This notice is for a design-build construction services contract to support Hurricane Florence recovery efforts at Marine Corps Base Camp Lejeune in North Carolina. The contract will include eight military construction projects with a combined value between $100-250 million to replace headquarters facilities, including for logistics battalions, a tank battalion, regimental headquarters, an infantry battalion, marine expeditionary units, a transportation support battalion, and an environmental management division. The projects involve constructing new steel and masonry buildings totaling over 300,000 square feet. The contract will be fixed-price with a 1,826-day period of performance starting in July 2020. The solicitation is unrestricted and will utilize a two-phase evaluation including technical, past performance, safety, project management, and price factors. The contracting office is Naval Facilities Engineering Command Mid-Atlantic and questions should be directed to the specified point of contact.

View the file

Other files

File Type Posted
Amendment 0020.pdf PDF
Amendment 0019.pdf PDF
Amendment 0018.pdf PDF
Amendment 0017.pdf PDF
Amendment 0016.pdf PDF
Amendment 0015.pdf PDF
Addendum 014.2_P1522_P1529 Comm Map from Bldg. 1.pdf PDF
Addendum 014.3_Trailer_on_Reasoner_Comm.pdf PDF
Addendum 014.5_MCIEAST-MCBCAMLEJ SURPLUS SOIL MILCON SPEC REVISION - 6APRIL2020.pdf PDF
Amendment 0014.pdf PDF
Updated Attachment I Price Proposal_Revisions 04.15.2020.pdf PDF
PACKAGE 2 ATTACHMENT (6) HISTORIC GEOTECHNICAL DATA Part 2.pdf PDF
Addendum 014.6 Locker Concrete Pad DWGS.pdf PDF
Addendum 013.9_Substation Impedances.pdf PDF
Addendum 013.7_DM for HQ.pdf PDF
Addendum 013.6_SW8 081015 MOD 01.17.18.pdf PDF
Addendum 013.8_DM for Armory.pdf PDF
Amendment 0013.pdf PDF
Updated Attachment I Price Proposal_Revisions 04.05.2020.pdf PDF
Addendum 013.5_SW 081015 DA.PDF PDF
Addendum 013.2_Wheeled Assets.pdf PDF
Addendum 013.3_SW NPDES PERMIT NCS000290.pdf PDF
Amendment 0012.pdf PDF
Updated Attachment I Price Proposal_Revisions 03.26.2020.pdf PDF
Updated Attachment H 3.26.2020.pdf PDF
Amendment 0011.pdf PDF
Package 2 Site Visit Agenda.pdf PDF
Amendment 0010.pdf PDF
Attachments.zip ZIP file
Site MapWC.pdf PDF
Site Visit HA Map.pdf PDF
Site Visit Main Side Map.pdf PDF
01 57 19.pdf PDF
Site Visit WC Map.pdf PDF
Site Visit Waiver.pdf PDF
Bldg. 812 Map.pdf PDF
Updated Attachment H.pdf PDF
Amendment 0009.pdf PDF
Attachment I Price Proposal Form.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_C-G.pdf PDF
TFF2_RFP_RTA_PART_1-5.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_A-B.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_H-K.pdf PDF
Amendment 0008.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0003.pdf PDF
One_Day_Pass_Request.xls XLS spreadsheet
Amendment_0002.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fin Ha

Mar

Con nal St adnot rch 2012 ntract No torm t Poin

. N40085 mwate nt Ar

5-07-D-26 er Ma reas aster 100 a

Mar r Plan and 2 rine C Cam n

Corp mp Le

North s Bas ejeun h Caroli se ne ina

FINAL STORMWATER MASTER PLAN

HADNOT POINT AREAS 100 AND 200

MCB Camp Lejeune N40085-07-D-2620

U.S. Marine Corps Camp Lejeune, NC

Issued for Marine Corp Base Camp Lejeune Review March, 2012

Government Services, IPT Mary C. Giles, P.E.

N.C. Professional Engineer No. 038095

Stormwater Management Program Hadnot Point Areas 100 & 200 Camp Lejeune, North Carolina

TABLE OF CONTENTS

TABLE OF CONTENTS

LIST OF FIGURES

LIST OF TABLES

LIST OF APPENDICES

EXECUTIVE SUMMARY

1. NATURAL RESOURCES INVENTORY AND ASSESSMENT

1.1. Project Location, Topography and Floodplains

1.2. Wetlands

1.3. Geology and Soils

1.4. Land Use

1.5. Land Uses in the Hadnot Point Areas 100 and 200

1.6. Public Lands, Scenic, Recreational, and State Natural Areas near the Study Area

1.7. Areas of Archaeological or Historical Value

1.8. Water Resources (Surface Water and Groundwater)

1.9. Forest Resources

1.10. Aquatic Species and their Habitats

1.11. Wildlife and Natural Vegetation in Camp Lejeune

1.12. Natural and Cultural Resources Inventory

2. STORM SEWER SYSTEM INFORMATION (EXISTING)

2.1. Population Served

2.2. Growth Rate

2.3. Jurisdictional Service Areas

2.4. Stormwater System: Composition and Maintenance

2.5. TMDL Identification

3. RECEIVING STREAMS

3.1. Specific Water Quality Issues

3.2. Installation Restoration (IR) and Hazardous Sites

4. EXISTING WATER QUALITY PROGRAMS

4.1. Local Programs

4.2. State Programs

4.3. Master Stormwater Permit: Existing and Proposed Stormwater Permits

5. STORMWATER ANALYSIS

2 March 2012

5.1. Background

5.2. Estimation of Stormwater Runoff under Existing Conditions (Year Analyzed: 2009)

5.3. Estimation of Stormwater Runoff under Original Conditions (Year Analyzed: 1938)

5.4. Progression of Stormwater Runoff from Original Conditions (1938) to Current Conditions (Years Analyzed: 1956, 1962 &1989)

5.5. Summary: Stormwater Progression from 1938 to Current Conditions

5.6. Post-Development Conditions

5.7. Pollutants in Stormwater

5.8. Current Stormwater and Other Environmental BMPs

5.9. Recommendations on stormwater BMPs for current and future loadings

5.10. Conceptual BMP alternatives: preliminary design

5.11. Maintenance

5.12. Estimated Costs

6. STORMWATER MANAGEMENT PROGRAM PLAN

6.1. Public Education and Outreach on Storm Water Impacts

6.2. Public Involvement/Participation

6.3. Illicit Discharge Detection and Elimination

6.4. Construction Site Stormwater Runoff Control

6.5. Post-Construction Stormwater Management in New Development and Redevelopment . 113

6.6. Good Housekeeping/Pollution Prevention for in Municipal Operations

7. MEETING MINUTES

LIST OF FIGURES

Figure 1. Hadnot Point: Topography

Figure 2. Hadnot Point: Floodplains

Figure 3. Hadnot Point: Wetlands

Figure 4. Hadnot Point: Soils Mapping

Figure 5. Facility Master Plan: Hadnot Point 100-500 Areas

Figure 6. Hadnot Point: Historic Sites

Figure 7. White Oak River- Sub-basin 03-05-02

Figure 8. Hadnot Point Station: Hydrogeologic Framework

Figure 9. Hadnot Point Areas 100 and 200: Existing Stormwater Structures

Figure 10. Hadnot Point: Pre-Development Conditions

Figure 11. Hadnot Point: Land Cover

Figure 12. Contaminated Sites in the Hadnot Point Area

Figure 13. Hadnot Point Areas 100 & 200: Land Use and Aerial Photography (Year Analyzed: 1938)

