAWINGS ARE RELATIVE

TO TOP OF THE FIRST/GROUND FLOOR SLAB. SEE CIVIL DRAWINGS FOR

THE ELEVATION OF THE FIRST/GROUND FLOOR RELATIVE TO MEAN SEA

LEVEL.

2. DETAILS LABELED "TYPICAL DETAILS" OR DETAILS ON SHEETS WHERE

THE TITLE INCLUDES "TYPICAL DETAILS" APPLY TO SITUATIONS THAT

ARE THE SAME OR SIMILAR TO THOSE SPECIFICALLY DETAILED. SUCH

DETAILS AND DIMENSIONS APPLY WHETHER OR NOT DETAILS ARE

REFERENCED AT EACH LOCATION.

3. DETAILS NOT LABELED AS "TYPICAL" APPLY AT THE SPECIFIC

LOCATIONS INDICATED AND OTHER SIMILAR CONDITIONS.

4. SLOPING DECK PLANES ARE USUALLY DEFINED BY A WORK POINT

ELEVATION AND A SLOPE OR A HIGH AND LOW POINT ELEVATION.

STEEL MEMBERS SUPPORTING A SLOPING DECK PLANE HAVE THEIR

TOP OF STEEL COINCIDENT WITH THE BOTTOM OF DECK, UON.

5. DO NOT REPRODUCE THE STRUCTURAL DRAWINGS FOR USE AS SHOP

DRAWINGS. SHOP DRAWINGS PREPARED IN SUCH A MANNER WILL BE

REJECTED AND RETURNED WITHOUT REVIEW.

CONSTRUCTION REQUIREMENTS

1. REVIEW AND VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO

SUBMISSION OF SHOP DRAWINGS AND BEGINNING CONSTRUCTION.

2. CONFIRM ACTUAL EQUIPMENT DIMENSIONS USING APPROVED

MANUFACTURER/ VENDOR DRAWINGS PRIOR TO SUBMISSION OF SHOP

DRAWINGS.

3. DETERMINE AND COORDINATE THE SIZE & LOCATION OF CHASES,

INSERTS, OPENINGS, SLEEVES, FINISHES, DEPRESSIONS,

HOUSEKEEPING PADS, AND EQUIPMENT SUPPORTS (INCLUDING

FOUNDATIONS) BEFORE SUBMITTING SHOP DRAWINGS.

4. SUBMIT DIMENSIONED SHOP DRAWINGS SHOWING THE LOCATION OF

SLEEVES AND OPENINGS THROUGH MASONRY WALLS, STRUCTURAL

STEEL MEMBERS AND CONCRETE ELEMENTS. OPENINGS THROUGH A

STRUCTURAL MEMBER MUST BE SHOWN ON THE SAME DRAWING.

DRAWINGS ORGANIZED BY DISCIPLINE OR SUB-CONTRACTOR ARE NOT

ACCEPTABLE. OPENINGS NOT SHOWN ON THE SHOP DRAWINGS

REQUIRE THE WRITTEN APPROVAL OF THE COR BEFORE INSTALLATION.

5. DO NOT FIELD CUT OR DRILL OPENINGS IN STRUCTURAL MEMBERS

UNLESS INDICATED ON THE ACCEPTED SHOP DRAWINGS OR

APPROVED BY THE COR.

6. REFER TO THE ARCHITECTURAL DRAWINGS FOR DETAILED

INFORMATION REGARDING FINISHES, WATERPROOFING,

NON-BEARING MASONRY PARTITIONS, ETC.

7. DO NOT SCALE DRAWINGS FOR THE PURPOSE OF ESTABLISHING

DIMENSIONS.

8. D0 NOT CHANGE THE SIZE, DIMENSION OR POSITION OF STRUCTURAL

ELEMENTS WITHOUT THE WRITTEN APPROVAL OF THE COR.

9. DO NOT STORE OR STACK CONSTRUCTION MATERIALS ON FLOORS OR

ROOFS IN EXCESS OF 80 PERCENT OF INDICATED LIVE LOAD.

10. THE STRUCTURE IS DESIGNED TO BE STABLE IN THE COMPLETED

CONDITION. PROVIDE BRACING AND SHORING TO MAINTAIN THE

STABILITY OF THE STRUCTURE AND TO AVOID OVER-LOADING THE

STRUCTURE DURING CONSTRUCTION. RETAIN A REGISTERED

PROFESSIONAL OR STRUCTURAL ENGINEER TO DESIGN THE

TEMPORARY SUPPORT SYSTEM AND ADVISE ON TEMPORARY LOADING

CONDITIONS.

DELEGATED DESIGN

1. EXCAVATION, DEWATERING, AND EARTH RETENTION SYSTEMS

2. OPEN WEB STEEL JOISTS AND JOIST BRIDGING

3. SUPPLEMENTARY FRAMING TO SUPPORT PIPES, DUCTS, MECHANICAL

EQUIPMENT, ELECTRICAL EQUIPMENT, ETC.

4. TEMPORARY SHORING AND BRACING

5. STRUCTURAL STEEL CONNECTIONS

6. ATFP BRACING

7. ARCHITECTURAL CANOPIES

THE FOLLOWING CODES AND STANDARDS, AS MODIFIED BY THE

REFERENCED UFC PUBLICATIONS, APPLY TO THE DESIGN AND

CONSTRUCTION OF THIS PROJECT:

1. UFC 1-200-01, DOD BUILDING CODE, 1 SEPTEMBER 2022

2. UFC 3-301-01, STRUCTURAL ENGINEERING, CHANGE, 04 FEBRUARY 2022

3. UFC 4-010-01, DOD MINIMUM ANTITERRORISM STANDARDS FOR

BUILDINGS, CHANGE 2 30 JULY 2022

4. ASCE 7-16, MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR

BUILDINGS AND OTHER STRUCTURES

5. IBC 2021, INTERNATIONAL BUILDING CODE

6. ACI 318-19, BUILDING CODE REQUIREMENTS FOR STRUCTURAL

CONCRETE

7. AISC 303-16, CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND

BRIDGES

8. AISC 360-16, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS

9. RCSC 2020, SPECIFICATION FOR STRUCTURAL JOINTS USING HIGH-

STRENGTH BOLTS

10. SJI 100-2020, STANDARD SPECIFICATION FOR K-SERIES, LH-SERIES, DHL-

SERIES OPEN WEB STEEL JOISTS AND FOR JOIST GIRDERS

11. AWS D1.1-2020, STRUCTURAL WELDING CODE - STEEL

12. SDI RD-2017, STANDARD FOR STEEL ROOF DECK

13. NAVSEA OP5, AMMUNITION AND EXPLOSIVES ASHORE SAFETY

REGULATIONS FOR HANDLING, STORAGE, PRODUCTION, RENOVATION, &

SHIPPING

ABV ABOVE

ACI AMERICAN CONCRETE INSTITUTE

ADDL ADDITIONAL

ADJ ADJACENT

AE AIR ENTRAINED

AFF ABOVE FINISHED FLOOR

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALT ALTERNATE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

