Addendum 013.9_Substation Impedances.pdf

PDF 45 KB Posted

Attached to
Hurricane Florence Recovery MILCON Package 2
Solicitation number
N4008519R9252
Issued by

About this file

This notice summarizes a federal solicitation for design-build construction services related to eight military construction projects at Marine Corps Base Camp Lejeune in North Carolina. The solicitation will result in a firm-fixed price contract to replace headquarters facilities and support buildings damaged by Hurricane Florence in 2018, including facilities for combat logistics battalions, a tank battalion, regimental headquarters, an infantry battalion, Marine expeditionary units, a transportation support battalion, and an environmental management division. The projects involve new construction of administrative, operational, and classroom buildings totaling over 300,000 square feet. The period of performance is 1,826 calendar days. The solicitation is unrestricted and will utilize a two-phase evaluation including technical, past performance, safety, project management, and price factors. The contracting office anticipates award by July 2020.

View the file

Other files

File Type Posted
Amendment 0020.pdf PDF
Amendment 0019.pdf PDF
Amendment 0018.pdf PDF
Amendment 0017.pdf PDF
Amendment 0016.pdf PDF
Amendment 0015.pdf PDF
Addendum 014.2_P1522_P1529 Comm Map from Bldg. 1.pdf PDF
Addendum 014.3_Trailer_on_Reasoner_Comm.pdf PDF
Addendum 014.5_MCIEAST-MCBCAMLEJ SURPLUS SOIL MILCON SPEC REVISION - 6APRIL2020.pdf PDF
Amendment 0014.pdf PDF
Updated Attachment I Price Proposal_Revisions 04.15.2020.pdf PDF
PACKAGE 2 ATTACHMENT (6) HISTORIC GEOTECHNICAL DATA Part 2.pdf PDF
Addendum 014.6 Locker Concrete Pad DWGS.pdf PDF
Addendum 013.4_HP Final SW Master Plan.pdf PDF
Addendum 013.7_DM for HQ.pdf PDF
Addendum 013.6_SW8 081015 MOD 01.17.18.pdf PDF
Addendum 013.8_DM for Armory.pdf PDF
Amendment 0013.pdf PDF
Updated Attachment I Price Proposal_Revisions 04.05.2020.pdf PDF
Addendum 013.5_SW 081015 DA.PDF PDF
Addendum 013.2_Wheeled Assets.pdf PDF
Addendum 013.3_SW NPDES PERMIT NCS000290.pdf PDF
Amendment 0012.pdf PDF
Updated Attachment I Price Proposal_Revisions 03.26.2020.pdf PDF
Updated Attachment H 3.26.2020.pdf PDF
Amendment 0011.pdf PDF
Package 2 Site Visit Agenda.pdf PDF
Amendment 0010.pdf PDF
Attachments.zip ZIP file
Site MapWC.pdf PDF
Site Visit HA Map.pdf PDF
Site Visit Main Side Map.pdf PDF
01 57 19.pdf PDF
Site Visit WC Map.pdf PDF
Site Visit Waiver.pdf PDF
Bldg. 812 Map.pdf PDF
Updated Attachment H.pdf PDF
Amendment 0009.pdf PDF
Attachment I Price Proposal Form.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_C-G.pdf PDF
TFF2_RFP_RTA_PART_1-5.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_A-B.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_H-K.pdf PDF
Amendment 0008.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0003.pdf PDF
One_Day_Pass_Request.xls XLS spreadsheet
Amendment_0002.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8 Substation Impedance and Fault Currents

Point of Delivery Impedance and Faults Sub. 1 Sub. 2 Sub. FC Sub. Geiger Sub. Johnson

Z1R Resistance (pu @ 100 MVA) 0.0448 0.086 0.0171 .0844 X/R Ratio = 13 Z1X Reactance (pu @ 100 MVA) 0.3439 0.6583 0.4336 .6462 N/A Z0R Resistance (pu @ 100 MVA) 0.0408 0.083 0.0125 .0817 N/A Z0X Reactance (pu @ 100 MVA) 0.3103 0.6306 0.3958 .6206 N/A Fault Curr. 3 Ph (Amps) 12,907 6,789 10,315 6,825 2,722 Fault Curr. Ph-Gnd (Amps) 13,340 6,885 10,624 6,916 N/A 3 Ph Shrt Crkt (MVA) 297 155.1 237.3 156 N/A Trnsfmr ONAN Rating (MVA) 30 15 24 15 (3) x 1.667 Trnsfmr Impedance (%) 9.39 9.54 9.5 9.39 5.47,5.39,5.43 High Side Voltage (kV) 230 230 230 230 22.86 Bus Voltage (kV) 13.09 13.00 13.09 13.09 13.09