Figure 14. Hadnot Point Areas 100 & 200: Land Use and Aerial Photography (Year Analyzed: 1956)

Figure 15. Hadnot Point Areas 100 & 200: Land Use and Aerial Photography (Year Analyzed: 1962)

Figure 16. Hadnot Point Areas 100 & 200: Post-Development Conditions

Figure 17. Bioretention Area for Management of Stormwater

Figure 18. Proposed BMPs

Figure 19. Proposed BMPs

Figure 20. Proposed BMPs

Figure 21. Proposed BMPs

Figure 22. Proposed BMPs

Figure 23. Proposed BMPs

Figure 24. Proposed BMPs

Figure 25. Proposed BMPs

Figure 26. Proposed BMPs

4 March 2012

LIST OF TABLES

Table 1. Soil Types within the Hadnot Point Areas 100 and 200

Table 2. Seasonal High Water table and Hydraulic Conductivity at Potential Stormwater BMP Site

Table 3. Seasonal High Water Table Evaluations & Soil Descriptions

Table 4. Hadnot Point Area 100: Existing Buildings

Table 4. Hadnot Point Area 100: Existing Buildings (continued)

Table 5. Hadnot Point Area 200: Existing Buildings

Table 5. Hadnot Point Area 200: Existing Buildings (continued)

Table 6. Rare Animals Associated with Aquatic or Wetland Habitats in the White Oak River Basin

Table 8. Environmental Resources Inventory for Study Area

Table 9. Occupants of the Hadnot Point Areas 100 and 200

Table 10. Existing Stormwater Permits

Table 11. Receiving Waters from Hadnot Point: Surface Water Classification and Support Rating

Table 12. Hadnot Point Area 100: Stormwater Runoff, Curve Number & Time of Concentration (1938) 59

Table 13. Hadnot Point Area 200: Stormwater runoff, Curve Number & Time of Concentration (1938) 59

Table 14. Hadnot Point Area 100: Stormwater Runoff, Curve Number & Time of Concentration (1956) 61

Table 15. Hadnot Point Area 200: Stormwater Runoff, Curve Number & Time of Concentration (1956) 62

Table 16. Hadnot Point Area 100: Stormwater Runoff, Curve Number & Time of Concentration (1962) 64

Table 17. Hadnot Point Area 200: Stormwater Runoff, Curve Number & Time of Concentration (1962) 65

Table 18. Hadnot point Area 100: Pre-Development Hydrology

Table 19. Hadnot point Area 200: Pre-Development Hydrology

Table 20. Typical Loading of Pollutants from Runoff by Urban Land Use (lb/ac/year)

Table 21. Hadnot Point Area 100: Estimated Pollutant Load from Proposed Impervious (lb/year)

Table 22. Hadnot Point Area 200: Estimated Pollutant Load from Proposed Impervious (lb/year)

Table 23. Potential BMPs to be Implemented in the Hadnot Point Area

Table 24. Bioretention Summary per Permit

Table 25. Hadnot point Area 100: Post-Development Hydrology

Table 26. Hadnot point Area 200: Post-Development Hydrology

Table 27. Master Permit Summary

Table 28. Proposed BMP Treatment Volume

Table 29. Proposed BMP Cost Estimates

LIST OF APPENDICES

Appendix A: Soil Investigation by S&ME. November 2009

Appendix B: Previous Permit Applications and Plans

Appendix C: Rescission of Previous Stormwater Permits

Appendix D: Issued Stormwater Permit No. SW8 020319—Stormwater Master Plan for Hadnot Point Areas 100 and 200

Appendix E: Issued Stormwater Permit No. SW8 080910—P-1221 Additions to Regimental Headquarters

6 March 2012

ACRONYM LIST

AEC Area of Environmental Concern

ASL Above Sea Level

ATFP Antiterrorism and Force Protection

BUA Built Upon Area

CAMA Coastal Area Management Act

CERCLA Comprehensive Environmental Response, Compensation & Liability Act

CRC Costal Resources Commission

CZMA Coastal Zone Management Plan

DCERP Defense Coastal/Estuarine Research Program

BEQ Bachelor Enlisted Quarter

BmB Baymeade-Urban

BMP Best Management Practice

LANTDIV Atlantic Division, Naval Facilities Engineering Command

IR Installation Restoration

ISMT Indoor Simulated Marksmanship Trainer

MCB Marine Corps Base

MCBCL Marine Corps Base, Camp Lejeune

MEF Marine Expeditionary Force

MEP Maximum Extent Practicable

MS4 Municipal Storm Sewer Systems

MSC Major Subordinate Command

NC DWQ North Carolina Division of Water Quality

NCDENR North Carolina Department of Environment and Natural Resources

NEPA National Environmental Policy Act

NPDES National Pollutant Discharge Elimination System

POV Personally-operated vehicle

ROICC Resident Officer in Charge of Construction

SERDP Strategic Environmental Research and Development Program

SHPO State Historic Preservation Office

SWMU Solid Waste Management Unit

TMDL Total Maximum Daily Load

UXO Unexploded Ordinance

EXECUTIVE SUMMARY

The enclosed study has been prepared for the United States Marine Corps Base Camp Lejeune (MCBCL) to evaluate existing and proposed development in Hadnot Point, develop a comprehensive stormwater master plan, and obtain a Master Stormwater Permit to facilitate development while meeting the goals of the NCDENR Coastal Stormwater Regulations.

To this end, two documents have been developed: (I) Stormwater Master Plan for Hadnot Point Areas 100 and 200; and (II) Stormwater Master Permit Application for Hadnot Point Areas 100 and 200.