APPROX APPROXIMATE

AR ANCHOR ROD

ARCH ARCHITECT or ARCHITECTURAL

ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS

ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS

ATFP ANTI TERRORISM/FORCE PROTECTION

AWS AMERICAN WELDING SOCIETY

B/ or BOT BOTTOM

BF BOTH FACES

BLDG BUILDING

BM BEAM

BOS BOTTOM OF STEEL

BP BEARING PLATE

BPL BASE PLATE

BRDG BRIDGING

BRG BEARING

BS BOTH SIDES

BTWN BETWEEN

℄ CENTERLINE

C/C CENTER TO CENTER

CANT CANTILEVER

CF CUBIC FEET

CFMF COLD-FORMED METAL FRAMING

CFRP CARBON FIBER REINFORCED POLYMER

CIP CAST-IN-PLACE

CJ CONTRACTION / CONTROL JOINT

CJP COMPLETE JOINT PENETRATION

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CLEAN OUT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

COR CONTRACTING OFFICER'S REPRESENTATIVE

CY CUBIC YARD

D DEPTH

db REINF BAR DIAMETER

DBA DEFORMED BAR ANCHOR

DEMO DEMOLITION

DIA OR ⌀ DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DL DEAD LOAD

DN DOWN

DWG(S) DRAWING(S)

(E) EXISTING

EA EACH

EE EACH END

EF EACH FACE

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC or ELECTRICAL

ELEV ELEVATOR

EMBED EMBEDMENT

EOD EDGE OF DECK

EOR ENGINEER OF RECORD

EOS EDGE OF SLAB

EQ EQUAL

EQUIP EQUIPMENT

ES EACH SIDE

EW EACH WAY

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FA FALL ARREST ANCHOR

FD FLOOR DRAIN

FDN FOUNDATION

FIN FINISH or FINISHED

FLG FLANGE

FLR FLOOR

FOW FACE OF WALL

FP FIRE PROTECTION

FRP FIBER REINFORCED POLYMER

FT FOOT or FEET

FTG FOOTING

ABBREVIATIONS

GA GAGE or GAUGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

H HIGH OR HORIZONTAL

HK HOOK

HORIZ HORIZONTAL

HP HIGH POINT

HS HIGH STRENGTH

HT HEIGHT

ID INSIDE DIAMETER

IF INSIDE FACE

IN INCH

INCL INCLUDED

INFO INFORMATION

INT INTERIOR

IP INFLECTION POINT

JT JOINT

JST JOIST

K KIPS (1000 POUNDS)

KB KNEE BRACE

KSF KIPS PER SQUARE FOOT

KSI KIPS PER SQUARE INCH

LBS POUND(S)

Ld REINF BAR DEVELOPMENT LENGTH

LE LEFT END

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LP LOW POINT

LTWT LIGHT WEIGHT

MAX MAXIMUM

MC MOMENT CONNECTION

MECH MECHANICAL

MEP MECHANICAL, ELECTRICAL AND PLUMBING

MID MIDDLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MTL METAL

MWFRS MAIN WIND FORCE RESISTING SYSTEM

NIC NOT IN CONTRACT

NLWT NORMAL WEIGHT

NOM NOMINAL

No. or # NUMBER

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

OPNG OPENING

OPP OPPOSITE OR OPPOSITE HAND

PCF POUNDS PER CUBIC FOOT

PEN PENETRATION

PJP PARTIAL JOINT PENETRATION

PL PLATE

PLUMB PLUMBING

PROJ PROJECTION

PS PRESTRESSED

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

R RISER OR RADIUS

RE RIGHT END

REBAR REINFORCING STEEL BARS

REINF REINFORCEMENT or REINFORCING

RTU ROOF TOP UNIT

SC SLIP CRITICAL

SCHED SCHEDULE

SDI STEEL DECK INSTITUTE

SDL SUPERIMPOSED DEAD LOAD

SHT SHEET

SIM SIMILAR

SJI STEEL JOIST INSTITUTE

SFRS SEISMIC FORCE RESISTING SYSTEM

SOG SLAB-ON-GROUND

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STRUCT STRUCTURAL

T TREAD

T/ TOP

TEMP TEMPORARY

THK THICK or THICKNESS

TMS THE MASONRY SOCIETY

TOS TOP OF STEEL

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

V VERTICAL

VERT VERTICAL

VIF VERIFY IN FIELD

W WIDTH

W/ WITH

W/CM WATER-CEMENTITIOUS MATERIAL RATIO

W/O WITHOUT

WD WOOD

WP WORK POINT

WT WEIGHT

WWR WELDED WIRE REINFORCING

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

R

S

T

U

W

V

GRAPHIC LEGEND

CONCRETE

STEEL

ROOF MECHANICAL EQUIPMENT

EXTENT OF SLAB-ON-GROUND

OR 2-WAY SLAB

[-X' - X"] INDICATES THE DIFFERENCE IN ELEVATION

BETWEEN THE TOP OF THE FOUNDATION,

PEDESTAL, SLAB, ROOF DECK OR BEAM AND

THE TOP OF THE FIRST/GROUND FLOOR SLAB

# KEYNOTE

V35 V35W12x22 C=1"

FACTORED VERTICAL SHEAR

REACTION (KIPS), REFER TO

GENERAL NOTES IF OMITTED

BEAM CAMBER, NONE IF OMITTED

BEAM / GIRDER SIZE

STEEL BEAM LEGEND

WALL FOOTING LEGEND

STEP IN FOOTING

[-X

X"

[-X

X"

T/ FTG ELEV

T/FTG ELEV

NOTE: IF THE FTG ELEV IS OMITTED, REFER TO

THE GENERAL SHEET NOTES

INDICATES ELEVATION AT LEVEL PLANE BASED

ON THE TOP OF THE FIRST/GROUND FLOOR

SLAB

X' - X"

EXTENT OF FRAMED SLAB

FRAMED SLAB SPAN DIRECTION

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S

YS

TE

M

S C

O M

M A

N D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS NOTED

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

6/

/2

:5 5:

