Amendment_0003.pdf
PDF 243 KB Posted
- Attached to
- Hurricane Florence Recovery MILCON Package 2
- Solicitation number
- N4008519R9252
About this file
This notice solicits proposals for a design-build construction contract to complete eight military construction projects at Marine Corps Base Camp Lejeune as part of Hurricane Florence recovery efforts. The projects include construction of headquarters facilities, battalion buildings, and a MEU building. The total value of the contract is estimated between $100-250 million and proposals are due by November 8, 2019. A single award will be made for a fixed-price contract with an anticipated completion date of 1,826 calendar days following award by July 20, 2020. The solicitation is unrestricted and will utilize a two-phase evaluation including non-price factors of technical approach, experience, past performance, safety, technical solution, project management, and small business participation, as well as price. The contracting agency is the Naval Facilities Engineering Command Mid-Atlantic.
Corrected Amendment 0003
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N40085-19-R-9252 DESIGN-BUILD (DB) HURRICANE FLORENCE RECOVERY MILCON PACKAGE 2, HURRICANE FLORENCE RECOVERY HQ
FACILITIES AT MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA
The purpose of this amendment is to provide responses to Pre-Proposal Inquiries and revisions to RFP Section 00 21 16. See SF30 Block 14 Continuation Page.
The proposal due date of 08 November 2019 remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Oct-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9252
X 9B. DATED (SEE ITEM 11)
09-Oct-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Oct-2019
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519R9252
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
1. Provides PPI responses 3-21.
2. Revises the following in the RFP, Section 00 21 16 - Instructions to Proposers, 3. Evaluation
Factors for Award:
- 3. Basis of Evaluation and Submittal Requirements for Each Factor, B. Non-Price Factors, Changes Proposal copies from eight to nine and font size from 12pt to 10pt
- Factor 1 – Technical Approach, (i) Solicitation Submittal Requirements: (3) Adds language for
Bonding Capacity Requirements
- Factor 3 Past Performance, Changes language to read regarding PPQ submittals: Offerors are permitted to submit copies of previously completed PPQs. However, Offerors shall not incorporate previously submitted PPQs submitted for other RFPs by reference into their proposal;
but this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
- Factor 5 Project Management Approach, Basis of Evaluation, (4) Schedule, Revises language from “within 1,826 days” to read “A schedule that phases individual building completion dates within the package so the Government can take beneficial occupancy earlier than the 1,826 days overall completion date may be considered more favorably.
(End of Summary of Changes)
SOLICITATION NO. N40085‐19‐R‐9252
PROJECT TITLE/LOCATION: HFRM PACKAGE 2
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
1 10/14/2019 N/A Attachme nt C ‐ Project Data Sheet
N/A The ATTACHMENT C ‐ CONSTRUCTION AND DESIGN EXP.
PROJECT DATA SHEET (PDF file) is actually the Attachment F PPQ form. Please reissue the Attachment C form that offerors are required to use for the project data sheets for Factor 2.
The correct attachment has been provided as part of Amendment 0001
2 10/14/2019 7 of 59 00 21 00 Instructions Please confirm the proposal due date. The SF 1442, box 13 indicates a due date of November 6, 2019; however, RFP Section 00 21 00, page 7 of 59 indicates that proposals are due on Friday, November 8, 2019.
The due date on the SF1442 has been changed to the correct due date of November 8, per Amendment 0001.
3 10/14/2019 16 of 59 00 21 16 Solicitation Submittal Requirements
The last paragraph of Factor 2, (2) Design Experience on page 16 of 59 indicates that "The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor." Please confirm that the necessary teaming agreement informaiton and any related teaming explanation narrative is to be included in Factor 1 and not in Factor 2.
All supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment shall be included in an offeror's Factor 1 proposal.
4 10/14/2019 13 of 59 00 21 16 Solicitation Submittal Requirements
In other recent NAVFAC solicitations we have responded to, we have seen either no minimum font requirements, or minimum font sizes below 12 point. The Factor 2 Construction & Design Experience Project Data Sheets (Attachment C) require us to provide detailed descriptions of our projects. We respectfully request that the minimum font size requirement for this Phase 1 proposal response to be reduced to 10 point, to allow for more detailed content.
The minimum font size requirement for the Phase 1 proposal is reduced to 10 point. See Amendment 0003.
Question No. Date Received REFERENCE QUESTION GOVERNMENT RESPONSE Posted on
Amend No.