I) The Stormwater Master Plan for Hadnot Point Areas 100 and 200 (Master Plan) followed the ―Instructions for Preparing a Stormwater Management Program Report‖ published by the North Carolina Division of Water Quality (NC DWQ), which are summarized in the scope of work that follows:

1. Assessment of Existing Conditions (General, project location, environmental features)

2. Storm Sewer System Information

a. Population Served

b. Growth Rate

c. Jurisdictional and Municipal Separate Storm Sewer Systems (MS4) Service Areas

d. Stormwater System in the Study Area

e. Land Use Composition Estimates

f. Total Maximum Daily Load (TMDL) Identification

3. Receiving Streams

4. Existing Water Quality Programs

5. Permitting Information

6. Stormwater Analysis

a. Current stormwater runoff

b. Comparison between current stormwater conditions and pre-1988 conditions

c. Analysis of current stormwater and other environmental Best Management Practices (BMPs)

d. Recommendations on stormwater BMP for current and future loadings

e. Conceptual BMP alternatives: preliminary design and costs

7. Stormwater Management Program Plan

a. Public Education and Outreach on Stormwater Impacts

b. Public Involvement and Participation

c. Illicit Discharge Detection and Elimination

d. Construction Site Stormwater Runoff Control

e. Post-construction Stormwater Management in New Development and Redevelopment

Pollution Prevention and Good Housekeeping

8 March 2012

II) Master Stormwater Permit Application for Hadnot Point Areas 100 and 200 (Application)

A Master Stormwater Permit has been processed and issued by the NCDENR Regional DWQ Office in Wilmington. This permit is included in Appendix D of this report. The Master Stormwater Permit has been issued and serves to unify into a single permit the area both (1) existing/individual permits and

(2) future permits for new projects planned for the period 2010-2018 in the Hadnot Point Facilities Master Plan.

1. NATURAL RESOURCES INVENTORY AND ASSESSMENT

1.1. PROJECT LOCATION, TOPOGRAPHY AND FLOODPLAINS

1.1.1. Project Location

The Marine Corps Base Camp Lejeune (MCBCL) is located within Onslow County, along the coastal plain of North Carolina. The Base covers more than 153,000 acres that consist of approximately 26,000 acres of water and 127,000 acres of terrestrial features. Elevation at the Base ranges from sea level to 70 feet above mean sea level, with much of the site topography traversed by swales, wetlands, streams, and creeks that drain into the New River. The Base encompasses a 92-mile perimeter, including approximately 14 miles along the Atlantic Ocean, more than 450 miles of roads, 50 miles of railroads, one waste water treatment plant, five water treatment plans, and one active municipal solid waste landfill and one closed landfill. Camp Lejeune is home to an active duty, dependent, and civilian population of approximately 150,000. Hadnot Point accounts for approximately fifty percent of the working Camp Lejeune population. Hadnot Point 100-500 Areas are home to the 2nd Marine Division (2D MAR DIV) and elements of the II marine Expeditionary Force (MEF).

This Stormwater Master Plan focuses on two watersheds within Hadnot Point, identified as Areas 100 and 200.

1.1.2. Topography

Topographic mapping of the project site is shown in Figures 1, 11, and 17.

Area 100 comprises 99.2 acres draining north towards Wallace Creek. Elevations range from 26 feet above sea level (asl) to zero feet at the lowest point, which is the site where the watershed discharges into Wallace Creek. Slopes vary from almost flat in the areas south of A Street to steep slopes at the lowest areas of the watershed, north of Cross Street. Area 100 is subdivided into three regions with the following elevations and slopes:

South of A Street: elevations vary between 26 and 20 feet asl, except for a low spot at the west of the area with elevation 16 feet. Average slope: 0.9%.

Between A and Cross Streets: drainage is from the center and sides of the area (elevation ~22 feet) towards two creeks located east and west of the area (elevations ~4 feet).

Average slope: 3.5%.

North of Cross Street: drainage is from the center and sides of the area (elevation ~22 feet) towards the two creeks that ultimately converge and discharge into Wallace Creek.

Average slope: 9%.

Area 200 comprises 85.8 acres draining west towards the New River. Elevations range from 26 feet asl to zero feet at the lowest point, which is the site where the watershed discharges into the New River.

Area 200 is subdivided into three regions with the following elevations and slopes:

North of ―C‖ Street: elevations vary between 26 and 20 feet asl; there exists one low area to the west, which has an elevation of 14 feet asl. Average slope 1.2%.

Between C and D Streets: drainage is towards the west, elevations vary between 22 feet and zero feet (West of Julien Smith Blvd.), at the site of the discharge into the New River.

Average slope: 5.25%

South of ―D‖ Street: Elevations vary between 26 and 20 feet asl. Average slope: 1.2%

10 March 2012

Figure 1. Hadnot Point: Topography

'1 , , , , :t:,::.'";'z:'- - ~ ___ .~"_r ~_ ..

I •

==n_",,, ~·"""",,,,,,·O_"""'''"''~''''

""'~N"-~~ '

1.1.3. Floodplains

Areas of 100-year floodplain are located at the site of the discharges into Wallace Creek and the New River, at the northernmost section of Area 100 and at the westernmost section of Area 200, respectively. This 100-year floodplain is based on FEMA mapping. Limits of 100 year floodplain are shown in Figure 2.

Figure 2. Hadnot Point: Floodplains

12 March 2012

1.2. WETLANDS

Tidal wetlands within the Study Area are regulated by the Coastal Area Management Act (CAMA). The Wetland Inventory identifies the wetland areas present in the Study Area, as shown in Figure 3, based upon the National Wetlands Inventory website, verified in December 2009.

o Wetlands in Area 100: A PFO1B wetland is present in Area 100, north of Cross Street, and extends towards A Street. The primary functions of this wetland are shoreline erosion protection, flood control, natural water quality protection, pollutant removal from stormwater runoff. As any other wetland, aesthetic value and fish/wildlife habitat is an additional attribute of this wetland area.

The following parameters defined the characteristics of the PFO1B wetland present in Area 100:

System: P: Palustrine

Class: FO: Forested

Subclass: 1: Broad-leaved Deciduous

Water Regime: B: Saturated o Wetlands in Area 200: There are no wetlands in Area 200.

Figure 3. Hadnot Point: Wetlands

LEGEND

PROJECT BOUNDARY -EXISTING BUILDING

MILCON PROJECTS

SURFACE WATER COURSE -FEMA FLOOD HAZARD AREA

EXISTING ROAD

WETLAND TYPE: PF01B (NATIONAL WETLANDS INVENTORY)

HADNOT POINT AREAS 100 and 200

WETLAND INVENTORY

,~ '" ----- '.000

... " ' .000

14 March 2012

1.3. GEOLOGY AND SOILS

1.3.1. Geology

As glacial events and slight crustal movements have changed sea level over the past 66 million years, the land base has been alternately exposed and submerged. Marine deposits laid down over time formed the weakly-dissected alluvial plain that Camp Lejeune occupies today. The deposits are mostly clean sand and clayey sand, layered with deposits of clay and marine shells. Along the coast, stream sediment deposition, and natural shore processes develop and maintain beaches, swamps, and mud flats.