P

M \\d c1 vs

\fe dp rj\

FD

ZE

\S

TR

U \B

LD

G

-1

-S -B

IM

_v

.rv t

S-001

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

F

AC

ILI

TY

G

EN

ER

AL

N O

TE

S, A

BB

RE

VI

AT

IO

NS

L

EG

EN

D

LP

12893956

JH JT

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLON FEAD

DIRECTOR NEW LONDON, GROTEN, CT

O

PE

RA

TI

O

NS

SMS/CWJ

1667770

GR

OT

ON

, C

ON

NE

CT

IC

UT

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

JWJ

NEK

HPN

M

ID

-A

TL

A N

TI

C

S -0

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

-M

ID

-A

TL

AN

TI

C N

A

VA

L S

TA

TI

O N

N

O R

FO

LK

, V A

SY

M

DE

SC

RI

PT

IO

N

DA

TE

3. BUILDING RISK CATEGORY II

4. SNOW

a. SNOW IMPORTANCE FACTOR, Is 1.0

b. GROUND SNOW LOAD, Pg 30 PSF

c. TERRAIN ROUGHNESS C

d. ROOF EXPOSURE FACTOR, Ce 1.0 PARTIALLY EXPOSED

e. THERMAL FACTOR, Ct 1.0

f. ROOF SLOPE FACTOR, Cs 1.0

g. FLAT-ROOF SNOW LOAD, Pf 21 PSF

h. MINIMUM UNIFORM SNOW LOAD, Pm 20 PSF

i. DESIGN SNOW LOAD W/ DRIFT REFER TO FIGURE 1

5. RAIN

a. INTENSITY, i 2.75 IN/HR

b. RAIN LOAD, R 11 PSF

6. WIND

a. ULTIMATE DESIGN WIND SPEED, V: 128 MPH

b. ALLOWABLE STRESS WIND SPEED, Vasd: 99 MPH

c. WIND EXPOSURE: C

d. INTERNAL PRESSURE COEF, GCpi ±0.18 ENCLOSED

e. MAIN WIND-FORCE RESISTING SYSTEM

• 0 FT - ROOF 31 PSF

• PARAPET 70 PSF

f. COMPONENTS & CLADDING REFER TO TABLE 1

7. EARTHQUAKE

a. SEISMIC IMPORTANCE FACTOR 1.0

b. SEISMIC SITE CLASSIFICATION C

c. MAPPED SPECTRAL ACCELERATION

• SHORT PERIOD, SS 0.190g

• 1-SECOND PERIOD, S1 0.052g

d. DESIGN SPECTRAL ACCELERATION

• SHORT PERIOD, SDS 0.165g

• 1-SECOND PERIOD, SD1 0.052g

e. SEISMIC DESIGN CATEGORY A

f. MAIN BUILDING (EXTERIOR WALLS)

• FORCE-RESISTING SYSTEM ORDINARY REINFORCED

CONCRETE SHEAR WALLS

• RESPONSE MODIFICATION, R 4

• SYSTEM OVERSTRENGTH, Ω0 2.5

• DEFLECTION AMPLIFICATION, Cd 4

• ANALYSIS PROCEDURE EQUIVALENT

LATERAL FORCE

• SEISMIC RESPONSE COEF, CS 0.041

• SEISMIC WEIGHT, W 435 KIPS

• DESIGN BASE SHEAR 18 KIPS

g. ARMS ROOM

• FORCE-RESISTING SYSTEM ORDINARY REINFORCED

CONCRETE SHEAR WALLS

• RESPONSE MODIFICATION, R 4

• SYSTEM OVERSTRENGTH, Ω0 2.5

• DEFLECTION AMPLIFICATION, Cd 4

• ANALYSIS PROCEDURE EQUIVALENT

LATERAL FORCE

• SEISMIC RESPONSE COEF, CS 0.041

• SEISMIC WEIGHT, W 115 KIPS

• DESIGN BASE SHEAR 5 KIPS

8. FOUNDATIONS

a. MINIMUM SOIL BEARING CAPACITY 4,000 PSF

b. FROST DEPTH 38 IN

DESIGN CRITERIA & LOADS

ROOF MEMBRANE & INSULATION

1. TOTAL SDL

CEILING

TY

PI

CA

L R

OO

F

AR

MS

R

OO

M

CE

ILI

NG

S

LA

B

TY

PI

CA

L F

LO

OR

RO

OF

A

BO

VE

M

EC

H

AN

D

EL

EC

R

OO

MS

2. LIVE LOAD

5 -----

5MEP

SUPERIMPOSED DEAD &

LIVE LOADS

(UNFACTORED - PSF)

125 100

----20 20

20 20

ME

CH

A

ND

E

LE

C

RO

OM

F

LO

OR

AR

MS

R

OO

M

FL

OO

R

---------- ---------HOUSEKEEPING PAD 50 -----

1. FOR MEMBERS, THE EFFECTIVE WIND AREA IS THE SPAN LENGTH MULTIPLIED BY THE WIDTH, WHERE THE WIDTH

EQUALS THE GREATER OF THE WIDTH TRIBUTARY TO THE MEMBER OR 1/3 THE SPAN LENGTH.

2. FOR FASTENERS, THE EFFECTIVE WIND AREA MUST NOT BE TAKEN GREATER THAN THE AREA THAT IS TRIBUTARY TO

AN INDIVIDUAL FASTENER.

3. PRESSURES INDICATED ARE THE TOTAL APPLIED WIND PRESSURE AND INCLUDE BOTH THE INTERNAL AND EXTERNAL

PRESSURES.

4. WIND PRESSURES ARE FACTORED LOADS.

5. POSITIVE VALUES INDICATE PRESSURE ACTING TOWARDS THE SURFACE AND NEGATIVE VALUES INDICATE PRESSURE

ACTING AWAY FROM THE SURFACE.

TABLE 1 - COMPONENTS & CLADDING WIND PRESSURE (PSF)

ROOF

WALLS

1'

4w

5w

4p

PARAPET

5p

-34 / +16

ZONE

≤10 20 50 100 200 ≥500

EFFECTIVE WIND AREA (SF)

-37 / +34

-29 / +16 -23 / +16

-36 / +33 -34 / +31 -32 / +29 -31 / +28 -29 / +26

-79 / +16 -73 / +16 -67 / +16 -62 / +16 -57 / +16 -50 / +16

-107 / +16 -97 / +16 -84 / +16 -73 / +16 -63 / +16 -50 / +16

-81 / +35 -75 / +34 -69 / +32 -63 / +30 -58 / +28 -51 / +26

-46 / +34 -43 / +33 -39 / +31 -36 / +29 -33 / +28 -29 / +26

-110 / +35 -99 / +34 -86 / +32 -75 / +30 -65 / +28 -51 / +26

-60 / +16 -56 / +16 -50 / +16 -46 / +16 -43 / +16 -37 / +16

-34 / +16 -34 / +16 -34 / +16

ZONE 4w ZONE 4p

ZONE 5w ZONE 5p

FINISHED

GRADE

ROOF

T/ PARAPET

10' - 1" 10' - 9"

10' - 1" 10' - 9"

10' - 1"

10' - 9"

3' - 5"

3' - 5"

ZONE 1'

ZONE 2

ZONE 4p

ZONE 5p

ZONE 5w ZONE 5p

ZONE 3

7' - 6"

7' - 6"

7' - 6"

7' - 6"

ZONE 4p ZONE 4w

ZONE 5w ZONE 5p

10' - 1"

10' - 9"

ZONE 1

ZONE 3

A

C

21 PSF

P

SF

P

SF

63 PSF

63 PSF

9'

- 3

9'

- 3

16' - 6" 16' - 6"

FIGURE 1 - DESIGN ROOF SNOW LOAD W/ DRIFT

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S

YS

TE

M

S C

O M

M A

N D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS NOTED

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

6/

/2

2:

:5

AM

\\d c1 vs

\fe dp rj\

FD

ZE

\S

TR

U

\B

LD

G -1

-S

-B

IM

_v

.rv t

S-002

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

F

AC

ILI

TY

DE

SI

GN

C

RI

TE

RI

A

LO

AD

S

LP

12893957

SK SK

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLON FEAD

DIRECTOR NEW LONDON, GROTEN, CT

O

PE

RA

TI

O

NS

SMS/CWJ

1667770

GR

OT

ON

, C

ON

NE

CT

IC

UT

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

JWJ

NEK

HPN

M

ID

-A

TL

A N

TI

C

S -0

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

-M

ID

-A

TL

AN

TI

C N

A

VA

L S

TA

TI

O N

N

O R

FO

LK

, V A

SY

M

DE

SC

RI

PT

IO

N

DA

TE

FOUNDATIONS AND EARTHWORK

CAST-IN-PLACE CONCRETE

POST-INSTALLED ANCHORS

STEEL DECKING

1. ROOF DECK:

a. CONFORM TO THE REQUIREMENTS OF ASTM A653, Fy = 50 KSI

MIN, GALVANIZED G90.

b. STEEL ROOF DECK MUST BE 1 1/2" HIGH, 20 GAUGE. DECK

DESIGN IS BASED ON A THREE SPAN CONDITION. INCREASE

DECK THICKNESS IF LESS THAN THREE SPAN CONDITION OR

CONSTRUCTION LIVE LOAD EXCEEDS 20 PSF.

c. THE DECK MUST HAVE THE FOLLOWING MINIMUM PROPERTIES

PER FOOT WIDTH:

Ip = 0.201 IN4 In = 0.222 Sp = 0.234 IN3 Sn = 0.247 IN3

2. DECK ENDS MUST BEAR AT LEAST 1 1/2" ON STRUCTURAL SUPPORTS.

END JOINTS MUST BE BUTTED.

