This solicitation concerns design-build construction services for eight military construction projects at Marine Corps Base Camp Lejeune to recover from Hurricane Florence damage. The projects include replacement of headquarters facilities, a battalion armory, and an environmental management division building. The design-build contractor will provide all design, engineering, and construction services required to complete the projects within 1,826 calendar days of award. The solicitation will utilize a two-phase evaluation with initial assessment of technical approach, corporate experience, past performance, safety, technical solution, project management, and small business utilization. Price will be evaluated separately in phase two. The contract is valued between $100-250 million and will be awarded by July 20, 2020. The Navy seeks competitive proposals by October 7, 2019.

View the file

Other files

File Type Posted
Amendment 0020.pdf PDF
Amendment 0019.pdf PDF
Amendment 0018.pdf PDF
Amendment 0017.pdf PDF
Amendment 0016.pdf PDF
Amendment 0015.pdf PDF
Addendum 014.2_P1522_P1529 Comm Map from Bldg. 1.pdf PDF
Addendum 014.3_Trailer_on_Reasoner_Comm.pdf PDF
Amendment 0014.pdf PDF
Updated Attachment I Price Proposal_Revisions 04.15.2020.pdf PDF
PACKAGE 2 ATTACHMENT (6) HISTORIC GEOTECHNICAL DATA Part 2.pdf PDF
Addendum 014.6 Locker Concrete Pad DWGS.pdf PDF
Addendum 013.9_Substation Impedances.pdf PDF
Addendum 013.4_HP Final SW Master Plan.pdf PDF
Addendum 013.7_DM for HQ.pdf PDF
Addendum 013.6_SW8 081015 MOD 01.17.18.pdf PDF
Addendum 013.8_DM for Armory.pdf PDF
Amendment 0013.pdf PDF
Updated Attachment I Price Proposal_Revisions 04.05.2020.pdf PDF
Addendum 013.5_SW 081015 DA.PDF PDF
Addendum 013.2_Wheeled Assets.pdf PDF
Addendum 013.3_SW NPDES PERMIT NCS000290.pdf PDF
Amendment 0012.pdf PDF
Updated Attachment I Price Proposal_Revisions 03.26.2020.pdf PDF
Updated Attachment H 3.26.2020.pdf PDF
Amendment 0011.pdf PDF
Package 2 Site Visit Agenda.pdf PDF
Amendment 0010.pdf PDF
Attachments.zip ZIP file
Site MapWC.pdf PDF
Site Visit HA Map.pdf PDF
Site Visit Main Side Map.pdf PDF
01 57 19.pdf PDF
Site Visit WC Map.pdf PDF
Site Visit Waiver.pdf PDF
Bldg. 812 Map.pdf PDF
Updated Attachment H.pdf PDF
Amendment 0009.pdf PDF
Attachment I Price Proposal Form.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_C-G.pdf PDF
TFF2_RFP_RTA_PART_1-5.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_A-B.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_H-K.pdf PDF
Amendment 0008.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0003.pdf PDF
One_Day_Pass_Request.xls XLS spreadsheet
Amendment_0002.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 1 GENERAL

SECTION 01 57 19.01 20

SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS

1.1.1.1.2 Surplus Soils Disposal for Camp Lejeune

No soil from construction sites shall leave Marine Corps Base Camp Lejeune or Marine Corps Air Station property, with the exception of environmental remedial activities. Any surplus soil that cannot be reused on its originating site shall be transported to one of the following locations:

a. Area managed by G-3/5 for reuse on training areas for various maintenance activities:

3.5 acre storage, within TLZ Condor off Verona Loop Road, approximate coordinates 34°38'07.3"N 77°26'41.7"W.

Coordinate with G-3/5 Project Development Specialist, MCIEAST-MCB CAMLEJ at (910) 451-5772 to determine capacity available at the storage location, prior to delivery.

This site operates Monday through Thursday between 0730 and 1500.

b. Area managed by PWD for use as daily cover:

Base landfill, located on Piney Green Road, approximate coordinates

34°41'26.9"N 77°19'27.4"W.

Contractor shall provide temporary silt fencing around designated stockpile areas as needed.

Coordinate with Landfill Manager at (910) 451-8666. Landfill use letters will be provided so that deliveries can be tracked.

This site operates Monday through Thursday between 0730 and 1500 and on Friday between 0700 and 1400.

Contact POCs listed above 7 to 10 days in advance to coordinate delivery of material at the storage locations.

Prior to transport, contractors shall screen soil on-site. Particle size shall be limited to 3 inches or less.

All soils will be clear of deleterious organic debris such as roots and timber, and construction debris. Construction debris shall include, but is not limited to: wood, plastic, glass, concrete, brick, and metal.

Upon each delivery to the storage areas, Contractor shall mobilize a bulldozer to the disposal location and assist the Government by the stacking of material. Subsequently, Contractor shall then provide the following items to the Contracting Officer for review and approval:

1) Photographic documentation, with timestamp, of stockpiled soil.

2) Certification statement indicating volume, in cubic yards (CY), of material delivered and confirming material is free of contaminants.

NOTE: Soil contaminated with debris or chemicals cannot be disposed at the stockpile locations. If contaminated soils are suspected or confirmed through presence of UXO, odors, or visual staining, affected soils must be properly tested, manifested, and disposed of in accordance with RCRA regulations.

Contact Base EMD, ER Program Manager, for more information.