The primary geomorphic surface at the Hadnot Point Areas 100 and 200 is the Pamlico surface, with elevations of 0-26’ in narrow strips along the Intracoastal Waterway, New River, and its tributaries.1

1.3.2. Soils

To describe the dominant soil(s) in the project area as well as any soil types that might prove to be a constraint to the proposed project, two sources of information were consulted:

USDA Soil Survey

In-situ soil investigation

USDA Soil Survey

Figure 4 and Table 1 summarize the soil types present within the Study Area, according to the USDA Soil Survey.

Well drained soils:

The most predominant soil type is the Baymeade-Urban (BmB) with 58% present in Area 100 and 83% in Area 200. Baymeade-Urban is classified as SM by the Unified Soil Classification.

These types of soil are characterized by good drainage (―A‖ Hydrologic Group) with the depth to the water table more than 1.0 meter.

Poorly drained soils:

Poorly drained soils are present near both discharge sites (~1%). Those soils are classified as Muckalee loam (Mk).

Soils information is detailed on the USDA Soil Survey and Results of Soil Investigation. More detailed soils investigations are included in Appendix A.

1 (MCB Camp Lejeune, NC Final Integrated Natural Resources Management Plan; website:

http://www.lejeune.usmc.mil/emd/INRMP%20MAY06/Chap%202%20April%2006%20GH.pdf)

Figure 4. Hadnot Point: Soils Mapping

N

.. --~ .... ,---1-. .

LEGEND

_ PRQJECTIlQUNDootIIly

SERIESJ O

Bo8 · IJRBAlHYOOOlANO COMPl.EX

_ &nil _ W'ELl..()lV,lNEO,~, lONGlEIo/'F'w.E SNJ-.

~ . W'ELL·OIWNEO. SAI<lY, PkNe.tloOAowooo SlOPE

_ "" • POORLY ORAImo. Ml!CI(Y. SMALL STREAM SWIWIP

SURFACE WATE!! CO\.fISE

MllCOH PR()J(ClS

CONTOUR ELEVATIONS

-~. • TEST LOCA'I"IONS

USDA SOIL SURVEY

AND RESULTS OF SOIL INVESTIGATION

16 March 2012

Table 1. Soil Types within the Hadnot Point Areas 100 and 2002

Map Unit Symbol

Map Unit Name

AOI

Unified Soil Classification

Hydrologic Soil Group

Depth to Water

Table (cm)

Drainage Class

BaB Baymeade fine sand

0-6 % slopes

11.1 SM A 122

Well drained

BmB Baymeade-Urban land complex 0-6 % slopes

58.2 SM A 122

Well drained

MaC Marvyn loamy fine sand

6-15 % slopes

30.5 SC-SM B >200

Well drained

Mk Muckalee loam 0.2 SC D 15 Poorly drained

Total Area 100 100.0

BmB Baymeade-Urban land complex 0-6 % slopes

82.6 SM A 122

Well drained

MaC Marvyn loamy fine sand

6-15 % slopes

16.3 SC-SM B >200

Well drained

Mk Muckalee loam 1.0 SC D 15 Poorly drained

Total Area 200 100.0

2 Source: USDA Web Soil Survey; verified October 2009; Onslow County Soil information updated in October 2009.

Soil Investigation

A soils investigation was performed by S&ME in the first week of November 2009 to assess potential sites for suitability of infiltration type stormwater BMPs. This soils investigation is included in Appendix A. The soil investigation included the following tasks:

In-situ soil hydraulic conductivity test at each seasonal high water table evaluation location for a total of eight tests. Hydraulic conductivity tests were performed using a compact constant head permeameter at depths recommended by the Government Services IPT Project Manager.

Evaluation of the seasonal high water table at eight locations as shown on enclosed map, to a depth of eight feet below the existing ground surface or until seasonal high soil wetness conditions are encountered (whichever is first encountered) as determined by, or under the guidance of a Licensed Soil Scientist.

Findings

In-situ soil hydraulic conductivity testing was performed by using a compact constant head permeameter at the test locations. Table 2 summarizes the results for each test location.

Table 2. Seasonal High Water table and Hydraulic Conductivity at Potential Stormwater BMP Site

Test Locations

Seasonal High Water Table

(inches below ground)

Seasonal High Water Table

(feet above MSL)

Hydraulic Conductivity Rate (inches per hour)

Testing Interval (inches below surface)

B-1 40 17.6 0.19 16 to 22

B-2 69 19.5 0.19 40 to 46

B-3 31 17.8 0.19 1 to 7

B-4 35 19.3 0.09 5 to 11

B-5 36 22.6 2.99 6 to 12

B-6 36 21.9 0.18 6 to 12

B-7 6 16.1 n/a (SHWT at 6‖) n/a

B-8 34 20.5 0.28 4 to 10

The seasonal high water table evaluations were performed on November 2 and 4, 2009, by advancing hand auger borings to depths ranging from approximately 29 to 88 inches below the ground surface at the test locations shown in Table 2.

Soils were evaluated under the guidance of a Licensed Soil Scientist for evidence of seasonal high water table influence. This evaluation involved looking at the actual moisture content in the soil and observing the matrix and mottle colors. Depending on the soil texture, the soil color will indicate processes that are driven by seasonally high water table fluctuations, such as iron reduction and oxidation and organic matter staining. A hand auger boring profile sheet which provides a description of the observed soil horizons and the determined seasonal high water tables has been included in the soil investigation report provided in Exhibit A.

18 March 2012

The soils at the test locations were observed to range from fine sand to silty clay loam. The seasonal high water tables were determined to be between 6 to 69 inches below the existing ground surface.

Table 3 summarizes the seasonal high water table depth at each test locations. These seasonal high water table evaluations are based on secondary evidence and not on direct groundwater level measurements. Potential indicators of seasonal high water table influence, mainly redoximorphic soil features, were observed in the fill horizons above the seasonal high water table depths determined by S&ME personnel. These features appeared to be relic based on their faded, non-distinct appearance and their location within the matrix of the soil not along soil ped faces or root channels.