3. CONTINUOUS SHEET METAL CLOSURES ARE REQUIRED AT OPENINGS

AND EDGES.

4. ROOF DECK FASTENING:

a. FASTEN DECK TO EACH SUPPORT WITH 5/8" DIAMETER PUDDLE

WELDS. WELD EDGE RIBS OF PANELS AND PROVIDE ADDITIONAL

WELDS AT MAXIMUM 12" ON CENTER.

b. FASTEN SIDE LAPS WITH #10 SELF DRILLING SCREWS AT THE

LESSER OF 1/2 OF THE SPAN OR 36" ON CENTER, UON.

c. FASTEN DECK EDGES TO PERIMETER SIDE SUPPORTS WITH #10

SELF DRILLING SCREWS AT THE LESSER OF 1/2 OF THE SPAN OR

24" ON CENTER, UON.

d. SECURE DECK ACCESSORIES, SUCH AS CLOSURES AND RIDGE

PLATES IN ACCORDANCE WITH SDI STANDARD PRACTICE.

FASTENER SPACING MUST NOT EXCEED 12-INCHES.

5. LOADS HUNG FROM DECKING MUST NOT EXCEED 50 POUNDS. PIPES,

DUCTS AND EQUIPMENT BENEATH ROOF DECKS MUST BE

SUPPORTED BY THE STRUCTURAL STEEL, STEEL JOISTS OR

SUPPLEMENTARY MEMBERS THAT ARE DIRECTLY SUPPORTED BY THE

STEEL FRAMING. DESIGN AND PROVIDE SUPPLEMENTARY MEMBERS

AT NO ADDITIONAL COST.

1. FOUNDATION DESIGN IS IN ACCORDANCE WITH THE

RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEERING REPORT

PREPARED BY JACOBS, DATED 07 FEBRUARY 2025.

2. PLACE FOUNDATIONS ON UNDISTURBED, NATURAL SUBGRADE OR

BACKFILL COMPACTED TO A MINIMUM OF 95% OF THE MAXIMUM SOIL

DENSITY AS MEASURED BY ASTM D1557, MODIFIED PROCTOR TEST.

THE MINIMUM ALLOWABLE SOIL BEARING CAPACITY UNDER

FOUNDATIONS MUST BE 4,000 PSF.

3. PROVIDE MEASURES TO PREVENT WATER, FROST OR ICE FROM

PENETRATING FOOTING OR SLAB SUBGRADE BEFORE PLACING

CONCRETE. FOOTINGS, MUD SLABS, OR BUILDING SLABS MUST NOT

BE PLACED INTO OR AGAINST SUBGRADE CONTAINING FREE WATER,

FROST, OR ICE.

4. CONCRETE FOUNDATIONS OR A 3" THICK CONCRETE MUD MAT (LEAN

CONCRETE) MUST BE PLACED THE SAME DAY THE SUBGRADE IS

INSPECTED. IF THE GROUND SURFACE IS DISTURBED BEFORE

CONCRETE IS PLACED, THE SUBGRADE MUST BE RE-INSPECTED BY

THE CONTRACTOR'S GEOTECHNICAL ENGINEER AT NO ADDITIONAL

COST.

5. DESIGN, PROVIDE AND MAINTAIN DEWATERING SYSTEMS, EARTH

RETENTION SYSTEMS, AND BRACING. PROTECT EXISTING

STRUCTURES AND UTILITIES DURING CONSTRUCTION.

6. WHEN FILLING AGAINST OPPOSITE SIDES OF A WALL OR STRUCTURE,

BACKFILL IN LIFTS THAT MAINTAIN LEVEL ELEVATIONS WITHIN 12" ON

BOTH SIDES TO BALANCE THE LATERAL PRESSURE.

7. EARTHWORK, INCLUDING FOUNDATION SUBGRADE, FILL AND

BACKFILL MUST BE INSPECTED AND APPROVED BY THE

CONTRACTOR'S GEOTECHNICAL ENGINEER.

8. WHERE EXCAVATION WOULD BE BELOW A LINE EXTENDING UPWARD

AT A 1.0 H TO 1.0 V SLOPE FROM THE BOTTOM OF A FOUNDATION OR

UTILITY, PROVIDE SHEETING, SHORING, AND BRACING. DO NOT

UNDERMINE EXISTING CONSTRUCTION.

1. PROVIDE CAST-IN-PLACE CONCRETE FOR EACH CLASS OF CONCRETE

SHOWN IN TABLE 2 - CONCRETE MATERIAL SCHEDULE.

2. CONCRETE REINFORCING:

a. TYPICAL DEFORMED BARS - ASTM A615, GRADE 60

b. WELDED DEFORMED BAR ANCHORS - ASTM A706, GRADE 70

c. PLAIN WELDED WIRE - ASTM A1064,GRADE 65, SUPPLIED IN FLAT

SHEETS

3. CONCRETE COVER OVER STEEL REINFORCING, UON:

a. REINFORCING IN CONCRETE CAST AGAINST & PERMANENTLY IN

CONTACT WITH GROUND - 3"

b. REINFORCING IN CONCRETE EXPOSED TO WEATHER OR IN

CONTACT WITH GROUND AFTER CONCRETE PLACEMENT,

INCLUDING ELEMENTS COVERED BY WATERPROOFING OR

DAMPPROOFING

• PRIMARY REINFORCING - 2"

• STIRRUPS AND TIES - 1 1/2"

c. REINFORCING IN CONCRETE SLABS AND WALLS NOT EXPOSED

TO WEATHER OR IN CONTACT WITH GROUND - 3/4"

d. REINFORCING IN CONCRETE BEAMS, GIRDERS, COLUMNS AND

PEDESTALS NOT EXPOSED TO WEATHER OR IN CONTACT WITH

GROUND, COVER TO - 1 1/2"

4. REFER TO TABLE 3 - CONCRETE REINFORCEMENT TENSION

DEVELOPMENT LENGTHS FOR Ld.

5. SPLICE REINFORCING BARS PER ACI 318 WITH CLASS B TENSION LAP

SPLICES (1.3 TIMES THE DEVELOPMENT LENGTH)

6. LAP SPLICE WWR SHEETS AT LEAST 8" AND TIE SECURELY.

7. DOWELS MUST MATCH SIZE AND SPACING AND BE CLASS B TENSION

LAP SPLICED WITH THE MAIN REINFORCEMENT, UON.