July 2011
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. Date Received QUESTION GOVERNMENT RESPONSE
Amend No.
5 10/16/2019 Reference RFP
Section 00 21 16 ‐ Instructions to Proposers;
Paragraph 3;
Evaluation Factors for Award; Factor 2 –Experience:
Additional requirements for relevant projects indicate “At least one project meeting the Size/Scope/Complexity requirements shall have a final construction cost of $125,000,000 or greater. This project may include a single facility or multiple facilities, as long as one of the facilities in the project meets the Size/Scope/Complexity requirements” Procurement agencies must state requirements in a manner that will allow for the broadest field of competition within the minimum needs required. When requirements are stated in a manner that exceeds the procuring agency’s actual needs, competition is considered to be restricted.
The requirement to demonstrate experience on one project with a final construction cost of $125,000,000.00 remains. This solicitation will result in a single contract award to one offeror where the total value of the contract is anticipate to exceed $125,000,000.00.
See Amendment 0003. (bonding)
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. Date Received QUESTION GOVERNMENT RESPONSE
Amend No.
5 (cont) Because none of the Projects listed within the RFP approach anywhere near $125 million and an awardee will have five (5) years to perform all backlog within the package while not having to perform all projects concurrently, this requirement has no rational basis and appears to be unduly restrictive of full and open competition (unnecessarily excluding many strong and capable regional contractors). While it is understood that the government has stated this requirement in furtherance of a need to procure services from a contractor that has financial strength and ability to successfully perform a large amount of backlog, there are alternative evaluative factors that would be rationally based and relevant to the subject procurement and would not run afoul of full and open competition. For example, the agency could instead require bidders to do one or both of the following: 1) demonstrate a minimum aggregate bonding capacity of $225 million (the high end of the government’s DB Budget for the package), and/or
2) demonstrate having performed at least a total of $225 million in federal government construction contracts over the last five (5) years.
The requirement to demonstrate experience on one project with a final construction cost of $125,000,000.00 remains. This solicitation will result in a single contract award to one offeror where the total value of the contract is anticipate to exceed $125,000,000.00.
See Amendment 0003.
5 (cont) To avoid an unreasonable restriction on competition, we recommend that NAVFAC lower the single project size requirement from the stated $125mil to something at or about $30 million (which would be closer to the value of the largest project within the package), and in lieu of the $125 million requirement, add the more rationally based requirements provided in the examples above.
The requirement to demonstrate experience on one project with a final construction cost of $125,000,000.00 remains. This solicitation will result in a single contract award to one offeror where the total value of the contract is anticipate to exceed $125,000,000.00.
See Amendment 0003.
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. Date Received QUESTION GOVERNMENT RESPONSE
Amend No.
6 10/18/2019 13 (b) (1) The RFP states “the offeror shall submit one (1) original, marked “Original”, one CD ROM, and eight (8) copies, marked “Copy”, however 13A on the SF1442 states “Sealed offers in original and 9 copies”. Please clarify if 8 or 9 proposal copies will be required.
Offerors shall submit one (1) original, marked "Original", one CD ROM, and nine (9) copies, marked "Copy."
7 10/18/2019 14 00 21 00 If the Offeror has a Past Performance Questionnaire (PPQ) on file previously completed by the Client that matches all fields of the required Attachment F, may this be submitted in lieu of requesting a new PPQ specific to this solicitation?
Offerors are permitted to submit copies of previously completed PPQs.
See Amendment 0003.
8 10/18/2019 Solicitation Instruction ‐ Factor 2
During the industry day it was mentioned that under normal circumstances these buildings would be solicited individually. However, due to time and available contracting resources five buildings have been bundled into one single solicitation. Given that it is uncommon for this many non‐adjacent structures to be solicited together, it is unreasonable that the government would expect contractors to have similar previous performance of this magnitude ($125M). A magnitude of $100M would be reasonable given the stated range of each building($25M‐100M) or the government should allow contractors to demonstrate relevant magnitude by showing that they completed several large projects in parallel. We kindly request that the government remove the unreasonable requirement which needlessly reduces competition and replaces it with a lower ($100M) threshold or allow projects completed concurrently above $50M each to counted towards the ($125M) requirement.
The requirement to demonstrate experience on one project with a final construction cost of $125,000,000.00 remains. This solicitation will result in a single contract award to one offeror where the total value of the contract is anticipate to exceed $125,000,000.00.