Table 3. Seasonal High Water Table Evaluations & Soil Descriptions

Location Horizon Depth (inches) Texture/Structure

B-1

Ap 0-13 Loamy sand, granular, topsoil

Ab 13-18 Sandy loam, sub-angular blocky, weak

E 18-40 Silt loam, blocky, weak

Bt 40-44+ Silty clay loam, blocky, moderate

Seasonal High Water Table = 40‖ below the existing ground surface = elevation 17.6 feet MSL

B-2

Fill 0-5 Loamy sand, granular, topsoil

Fill 5-12 Loamy sand, granular, fill

Fill 12-69 Sandy loam, blocky, moderate, fill

Bg 69-81+ Loamy sand, granular

Seasonal High Water Table = 69‖ below the existing ground surface = elevation 19.5 feel MSL

B-3

Fill 0-31 Loamy sand, granular, clay pieces present, fill

Bg 31-38 Silt loam, blocky, moderate

Cg 38-44+ Clay, massive, sticky, plastic, sand seams present

Seasonal High Water Table = 31‖ below the existing ground surface = elevation 17.8 feel MSL

B-4

Fill 0-31 Loamy sand, granular, clay pieces present, fill

Bg 31-38 Silt loam, blocky, moderate

Cg 38-44+ Clay, massive, sticky, plastic, sand seams present

Seasonal High Water Table = 35‖ below the existing ground surface = elevation 19.3 feel MSL

B-5

Ap 0-5 Fine sand, single grain

Fill 5-36 Fine sand, single grain, slightly compacted

Bt 36-45 Silt loam, blocky, moderate

Bg 45-88+ Sandy loam, blocky, moderate

Seasonal High Water Table = 36‖ below the existing ground surface = elevation 22.6 feel MSL

B-6 Ap 0-3 Fine sand, single grain, topsoil

Location Horizon Depth (inches) Texture/Structure

Fill 3-6 Loamy sand, granular

Fill 6-14 Loamy sand, granular

Fill 14-36 Loamy sand, granular

Bt 36-48+ Silt loam, blocky, weak to moderate

Seasonal High Water Table = 36‖ below the existing ground surface = elevation 21.9 feel MSL

B-7 Ap 0-6 Sandy loam, blocky, moderate, organics present

Bt 6-29 Sandy clay loam, blocky, moderate

Seasonal High Water Table = 6‖ below the existing ground surface = elevation 16.1 feel MSL

B-8

Ap 0-8 Loamy sand, granular, topsoil

Fill 8-13 Fine sand, single grain, gravel present

Fill 13-34 Loamy sand, granular

Bt 34-43+ Silt loam, sub-angular blocky, weak

Seasonal High Water Table =34‖ below the existing ground surface = elevation 20.5 feel MSL

20 March 2012

1.4. LAND USE

The Study Area for this Stormwater Master Plan (Areas 100 and a section of Area 200 of Hadnot Point) complies with the planning principles established in the Facility Master Plan for the configuration of facilities within the Hadnot Point Areas 100-500 developed by Government Services IPT in 2009 (Figure 5). The 2009- Facility Master Plan addressed organizations affected by anticipated troop increases and organizations targeted for relocation to their designated Major Subordinate Command (MSC) area.

Consideration was given to the existing constraints and opportunities including Antiterrorism and Force Protection (ATFP) requirements, ground noise levels, transportation and utility corridors, Installation Restoration (IR) sites and management areas, hydrologic features, and historical buildings and districts.

The emphasis for Hadnot Point was to minimize demolition through the reuse of existing buildings, maintain operational efficiencies through unit integrity, resolve numerous ATFP standoff deficiencies and provide adequate privately-owned vehicle (POV) parking through surface lots and structured parking where necessary.

The Final Facility Site Plan primarily proposed reuse of existing buildings rather than demolition. The Hadnot Point Area (Areas 100-500) land uses are illustrated in the site plan in Figure 1. Current and proposed land uses of the Hadnot Point Areas 100 and 200 are described below.

From the preparation of the Facility Master Plan, consensus was reached on major decisions to be incorporated in the preferred Site Plan for the 100 and 200 Areas:

Provide facilities for one or two Infantry Regiments

Incorporate six-story BEQs and required parking at the location of the existing II MEF training facility, at the tennis courts north of Cross Street, and potentially on land immediately north of the 100 Area if necessary

Provide one Mess Hall to serve the combined 100 and 200 Area populations

Figure 5. Facility Master Plan: Hadnot Point 100-500 Areas

22 March 2012

1.5. LAND USES IN THE HADNOT POINT AREAS 100 AND 200

Facilities in Area 100 include the Infantry Regiment, Intel, and Radio BN; approximately 5,000 parking spaces, and 2,078 Bachelor Enlisted Quarters (BEQs). North of Area 100 is a dense mixed hardwood and pine tree canopy. Facilities in Area 200 include the Infantry Regiment, approximately 3,400 parking spaces and 1,700 BEQ rooms. A description of the facilities within Areas 100 and 200 follows.

Infantry Regiment - Hadnot Point 100-200 Area

Hadnot Point 100 Area and a portion of the 200 Area provide facilities for one Infantry Regiment.

Existing community facilities and associated parking include the fire station, new pool, Base Exchange, and theater. Buildings less suitable for preservation are proposed for demolition to provide some areas for strategic redevelopment. Older Mess Hall buildings and many of the small brick buildings (often used for storage or Indoor Simulated Marksmanship Trainers (ISMTs) are proposed for removal, replacement, or consolidation in new facilities.

Site Plan

The site plan maintains the existing land use pattern and vehicular circulation with a core of Bachelor Enlisted Quarters (BEQs) and operational facilities at the periphery. New BEQs are proposed north of the intersection of Julian C. Smith Boulevard and Cross Street. This will satisfy the deficiency in BEQ rooms for one Regiment. Due to the land constraints in the immediate area, two new three-story parking structures are proposed to meet the required quantity of POV parking. New Maintenance Shops are provided across from the existing Communications/Electric (Comm/Elec) Maintenance Shops on Cross Street to consolidate maintenance facilities to the maximum extent possible. New HQ CPs are proposed north of C Street in proximity to the existing BEQs. A new Mess Hall is proposed in a central location to all BEQs. A new ISMT to serve this area is proposed in the 2D MAR DIV Training Center in Wallace Creek.

Antiterrorism Force Protection

The 100 and 200 Area Site Plan corrects all ATFP standoff deficiencies for applicable buildings in this area with the exception of Buildings 119, 121, 123, HP125, and HP195.

BEQ Space

Required BEQ rooms are provided in existing buildings and three new five-story buildings north of the intersection of Julian C. Smith Boulevard and Cross Street. The existing BEQs provide 900 rooms in three-story configurations between Julian C. Smith Boulevard, A Street, McHugh Boulevard, and B and C Streets. The proposed BEQs in three five-story buildings will provide an additional 402 rooms meeting the target requirement for this area. Although the ideal configuration of BEQs is to consolidate each Battalion in approximate 400 room clusters to maintain unit integrity, this is not possible without the demolition of existing BEQs. At such time as the existing BEQs reach the limit of their lifecycle and maintenance and renovation are no longer viable, they may be replaced with comparable facilities to those proposed in the Facility Master Plan to achieve this objective.