8. FIELD BENDING OF REINFORCEMENT IS NOT PERMITTED UNLESS

INDICATED ON THE DRAWINGS OR APPROVED IN WRITING BY THE

COR. DO NOT HEAT REBAR WITH A TORCH IN THE FIELD.

9. EXCEPT FOR WELDED DEFORMED BAR ANCHORS, DO NOT WELD

REINFORCING.

10. WIRE BRUSH, CLEAN, AND COAT CONSTRUCTION JOINTS WITH A

BONDING AGENT OR MOISTEN WITH A CEMENT SLURRY SCRUBBED

INTO THE JOINT IMMEDIATELY PRIOR TO PLACING FRESH CONCRETE.

11. CHAMFER EXPOSED CORNERS 3/4", UON.

STRUCTURAL & MISCELLANEOUS STEEL

1. STRUCTURAL STEEL MUST CONFORM TO THE FOLLOWING, UON:

a. W & WT SHAPES ASTM A992

b. ANGLES & CHANNELS ASTM 572, GR 50

c. PLATES & BARS ASTM 572, GR 50

d. HSS ASTM A500, GRADE C

e. ANCHOR RODS ASTM F1554, GRADE 36

f. HIGH STRENGTH BOLTS ASTM F3125, GRADE A325

g. TENSION-CONTROL HS BOLTS ASTM F3125, GRADE F1852, TYPE 1

h. DIRECT TENSION INDICATORS ASTM F959, TYPE 325-1

i. COMMON GRADE BOLTS ASTM A307, GRADE A

j. WELDING ELECTRODES E70xx

2. GROUT UNDER STEEL BEARING PLATES MUST HAVE A MINIMUM 28

DAY COMPRESSIVE STRENGTH OF 7,000 PSI.

3. FILLET WELDS MUST HAVE A MINIMUM SIZE OF 1/4", UON. INCREASE

THE EFFECTIVE THROAT OF THE WELD TO MAINTAIN THE WELD SIZE

WHEN PARTS JOINED BY FILLET WELDS ARE SEPARATED. THE ROOT

OPENING MUST NOT EXCEED 3/16".

4. BOLTED CONNECTIONS MUST HAVE A MINIMUM OF (2) 3/4" DIAMETER

HIGH STRENGTH BOLTS.

5. MEMBERS EXPOSED TO WEATHER MUST BE HOT DIPPED

GALVANIZED.

6. PROVIDE ZINC COATED (GALVANIZED) BOLTS, NUTS, AND WASHERS

TO CONNECT GALVANIZED STEEL MEMBERS.

7. HIGH STRENGTH BOLTED CONNECTIONS MUST BE PRETENSIONED.

CONNECTIONS THAT USE OVERSIZE HOLES OR SLOTTED HOLES IN

THE DIRECTION OF THE LOAD MUST BE SLIP CRITICAL.

8. PROVIDE STEEL TO STEEL CONNECTIONS IN ACCORDANCE WITH AISC

360-16. CONNECTIONS NOT SPECIFICALLY DETAILED ON THE

DRAWINGS MUST BE DESIGNED BASED ON A BEAM END REACTION

OBTAINED FROM THE MAXIMUM UNIFORM LOAD TABLES IN PART 3

(DESIGN OF FLEXURAL MEMBERS). THE END REACTION IS EQUAL TO

1/2 THE TOTAL ALLOWABLE LOAD FOR THE GIVEN BEAM, SPAN AND

GRADE OF STEEL SPECIFIED. DETAILED CONNECTIONS ON THE

DRAWINGS SUPERCEDE THIS NOTE.

9. DO NOT FIELD CUT STRUCTURAL STEEL MEMBERS WITHOUT THE

WRITTEN APPROVAL OF THE COR.

10. DO NOT SPLICE STEEL MEMBERS EXCEPT WHERE SPECIFICALLY

DETAILED ON THE DRAWINGS.

11. PROVIDE TEMPORARY SHORING AND BRACING UNTIL THE

STRUCTURE IS ALIGNED AND PERMANENT CONNECTIONS HAVE BEEN

COMPLETED.

1. ANCHORS AND INSERTS EXPOSED TO EARTH OR WEATHER MUST BE

STAINLESS STEEL, UON. AT OTHER LOCATIONS PROVIDE

GALVANIZED ANCHORS IN ACCORDANCE WITH ASTM A153.

EMBEDDED DEFORMED REINFORCING BARS MUST BE UNCOATED

STEEL.

2. PROVIDE TYPE & SIZE AS INDICATED & EMBED INTO THE EXISTING

CONCRETE AS SHOWN IN TABLE 4 - POST-INSTALLED ANCHOR

SCHEDULE. VERIFY MINIMUM EFFECTIVE EMBEDDMENT DEPTH WITH

THE ANCHOR MANUFACTURER.

3. EXPANSION ANCHORS MUST BE WEDGE TYPE, TORQUE

CONTROLLED.

4. ADHESIVE ANCHORS MUST CONSIST OF AN INSERT AND CARTRIDGE

TYPE, TWO COMPONENT, EPOXY OR HYBRID ADHESIVE DISPENSED

AND MIXED THROUGH A STATIC MIXING NOZZLE PROVIDED BY THE

ADHESIVE MANUFACTURER.

5. ANCHORING TO CONCRETE:

a. MECHANICAL ANCHORS USED IN CONCRETE MUST HAVE BEEN

TESTED AND QUALIFIED FOR PERFORMANCE IN CRACKED AND

UNCRACKED CONCRETE IN ACCORDANCE WITH ACI 355.2.

b. ADHESIVE ANCHORS MUST HAVE BEEN TESTED AND QUALIFIED

FOR PERFORMANCE IN CRACKED AND UNCRACKED CONCRETE,

INCLUDING HORIZONTAL AND OVERHEAD INSTALLATIONS, AND

LONG TERM CREEP IN ACCORDANCE WITH ACI 355.4.

6. IDENTIFY POSITION OF REINFORCING STEEL AND OTHER EMBEDDED

ITEMS PRIOR TO DRILLING HOLES FOR ANCHORS. EXERCISE CARE IN

DRILLING TO AVOID DAMAGING EXISTING REINFORCING OR

EMBEDDED ITEMS. NOTIFY THE COR IF REINFORCING STEEL OR

OTHER EMBEDDED ITEMS ARE ENCOUNTERED DURING DRILLING.

7. PROVIDE ANCHORS IN DRY HAMMER DRILLED HOLES IN ACCORDANCE

WITH MANUFACTURER’S PRINTED INSTRUCTIONS.

1. MAXIMUM SLUMP OF CONCRETE AT POINT OF PLACEMENT - WITHOUT / WITH HIGH-RANGE WATER-REDUCING ADMIXTURE

2. REFER TO CIVIL FOR CONCRETE SITE WALLS

TABLE 2 - CONCRETE MATERIAL SCHEDULE (NORMAL WEIGHT)

ELEMENT ASTM C33

AGGREGATE

CLASS

MAXIMUM

CHLORIDE

CONTENT

DRY UNIT

WEIGHT

MAX

AGGREGATE

SIZE

SLUMP

(NOTE 1)

AIR

CONTENT

FOUNDATIONS 145 PCF 3/4" 4"/8" 0.15%5%

MAX W/CM

RATIO

4,500 PSI 0.45 4S

0.55INTERIOR SOG 4,000 PSI 1 1/2" 4S 3% MAX 4"/8" 0.15%

1. TOP BARS ARE DEFINED AS HORIZONTAL REINFORCING WHERE MORE THAN 12" OF FRESH CONCRETE IS

CAST BENEATH THE BAR.