See Amendment 0003.
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. Date Received QUESTION GOVERNMENT RESPONSE
Amend No.
9 10/23/2019 N/A N/A N/A Please provide a definition of “Design to Budget”. Please clarify if the intent is (A) Fixed price specified by the Government where the Offeror will fill out the bid form with 100% of the Design to Budget for each MILCON or
(B) the Design to Budget is a Not To Exceed amount for each MILCON and the expectation is the Offeror is to evaluate the scope of each MILCON and provide a firm fixed price equal to or less than the Design to Budget for each MILCON.
Please Note: If Option B is selected, a minimum 90‐day response time will be required for Phase II and a hefty stipend provided for Phase II respondents.
For this solicitiaton, NAVFAC is using the term "Design to Budget" to mean the amount of funds that are available for construction of the specific project. The expectation for the Price Proposal in Phase II is that the offeror will evaluate the scope and provide a separate price for each of the projects within the package as a firm fixed price. Also, the Design to Budget is not a Not To Exceed amount but rather is provided for information on the Government's expectations of the scope concerning both cost and quality.
10 10/23/2019 N/A N/A N/A Please provide the “Design To Budgets” in phase 1 for each MILCON with basic parameters so Teams can make a determination if budgets are adequate before expending efforts for Phase 1.
Design to Budgets will be provided in Phase 2. RFP Packages will not be developed with sufficient fidelity to provide Design to Budgets during the Phase 1 solicitation period.
11 10/23/2019 N/A N/A N/A Please explain what information will be provided in Phase II as part of the AE1 RFP Packages. Will bridging design level information be provided with programmatic drawings or will only narratives be provided?
The Government's intent is to provide in the Phase II RFP Package, at a minimum, adjacencies, room requirements, minimal site information, and narratives.
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. Date Received QUESTION GOVERNMENT RESPONSE
Amend No.
12 10/23/2019 N/A N/A N/A Will individual contracts be awarded for each MILCON? In accordance with The RFP, Section
00 21 16, INSTRUCTIONS TO
OFFERORS, 1.2 GENERAL OVERVIEW
OF THE CONTRACT: "The general intent of this solicitation is to award a Fixed Price construction contract for design‐build (DB) projects in Package 2, Hurricane Florence Recovery HQ Facilities at MCB Camp Lejeune." The intent is to award one contract that includes all Projects.
13 10/23/2019 N/A N/A N/A Please clarify if a Stipend will be provided to Phase II responsive firms. If so, please provide the amount. At this time, stipends will not be provided.
14 10/23/2019 N/A N/A N/A Please provide the anticipated Phase II RFP response period.
Phase II will be issued via amendment. As included in the Hurricane Florence Industry Day Brief, Phase 2 is anticipated to be issued February 2020 and responses are anticipated to be due in April 2020.
The government intends to allow approximately 60 days for the Phase II Non‐Price Proposal and to allow approximatley 20 additional days for the Phase II Price Proposal.
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. Date Received QUESTION GOVERNMENT RESPONSE
Amend No.
15 10/23/2019 7 of 59 00 21 00 –
Instructio ns
N/A RFP Section 00 21 00 indicates, “The Design to Budget will be included in the Phase II Amendment.” Please clarify what is meant by “The Design to Budget”. Per a Hurricane Florence Industry Day, is it the Government's intent to provide a simple Construction Cost Limitation (CCL) for each project?
For this solicitiaton, NAVFAC is using the term "Design to Budget" to mean the amount of funds that are available for construction of the specific project. The expectation for the Price Proposal in Phase II is that the offeror will evaluate the scope and provide a separate price for each of the projects within the package as a firm fixed price. Also, the Design to Budget is not a Not To Exceed amount but rather is provided for information on the Government's expectations of the scope concerning both cost and quality.
16 10/23/2019 15 of 59 00 21 16 ‐ Instructio ns to Proposers and Attachme nt C
N/A RFP Section 00 21 16, Factor 2, (a) Solicitation Submittal Requirements indicates for Design Experience that offerors are to submit “…relevant design projects for the Designer of Record(s)…”. Referencing Attachment C ‐ Design Experience Project Data Sheet, please confirm for a Design Experience project to be considered relevant, it must have the box checked for “Designer of Record” under Box 8. Design Project: Type of Contract/Task Order.