Command Facilities

A new Headquarters Command Post (HQ CP) to meet the needs of the Regiment and Battalions is proposed along C Street. The HQ CP comprises three buildings. The one-story Regiment HQ CP is centrally located at southern end of the Battalion/Company HQ CP facilities. One building containing HQ CPs for two Battalions/Companies is proposed on each side of the Regiment HQ CP. Each two-story Battalion HQ CP can be designed to provide each Battalion with a prominent separate entrance. A central green space/plaza runs from the Regiment HQ CP between the Battalion/Company HQ CPs.

Maintenance Shops

Existing Motor Transport and Comm/Elec Maintenance Shops are maintained in the 100 Area. Space deficiencies in the existing facilities will require construction of new facilities or building additions where possible. An addition to the existing facilities between Cross and A Streets provides sufficient Motor Transport Shops for two Battalions. The existing Comm/Elec Shops provide sufficient space for three Battalions. A Motor Transport Maintenance Shop addition to the Comm/Elec Maintenance Shop will provide sufficient space for two Battalions. One new single-story Comm/Elec Maintenance Shop is proposed immediately south of the proposed new HQ CP on C Street. New single-story Regimental Motor Transport and Comm/Elec Maintenance Shops are proposed immediately north of the existing Comm/Elec Shops on Cross Street.

Supply/Storage Facilities

Supply/Storage facilities are provided outside of the Study Area.

Armory

The existing Armory facility located on A Street is inadequate to accommodate all of the requirements for one Regiment. An expansion to this facility is proposed to serve four Battalions. The recently constructed Armory (Building HP112) between the BEQs, and accessible from C Street, is proposed to serve the Regiment.

The preferred configuration is to provide all armory requirements for a complete Infantry Regiment in a single facility. One option to accommodate this configuration may be to further expand Building HP131 beyond what is proposed in the Master Plan. Although expansion would result in loss of existing surface parking associated with this facility, this option may be highly desirable since Building HP112 is targeted for the MP Company.

Indoor Simulated Marksmanship Trainer

The ISMT supporting the Infantry Regiment in this area will be incorporated in the 2D MAR DIV Training Center in Wallace Creek.

Mess Hall

A new single-story Mess Hall is proposed north of A Street.

Field Mess

A Regimental Field Mess facility is proposed in existing Building 123.

Medical/Dental Clinic

A new Medical/Dental Clinic is proposed in the existing location of Building 106 southwest of the intersection of McHugh Boulevard and A Street. This facility replaces the temporary dental facilities currently housed in trailers and will serve all Marines in the Hadnot Point area.

II Marine Expeditionary Force Training

The existing II MEF training facilities in Buildings 125, 126, and 127 will be relocated to a complex adjacent to the 2D MAR DIV Training Center at Wallace Creek. The existing facilities will be demolished to provide opportunities for future development beyond the Master Plan programming horizon.

POV Parking

Personally owned-vehicles (POV) parking areas have been relocated and in some cases enlarged through the demolition of existing obsolete facilities in order to achieve the 82 foot ATFP standoff required for buildings. Reconfigured surface parking facilities provide 2,522 POV parking spaces. Two additional three-deck parking garages have 500 spaces each, providing a total of 1,000 spaces. The parking goal

24 March 2012 based on the required facilities for this area is 3,726 spaces. The total number of spaces provided is 3,522 POV parking spaces.

Open Space/Conservation areas

Open spaces are provided surrounding the BEQ clusters. The land between Julian C. Smith Boulevard and the New River shoreline is preserved for open space and recreation facilities. The deficiency in parking may necessitate continued use of the existing parking areas within this strip of land.

Tables 4 and 5 list the existing facilities within the Hadnot Point areas 100 and 200 (sorted by stormwater sub-basins).

Table 4. Hadnot Point Area 100: Existing Buildings

Sub-Basin within Area 100 Building Number

Sub-Basin 1

CONT 64

24A

24A -1

S34

Sub-Basin 2 Milcon

Sub-Basin 3

HP 104

HP 131

S124

Sub-Basin 4

S143

Milcon

125A

Sub-Basin 5

HP 131

HP 104

SHP 107

HP 100

Sub-Basin 6

HP 100

188-1

S18A

Sub-Basin 7 17

Sub-Basin 8

HP 195

HP185

HP 165

HP 166

122-1

Table 4. Hadnot Point Area 100: Existing Buildings (continued)

Sub-Basin within Area 100 Building Number

Sub-Basin 9

114-4

Sub-Basin 10

HP 135

HP 145

114-4

HP 140

HP 146

SHP 111

Sub-Basin 11

HP 106

HP 105

102-M

Sub-Basin 12

111A

HP 135

HP 136

HP 105

HP 115

HP 112

HP 125

26 March 2012

Table 5. Hadnot Point Area 200: Existing Buildings

Sub-Basin 1

HP 185

SHP 164

HP 175

HP 156

Sub-Basin 2

117A

Sub-Basin 3

S108

HP 127

HP 125-1

Sub-Basin 4

3B

Sub-Basin 5

HP 175

HP 176

Sub-Basin 6 S120

Sub-Basin 7

Sub-Basin 8

Sub-Basin 9

Table 5. Hadnot Point Area 200: Existing Buildings (continued)

Sub-Basin 10 SHP 249

AST46

Sub-Basin 11 HP 250

HP 259

Sub-Basin 12 HP 259

S162

Sub-Basin 13 236

Sub-Basin 14 229

HP 250

Sub-Basin 15 222

Sub-Basin 16 216

Sub-Basin 17

Sub-Basin 18 HP 215

202A

202B

Milcon

Sub-Basin 19 4

28 March 2012

1.6. PUBLIC LANDS, SCENIC, RECREATIONAL, AND STATE NATURAL AREAS NEAR THE STUDY AREA

The Marine Corps permits public access to natural resources to the extent appropriate and consistent with the military mission and safety and security requirements. For the most part, the general public is allowed access to the base if accompanied by a Marine civilian staff or if they are participants in the sponsorship program associated with hunting, fishing and trapping. However, there are opportunities for the general public to participate in outdoor recreation aboard Camp Lejeune without accompaniment or sponsorship. The majority of these non-accompanied special events such as the Sand Jam, Maynia Carnival, and the 4th of July fireworks celebration are administered by the AC/S, MCCS.

The general public can also gain access to Camp Lejeune for bicycle road races and concerts, or for a self-guided cultural resources tour. MCCS also manages, coordinates and operates recreational activities such as the equestrian facilities, golf course, and developed campgrounds on Base.

Boat launching facilities for military personnel, civilian employees and guests are available at ten locations. These locations are Onslow Beach Bridge, Mile Hammock Bay, Sneads Ferry Bridge, Mill Creek, French Creek, Rhodes Point, Town Point, Weil Point, Maple Landing and Everett Creek Hunting, Fishing and Trapping Regulations3.

Onslow Beach is an 11-mile-long barrier island with the New River Inlet at its southern boundary and Bear Inlet at the northern boundary. The beach provides recreation and important habitat for nesting sea turtles, colonial nesting shorebirds, and the threatened seabeach amaranth.