2. Ld = THE STRAIGHT BAR DEVELOPMENT LENGTH

3. Ldh = THE HOOKED BAR DEVELOPMENT LENGTH

4. CASE 1: CLEAR SPACING OF BARS DEVELOPED OR SPLICED NOT LESS THAN db, CLEAR COVER NOT LESS

THAN db, AND STIRRUPS OR TIES THROUGHOUT Ld NOT LESS THAN THE CODE MINIMUM OR CLEAR SPACING OF BARS BEING DEVELOPED OR SPLICED NOT LESS THAN 2*db AND CLEAR COVER NOT LESS THAN db

5. CASE 2: REINFORCING BARS THAT DO NOT MEET THE REQUIREMENTS OF CASE 1

6. DEVELOPMENT LENGTHS ONLY APPLY TO THE OPPERATIONS AND SENTRY CONSTRUCTION.

TABLE 3 - CONCRETE REINF TENSION DEVELOPMENT LENGTHS (INCHES)

BAR

SIZE

#3

#4

#5

#6

TOP BARS OTHER BARS

UNCOATED BARS

4,000 PSI

f'c

145 PCF

Ld Ldh

HOOKED

BARS

LEAN CONCRETE FILL --------1,000 PSI 3/4" 4S -------- -------- 0.15%145 PCF

0.55ARMS ROOM ROOF & WALLS 4,000 PSI 3/4" 4S 4"/8" 0.15%145 PCF

CASE 1 CASE 2 CASE 1 CASE 2

UNCOATED BARS

4,500 PSI

14 7

CRITICAL SECTION

Ld

Ldh

TABLE 4 - POST-INSTALLED ANCHOR SCHEDULE

ANCHORING TO NORMAL WEIGHT CONCRETE

ANCHOR TYPE ANCHOR DIAMETER/

REBAR SIZE

MINIMUM EFFECTIVE

EMBEDMENT, UON

MECHANICAL 5/8" 4"

1/2" 3 1/4"

3/4" 4 3/4"

2 3/4"

3/4"

1/2"

4"

ADHESIVE

TOP BARS OTHER BARS

Ld Ldh

HOOKED

BARSCASE 1 CASE 2 CASE 1 CASE 2

OPEN WEB STEEL JOISTS

1. JOIST DESIGN, FABRICATION, AND ERECTION OF OPEN WEB STEEL

JOISTS MUST BE PERFORMED IN ACCORDANCE WITH THE STEEL

JOIST INSTITUTE, LATEST EDITION.

2. ALL BRIDGING, INCLUDING SIZING, SPACING CONNECTIONS, MUST BE

DESIGNED BY JOIST DESIGNER IN ACCORDANCE WITH STEEL JOIST

INSTITUTE REQUIREMENTS TO RESIST UPLIFT LOADING INDICATED

ON DRAWINGS.

3. REFER TO S-102 FOR JOIST LAYOUT AND SHEET S-601

LOADING/DEPTH REQUIREMENTS TO BE USED IN DESIGN OF THE

DELEGATED OPEN WEB STEEL JOISTS.

4. REFER TO S-505 FOR TYPICAL JOIST DETAILS INCLUDING END

CONNECTION INFORMATION AND CHORD REINFORCEMENT

REQUIREMENTS AT CONCENTRATED LOADING.

5. DO NOT CUT HOLES OR NOTCHES IN CHORD AND WEB MEMBERS,

UNLESS APPROVED BY JOIST DESIGNER AND COR.

6. DO NOT APPLY TEMPORARY OR PERMANENT LOADS TO JOIST

BRIDGING.

7. SHOP DRAWINGS FOR JOISTS AND JOIST ACCESSORIES TO BE

PREPARED BY THE JOIST MANUFACTURER'S DETAILS.

8. SUBMIT DESIGN CALCULATIONS FOR REVIEW IN ACCORDANCE WITH

THE STEEL JOIST INSTITUTE DESIGN STANDARDS. SUBMIT DESIGN

CALCUALTIONS SIGNED AND SEALED BY A PROFESSIONAL LICENSED

ENGINEER IN THE STATE WHERE THE PROJECT IS LOCATED.

0.45OTHER WALLS 4,000 PSI 3/4" 4S 4"/8" 0.15%145 PCF

3% MAX

ULTIMATE DESIGN

SHEAR CAPACITY (KIP)

ULTIMATE DESIGN

TENSILE CAPACITY (KIP)

8.4 4.4

13.1 6.6

19 8.9

8.6 3.5

20.4 8.3

5%

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S

YS

TE

M

S C

O M

M A

N D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS NOTED

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

6/

/2

:5 5:

P

M \\d c1 vs

\fe dp rj\

FD

ZE

\S

TR

U \B

LD

G

-1

-S -B

IM

_v

.rv t

S-003

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

F

AC

ILI

TY

M

AT

ER

IA

L

NO

TE

S

LP

12893958

JH JT

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLON FEAD

DIRECTOR NEW LONDON, GROTEN, CT

O

PE

RA

TI

O

NS

SMS/CWJ

1667770

GR

OT

ON

, C

ON

NE

CT

IC

UT

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

JWJ

NEK

HPN

M

ID

-A

TL

A N

TI

C

S -0

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

-M

ID

-A

TL

AN

TI

C N

A

VA

L S

TA

TI

O N

N

O R

FO

LK

, V A

SY

M

DE

SC

RI

PT

IO

N

DA

TE

A. TOP OF FIRST FLOOR SLAB, REFERENCE DATUM, IS ELEVATION 0'-0".

REFER TO CIVIL FOR THE ACTUAL FLOOR ELEVATION.

B. T/WALL FTG EL = [-2'-4"] UON.

C. T/COL FTG EL = [-1'-0"] UON.

D. REFER TO S-000 SERIES DRAWINGS FOR GENERAL NOTES, DESIGN LOADS

AND ABBREVIATIONS.

E. REFER TO S-500 SERIES DRAWINGS FOR TYPICAL DETAILS.

F. "Fx" REFERS TO SPREAD FOOTING TYPE FOUNDATIONS AND "WFx"

CONTINUOUS TYPE WALL FOUNDATIONS. REFER TO S-601 GEOMETRY AND

REINFORCEMENT INFORMATION.

G. FOUNDATIONS MUST BE CENTERED ON ELEMENT BEING SUPPORTED

UNLESS NOTED OTHERWISE.