As long as the proposed design propject meets the defined Size, Scope, and Complexity requirements and is compliant with requirements of Factor 2; the proposed Designer(s) of Record does not have to have been the Designer of Record on a proposed project for it to be considered Relevant.
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. Date Received QUESTION GOVERNMENT RESPONSE
Amend No.
17 10/23/2019 49 of 59 00 21 16 ‐
Instructio ns to Proposers and 00 73 00 ‐ Suppleme ntary Condition s
N/A Per RFP Section 00 21 16, Factor 5 – Project Management Approach, (a) Solicitation Submittal Requirements, "Offerors are required to submit a completed Attachment H (Proposed Project Durations) in Factor 5 as part of the phase 2 proposal, noting that the awardee’s proposed project duration from award for each Project will be incorporated into the contract. Referring to RFP Section 00 73 00 – Supplementary Conditions, please confirm that Supplemental NAVFAC Language, “Phase Construction Schedule” is not relevant to this solicitation.
If so, please remove from RFP Section 00 73 00.
Offerors are required to complete Attachment H with the number of days to project CCD from Contract Award Notice. "Phase Construction Schedule" will remain in the RFP to allow potential Offerors the flexibility to propose a phase construction schedule if they choose.
18 10/23/2019 16 of 59 00 21 16 ‐ Instructio ns to Proposers
N/A RFP Section 00 21 16, Factor 3, (i) Solicitation Submittal Requirements indicates, "If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for Construction Experience." Please confirm that if a Construction Experience project has a CPAR available that it is weighted more favorable than a project that does not have a CPAR available (i.e., a Construction Experience project that includes a PPQ).
No, CPARS evaliations will not be weighted more favorably than completed PPQs. In accordance with the Factor 3, Basis of Evaluation: The evaluation will consider how well the Offeror’s team performed on relevant projects submitted under Factor 2 – Experience and may also consider past performance on other projects currently documented in known sources.
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. Date Received QUESTION GOVERNMENT RESPONSE
Amend No.
19 10/23/2019 16 of 59 00 21 16 ‐
Instructio ns to Proposers
N/A RFP Section 00 21 16, Factor 3, (i) Solicitation Submittal Requirements indicates, "If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for Design Experience." Please confirm that for featured Design Experience projects that are design‐build, the associated prime contractor's CPAR or CCASS for that featured project is not an allowed performance evaluation document to demonstrate past performance for an offeror's Designer of Record.
If there is not a completed CPARS evaluation specific to the proposed Designer of Record for design‐build projects, then submit Past Performance Questionnaires (Attachment F) for each project included in Factor 2 for both Construction Experience and Design Experience.
20 10/23/2019 Amendm ent 0002 ‐ Page 3 of 4
SECTION
00 70 00 ‐
CONDITIO
NS OF
THE
CONTRAC
T 52.211‐
LIQUIDAT
ED
DAMAGES‐
CONSTRU
CTION
The LD rates per project were issued with Amendment 0002. Please advise if the start of these LDs is: 1) for each project that is not completed before the 1826 calendar day total project allowance or 2) for each project that is not completed by it's individual completion date as stated (in the Phase 2 submission) in Attachment H?
In accordance with the RFP, Factor 5 ‐ Project Management Approach, (a) Solicitation Submittal Requirements,
(4) Schedule, "The awardee’s proposed project duration from award for each Project will be incorporated into the contract. Upon award, each project will have a separate completion date." Liquidated Damages will be assessed on a per Project basis based on the awardee's proposed completion date for each Project.
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. Date Received QUESTION GOVERNMENT RESPONSE
Amend No.
21 10/24/2019 Amendment 2 revised the proposal submission requirements to require hand delivery of proposals. The amendment also states “If the proposal due date is extended, it is the contractor’s responsibility to work with the Government to revise the date on the pass request”. Please clarify what is required of the contractors to “work with the government”.
Please refer to RFP Section 00 21 16, Instructions to Proposers, 4. Proposal Requirements, 4.2 Proposal Submission Instructions "All proposals shall be mailed or hand carried to the following address:
Naval Facilities Engineering Command, Mid‐Atlantic 9324 Virginia Avenue Building Z‐140, Room 225 Norfolk, Virginia 23511 Attn: John Bishop, ACQ2"
If the proposal due date is changed, it will be the responsibility of the contractor to email the government only if you wish to change the personnel submitted for base access.
In that case, the contractor would submit the 5512 and ODPR for the person needing access.
| Amendment 0003 |