The Hadnot Point Facility Master Plan (June 2009) addressed the need for maintaining open space and conservation areas through the implementation of the following measures:

New facilities adjacent to Wallace Creek or the New River will maintain a 50-foot buffer.

Recreation fields are proposed southeast of the intersection of the Cross Street extension and the proposed arterial road connecting Wallace Creek South facilities to Hadnot Point.

The land between Julian C. Smith Boulevard and the New River shoreline is preserved for open space and recreation facilities.

3 Source: Final Integrated Natural resources Management Plan, November 2006, MCB Camp Lejeune, NC.

1.7. AREAS OF ARCHAEOLOGICAL OR HISTORICAL VALUE

A historic district has been designated between G and H Streets, within the Hadnot Point 300 Area (beyond the Study Area, which are Areas 100 and a section Area 200). Most 1940s-era buildings within the historic district are designated historic. The theater and training pool located west of McHugh Boulevard and between C and D Streets are also designated historic. Hadnot Point historic structures and associated historic district are delineated in Figure 2. All historic structures in the historic district will remain in place.

All new construction within the historic district must be compatible with the architectural style of the existing historic buildings and approved by the State Historic Preservation Office (SHPO) as demonstrating no adverse impact on district integrity. Demolition of historically-designated structures requires a greater level of SHPO review and mitigation of any adverse impacts through detailed photographic documentation.

Figure 6. Hadnot Point: Historic Sites

30 March 2012

1.8. WATER RESOURCES (SURFACE WATER AND GROUNDWATER)

1.8.1. Surface Waters: Sub-basin 03-05-02

The New River watershed (sub-basin 03-05-02) is the farthest west of the four major river systems in the White Oak River basin. It is also the largest and most populated and includes the City of Jacksonville and the Camp Lejeune Marine Corps Base. The New River is a coastal, tidal blackwater river with a watershed entirely within Onslow County. Gum-cypress swamps characterize the watershed above Jacksonville with upland areas used primarily for agriculture and forestry activities. At Jacksonville, the river widens into a broad, slow-moving tidal embayment. It eventually discharges to the Atlantic Ocean through a narrow opening called New River Inlet. There are 204 stream miles, 22,840 estuarine acres, and 15 miles of Atlantic coastline in this sub-basin. The White Oak River sub basin boundary is shown in Figure 7.

Camp Lejeune encompasses 16,650 acres of the New River and 1,720 acres of the Intracoastal Waterway. Approximately 17 miles of the river is found within the boundaries of Camp Lejeune.

Navigable creeks and waters adjacent to or within the boundaries of the Base (including the New River) are generally subject to the public trust rights of the State of North Carolina. Additionally, navigable waters in the New River watershed and the Intracoastal Waterway fall under the jurisdiction of the U.S. Army Corps of Engineers.

The Hadnot Point area is bordered on the west by the New River and to the north by Wallace Creek, which is defined by the state as inland public waters as shown in Figure . These two water bodies and their tributaries are subject to CAMA regulation. The estuary shoreline of the New River is within a 75-foot Area of Environmental Concern (AEC) permitting limited development subject to State review.

Wallace Creek, classified as inland public water, is subject to a 30-foot AEC.

Surface Water Classification and Impaired Waters

Section 3 summarizes the water quality classification(s), the NCDENR Use Support Rating and identifies specific water quality issues of the Hadnot Point area receiving streams.

Figure 7. White Oak River- Sub-basin 03-05-02

Hadnot Point Areas 100 and 200

32 March 2012

Groundwater

Surficial Aquifer

The surficial aquifer is the uppermost aquifer in the groundwater system and confining units that comprise the hydrogeologic framework of the Coastal Plain of North Carolina. The surficial aquifer is unconfined and thus the water table is able to fluctuate with changes in ground water storage. It is the first aquifer to receive recharge, storing water as it moves laterally to rivers, lakes and other discharge areas, and downward in small quantities to deeper, confined aquifers. The rate at which recharge occurs in any given area in the study region is dependent on several factors, including:

Differences in precipitation rates from one area to another

Variations in soil types and their differing infiltration capacities

The position of the water table relative to land surface, which varies over time

The slope of the land surface

Evapo-transpiration rates which vary across the region and over time

The surficial aquifer is important because it extends over a large part of the Coastal Plain and the infiltration from rainfall is the bulk of the recharge to the Coastal Plain aquifer system. The aquifer transmits water laterally to streams and serves as a source bed holding the water that moves down gradient to deeper aquifers.

Recharge to the surficial aquifer depends on how rapidly rainfall can infiltrate into the aquifer. The rocks of the aquifer are not uniform in either composition or thickness. Recharge rates depend on the capacity of the soils formed from the various rock materials to allow water to move downward through the unsaturated zone.

One way of evaluating relative recharge rates is to look at the infiltration capacities of the various soil associations delineated by the U.S. Soil Conservation Service. Soil associations having similar characteristics of drainage, sand-clay content, and permeability were identified on the General Soil Map of North Carolina and arranged as groups having good, moderate, or poor infiltration capacity.

Soils deemed to have good infiltration capacity were well-drained to very well-drained sandy soil and sandy loam having vertical saturated permeabilities of 2 to 20 inches per hour. A few sandy soils containing significant amounts of clay were included if their permeabilities were within this range. The annual recharge to thick, sandy soils in the surficial aquifer is estimated to be as much as 20 inches of equivalent rainfall.

Fine sand, silty loam, and sand clay loam having vertical saturated permeabilities of 0.2 to 6 inches per hour were consider to have moderate infiltration capacity. Poorly drained clay, clay loam, and sandy-clay loam having vertical saturated permeabilities of 0.06 to 2 inches per hour were considered to have poor infiltration capacity. Recharge to the surficial aquifer through these soils having poor infiltration capacity may be as little as five inches per year. For the most part, soils derived from fine sand, silt, and clay of marine origin in the Tidewater region have poor to moderate infiltration capacities.

In the Study Area, results from the in-situ soil investigation (total of eight borings) indicate that the soil infiltration capacity at seven (7) boring sites ranges from 0.09 to 0.28 in/hour. The remaining site has an infiltration capacity of 2.99 inches/hour. The significant difference between the locations results from measuring a single fill modified site as compared to 7 original soils sites.

Castle Hayne Aquifer

The aquifer consists primarily of light gray to white moldic limestone and bryozoan rich limestone of the Eocene age Castle Hayne Formation, grading downward to calcareous, fine-grained sandstone in the deeper subsurface. It also contains the uppermost part of the Peedee Formation of Cretaceous age in central New Hanover County, the lower part of the River Bend Formation of Oligocene age in southern New Hanover County, and the upper part of the Beaufort Formation of Paleocene age in southeastern Brunswick County.