H. REFER TO S-601 FOR SCHEDULES.

J. REFER TO PLUMBING DRAWINGS FOR RADON REMEDIATION.

A

B

C

2 3 4 6 7 8

S-201 A1

S-201 C1

S-201 A3

S-201 B1

2 EQ SPACES

17' - 6" 18' - 3" 19' - 9" 15' - 10"

2 EQ SPACES

19' - 9"

2 EQ SPACES

21' - 9"

3 EQ SPACES

29' - 10"

142' - 8"

0"

0"

0"

11' - 10" 3' - 4" 3' - 1" 1' - 2" 3' - 4" 25' - 4"

4'

- 8

3'

- 4

9'

- 4

3'

- 4

4"

4"

3'

- 4

9'

- 4

3'

- 4

4'

- 8

1'

- 6

6"

TYP

TYP

C1 S-510

C2 S-510

HSS6X6X3/8

1' - 3" 20' - 4"

2' - 8" 3' - 4"

5TYP

TYP

[ -1' - 0" ]

[ -1' - 0" ]

1'

- 0

1'

- 0

S-510 C3

HSS6X6X3/8 HSS6X6X3/8 HSS6X6X3/8 HSS6X6X3/8 HSS6X6X3/8

6 6 6 6

1' - 8"

1'

- 1

1"

1' - 8"1'

- 1

1"

7' - 11" 9' - 1"

1' - 3"

9' - 10 1/2" 9' - 10 1/2"

1' - 3"

7' - 0" 7' - 7"

3 E Q

SP

AC

ES

3 E

Q

SP

AC

ES

S-510 C4

S-510 C4

W F1

F1

W F1

WF3

WF3

F2 F2

WF2

W F2

W F2

WF2

SIM

S-202 A3

S-202 A1

S-202 B1

S-202 B3

T/FTG -2'-4"

T/FTG -4'-0"

T/FTG -4'-0"

T/FTG -2'-4"

F1 F1 F1

2'

- 8

8'

- 4

3'

- 4

6'

- 4

4'

- 4

6'

- 4

5'

- 8

[ -2' - 6" ]

5' - 0" 20' - 6"

T/

FT

G -2

'-4

T/

FT

G -4

'-0

T/

FT

G -4

'-0

T/

FT

G -2

'-4

1 6" THICK SLAB-ON-GROUND W/ #4 @ 10" OC EW

2 EXTERIOR WALLS: 8" CAST-IN-PLACE CONCRETE WALL W/ #5@10" EW

CENTERED IN WALL

3 ARMS ROOM WALLS: 8" CONCRETE WALL W/ #4 @ 9" EW EF STAGGER EF @ 4

1/2"

4 SLAB-ON-GROUND CONTRACTION OR CONSTRUCTION JOINT

5 6" THICK SLAB-ON-GROUND W/ #4 @ 10" OC EW

6 COLUMN ISOLATION JOINT

7 SLAB DEPRESSION FOR HIGH DENSITY FILING SYSTEM, SEE INTERIORS,

COORD SIZE AND LOCATION OF DEPRESSION WITH SELECTED

MANUFACTURER PRIOR TO CASTING OF SLAB-ON-GRADE

1/8" = 1'-0"A1 FOUNDATION & SLAB PLAN

PLAN

NORTH

1/8" = 1'-0"

24'4' 8' 16'

GENERAL SHEET NOTES

SHEET KEYNOTES

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S

YS

TE

M

S C

O M

M A

N D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS NOTED

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

6/

/2

:5 6:

P

M \\d c1 vs

\fe dp rj\

FD

ZE

\S

TR

U \B

LD

G

-1

-S -B

IM

_v

.rv t

S-101

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

F

AC

ILI

TY

FO

UN

DA

TI

O N

G

RO

UN

D

FL

O O

R

PL

AN

LP

12893959

JH JT

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLON FEAD

DIRECTOR NEW LONDON, GROTEN, CT

O

PE

RA

TI

O

NS

SMS/CWJ

1667770

GR

OT

ON

, C

ON

NE

CT

IC

UT

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

JWJ

NEK

HPN

M

ID

-A

TL

A N

TI

C

S -1

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

-M

ID

-A

TL

AN

TI

C N

A

VA

L S

TA

TI

O N

N

O R

FO

LK

, V A

SY

M

DE

SC

RI

PT

IO

N

DA

TE

A

B

C

2 3 4 6 7 8

S-201 A1

S-201 C1

S-201 A3

S-201 B1

17' - 6" 18' - 3" 19' - 9" 15' - 10" 19' - 9" 21' - 9" 29' - 10"

142' - 8"

0"

0"

0"

EL 16' - 8"

B/DECK @ HP

SL

OP

E

DO

W N

SL

OP

E

DO

W N

W21X48 W21X48 W21X48W21X48 W21X48W21X48

K

SP

-5

K

SP

-5

K

SP

-4

K

SP

-5

K

SP

-5

K

SP

-4

K

SP

-4

K

SP

-3

K

SP

-2

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-2

K

SP

-3

K

SP

-4

K

SP

-4

K

SP

-4

K

SP

-5

K

SP

-2

K

SP

-3

K

SP

-4

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-4

K

SP

-4

K

SP

-5

K

SP

-4

K

SP

-3

K

SP

-2

K

SP

-1

K

SP

-1

K

SP

-1

K

SP

-1

2' - 0" 2' - 0" 3 EQ SPACES 4 EQ SPACES 4 EQ SPACES 4 EQ SPACES 4 EQ SPACES 5 EQ SPACES 6 EQ SPACES 2' - 0" 2' - 0"

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

K

SP

-5

S-510 C4

S-510

C4 OPP

K

SP

-5

K

SP

-5

B1 S-510

4"

20' - 11"

K

SP

-5

K

SP

-5

S-202 A3

S-202 A1

S-202 B1

S-202 B3

B4 S-510

B4 S-510

OPP

B1 S-510

TYP

T.O. CONC 18'-8"

T.O. CONC 18'-8"

T.O. CONC 18'-8"

T.O. CONC 18'-8"

T.O. PILASTER 17'-2" T.O. PILASTER 17'-2"

6 6

OPP

B/DECK @ LP

B/DECK @ LP

EL 15'-1 1/2"

EL 15'-1 1/2"

A. TOP OF JOIST ELEVATION IS BOTTOM OF DECK ELEVATION AS INDICATED

ON THE PLAN UON.

B. REFER TO S-000 SERIES DRAWINGS FOR GENERAL NOTES, DESIGN LOADS

AND ABBREVIATIONS.

C. REFER TO S-500 SERIES DRAWINGS FOR TYPICAL DETAILS.

D. REFER TO FOUNDATION PLAN FOR COLUMN SIZES AND CONCRETE WALL

THICKNESS AND REINFORCING.

E. REFER TO S-601 FOR SCHEDULES.

B

3 4

1' - 3" 19' - 9" 1' - 3"

22' - 3"

1'

- 6

2"

8" 3

T.O. SLAB 12'-9"

S-510 B2

S-510

B2 OPP

PLAN

NORTH

1/8" = 1'-0"

24'4' 8' 16'

GENERAL SHEET NOTES

SHEET KEYNOTES

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S

YS

TE

M

S C

O M

M A

N D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS NOTED

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

6/

/2

:5 6:

