Addendum 014.6 Locker Concrete Pad DWGS.pdf
PDF 303 KB Posted
- Attached to
- Hurricane Florence Recovery MILCON Package 2
- Solicitation number
- N4008519R9252
About this file
This notice summarizes a solicitation for design-build construction services for Hurricane Florence Recovery MILCON Package 2 at Marine Corps Base Camp Lejeune in North Carolina. The solicitation will result in a firm-fixed price contract and includes projects for constructing and replacing several headquarters facilities, a regimental headquarters, a battalion headquarters, and an environmental management division building. The anticipated contract completion time is 1,826 calendar days. The solicitation is unrestricted and will utilize a two-phase evaluation including non-price and price factors, with the non-price factors when combined being significantly more important than price. Phase 1 non-price factors are technical approach, corporate experience, and past performance, while Phase 2 factors include safety, technical solution, project management/schedule, and small business utilization along with price. The solicitation is expected to be issued on 7 October 2019 with a planned award date of 20 July 2020. The Naval Facilities Engineering Command is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24’
36’
Slab bolster: 3 1/2” x 5 ft.
One upper runner .204 diameter
Two lower runners .162 diameter
Expansion joints
4”
7”
ABC rock
Slab bolsters Concrete
Sketch Locker Concrete Pads
File details come from the government source that posted it. Updated .