The aquifer is recharged by water moving downward from the surficial aquifer at a rate that varies from place to place. Rates of recharge are dependent on the thickness and vertical hydraulic conductivity of the overlying confining unit, and how much higher the water table elevation is above the elevation of the Castle Hayne potentiometric surface in recharge areas. The Castle Hayne aquifer is affected by seasonal recharge variations in a similar way as the surficial aquifer, indicating fairly quick recharge from the surficial to the Castle Hayne. Figure 8 illustrates a cross section of the Hadnot Point subsurface.

Figure 8. Hadnot Point Station: Hydrogeologic Framework4

4Source: NC Division of Water Resources http://www.ncwater.org/Data_and_Modeling/Ground_Water_Databases/framedetail.php?quado=711;

updated 14 November 2008 http://www.ncwater.org/Data_and_Modeling/Ground_Water_Databases/framedetail.php?quado=711

34 March 2012

1.8.2. Presence of Hazardous Sites

Areas of concern include Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) designated areas for groundwater, aquifer, and soil contamination areas. These areas are under the control of the Camp Lejeune Installation Restoration (IR) program. One deep contamination plume identified within the Hadnot Point 100 Area previously contained a dry cleaning facility. This site is currently under assessment/remediation and only unoccupied structures (such as parking areas) are recommended for construction in this location.

1.9. FOREST RESOURCES

Camp Lejeune encompasses approximately 92,300 acres of forest, including 47,734 acres of pure pine, 21,985 acres of pure hardwood, and 22,596 acres of mixed pine/hardwood stands. An additional 17,328 acres are non-forested and 12,543 acres fall within impact areas.

Loblolly is the most common pine species, accounting for approximately 75 percent of timber on the Base. Blackgum is the most common hardwood. Fire plays a deciding role in the communities of Camp Lejeune, affecting canopy and understory density and species composition.

Forest resources in the Hadnot Point Area 100 include Bottomland hardwood forest, mixed pine and hardwood forest and pine forest. Area 200 forest resources include mixed pine and hardwood forest.

1.10. AQUATIC SPECIES AND THEIR HABITATS

1.10.1. Shellfish, fish, and their Habitats within the White Oak River Basin

Table lists the rare animals living in the aquatic habitats of the White Oak River Basin. Several of the listed rare aquatic species are entirely marine, such as Loggerhead and the Leatherback sea turtles.

Others live in the estuarine brackish waters between the ocean and freshwater streams and rivers. For example, the Carolina Diamondback Terrapin is a small to medium (4-9 inches long) reptile found in the coastal marshes, bays, lagoons, creeks, mud flats as well as tidal channels of sounds and estuaries that are bordered chiefly by Spartina. The American Alligator lives in slow moving coastal rivers, canals, lakes, marshes and estuaries and is a state and federally threatened species. The American Alligator has recovered from the low populations of the past century, and is no longer biologically threatened or endangered under the Endangered Species Act. However, it retains the federally threatened status due to its similarity of appearance to other rare crocodilians, and commercial hunting and trade are regulated.

Table 6. Rare Animals Associated with Aquatic or Wetland Habitats in the White Oak River Basin5

Scientific Name Common Name Major Group

State Status

Federal Status

Spahaerium simile Grooved Fingernail Clam Mollusk SR

Procambarus plumimanus Croatan Crayfish Crustacean SR

Caretta caretta Loggerhead Reptile T T

Alligator mississippiensis American Alligator Reptile T T(S/A)

Acipenser brevirostrum Shortnose Sturgeon Fish E E

Fundulus confluentus Marsh Killfish Fish SR

Malaclemys terrapin centrata

Carolina Diamondback Terrapin

Reptile SC

Fundulus luciae Spotfin Killfish Fish SR

Dermochleys coriacea Leatherback Reptile E E

Chelonia mydas Green Turtle Reptile T T

Rana capito Carolina Gopher Frog Amphibian T FSC

Nerodia sipedon williamengelsi

Carolina Water Snake Reptile SC

Bufo quercicus Oak Toad Amphibian SR

Regina rigida Glossy Crayfish Snake Reptile SR

Seminatrix pygaea Chicken Turtle Reptile SR

Phalacrocorax auritus Black Swamp Snake Reptile SR

Rare Species Listing Criteria

E: Endangered

T: Threatened

SR: Significantly Rare

SC: Species of Concern

FSC: Federal Species of Concern

T(S/A): Threatened due to similarity of appearance

Source: NC DWQ Oak River Basin:

http://h2o.enr.state.nc.us/basinwide/documents/Chapter14_004.pdf; verified December 2009

5 For information on any of the species listed, visit the NC Natural Heritage Program (NHP) website at www.ncnhp.org.

http://h2o.enr.state.nc.us/basinwide/documents/Chapter14_004.pdf http://www.ncnhp.org/

36 March 2012

1.10.2. Marine Mammals and Endangered Turtles in Camp Lejeune

The waters off Camp Lejeune provide habitat for endangered species of marine mammals and endangered sea turtle species, including:

Fin whale

Humpback whale

Northern right whale

Sei whale

Sperm whale

West Indian manatee

Leatherback sea turtle

Kemp’s ridley sea turtle

Hawksbill sea turtle

1.11. WILDLIFE AND NATURAL VEGETATION IN CAMP LEJEUNE

Wildlife at Camp Lejeune is typical of that found in the southeastern Coastal Plain of North Carolina.

Wildlife species found year-round on MCBCL have been discussed in detail in the Integrated Natural Resources Management Plan6.

Mammals commonly found include white-tailed deer (Odocoileus virginianus), eastern gray squirrel (Sciurius carolinensis), eastern cottontail (Sylvilagus floridanus), opossum (Didelphis virginiana), southern flying squirrel (Glaucomys volans), and raccoon (Procyon lotor). Many reptiles and amphibians, from the pine wood snake (Rhadinaea flavilata) to the oak toad (Bufo quercicus), are abundant throughout the Base.

Birds common to the area include mourning dove (Zenaida macroura), northern bobwhite quail (Colinus virginianus), mockingbird (Mimus polyglottos), American robin (Turdus migratorius), catbird (Dumetella carolinensis), and various sparrows (Fringillidae) and warblers (Parulidae).

A multi-species scientific management strategy is used to maintain habitat requirements for several game and non-game species within MCB Camp Lejeune. Terrestrial game species include eastern wild turkey (Meleagris gallopavo), white-tailed deer, black bear, squirrel, bobwhite quail, eastern cottontail, and raccoon. Non-game species under management plans include the eastern bluebird (Sialia sialis), purple martin (Progne subis), least tern (Sterna antillarum), various neo-tropical migrant birds, and a variety of reptiles and amphibians (USMC, November 2001).

Virtually all birds that occupy MCBCL are…