P

M \\d c1 vs

\fe dp rj\

FD

ZE

\S

TR

U \B

LD

G

-1

-S -B

IM

_v

.rv t

S-102

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

F

AC

ILI

TY

RO

O

F

FR

AM

IN

G P

LA

NS

LP

12893960

JH JT

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLON FEAD

DIRECTOR NEW LONDON, GROTEN, CT

O

PE

RA

TI

O

NS

SMS/CWJ

1667770

GR

OT

ON

, C

ON

NE

CT

IC

UT

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

JWJ

NEK

HPN

M

ID

-A

TL

A N

TI

C

S -1

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

-M

ID

-A

TL

AN

TI

C N

A

VA

L S

TA

TI

O N

N

O R

FO

LK

, V A

1/8" = 1'-0"A1 ROOF FRAMING PLAN

1 ARMS ROOM CEILING, SEE C2/S-102

2 1 1/2" STEEL ROOF DECK

3 9" CONC SLAB W/ #5 @ 10" OC EW EF

4 JOIST BRIDGING

5 ROOF ACCESS OPENING, REFER TO C2/S-504 FOR ADDITIONAL FRAMING,

COORD LOCATION WITH ARCH

6 CANOPY, SEE ARCH

1/8" = 1'-0"C2 ARMS ROOM CEILING FRAMING PLAN

SY

M

DE

SC

RI

PT

IO

N

DA

TE

FIRST FLOOR

0"

1 2 3 4 6 7 8

T/WALL

18' - 8"

8" 17' - 6" 18' - 3" 19' - 9" 15' - 10" 19' - 9" 21' - 9" 29' - 10" 8"

8" 1' - 3" 5' - 1" 8"

1' - 0" 1' - 0" 8"

1' - 0"

1' - 0" 2' - 7" 3"

8" 1' - 0"

1' - 0" 3' - 9"

8"

1' - 0" 1' - 0"

1' - 4" 3' - 0" 3' - 8" 1' - 10"

TY

P8"

EQ EQ EQ EQ EQ EQ EQ

C.

J.

9' - 4"7' - 6"

C.

J.

C.

J.

C.

J.

C.

J.

C.

J.

C.

J.

C.

J.

0' -

2 TYP

3'

- 0

4" 1'

- 1 1"

TYP

9"

3"1' - 0"

TY

P8"

0"

TY

P2"

RO

OF

M

EM

BR

AN

E

LO

W

PO

IN

T

(S

EE

A

RC

H)

FIRST FLOOR

0"

1234678

T/WALL

18' - 8"

8"17' - 6"18' - 3"19' - 9"15' - 10"19' - 9"21' - 9"29' - 10"8"

8" 1' - 9"8" 9" 1' - 0"

7' - 0"1' - 0" 8"

8"11"8" 8"

1' - 0" 2' - 3"

1' - 0"

1' - 0"

8" 7' - 5"

3' - 4"3' - 0 3/4"

8" 7'

- 4

3' - 4" 1' - 2 1/4"

8" 7'

- 4

TY

P8"

C.

J.

C.

J.

C.

J. C.

J.

10' - 0" 10' - 0"

EQ EQ EQ EQ EQ

6' - 6"

C.

J.

C.

J.

C.

J.

C.

J.

NOTES:

1. C.J. INDICATES CONTROL JOINT LOCATIONS. AT CONTRACTOR'S OPTION, CONSTRUCTION JOINT MAY BE USED IN

LIEU OF CONTROL JOINT AT INDICATED LOCATIONS. REFER TO S-503 FOR CONTROL JOINT INFORMATION.

1-#4x4'-0"

TYP

0' -

2 TYP

0"

TY

P8"

3"

9"1' - 0"

RO

OF

M

EM

BR

AN

E

LO

W

PO

IN

T

(S

EE

A

RC

H) TY

P2"

FIRST FLOOR

0"

ABC

T/WALL

18' - 8"

8" 37' - 0" 37' - 0" 8"

3'

- 0

6"

3' - 4" 3' - 0" 2' - 2" 1' - 10"

8"

2' - 8" 8' - 4"

C.

J.

9' - 4"

C.

J. C.

J.

C.

J.

EQ EQ

NOTES:

1. C.J. INDICATES CONTROL JOINT LOCATIONS. AT CONTRACTOR'S OPTION, CONSTRUCTION JOINT MAY BE USED IN

LIEU OF CONTROL JOINT AT INDICATED LOCATIONS. REFER TO S-503 FOR CONTROL JOINT INFORMATION.

1-#4x4'-0"

TYP

0' -

3-#5 @ 4"OC

TYP

1'

- 1

0"TYP

FIRST FLOOR

0"

A B C

T/WALL

18' - 8"

8"37' - 0"37' - 0"8"

4' - 8" 3' - 4" 9' - 4" 3' - 4" 3' - 4" 9' - 4" 3' - 4" 4' - 8"

TY

P

7'

- 4

TY

P8"

C.

J.

C.

J. C.

J.

C.

J.

C.

J.

12' - 8" 20' - 0"

NOTES:

1. C.J. INDICATES CONTROL JOINT LOCATIONS. AT CONTRACTOR'S OPTION, CONSTRUCTION JOINT MAY BE USED IN

LIEU OF CONTROL JOINT AT INDICATED LOCATIONS. REFER TO S-503 FOR CONTROL JOINT INFORMATION.

1-#4x4'-0"

EF ES, TYP

0' -

2-#5@4"OC AT

DOOR OPENING

TYP

3' - 4"

A. TOP OF FIRST FLOOR SLAB, REFERENCE DATUM, IS ELEVATION 0'-0".

REFER TO CIVIL FOR THE ACTUAL FLOOR ELEVATION.

B. REFER TO S-000 SERIES DRAWINGS FOR GENERAL NOTES, DESIGN LOADS

AND ABBREVIATIONS.

C. REFER TO S-500 SERIES DRAWINGS FOR TYPICAL DETAILS.

1/8" = 1'-0"

24'4' 8' 16'

GENERAL SHEET NOTES

SHEET KEYNOTES

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S

YS

TE

M

S C

O M

M A

N D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS NOTED

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

6/

/2

:5 6:

P

M \\d c1 vs

\fe dp rj\

FD

ZE

\S

TR

U \B

LD

G

-1

-S -B

IM

_v

.rv t

S-201

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

F

AC

ILI

TY

BU

IL

DI

NG

E

LE

VA

TI

O

NS

LP

12893961

JH JT

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLON FEAD

DIRECTOR NEW LONDON, GROTEN, CT

O

PE

RA

TI

O

NS

SMS/CWJ

1667770

GR

OT

ON

, C

ON

NE

CT

IC

UT

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

JWJ

NEK

HPN

M

ID

-A

TL

A N

TI

C

S -2

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

-M

ID

-A

TL

AN

TI

C N

A

VA

L S

TA

TI

O N

N

O R

FO

LK

, V A

1 OPENING FOR ELECTRICAL DUCT BANK, COORDINATE SIZE AND LOCATION

WITH ELECTRICAL. REFER TO B3/S-503 FOR ADDITIONAL REINF

2 REFER TO B3/S-503 FOR ADDITIONAL REINF AT WALL PENETRATIONS

1/8" = 1'-0"C1 SOUTH ELEVATION

1/8" = 1'-0"B1 NORTH ELEVATION

1/8" = 1'-0"A1 EAST ELEVATION

1/8" = 1'-0"A3 WEST ELEVATION

NOTES:

1. C.J. INDICATES CONTROL JOINT LOCATIONS. AT CONTRACTOR'S OPTION, CONSTRUCTION JOINT MAY BE USED IN

LIEU OF CONTROL JOINT AT INDICATED LOCATIONS. REFER TO S-503 FOR CONTROL JOINT INFORMATION.

2-#5@4"OC AT

DOOR OPENING

TYP

SY

M

DE

SC

RI

PT

IO

N

DA

TE

B

T/SLAB…

This is the start of the file's text. The full file is on GovTribe.